SWITCH GEAR SERVICE AND MAINTAINNANCE SAFETY MEASURES AND REQUIREMENTS

Similar documents
TRANSFORMER SERVICE AND MAINTENACE FOR TATACHEMICALS MAGADI.

TENDER FOR FURNACE CASTING SAFETY MEASURES AND REQUIREMENTS.

TENDER FOR KILN REFRACTORY BRICK REPLACEMENT

INSTALLATION OF NEW FURNACE CALCINER 2

Low Voltage Switchgear Construction Checklist (under 500 kva)

Unit Substation Transformer Construction Checklist (under 500 kva)

FIELD TEST AND OPERATIONAL CHECK SECTION A. Refer to Section 16010, Electrical General Requirements.

Warren State Hospital, Statement of Work Electrical Distribution Infrared Inspection ANTICIPATED PERIOD OF CONTRACT

FABRICATION OF A NEW INDUCED DRAUGHT FAN DUCTING KILN 2

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION

Candidate NICET ID No.: NICET ENGINEERING TECHNICIAN CERTIFICATION Experience Application, Part II: Verifier Data. (Please print legibly or type)

37-SDMS-01 REV. 03 SPECIFICATIONS FOR

CAL/OSHA ELECTRICAL HIGH VOLTAGE

SECTION AUTOMATIC TRANSFER SWITCH

SECTION SECONDARY UNIT SUBSTATIONS

SECTION PROJECT CLOSEOUT

This section applies to the requirements for electrical Inspection, calibration, and testing.

WESTERN CONNECTICUT STATE UNIVERSITY ELECTRICAL SAFETY PROCEDURE S-109

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Capital Projects Group Gas Fired Warm Air Furnace Specification

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard

Statement of Work. Single Phase Power Up Service Single Phase Power-UP. Implementation Services. Table of Contents. 1.0 Executive Summary

Optimize the Performance of New Electrical Equipment Installations

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY NHMFL LOCKOUT/TAGOUT SAFETY PROCEDURE SP-1

Program management and contract administration of the work per section 4.0

ADDENDUM 1. Repair and Maintenance of Landfill Gas Chiller System. Return date: Bid must be received no later than 2:00 PM, Monday, June 25, 2018

System Part Number STC SR00892SE

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

RFP for Elevator Maintenance

UPS Electrical Design and. Installation. critica POWER SUPPLIES

Houston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER

ELECTRICAL CX RELIABILITY AND HIDDEN DANGERS

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC

Millersville University Finance and Administration Division Management Directive

SECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL

A. Section includes busway and fittings including plug-in units.

OPERATING POLICY MANUAL

1. Schedule For Preventative Maintenance Requirements:

Request for Proposal (RFP) Building Repair and Renovation Project. Instruction to Bidders (Project Management Consultants) & Eligibility Criteria

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /19/2011 PAGE 1 OF 4 FACILITY LIGHTING SYSTEMS INSTALLATION

Critical POWER Supplies Projects Support

ELECTRICAL INSPECTION BULLETIN (Effective )

All applicable equipment trip settings must be checked and recorded on the appropriate record sheet.

SECTION GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT

Carry out routine inspection and service on high voltage indoor metal clad circuit breakers and bus

City of San Mateo Clean Water Program Programmable Logic Controller (PLC) and Human Machine Interface (HMI) Programming Services

FCX Department of Occupational Health and Safety Policy

CITY OF LODI ELECTRIC UTILITY DEPARTMENT RULE AND REGULATION NO. 16 SERVICE CONNECTIONS AND FACILITIES ON CUSTOMER'S PREMISES

Dutch-Bangla Bank Limited

Technical Guideline for. Section 8. Inspection and Approval of Construction

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

COMMONWEALTH SCAFFOLD Quality Scaffolding Across New England

Title: Lockout / Tagout Effective Date: 11/28/2014 Control Number: THG_0008 Revision Number: 1 Date: 10/8/2015 Annual Review Completed: 5/13/2015

APPENDIX A TECHNICAL SPECIFICATIONS FORM ITN FACILITIES REPAIR AND MAINTENANCE OF GENERATORS

AUTOMATIC CAPACITOR BANK FOR LOW VOLTAGE NETWORKS INSTRUCTION MANUAL. MIBATBT_05i

Specification for UDC Electrical Testing

Level One and Level Two

Effective Date Revision Date Page October 1, 2014 June 2015 Page 1 of 13

VOLUME-2 (PRICE BID) FOR TENDER NO. NABI/7(171)/2019-WORKS

GEK B Instructions. Test Cabinet. for Power/Vac Vacuum Circuit Breakers

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

Conveyor Safe Operating Procedures

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION

SECTION PACKAGED, SUBMERSIBLE SEWERAGE PUMP UNITS

General Requirements: The inspection and testing of medium voltage components shall be performed by an independent testing agency.

Lockout / Tagout Policy

PROJECT TITLE PROJECT NO.: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

SECTION ENCLOSED BUS ASSEMBLIES

Apprenticeship Curriculum Standard. Powerline Technician. Level 1. Trade Code: 434A

ADDENDUM NO. 1 BID AND CONTRACT DOCUMENTS FOR. BID No. 2019PW299

INSTRUCTION MANUAL PHANTOM LOAD MODEL PA For SERIAL NO.

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY

MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT

TOOLS, EQUIPMENT, AND PERSONAL PROTECTIVE EQUIPMENT ASSOCIATED WITH THIS PROCEDURE

Facility Interconnection Requirements

i. Supplier may visit to the site and get familiarized with the exact requirements

TECHNICAL SPECIFICATION FOR ELECTRICAL ASSET S CONDITION MONITORING EQUIPMENTS

SPECIFICATIONS FOR Gas-to-Cable termination

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

Lift (Elevator) Safety Procedure

SECTION 1 SCOPE, SPECIFIC TECHNICAL REQUIREMENTS AND QUANTITIES

Title: Lockout/Tagout Policy. University Division/Department: Environmental Health & Safety Effective Date : May, 1996 Revised: July, 2017

30-SDMS-01 SPECIFICATIONS FOR LOAD BREAK SWITCH

Standards Summary Sheet

ENERGIZED ELECTRICAL WORK APPROVAL WORKSHEET INSTRUCTION August 2016

Transnational Skill Standards Foreman Electrical Works (Construction)

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents

Accent Floor Heating. Tmat System Installation Manual. Floor heating system

Point Eight Power, Inc. Switchgear Specification Low Voltage UL 1558 Metal-Enclosed Switchgear

Tender No: KKNPP/CMM/15673 Section C2 Other Conditions. Index

THE KENYA POWER AND LIGHTING CO. LTD

POWER TRANSFORMER INSTALLATION

SECTION REQUIREMENTS FOR ELECTRICAL INSTALLATIONS

MATERIAL AND WORKMANSHIP

Section 70 Airport Transformer Vault and Vault Equipment (FAA L-109)

Transcription:

SWITCH GEAR SERVICE AND MAINTAINNANCE SAFETY MEASURES AND REQUIREMENTS i) A thorough site risk assessment to be done before commencement of work. ii) All personnel involved in the job to be taken through safety induction for familiarization with the scope of work and the risks involved. iii) A risk assessment board to be availed on site furnished with the permit to work, risk assessment form, hot work permit and job procedure. iv) Ensure all electrical connections have been isolated and a lock out, try out and tag out procedures have to be followed before taking over the plant for the job. v) A tool box talk to he held before commencement of every shift to highlight on the new risks encountered or expected and how to mitigate them. vi) A person in charge of safety to be identified and be known to all the personnel during every shift. vii) A first aid kit to be availed on site at all times and a shift first aider identified. viii) All personnel shall wear the mandatory PPE at all times and ensure use of other relevant PPE depending on the nature of work and condition of the work site. ix) Housekeeping to be done at every stage of work and thoroughly at every close of shift. TOOLS REQUIRED i) Vendor to provide his/her own tools during service EQUIPMENT (TATA TO PROVIDE) i) Trolley CONSUMABLES REQUIRED (TATA TO PROVIDE) i) Cotton rags ii) Cable lugs

POWER STATION SWITCH GEARS SERVICE I. INTRODUCTION: TATA Chemicals Magadi (TCML) is seeking contractor proposals to perform preventive maintenance, inspections, testing, and training, on the facility s existing electrical distribution switchgear. This is a one-time service visit. Bidders are asked to schedule their visit within working hours 8.00a -5.00 pm week days within the period given. All proposals will be evaluated on the Lowest Priced and Technically Acceptable basis. Technical acceptance evaluation will be based on vendor credentials and work plan. Contractors must submit with their proposals a letter supporting the contractor experience with the associated electrical distribution system as noted in the equipment description within this work statement. Proposals must be presented in a firm fixed price, with itemized costs for all labour, equipment mobilization and travel expenses. The work plan must provide projected completion time and dates for all site work. All cost proposal packages are due to PROCUREMENT TATA CHEMICALS MAGADI. II. PROJECT REQUIREMENTS: i. Contractor shall provide all supervision, qualified labor, tools, test equipment, noted materials, ii.. All personnel working in the vicinity of this electrical gear shall wear and /or use the appropriate Personal Protective Equipment (PPE) in performance of this work statement. iii. Any questions or injuries shall be brought to the attention of the Safety Officer. iv. Follow manufacturer specific maintenance and testing procedures, and general industry practices to ensure operational readiness of the buildings electrical switchgear. v. Perform cleaning and testing on these systems following procedures and general operational requirements for this type of switchgear. The contractor shall include the TCML Engaged assigned electricians in all aspects of this site work. vi.. This one-time service contract is for planned maintenance only.

vii. If any discrepancies are found that are not covered under this scope of work, then the contractor must provide the following: viii. Detailed report noting the discrepancy found Bill of Materials (BOM) to include component name, quantity, part number etc. ix. Contractor shall provide all supervision, qualified labor, tools, test equipment, etc. III. DESCRIPTION OF EQUIPMENT TO BE SERVICED:. Service includes inspection, testing and cleaning of the existing Automatic Transfer Switches (ATS). Switches are located at TCML power station and powered at 415/240 volts, 50 HZ.. N/B For more information site visit is mandatory. IV. SCOPE OF WORK: i. Coordinate all the jobs on site. ii. Prior to beginning any site work the contractor must follow TCML isolation Standard Operating Procedure (SOP) and schedule to reflect the planned work and sequence. iii. The contractor must obtain written approval from the TCML facility Manager noting the planned servicing schedule. iv. Correct any faulty, damaged, discolored, and worn components using site spares. v. Provide a BOM to include part number for any noted deficiency found that cannot be corrected during this site visit. vi. Note the faulty equipment or deficiency in a final service report. vii. All follow-on repair action and material will be covered under a separate scope of work. At a minimum this service shall include the following: A. Step-One, Visual Inspection:

1. Visual and Mechanical Inspection to ensure the proper operation of all factory and vender installed meters, breakers, remote power monitoring equipment associated with the switch gear. 2. Inspect physical, electrical, and mechanical condition including evidence of moisture or corona. 3. Inspect that all filters are in place, and the vents are clear. 4. Inspect that the working space is maintained in front of all the electrical gear per the IEE requirements. 5) Inspect that the electrical room is free from foreign articles not associated with the room. B. Step-Two, Verify: 1. Compare the installed metering measurements with voltage and power readings from a True RMS meter. Make calibration corrections as necessary to ensure accurate voltage and power readings. 2. Verify the switchgear circuit breakers sizing match the drawings. 3. Verify the proper labeling of all the breakers in the switchgear. 4. Verify that the Post as-build drawings (electrical one-line) match the switchgear distribution. C. Step-Three, Test/Clean/Correct: 1. Inspect anchorage, alignment, grounding for the equipment. 2. Test the system earth ground (25 ohms or less). 3. Perform infrared testing on all conductor connections, buss terminations. Only record found hot spots on a digital format for review. 4. Conduct an operational test of the system, observing automated transfer to and from generator power on each ATS unit, and automated opening and closing of the Bus-Tie breaker per design specifications.

5. Ensure that all components are operational, record noted discrepancies. Make the TCML aware of all components that are not functioning prior to shut down. 6) Perform Lock-out/Tag-out and ensure the system is de-energized before removing panel covers and exposing any electrical bus or cabling. Under no circumstances should the equipment be energized during the maintenance operation. 7. Rack-out breakers for inspection; perform function tests using external power, test trip units and settings. Replace any faulty battery, fuse, or switch. 8. Clean each compartment. Check for damage, excessive wear, or corrosion 9. Spot check and correct any loose components or connections. 10. Torque loose connections identified during the infrared test or during inspection. 11. Confirm correct operation and sequencing of electrical and mechanical interlock systems. 12. Use appropriate dielectric lubrication on moving current-carrying parts and on moving and sliding surfaces. 13. Correct any faulty, damaged, discolored, and worn components using site spares. 14. Exercise all active components. This includes racking the breakers out then back in. 15. Inspect mechanical indicating devices for correct operation. 16. Inspect power control transformers for physical damage, cracked insulation, broken leads, and tightness of connections, defective wiring, overload protection, and system condition. 17. Conduct a thorough safety inspection prior to removing locks/tags and reenergizing equipment. Upon restoration of power verify configuration and normal system operation. 18. Refer to the manufactures suggested recommendations for additional maintenance requirements, required or recommended. Conduct these accordingly.

19. Clean or replace any air filters present. 20. Make calibration corrections as necessary to ensure accurate voltage and power readings on permanently installed switchgear metering. Deliverable Requirements: i. The contractor shall provide one copy of a typed summary report within 30 days of site work statement completion. ii. The report must be written in the English language. At a minimum the report must include the following: A. Provide an executive narrative summary that provides an overview of work completed and immediate follow-up action required. B. Provide a detailed report per equipment serviced that includes all findings, corrective measures taken, inspection/testing checklists. C. Outline any discrepancies found and include photos of the problem and a narrative summary of the corrective action required D. Provide a Bill of Materials (BOM) as necessary for any required repair parts

TECHNICAL EVALUATION Quantitative Technical Criteria Tender Returnable Proof Criteria Criteria Sub Description Format Weighting Weighting 1 Technical criteria 80% 1 Your company must be certified and registered with the relevant authority. Attach current Certificate 10% The bidder shall submit copy of completion certificates/ un-priced P.O. The vendor MUST have done copies in support of above. 2 similar jobs (Installation, If required purchaser may maintenance and servicing of visit the one of bidder s 30% switch gears client to verify the details submitted by the bidder in support of past experience as indicated above Attach a detailed work 3 Show detailed preparation and execution work plan schedule for the activities in scope (Gantt Chart with 30% manning levels. 4 Vendor site visit Site visit by the vendor is mandatory 10% Safety criteria 10% 4 Does your company have competent, trained, safety conscious, and insured personnel Attach a valid WIBA for your staff 10% Total 100%

A minimum overall score of 70% will be used to deem the renderer technically acceptable and anything below 70% will deem the renderer technically unacceptable FINANCIAL DESCRIPTION QTY UNIT PRICE (KES) @ TENDER FOR POWER HOUSE HV SWITCH GEAR SERVICE 1 LUMP SUM Mobilization and Demobilization cost 1 LUMPSUM SUB TOTALS VAT TOTAL Payment Terms Mandatory Site Visit on 19 th July, 2017