EcolibriumSolar. Customer Info. Project Info. System Info. Project Design Variables. Name: Phone:

Similar documents
Structural Criteria for Residential Rooftop Solar Energy Installations

Structural Criteria for Residential Rooftop Solar Energy Installations

Structural Criteria for Residential Rooftop Solar Energy Installations

Streamline Solar Photovoltaic Structural Criteria for Residential Rooftop Solar Energy Installations (Streamline Solar Form 5)

Building and Safety Division 245 E Bonita Avenue Ph:

Name: McNaughton - McKay Elec. Designed by JMadrid. Address: None RM-BALLASTED FLAT ROOF. City, State: Unknown, Watt Panels

Structural Criteria for Residential Rooftop Solar Energy Installations

Structural Criteria for Residential Rooftop Solar Energy Installations

APPENDIX. WOOD JOIST/RAFTER MAXIMUM SPANS ( for 16 o.c. spacing) WITH SINGLE ROW OF PV PANELS AT MIDSPAN (ft.) AND PANEL SUPPORT AT 32 o.c.

Structural Criteria for Residential Rooftop Solar Energy Installations

Structural Criteria for Residential Rooftop Solar Energy Installations

Structural Criteria for Residential Rooftop Solar Energy Installations

SUBMITTAL REQUIREMENTS FOR EXPEDITED ROOF TOP SOLAR PERMITTING

STRUCTURAL REPORT. Magerack Series 101 PV Mounting System. 130 mph Wind, Exposure B & C. California DESIGNER OF RECORD

Structural Criteria for Residential Rooftop Solar Energy Installations

City of Santa Monica Building and Safety Division Submittal Requirements Expedited Solar Photovoltaic (10 kw or Less)

DESIGN & ENGINEERING GUIDE

PITCHED ROOF DESIGN GUIDE A WALKTHROUGH OF THE SOLAR MOUNTING DESIGN PROCESS

Addition. Wind Loads on Rooftop Solar Panels , At a Glance Standard. Wind Loads on Rooftop Solar Panels

Just Makes Cents... Per Watt. Compliance Report Composition L-Foot Kit State of California September 25th SOLARACK INC.

Tables 1 and 2: Base Mount Capacity in Landscape and Portrait Orientations

This permit is issued under OAR Permits expire if work is not started within 180 days of issuance or if work is suspended for 180 days.

Project ULA 120D Snow-0 Seis-IV

Wind Load Report - Check for uplift

Broward County Advantage Marketing Program In-Kind Exchange Agreement

Wind Load Report - Naples Residence

City of Santa Monica. Building and Safety Division. Structural Criteria for Residential Rooftop Solar Energy Installations

Conergy SunTop IV Price List. Made in. USA & Ontario, CANADA

Please fill out as much as information as possible and do not hesitate to contact us at 844-Solerus if you need any help. AHJ Name: Snow Load:

Railed Systems: How to Be Competitive While Still Maintaining Value

Site Survey in Project Info Structural Info Electrical Info

Installation Guide EcoFoot2+ 10-Degree Ballasted Racking System Document No. ECO-002_850. Rev 1.6, January 2018

Be sure to read and completely understand these guidelines before attempting to install this Power-Fab product.

CITY OF SONOMA - TOOLKIT DOCUMENT #1b

ENGINEERING STRUCTURAL CALCULATIONS For HiPower/Himoinsa - UL2-D10-E10

Technical Bulletin #1 : Evaluating roofs for solar

STRUCTURAL NOTES MISCELLANEOUS COLD-FORM STEEL FRAMING MASONRY SITE WORK CAST IN PLACE CONCRETE

ESR-2015P* Reissued April 2014 This report is subject to renewal April 1, 2015.

B-RAIL SPAN CHART REPORT

AE Brochure2.1 US smart mounting solutions

RAPIDRAC G10. Unirac Code-Compliant Installation Manual. Code-Compliant Installation Manual 650. Table of Contents. Bright Thinking in Solar

B-RAIL SPAN CHART REPORT

The Racking System Designed By Installers for Installers

Benefits in Speed and Logistics using the RL System. snapnrack.com

Load Design Charts. R-CONTROL SIPs STRUCTURAL INSULATED PANELS. CONTROL, NOT COMPROMISE.

Installation Guide EcoFoot5D High Density 5-Degree Ballasted Racking System Document No. ES10560

STRUCTURAL ISSUES IN RESIDENTIAL CONSTRUCTION. Presented by: Susan L. Lasecki P.E., S.E.

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

STRUCTURAL CERTIFICATION & SPAN TABLES FOR MCR MOUNTING SYSTEMS

Reference: Photovoltaic Systems, p. 255

STRUCTURAL CERTIFICATION & SPAN TABLES FOR MCR MOUNTING SYSTEMS

STRUCTURAL CERTIFICATION & SPAN TABLES FOR MCR MOUNTING SYSTEMS

STRUCTURAL CERTIFICATION & SPAN TABLES FOR MCR MOUNTING SYSTEMS

ROOFING APPLICATION STANDARD (TAS) No. 102(A)-95

FACT SHEET #2 DECK INFORMATION

FLAT TILE HOOK SPAN CHART

Solar America Board for Codes and Standards. For more information, visit the Solar ABCs web site:

ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA

Solcellspaket - Poly (4.2 kwp Jinko 265W Poly) System Plan. Created with Solar-Planit by Mikael Johansson Futura Energi AB in Simrishamn.

Mounting instructions. novotegra for trapezoidal metal - roof parallel

A REPORT ON THE EFFECTS OF WIND SPEED ON TIMBER CONSTRUCTION JOSHUA HUENEFELD. B.S., Kansas State University, 2012 A REPORT

DynoRaxx EVOLUTION PR Guide to Code Compliant Installation

Subject: Engineering for SolarMount Evolution ICC-ES ESR 3083

STRUCTURAL TECHNICAL REPORT 1

Stealth Residential Roof Mount System Installation Manual

Common Errors in Truss Design

Code Requirement for Solar Photovoltaic (PV) Systems - General

BERKELEY UNIFIED SCHOOL DISTRICT (BUSD) Chapter 3. Structural Evaluations

A PROGRAM OF IBHS COMMERCIAL

Code Requirements for Solar Photovoltaic (PV) Systems for One and Two-Family Dwellings

The Racking System Designed by Installers for Installers. PV Stealth Roof System Installation Instructions

Leading in integration for partial- and full roofs: Photovoltaic in-roof mounting system Solrif by Schweizer.

Typical Deck Details Based on the 2009 International Residential Code (Designed and Printed August 2010)

Typical Deck. CONSTRUCTION TIP SHEET 5 Basic Decks w/ 60 lb Live Loading

DynoRaxx EVOLUTION PR Quick Guide Installation Steps

Considerations for Outof-Plane. Design

PRODUCT EVALUATION Effective July 1, 2014 RC-28

Individual Truss Marking Is it a Building Code Requirement?

CONTACT INFORMATION. PV System will require a separate Electrical Permit.

Quick Mount PV Tile Replacement Mount Texas State Compliance Letter SEI Project No.:

GARAGES/ONE-STORY City of Grand Rapids Building Safety Division

6KW Grid Interactive Photovoltaic System

BERNALILLO COUNTY SOLAR PACKET

Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses (MPCWT) Design Guide Revised 11/17/2016

Scope. resistance expressed as a moment

INSTALLATION GUIDE REV2016NOV15 DOCUMENT REVISION HISTORY - INTERNAL USE ONLY - NOT FOR PUBLIC RELEASE REVISED EQUATIONS - PAGE 1 - ADDITIONAL CHANGES

Originally Issued: 09/19/2014 Revised: 10/17/2017 Valid Through: 11/15/2017

STRUCTURAL DESIGN CERTIFICATE No: CSM SC Job No: 14S 391

Quick Mount PV Tile Replacement Mount Florida State Compliance Letter SEI Project No.:

Mounting systems for solar technology

Typical Deck. CONSTRUCTION TIP SHEET 5 Basic Decks w/ 60 psf Live Loading

Code Change Alert: Permitting of Solar Photovoltaic Systems in Washington State

Rack-in-a-BoxTM INSTALLATION MANUAL

STRUCTURAL EDGE ENGINEERING, PLLC

APPLICATION FOR SOLAR PERMIT

Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses (MPCWT) Overview Revised 11/17/2016

Transcription:

Customer Info Name: Email: Phone: Project Info Identifier: 4765742_preinstall Street Address Line 1: Street Address Line 2: City: State: Zip: Country: System Info Module Manufacturer: Jinko Solar Module Model: JKM260P-60 Module Quantity: 24 Array Size (DC watts): 6240.0 Mounting System Manufacturer: Ecolibrium Solar Mounting System Product: EcoX Inverter Manufacturer: SolarEdge Technologies Inverter Model: v.se6000a-us (240V) Project Design Variables Module Weight: 41.88778 lbs Module Length: 64.960665 in Module Width: 39.0551392 in Basic Wind Speed: 100.0 mph Ground Snow Load: 40.0 psf Seismic: 1.5 Exposure Category: B Importance Factor: I Exposure on Roof: Partially Exposed Topographic Factor: 1.0 Wind Directionality Factor: 0.85 Thermal Factor for Snow Load: 1.2 Lag Bolt Design Load - Upward: 820 lbf Lag Bolt Design Load - Lateral: 288 lbf EcoX Design Load - Downward: 918 lbf EcoX Design Load - Upward: 720 lbf EcoX Design Load - Downslope: 460 lbf EcoX Design Load - Lateral: 252 lbf Module Design Moment Upward: 3655 in-lb Module Design Moment Downward: 3655 in-lb Effective Wind Area: 20 ft2 Min Nominal Framing Depth: 2.5 in Min Top Chord Specific Gravity: 0.42

Plane Calculations (ASCE 7-10): South East Roof 3 Roof Shape: Roof Type: Composition Shingle Average Roof Height: 30.0 ft Least Horizontal Dimension: 15.1940228468992 ft Roof Slope: 33.0 deg Truss Spacing: 16.0 in Snow Load Calculations Edge and Corner Dimension: 3.0 ft Stagger Attachments: Yes Include Snow Guards: No Include North Row Extensions: No EcolibriumSolar Flat Roof Snow Load 26.9 26.9 26.9 psf Slope Factor 0.68 0.68 0.68 Roof Snow Load 18.3 18.3 18.3 psf Wind Pressure Calculations Net Design Wind Pressure Uplift -20.7-24.3-24.3 psf Net Design Wind Pressure Downforce 19.4 19.4 19.4 psf Adjustment Factor for Height and Exposure Category 1.0 1.0 1.0 Design Wind Pressure Uplift -20.7-24.3-24.3 psf Design Wind Pressure Downforce 19.4 19.4 19.4 psf ASD Load Combinations Dead Load 2.4 2.4 2.4 psf Snow Load 18.3 18.3 18.3 psf Downslope: Load Combination 3 9.6 9.6 9.6 psf Down: Load Combination 3 14.9 14.9 14.9 psf Down: Load Combination 5 13.6 13.6 13.6 psf Down: Load Combination 6a 20.4 20.4 20.4 psf Up: Load Combination 7-11.2-13.4-13.4 psf Down Max 20.4 20.4 20.4 psf Spacing Results (Landscape) Max Allowable Spacing Between Attachments 72.8 72.8 72.8 in Max Spacing Between Attachments With Rafter/Truss Spacing of 16.0 in 64.0 64.0 64.0 in Max Cantilever from Attachment to Perimeter of PV Array 24.3 24.3 24.3 in Spacing Results (Portrait) Max Allowable Spacing Between Attachments 56.4 56.4 56.4 in Max Spacing Between Attachments With Rafter/Truss Spacing of 16.0 in 48.0 48.0 48.0 in Max Cantilever from Attachment to Perimeter of PV Array 18.8 18.8 18.8 in

Layout Skirt Coupling End Coupling Clamp End Clamp North Row Extension Bonding Jumper Note: If the total width of a continuous array exceeds 35 ft, break array to allow for thermal expansion and contraction. See Installation Guide for details. Warning: PV Modules may need to be shifted with respect to roof trusses to comply with maximum allowable overhang.

Roof Weights In Conformance with Solar ABC's Expedited Permit Process Module Quantity: 4 Weight of Modules: 168 lbs Weight of Mounting System: 18 lbs Total Plane Weight: 186 lbs Total Plane Array Area: 70 ft2 Distributed Weight: 2.63 psf Number of Attachments: 9 Weight per Attachment Point: 21 lbs

Plane Calculations (ASCE 7-10): South East Roof 2 Roof Shape: Roof Type: Composition Shingle Average Roof Height: 30.0 ft Least Horizontal Dimension: 14.3064353750378 ft Roof Slope: 33.0 deg Truss Spacing: 16.0 in Snow Load Calculations Edge and Corner Dimension: 3.0 ft Stagger Attachments: Yes Include Snow Guards: No Include North Row Extensions: No EcolibriumSolar Flat Roof Snow Load 26.9 26.9 26.9 psf Slope Factor 0.68 0.68 0.68 Roof Snow Load 18.3 18.3 18.3 psf Wind Pressure Calculations Net Design Wind Pressure Uplift -20.7-24.3-24.3 psf Net Design Wind Pressure Downforce 19.4 19.4 19.4 psf Adjustment Factor for Height and Exposure Category 1.0 1.0 1.0 Design Wind Pressure Uplift -20.7-24.3-24.3 psf Design Wind Pressure Downforce 19.4 19.4 19.4 psf ASD Load Combinations Dead Load 2.4 2.4 2.4 psf Snow Load 18.3 18.3 18.3 psf Downslope: Load Combination 3 9.6 9.6 9.6 psf Down: Load Combination 3 14.9 14.9 14.9 psf Down: Load Combination 5 13.6 13.6 13.6 psf Down: Load Combination 6a 20.4 20.4 20.4 psf Up: Load Combination 7-11.2-13.4-13.4 psf Down Max 20.4 20.4 20.4 psf Spacing Results (Landscape) Max Allowable Spacing Between Attachments 72.8 72.8 72.8 in Max Spacing Between Attachments With Rafter/Truss Spacing of 16.0 in 64.0 64.0 64.0 in Max Cantilever from Attachment to Perimeter of PV Array 24.3 24.3 24.3 in Spacing Results (Portrait) Max Allowable Spacing Between Attachments 56.4 56.4 56.4 in Max Spacing Between Attachments With Rafter/Truss Spacing of 16.0 in 48.0 48.0 48.0 in Max Cantilever from Attachment to Perimeter of PV Array 18.8 18.8 18.8 in

Layout Skirt Coupling End Coupling Clamp End Clamp North Row Extension Bonding Jumper Note: If the total width of a continuous array exceeds 35 ft, break array to allow for thermal expansion and contraction. See Installation Guide for details. Warning: PV Modules may need to be shifted with respect to roof trusses to comply with maximum allowable overhang.

Roof Weights In Conformance with Solar ABC's Expedited Permit Process Module Quantity: 8 Weight of Modules: 335 lbs Weight of Mounting System: 36 lbs Total Plane Weight: 371 lbs Total Plane Array Area: 141 ft2 Distributed Weight: 2.63 psf Number of Attachments: 18 Weight per Attachment Point: 21 lbs

Plane Calculations (ASCE 7-10): South West Roof 3 Roof Shape: Roof Type: Composition Shingle Average Roof Height: 30.0 ft Least Horizontal Dimension: 60.487926980053 ft Roof Slope: 33.0 deg Truss Spacing: 16.0 in Snow Load Calculations Edge and Corner Dimension: 6.048792698005296 ft Stagger Attachments: Yes Include Snow Guards: No Include North Row Extensions: No Flat Roof Snow Load 26.9 26.9 26.9 psf Slope Factor 0.68 0.68 0.68 Roof Snow Load 18.3 18.3 18.3 psf Wind Pressure Calculations Net Design Wind Pressure Uplift -20.7-24.3-24.3 psf Net Design Wind Pressure Downforce 19.4 19.4 19.4 psf Adjustment Factor for Height and Exposure Category 1.0 1.0 1.0 Design Wind Pressure Uplift -20.7-24.3-24.3 psf Design Wind Pressure Downforce 19.4 19.4 19.4 psf ASD Load Combinations Dead Load 2.4 2.4 2.4 psf Snow Load 18.3 18.3 18.3 psf Downslope: Load Combination 3 9.6 9.6 9.6 psf Down: Load Combination 3 14.9 14.9 14.9 psf Down: Load Combination 5 13.6 13.6 13.6 psf Down: Load Combination 6a 20.4 20.4 20.4 psf Up: Load Combination 7-11.2-13.4-13.4 psf Down Max 20.4 20.4 20.4 psf Spacing Results (Landscape) Max Allowable Spacing Between Attachments 72.8 72.8 72.8 in Max Spacing Between Attachments With Rafter/Truss Spacing of 16.0 in 64.0 64.0 64.0 in Max Cantilever from Attachment to Perimeter of PV Array 24.3 24.3 24.3 in Spacing Results (Portrait) Max Allowable Spacing Between Attachments 56.4 56.4 56.4 in Max Spacing Between Attachments With Rafter/Truss Spacing of 16.0 in 48.0 48.0 48.0 in Max Cantilever from Attachment to Perimeter of PV Array 18.8 18.8 18.8 in EcolibriumSolar

Layout Skirt Coupling End Coupling Clamp End Clamp North Row Extension Bonding Jumper Note: If the total width of a continuous array exceeds 35 ft, break array to allow for thermal expansion and contraction. See Installation Guide for details. Warning: PV Modules may need to be shifted with respect to roof trusses to comply with maximum allowable overhang.

Roof Weights In Conformance with Solar ABC's Expedited Permit Process Module Quantity: 12 Weight of Modules: 503 lbs Weight of Mounting System: 38 lbs Total Plane Weight: 541 lbs Total Plane Array Area: 211 ft2 Distributed Weight: 2.56 psf Number of Attachments: 19 Weight per Attachment Point: 28 lbs

Bill Of Materials Part Name Quantity ES10195 EcoX Base, Comp Shingle 46 ES10197 EcoX Flashing, Comp Shingle 46 ES10144 EcoX Junction Box Bracket 3 (Optional) ES10132 EcoX Power Accessory Bracket 24 ES10184 PV Cable Clip 120 ES10103 EcoX Clamp Assembly 28 ES10136 EcoX End Clamp Assembly 18 ES10201 EcoX Bonding Jumper 4 ES10121 EcoX Coupling Assembly 24 ES10146 EcoX End Coupling 12