Clean Energy and Pollution Reduction Act Senate Bill 350 Early Release Material. April 14, 2016

Similar documents
SB 350 Study: The Impacts of a Regional ISO-Operated Power Market on California

Senate Bill 350 Study

Making Sense of U.S. Energy Markets

Stakeholder Comments Template

ISO Transmission Planning Process. Supplemental Sensitivity Analysis: Benefits Analysis of Large Energy Storage

Modeling the 1-Step and 2-Step Dispatch Approaches to Account for GHG Emissions from EIM Transfers to Serve CAISO Load

With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development

DEVELOPMENTS IN WESTERN MARKETS: RENEWABLES AND EXPANSION OF ORGANIZED MARKETS IN THE WEST

Regional Coordination in the West: Benefits of PacifiCorp and California ISO Integration

Western Energy Imbalance Market and Regional Initiatives

Bulk Energy Storage Resource Case Study Update with the 2016 LTPP Assumptions

California s Solar Buildout: Implications for Electricity Markets in the West

Low Carbon Grid Study Phase II Results

Status of the western energy imbalance market and regional initiatives

2018 CAISO Policy Initiatives Roadmap

Organized Markets in WECC 4/18/18

Great Basin Transmission ITP Submission to California ISO. May 2018

Energy Imbalance Market Year 1 Enhancements

L.A. s Clean Energy Transition: 100% Renewable Energy Study. By LADWP General Manager David H. Wright

REGULATORY FRAMEWORKS BEHIND DISTRIBUTED ENERGY RESOURCE MARKETS

Localized Renewable Energy and California Communities. Wade Crowfoot Governor s Office of Planning and Research September 12, 2012

Western Energy Imbalance Market

Load Shift Working Group.

The Western Energy Imbalance Market DOUG HOWE, CHAIR, WESTERN ENERGY IMBALANCE MARKET JANUARY 10, 2018

Low Carbon Grid Study: Analysis of a 50% Emission Reduction in California

Pacific Northwest Low Carbon Scenario Analysis

LS Power. Southwest Intertie Project (SWIP) North. NTTG Stakeholder Meeting April 12, Bringing Energy Forward

Benefits for Participating in EIM February 1, 2016

Western EIM Benefits Report Fourth Quarter 2017

Energy Imbalance Market Year 1 Enhancements Phase 2. Draft Final Proposal

Organized Markets in WECC. Status Update and Implications for Planning 2/1/18

Welcome to the California Independent System Operator. August 7, 2015

Tucson Electric Power 2017 Integrated Resource Plan. Southern Arizona Regional Solar Partnership Jeff Yockey, PE

CAISO Energy Imbalance Market Dr. Khaled Abdul-Rahman Executive Director, California ISO

Geothermal s Value in a Changing Energy Market

SB 350 Environmental Study Plan. February 8, 2016 Susan Lee and Brewster Birdsall, Aspen Environmental Group

DATA ASSUMPTIONS AND DESCRIPTION OF STUDIES TO BE PERFORMED 2014 EGSL & ELL Integrated Resource Plans

Low Carbon Grid Study: Comparison of 2030 Fixed Costs of Renewables, Efficiency, and Integration with Production Cost Savings

Draft Plenary Report Presentation

IESO Market Renewal Project Proposed Approach to the Benefits Case Analysis

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Chapter 2. Direct Testimony of Joseph P. Hoerner and Shayleah J.

Pacific Northwest Low Carbon Scenario Analysis

2025 California DR Potential Study

Energy Imbalance Market Overview

The Superior Value of Distribution-interconnected Generation

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Well-Planned Transmission to Integrate Customer Needs and Resources

Transmission To Capture Geographic Diversity of Renewables

CAISO s Plan for Integration of Renewable Resources

March 17, 2017 BOARD APPROVED

From: Keith Casey, Vice President, Market and Infrastructure Development

GREENING OF THE GRID: RICK BROWN, PHD, TERRAVERDE

EIM Transitional Committee Governance Straw Proposal

Exhibit to Agenda Item #1

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON PACIFICORP. REDACTED Exhibit Accompanying Direct Testimony of Michael G. Wilding

2016 Fall Reliability Conference MRO

Portland General Electric 2016 Integrated Resource Plan. OPUC Public Meeting December 20, 2016

Comments of Pacific Gas & Electric Company Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2 Revised Straw Proposal

California s Approach to Designing a Net Energy Metering (NEM) Tariff. Sara Kamins California Public Utilities Commission June 18, 2014

California s Renewable Portfolio Standard

The Changing Role of Hydro Power in Transforming Wholesale Power Markets

Regional Expansion SB 350 Implementation Timeline Special Study Portfolios

Market Design and Renewables in the U.S.

SPSC 2011 and 2012 Study Requests to WECC/TEPPC: Update for January 2013

ATTACHMENT A. Alternative LSE Plan. Solana Energy Alliance 2018 INTEGRATED RESOURCE PLAN

Battery Storage Development

Battery Storage Development

Regional Transmission Planning in the West. State-Federal RPS Collaborative Webinar Hosted by Clean Energy States Alliance October 5, 2011

The Renewable Energy Integration Challenge: Mitigation Options Lori Bird, NREL NCSL Webinar April 28, 2013

Roadmaps for Demand Response & Storage

CAISO Generator Deliverability Assessment Methodology. On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes)

Low Carbon Grid Study: SWIP North Economic Benefits

Re: Base Case and Alternative Renewable Resource Portfolios for the CAISO Transmission Planning Process

Envisioning a Renewable Electricity Future for the United States

CPP Panel Comments. PSERC Summer Workshop July, 2015

A Bulk Energy Storage Resource Case Study with 40% RPS in 2024

Open Access Technology International, Inc. (OATI)

GridView Review 2026 Common Case Version 2.0

Risks And Opportunities For PacifiCorp State Level Findings:

Diablo Canyon Power Plant: Joint Proposal Overview. Tom Jones Director of Strategic Initiatives October 20, 2016

Procurement Under GHG Regulation

BC Hydro Renewable Generation Market Competitiveness Report

DOE Funded Pumped Storage Study

Zero Net Carbon Portfolio Analysis

Observations on US Renewable Energy Trends

Recommendations on the TPP policy and economic assessment by TPP topic

Stakeholder Comments Template

CHAPTER 6 - Load Forecast & Resource Plan

Beyond LCOE: The Value of CSP with Thermal Energy Storage

Valuing Energy Storage as a Flexible Resource. Final Phase 1 Report for Consideration in CPUC A

SOLAR VALUATION & COST/BENEFIT ANALYSES

Renewables Portfolio Standard (RPS) Sara Kamins April 2, 2008

Pacific Northwest Low Carbon Scenario Analysis

Western EIM Benefits Report Second Quarter 2017

Common Case Process. Jon Jensen Staff Engineer System Adequacy Planning

California Electricity Sector GHG Planning: Making early investments in CCS to lower the long-term cost of achieving a GHG reduction target

Jan Strack and Huang Lin March 14, 2017

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

STAKEHOLDER COMMENTS TEMPLATE

California ISO Energy Imbalance Market Operations Overview. June 10, 2014 Webinar

Transcription:

Clean Energy and Pollution Reduction Act Senate Bill 350 Early Release Material April 14, 2016

April 14, 2016 Call Agenda Time Topic Presenter 9:00 9:05 Introduction Kristina Osborne 9:05 9:10 Overview Deb Le Vine 9:10 9:30 Brattle: - Existing Regional Market Studies - Production Cost Analysis 9:30 9:50 E3: - RESOLVE Overview - Input Updates 9:50 10:10 BEAR: - BEAR and IMPLAN Models - Disadvantages Communities 10:10 10:30 Aspen: - Methodology Overview - Disadvantaged Communities Judy Chang Hannes Pfeifenberger Arne Olsen David Roland-Holst Brewster Birdsall Susan Lee 10:30 10:40 Next Steps Deb Le Vine Page 2

CAISO s SB350 Evaluation Plan Ratepayer Impact Analysis PRESENTED TO: SB350 CAISO Stakeholder Webinar on Early Release Materials PRESENTED BY: Judy Chang Hannes Pfeifenberger Ap r i l 1 4, 2 0 1 6 Copyright 2016 The Brattle Group, Inc.

Summary of Existing Regional Market Studies The final report will leverage insights from relevant existing studies to inform the analysis and provide bookends to estimated impacts Study Type Day-2 Market Studies Evaluate benefits of moving from de-pancaked transmission + energy imbalance market to full Day-2 market RTO Participation Studies Evaluate benefits and costs to a utility of joining an existing RTO Post Order 2000 Studies Benefit-cost studies of forming RTOs that followed issuance of FERC Order 2000 in late 1999 EIM Studies Evaluate the benefits of the Western EIM, or the benefits of a utility joining the EIM European Market Integration Studies Evaluate the benefits of market integration in the European context WECC Renewable Integration Studies Studying the challenges of higher penetration of renewable resources Examples of Studies SPP IM Retrospective (2015), SPP IM Prospective (2009) PAC-CAISO Integration (2015), WAPA/Basin-SPP (2013), Entergy-MISO (2011) LBNL RTO Study Review (2005), RTO West (2002), National RTO Study (2002) WECC-Wide EIM (2011), APS-EIM (2015), PGE-EIM (2015), NV Energy-EIM (2014), Puget Sound-EIM (2014), PacifiCorp-EIM (2013) EPRG Integrating European Markets (2015), EU Single Market Study (2013) NREL/DOE WWSIS 2 & 3, CEERT/NREL Low Carbon Grid Study, CAISO/GE (stability), WGA least-cost integration Privileged and Confidential Prepared at the Request of Counsel 4 brattle.com

Findings from Other Market Studies Most market integration studies estimated production cost savings from implementing Day- 2 energy markets across larger regions to be 1-3% of total production costs, including when starting from EIM-type markets Savings associated with unit commitment and day-ahead dispatch (not captured by EIM) Additional savings from managing uncertainties between day-ahead and real-time operations Regional markets lead to better utilization of the existing grid Stronger incentives to increase the efficiency and availability of existing generators (typically not estimated) In addition to production cost savings, other savings of larger regional markets include: Reduced generation capacity needs and associated investment costs Increased access to low-cost renewable generation resources Reduced cost of balancing variable renewable generation Most prospective studies emphasize their limitations, which tend to not capture certain benefits and underestimate the overall benefits of regional market integration Retrospective studies of market integration benefits tend to document higher benefits than those estimated in prospective studies Production cost savings of 2-8%, demonstrating limitations of prospective studies The SB350 study will be conservative in estimating the benefits of regional markets Privileged and Confidential Prepared at the Request of Counsel 5 brattle.com

Summary of Assumptions for Production Cost Analysis 2020 Analysis: Using key assumptions from CEC s 2015 IEPR data California loads, distributed solar, natural gas, and GHG prices Wheeling and hurdle rates reflect economic barriers between Balancing Authorities Refined representation of future WECC transmission projects Refined modeling of pumped storage hydro, and gas CC and CT unit commitment Privileged and Confidential Prepared at the Request of Counsel Inputs 2020 Current Practice Renewable portfolio Transmission ISO s Gridview model ISO s Gridview model (removed post-2020 projects) 2020 Regional (ISO+PAC) Same as Current Practice Same as Current Practice Load 2015 IEPR Same as Current Practice Gas price 2015 IEPR Same as Current Practice GHG price Reserve requirements ISO net export limit Hurdle rate Contract path 2015 IEPR ($0 outside of CA) Updated frequency response, LF, and regulation 0 MW Wheeling based on recent tariff; + admin. charges & friction PACE/PACW path not subject to any hurdle rates Same as Current Practice Allow sharing in ISO+PAC 776 MW (based on ISO-PAC contract path) Same as Current Practice ISO-PAC and PACE-PACW paths not subject to any hurdle rates 6 brattle.com

Summary of Assumptions for Production Cost Analysis 2030 Analysis: Growth in loads, distributed solar, and gas prices based on CEC and WECC data Added new regional transmission based on TEPPC 2024 Common Case Regional Case 3: Used PacifiCorp s Gateway D & F to represent generic transmission solution to deliver WY wind Also assume generic transmission solution for NM solar Assumed no rest-of-wecc carbon price, but considering a carbon price sensitivity Privileged and Confidential Prepared at the Request of Counsel Inputs 2030 Current Practice Renewable portfolio Transmission Load Incremental renewables from E3 ISO s Gridview model (removed Gateway D &F) 2015 IEPR, WECC Load & Resources forecast 2030 Regional (WECC-PMAs) Incremental renewables from E3 ISO s Gridview model (assumed WY & NM transmission in Case 3) Same as Current Practice Gas price 2015 IEPR Same as Current Practice GHG price Reserve requirements ISO net export limit Hurdle rate 2015 IEPR ($0 outside of CA; sensitivity analysis with same as CA, if time allows) Updated frequency response, load-following, and regulation Same as Current Practice Reduce requirements and allow sharing in WECC minus PMAs 2,000 or 8,000 MW 8,000 MW Wheeling based on recent tariff; + admin. charges & friction Removed hurdles within regional footprint 7 brattle.com

Portfolio Development and Data Inputs for ISO SB 350 Study Arne Olson, Partner

Overview of the RESOLVE model RESOLVE is an E3 model that selects least-cost portfolios of renewable resources and integration solutions within the ISO region between 2015 2030 Selects portfolio of solar, wind, geothermal, biomass, and small hydro Adds cost-effective integration solutions such as energy storage and flexible conventional resources, in combination with renewable portfolio, to minimize total cost over analysis period Resources are added to meet RPS target, overbuilding renewable portfolio if necessary Renewables are curtailed if the output cannot be consumed in California or exported to neighboring systems due to oversupply or insufficient power system flexibility Renewable contracts are treated as sunk costs and fully compensated for curtailed output Resources added to portfolio if necessary to replace curtailed output; Renewable curtailment implicitly valued at replacement cost, which increases geometrically with curtailment 9

Updates to Key Input Assumptions Based on Stakeholder Feedback Updated load forecast to CEC 2015 IEPR mid-aaee Load and EVs are lower, Rooftop PV is higher Statewide analysis rather than exclusive focus on ISO area Added procurement assumptions for non-iso areas (LADWP, BANC, TID, IID) Reduced cost of solar, wind and geothermal resources Reduced battery storage costs Reduced capital cost, adder inverter replacement, increased balanceof-systems costs, reduced fixed O&M, adjusted lifetime Other Hydro and storage can provide frequency response Revised 2030 renewable portfolios will be presented at the next stakeholder workshop based on these changes 10

Stakeholder Meeting Discussion of Early Release Materials David Roland-Holst Berkeley Economic Advising and Research dwrh@bearecon.com 14 April 2016 Berkeley Economic Advising and Research www.bearecon.com

A Few Economic Principles 1. Infrastructure investment can create shortterm employment. 2. Capacity investment can create short and long term jobs, depending on import content. 3. Expenditure Shifting: Demand funded by energy savings is long term, creates more jobs, more kinds of jobs, and is more likely to be for California goods and services. 4. More affordable energy is pro-poor: Lower income households spend a larger percent of their income on energy services. 14 April 2016 Roland-Holst 12

Economic Assessment Framework Economywide Structural Data E3 Data by scenario New generation capacity by fuel source (MW) and year O&M costs and Capital costs for new construction (by fuel source). New in-state transmission costs Average in-state retail electricity prices BEAR Model Statewide Economic Impacts Detailed employment impacts Brattle Data by scenario Generation by fuel source (GWh) and year Net electricity imports (GWh) by fuel source In-State fuel costs (for coal, oil, NG, etc.) CO2 allowance costs (for coal, oil, NG, etc.) O&M costs for generation by source Electricity import costs IMPLAN /Census Disadvantaged Community impacts 14 April 2016 Roland-Holst 13

BEAR Macroeconomic Impacts Category Employment Output Aggregate Sector Households by Income Decile Labor category (skilled, unskilled) Gross state product Aggregate Sector Personal income Household ratepayer by income decile Labor category Enterprise Income State tax revenue Firm ratepayers by sector Aggregate 14 April 2016 Roland-Holst 14

Detailed Livelihoods Impacts BEAR Model IMPLAN Impacts in Disadvantaged Communities 1 Employment 2 Wages 3 Real Household Incomes 4 Real Household Consumption 5 Household Energy Cost 14 April 2016 Roland-Holst 15

Economic Assessment - Summary Objective to promote evidence-based energy policy dialog Overview of income and job dynamics Economic Model, Data, and Scenarios Stakeholder Inputs Data sources and perspectives Subjects and issues of emphasis Assumptions 14 April 2016 Roland-Holst 16

SB 350 Environmental Study Methodology Overview For stakeholder call: April 14, 2016

Technical Material Included Contents of Methodology Overview: Environmental Study Approach Description of Study Zones Baseline Conditions and Indicators of Impacts How Topics would be Analyzed

Technical Material Included Screening for Disadvantaged Communities Census tract scores from CalEnviroScreen 2.0 results 25% highest-scoring census tracts, mapped as disadvantaged communities Distributed per County, Air Basin, and certain CREZs

Next steps April 27 28, 2016 stakeholder meeting on preliminary results May 13, 2016 stakeholder comments due to ISO Additional reference materials: Senate Bill No. 350 - Clean Energy and Pollution Reduction Act of 2015 https://leginfo.legislature.ca.gov/faces/billnavclient.xhtml?bill_id=201520160sb350 Fast Facts Benefits of a regional energy market http://www.caiso.com/documents/2015regionalbenefitsfactsheet.pdf Early release material http://www.caiso.com/informed/pages/regionalenergymarket/benefitsofaregionalenergy Market.aspx Page 20