Jersey City Public Safety Communications Center

Similar documents
The Fort Collins Discovery Museum LEED stands for Leadership in Energy and Environmental Design.

GLADYS VALLEY HALL. Materials & Resources Innovation & Design Process

ASC New Building 400 Masthead Street Albuquerque, NM

ENERGY AND ENVIRONMENT DESIGN AND CONSTRUCTION STANDARDS ENERGY AND ENVIRONMENT

Appendix C APPLICATION #: ADDRESS: CITY OF SANTA CRUZ GREEN BUILDING PROGRAM GREEN POINTS CHECK LIST FOR NON-RESIDENTIAL BUILDINGS

LEED BUDGET IMPACTS. LEED Architectural Credits

Project Summary. Sustainability Facts. LEED for New Construction Rating (out of 69 possible points) Total Score 40 Sustainable Sites 7

City of Millbrae 2016 CALIFORNIA GREEN BUILDING CODE CHECKLIST FOR NEW NONRESIDENTIAL BUILDINGS

5 Cowperthwaite Street Harvard Real Estate Services LEED-NC GOLD, August 2007

54% reduction in water consumption 35% 78%

10 Akron Street Harvard Real Estate Services LEED GOLD

Prerequisites must be achieved. Non-compliant prerequisites must be resolved before a certification can be awarded.

SACRAMENTO County New Animal Care Facility LEED Elements

Taylor Institute. LEED Certification : GOLD

CALGREEN NON-RESIDENTIAL BUILDING Checklist

Green Building Ordinance Overview

Eaton Center - Shanghai LEED CI Certification Project

Decatur Fire Station No. 2

37% 100% 100% PROJECT HIGHLIGHTS LEED Facts. Wiener Auditorium

Sustainable Design A DIVISION OF SHIVE-HATTERY

BUILDING FOR OUR FUTURE

Duke Sustainability Sands Parking Garage

Understanding the 2010 California Green Building Standards Code

38.7% 25% PROJECT HIGHLIGHTS. LEED Facts. Reduction in water use compared to EPAct 1992 baselines.

Monroe Community College Louis S. and Molly B. Wolk Center for Excellence in Nursing

88.2% 32% 23% WEITZ LABORATORY GOLD. PROJECT HIGHLIGHTS LEED Facts. of on-site generated construction waste was diverted from landfills.

LEED 2009 for New Construction and Major Renovations

WINDMILL DEVELOPMENT GROUP

New Montgomery County Elementary School. Construction Indoor Air Quality Management Plan IEQc3.1 IAQ Plan During Construction

30% 85% 37% PROJECT HIGHLIGHTS LEED Facts. Lecture Hall BioLabs Building

Analysis 1. LEED Analysis of Laboratory Buildings. Penn State School of Forest Resources University Park, PA

96% 33% 30% PLATINUM B1 ANNEX - NORTHWEST LABS BUILDING. PROJECT HIGHLIGHTS LEED Facts

Component Goal Performance Measurement Unit. meet the sustainability criteria. described below. described below. from landfills.

Construction Indoor Air Quality (IAQ) Management Plan

LEED Certified Health Center

Green Buildings, and LEED Certification. By Mohammad Tassi, BME, MEM, LEED AP, CxA, USGBC Faculty Sustainability & LEED Consultant

Research Analysis: Building Envelope and LEED Credits Introduction

Environmental Stewardship Conference October 05, 2013 Energy Water and Sustainability (EWaS) Program

McCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007

Genentech Building 20 Office LEED-CI Gold XL CONSTRUCTION

Building Sustainability

Larsen Classrooms Photo: Harvard Office for Sustainability PROJECT HIGHLIGHTS. > 22% of the total value of materials has recycled content

Note year for Reference as Specified in the LEED V Manual.

2012 USGBC Central Florida Chapter LEEDership Awards Outstanding Green Building of the Year: Valencia College, Lake Nona Campus Valencia College s

LEED Application Guide for Multiple Buildings and On Campus Building Projects

GREEN BUILDING REQUIREMENTS

COUNTY OF SACRAMENTO DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING PERMITS & INSPECTION DIVISION

L E E D S C O R E C A R D ( B U I L D I N G D E S I G N & C O N S T R U C T I O N )

CE Option 1 and 2 - Provide the pre-development site run -off rate (cfs) CE Option 1 and 2 - Provide the pre-development site run -off quantity (cf)

10. LEED RATING EVALUATION

LEED-CI ANALYSIS 1 LANDMARK SQUARE STAMFORD, CT

LEED-CI ANALYSIS 6 LANDMARK SQUARE STAMFORD, CT

CONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability

City Green Court, Czech Republic

LEED Project Delivery Process Manual Appendices

Toyota Logistics Service. Portland Vehicle Distribution Center Redevelopment

Environmental Principles

CALGreen Mandatory Regulatory Provisions and Synergies with LEED. Antea USA, Inc.

Phillips Exeter Academy

LEED-CI ANALYSIS 4 LANDMARK SQUARE STAMFORD, CT

Case Study: Element PROJECT DESCRIPTION

Ecole Connaught Community School Welcomes. CaGBC Sask Chapter Members & Colleagues

Dell Seton Medical Center at The University of Texas Overview

75% 40% reduction in water consumption. 43% 68% 90%

WEST WINDSOR TOWNSHIP GREEN DEVELOPMENT PRACTICES CHECKLIST

Non-Residential CALGreen (CGBSC) Correction List (To be inserted within the body of the Non-Residential/Plan Check Correction List)

EPS MUSEUM RENOVATION. PROJECT HIGHLIGHTS LEED Facts GOLD (PENDING) 34% reduction of Wastewater by plumbing fixtures. 69% 38% EPS Museum

Colorado Mountain College: Sustainable Design Standards

LEED-CI ANALYSIS 140 GRAND STREET WHITE PLAINS, NY

A PRACTICAL GUIDE TO SAN FRANCISCO'S GREEN BUILDING ORDINANCE

SECTION GREEN BUILDING POLICY IMPLEMENTATION

GOLD 24 OXFORD STREET, CAMBRIDGE, MA 02138

MANDATORY GREEN CODE STANDARDS NEW NONRESIDENTIAL CHECKLIST & CERTIFICATION

GOLD EAST WING OFFICES - NORTHWEST LABS BUILDING. PROJECT HIGHLIGHTS LEED Facts 18% 14% 23% 100% 30%

DESIGN TIPS TECHNICAL BULLETIN #53 CAST STONE AND THE LEED CERTIFICATION PROGRAM [1 of 5]

SECTION INDOOR AIR QUALITY MANAGEMENT PLAN. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

LEED-CI ANALYSIS 115 STEVENS AVENUE VALHALLA, NY

SOUTHERN CALIFORNIA EDISON DATA CENTER GREEN BUILDING EDUCATION: VIRTUAL TOUR

- AIA Honor Award for Interior Architecture - ALA/IIDA Library Interior Design Awards: Best

2010 CALIFORNIA GREEN BUILDING STANDARDS CODE SUMMARY OF NONRESIDENTIAL MANDATORY MEASURES

Allowance Table for: General:

LEED EB:OM Credit Catagories

LEED version 4 Leadership in Energy and Environmental Design

SECTION SUSTAINABILITY CERTIFICATION REQUIREMENTS LEED NC V3

Introduction to Integrated Sustainable Design

LEED And Your Indoor Environment

43% reduction in water use below code maximum 100% 100% 14% reduction in lighting power density. 56% of offices have thermal comfort controls 100%

Sustainability at University of Florida. Bahar Armaghani, LEED AP

CITY COUNCIL AGENDA REPORT

Contractor's Letter of Assurance

Title: In-House Green Building Certification Supporting Documentation Issued by: Sustainability Department (Green Building Department)


2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone:

LEED v4 ATAS Reference Guide

University of Hawaii Law School Honolulu, HI. Preliminary LEED Goals Report 10/4/2007

Prerequisite. prerequisite.

LEED Credits. How FieldTurf Can Contribute To Obtaining

LEED for Commercial Interiors

EnviroLube LEED Point Contribution

Transcription:

LEED Innovation and Design Credit 1.2 Green Building Education LEED SILVER Pending Case Study: The city of Jersey City chose to incorporate sustainable and high efficiency design features to make the Public Safety Communications Center a healthy and enjoyable place to work as well as lower its environmental impact in the local and global environment. Urbahn Architects is seeking an innovation point for the Jersey City Public Safety Communications Center (JCPSCC) based on our sustainable building education efforts. We will comply with the requirements of CIR Ruling dated 9/24/2001 (see attached) by creating this case study to inform the design of other buildings based on the successes of this project as well as provide the installation of a real time interactive utility display system within the building. Urbahn Architects will submit this case study to the local USGBC chapter including all submitted credit templates and back up documentation for future reference. In addition to the publicly available case study, building occupants and visitors will have access to a real time utility consumption display system. With the installation of a touch screen monitor installed in the staff break room, building occupants can quickly see how their building is performing with water reduction and energy savings for example. User friendly functions will help encourage occupants to learn more about the building and their environment. Green Building Highlights: The entire building envelope, mechanical and electrical systems are designed to maximize energy performance. Prefabricated building construction minimizes construction waste. All building systems are continually measured and monitored through a building management system. Real Time / Interactive Utility Display will be installed in the staff lounge informing the building s occupants of the building s performance and sustainable highlights throughout the facility. Over 90% of construction waste was diverted away from landfills. Water efficient landscaping contributes to water savings. Carefully selected native plantings will reduce the need for ongoing irrigation. Through the installation of low flow fixtures, dual flush handles, and non water urinals the building will reduce potable water use by 24%. 1

Location: Situated on a previously developed urban site, The Jersey City Public Safety Communications Center (JCPSCC) is contained within a compact footprint on the site. The building is within easy walking distance to public transportation as well as shops and restaurants. Program: A new highly secure 25,000 square foot facility will serve as a combined police, fire operations, and EMS communications center for Jersey City. The building will include a theater layout that will serve as 911 call and dispatch center for all three departments. The building will also house the Telephone Reporting Unit (TRU) and Criminal Justice Information Systems Unit (CJIS) for the Jersey City Police Department, a training center for 911 call takers and dispatchers, administrative facilities and employee support units. The building was designed to support 24/7 operations, with redundant HVAC, electrical, and telecommunications systems. The project used LEED for New Construction Version 2.2 to guide and certify the green design elements throughout the building and site. The pending Silver Certification demonstrates the design team s commitment to sustainable design. Project Team: Client: Jersey City Architect: Urbahn Architects MEP Engineers: Joseph R. Loring & Associates, Inc Structural Engineer: Ysrael Seinuk Civil Engineer: Medina Consultants Construction Manager: CCMS Prefabricator Manufacturer: Landmark 2

Sustainable Strategies JCPSCC expects to achieve 12 out of 14 Sustainable Sites credits in the LEED program. This includes: Maximizing open space While no local zoning ordinance exists for this site, over 24% of the open space on the site is covered with vegetated plantings including the incorporation of a green roof system. Site Public Transportation access and bicycling The site is conveniently located within walking distance of two different bus lines. Bicycle racks and shower facilities are available for employees to encourage alternative methods of transportation. Heat Island Effect The installation of a highly reflective roof surface (calculated SRI value of 94) and a green roofing system will combine to reduce cooling costs for the building. Storm Water Incorporating the use of storm filters to retain and treat storm water runoff will reduce the demand on the public storm sewer system. Incorporating the use of a green roof and vegetated buffers around the site contribute to runoff conditions equivalent to existing site conditions. Light Pollution Reduction The use of shielded exterior light fixtures will improve night sky access and reduce development impact in the local environment. 3

JSPSCC expects to achieve 3 out of a possible 5 credits. This includes: Jersey City Public Safety Communications Center Water Efficiency Water efficient landscaping There will be no permanent irrigation system installed after the establishment of all landscaping and plantings. Water use reduction By using water saving strategies such as dual flush water closets, waterless urinals, low flow lavatories and shower heads the building will generate over 24% savings in water use. 4

Energy & Atmosphere JCPSCC will undergo fundamental commissioning of all building systems to ensure that they are running as they were designed. The project also meets the minimum requirements of all mandatory provisions of ASHRAE 90.1 2004. Materials and Resources JCPSCC expects to achieve 5 out of a possible 13 credits. Careful attention was paid to both the disposal of construction waste and to the selection and purchasing of new materials. This includes: Construction waste management Over 90% of all construction waste was diverted away from landfills. Recycled content Over 11% of all materials purchased for this project contained the minimum recycled content quantities required by USGBC standards. The use of materials containing recycled content will help reduce the impact of virgin resource extraction, encouraging the diversion of waste materials away from the landfills. Regional materials 12% of all materials and products purchased for this project were both manufactured and extracted within 500 miles of the site. Specifying regionally harvested and manufactured products greatly reduces the transportation energy required and its associated global impacts on the environment. 5

Indoor Environmental Quality JCPSCC expects to achieve 9 out of a possible 15 credits. Strategies to improve indoor air quality can positively impact the building s occupants, contributing to overall productivity and employee health. These include: Indoor Air Quality Plan During the construction process an IAQ plan was implemented to include: HVAC protection: ensuring all ductwork was sealed from dust and debris Source Control: Water absorbent materials were protected from moisture, paint and finishing operations were well ventilated, sweeping compound used to keep air borne dust minimized Pathway Interruption: Construction entrance way mats were used to limit dirt and debris, temporary dust curtains or enclosures prevented dust and debris from migrating to adjacent spaces. Housekeeping: Site was kept clean and clear of dust and debris build up. Interior spaces were protected from exterior weather conditions. Scheduling: Construction activities were scheduled to minimize IAQ impacts. Low Emitting Materials Volatile Organic Compounds (VOCs) were kept to a minimum, and below the LEED maximums for all adhesives, sealants, paints and carpets used within the interior of the building. Controllability of Systems Lighting and temperature systems in all common spaces can be individually controlled so building occupants can achieve their own comfort levels. 6

Innovations JCPSCC expects to achieve 3 additional Innovation in Design credits. These include: Green Building Education and Awareness Through the installation of a real time, interactive utility monitoring systems, the building s occupants will be informed of the energy, electric and water consumption within the building. The sustainable design features will be highlighted in the interactive touch screen system, raising the occupant s awareness of Green design and energy consumption. This comprehensive case study has also been prepared and will be submitted to USGBC to inform the Council of the sustainable design strategies incorporated for this project. Green Housekeeping Policy JCPSCC will incorporate the city s ordinance mandating a green housekeeping policy. The use of only Green Seal certified cleaning products will follow a procedure to improve indoor air quality and reduce hazardous materials exposure for the building s occupants. Glycol Heat Recovery Loop To be added. 7

APPENDIX 8