Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT

Similar documents
EBRD Environmental and Social Action Plan

1 Environmental and Social Action Plan

Project: Category A Road Project, Kazakhstan Kurty Buribaytal 62 km Road Project

ENVIRONMENTAL AND SOCIAL ACTION PLAN

Doc. No H1 Rev. 0 - July 2011 APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN

ENVIRONMENTAL & SOCIAL ACTION PLAN

Environmental and Social Action Plan

DRAFT FOR CONSULTATION OCTOBER 7, 2014

Syvash Wind Farm Environmental and Social Action Plan (ESAP)

Performance Requirements

ENVIRONMENTAL AND SOCIAL ACTION PLAN ÖKSÜT GOLD MINE, TURKEY (THE 'PROJECT')

Mezitli Wastewater Treatment Plant

Uzbekenergo: Talimarjan Thermal Power Plant 2, Uzbekistan Environmental and Social Action Plan (ESAP)

SNTGN TRANSGAZ SA MEDIAS. ESAP BRUA Version 3 1

DRAFT ENVIRONMENTAL AND SOCIAL ACTION PLAN (ESAP)

GEORGIA URBAN ENERGY LTD

CRUCEA NORTH WIND POWER PLANT

Ankara-Nigde Motorway Project

EBRD Performance Requirement 10

Source of requirement EBRD. - Each six months during construction - Annually during operation. Best practice EBRD PR 1

GATSUURT GOLD MINE : ENVIRONMENTAL AND SOCIAL ACTION PLAN

Draft Environmental and Social Action Plan (ESAP) For M6-M60 Motorway, Sections between Szekszard-Boly, and Boly-Pecs

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT

ENVIRONMENTAL IMPACT ASSESSMENT

City of Bishkek & European Bank for Reconstruction & Development (EBRD) Bishkek Solid Waste Management Project Environmental and Social Action Plan

Requirement (legislative, lender requirement (e.g. EBRD PR), Best Practice)

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

Darial Energy LLC. Dariali Hydro Power Plant Construction and Operation Project. Environmental and Social Action Plan, Dariali HPP

Environmental and Social Action Plan

Jbel-Sendouq Khalladi Wind Farm and 225kV Power Line Project Tangier, Morocco. Environmental and Social Action Plan

220 KV TRANSMISSION LINE AKHALTSIKHE-BATUMI

ESAP Final 12 September 2017

Environmental and Social Action Plan. Draft Report. The business of sustainability

Environmental and Social Policy

Environmental and Social Action Plan 400kV Transmission Line, SS Bitola 2 Macedonian/Albanian border and SS Ohrid

HYDRO EXTRUDED SOLUTIONS HOOGEZAND B.V.

Environmental and Social Action Plan Adjaristskali Hydropower Plants

Environmental and Social Review Summary. Sertum Energy

Total employees by employment contract and gender

NON TECHNICAL SUMMARY

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process

NON-TECHNICAL SUMMARY CORRIDOR VC IN REPUBLIKA SRPSKA: PODNOVLJE TO RUDANKA (KOSTAJNICA)

GENERAL STANDARD DISCLOSURES

Chapter 13 Management and Monitoring

Republic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY PROJECT Rehabilitation works on the big arch of Krk Bridge

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

EBRD Performance Requirement 1

Draft Code of Construction Practice

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

Environmental and Social Review Summary. Ejuva One and Ejuva Two Solar Projects

Europe and Central Asia Region Capacity Development Trust Fund

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

MONITORING ASSESSMENT SUMMARY REPORT

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item.

Introduction to Environmental Impact Assessment for Masterplan Sites 25 April 2018

Environmental and Social Data Sheet

Required Actions. Perform monitoring as described in the EMP.

E767 May 2003 ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT. Objectives

8 ENVIRONMENTAL MANAGEMENT PROGRAMME (PROJECT ENVIRONMENTAL SPECIFICATION)

Mining Environmental Impact Assessment Guidelines. May 2018

Principles for environmental and social responsibility

MAPPING & SOLUTIONS GUIDE. RIIENV201D Identify and assess environmental and heritage concerns

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project

Environmental, Social and Governance (ESG) management

TERMS OF REFERENCE FOR CONSULTING SERVICES FOR ENGINEERING AND CONSTRUCTION SUPERVISION CONSULTANT

Environmental and Social Review Summary

Amaila Hydropower ESIA Update Section 7

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country?

ENVIRONMENTAL AND SOCIAL COMMITMENTS SUMMARY

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

DRAFT FOR PUBLIC COMMENT Guidance Note for ESS10 Stakeholder Engagement and Information Disclosure

Environmental and Social Review Summary. Airport City Belgrade

Global Reporting Initiative (GRI) G4 Content Index

18 Cumulative Impacts and Interaction of Effects

The Energy Supply and Purchase Agreement (ESPA) was signed between Solar Energy Ltd and the Central Electricity Board on 28 November 2014.

CEZ DISTRIBUTIE S.A. Environmental and Social Due Diligence of CEZ Distributie Investment Programme Non-Technical Summary

LNG Terminal Świnoujście, Poland. Environmental and Social Action Plan (ESAP)

MOLDOVA CHISINAU SOLID WASTE PROJECT ENVIRONMENTAL AND SOCIAL ASSESSMENT FOR EBRD BROWNFIELD CATEGORY A PROJECT TERMS OF REFERENCE

Kitchener Drain Depollution Project: Drain Rehabilitation Solid Waste. Non-Technical Summary

PUBLIC DISCLOSURE OF THE ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) REPORT FOR THE MZIMBA TURN OFF- MZUZU-KACHECHE SECTION OF THE M1 ROAD.

QUESTIONNAIRE FOR AGRICULTURE AND FORESTRY (SECTOR RELATED QUESTIONS)

Code of Conduct Fleggaard GmbH

10.0 Environmental protection, follow-up and monitoring

SANKO GEOTHERMAL POWER PROJECT TRAFFIC MANAGEMENT PLAN

World Bank Environmental and Social Framework (ESF) Frequently Asked Questions (FAQ) October 2018

Environmental and Social Data Sheet

Stakeholder Engagement Plan Code Of Practice

BIO DIVERSITY POLICY Textile, Acrylic Fibre & Overseas Spinning Business

Environmental and Social Management Plan Çanakkale Bridge and Malkara - Çanakkale Motorway Project Final Draft. December 2017.

ENVIRONMENTAL AND SOCIAL ASSESSMENT FOR EBRD

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

1 Project description

ENVIRONMENTAL IMPROVEMENT PROJECT AT KOLUBARA MINE BASIN NON-TECHNICAL SUMMARY

Bahrain LNG Environmental Impact Assessment (2014) Summary

Factor Potential Effects Mitigation Measures

Transcription:

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT Environmental and Social Action Plan August 2016 Project: Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) Environmental and Social Assessment Report: Environmental and Social Action Plan Prepared by: ENOVA d.o.o. Sarajevo (Consultant) Financed by: European Bank for Reconstruction and Development

1. Environmental and Social Action Plan The table below constitutes the ESAP. It identifies the required actions during pre-construction, construction and operation of the project. of the actions is the responsibility of PC Motorways. When contractors perform work under contract, PC Motorways will be responsible for those contractors compliance with the requirements of the ESAP. No. Action Environmental PR 1 Assessment and Management of Environmental and Social Impacts and Issues 1.1 Obtain and comply with all necessary environmental, water and health and safety permits. Permits to apply for include: Environmental Permit for the Donja Gračanica-Klopče - application submitted (but still not issued) Water Act for all highway sections - the application process normally follows the completion of construction Operation Permit for all highway sections the application process normally follows the completion of construction Compliance with national and EBRD requirements PR 1 and Contractor; PC Motorways has to ensure that Contractor has all necessary construction related approvals. In house resources, Contractor resources Pre-construction During construction During operation Permits and Approvals from competent authorities Report in Annual Environmental and Social Report (AESR) to EBRD 1.2 Develop and implement Construction Site Organization Plan (CSOP) which should include mitigation measures for specific issues such as: construction waste, air emissions, access, constrains, flora and fauna, groundwater and surface water, influx of workers, human resources policies, working relationships, child and forced labour, non-discrimination and equal opportunity, workers organisations, wages, benefits and conditions of work, grievance management, worker accommodation (as applicable), security personnel requirements (as applicable), All environmental and social issues properly addressed PR 1 for supervision of implementation of mitigation measures. Plans will be developed by Contractors. In house resources, Contractor may hire consultants Before construction commences, Contractor has to develop Plans which have to be approved by PC Motorways. Contractor to implement all Plans during construction. Management plan documented Report on updates in AESR to EBRD 3

information disclosure, etc. If CSOP has already been developed, check whether CSOP encompass all relevant aspects of environmental protection. If not, update the CSOP. Other plans, required by this ESAP or legally required, should also be incorporated into the CSOP, e.g.: Construction Environmental and Social Management Plan (CESMP), Fire and Explosion Management Plan, Occupational Health and Safety Management Plan. Traffic Management Plan is to be reviewed by a road safety auditor before implementation, especially where transport is moving through or near settlements or areas with vulnerable road users. Include timely maintenance and rehabilitation of local roads used for highway construction impacted by construction vehicles. Emergency Preparedness and Response Plans will identify and address all major hazards for workers and the local community during the motorway construction and operation. 1.3 Develop and implement Operational Environmental and Social Management Plan (OESMP) for the operation and maintenance of planned motorway, which should include (but not be limited to): Waste Management Plan, Emergency Preparedness and Response Plan, Traffic Management Plan and Health and Safety All environmental and social issues properly addressed PR 1. In house resources, external consultant support Prior to operation (development of OESMP) and during operation (implementation of OESMP) Management plan documented Report on updates in AESR to EBRD 4

Management Plan. Emergency Preparedness and Response Plans will identify and address all major hazards for workers and the local community during the motorway construction and operation. 1.4 identify requirements for environmental and social monitoring during construction and operation and include in the relevant E&S management procedures (internal procedures concerning environmental and social management) Before construction complete the baseline measurements and surveys for key environmental topics (e.g. air, noise, water, biodiversity, road conditions, access arrangements, road conditions, access arrangements, etc.). During construction, the contractor will develop a monitoring plan for their specific sub-section(s) and PC Motorways will approve this plan. Key issues to be monitored include (but not limited to): air emissions, construction noise levels, water quality, habitat clearance, erosion, grievances, haulage routes, etc. During operation, key issues to be monitored include (but not limited to): noise levels (upon complaints), effluent quality, soil contamination, wildlife passes, animal carcass, etc. Monitor stakeholder engagement and grievance management throughout all All environmental and social effects appropriately monitored PR 1 PR 10 Responsibility: control, monitor and ensure implementation. Contractor is responsible to organise monitoring (a third party consultant may be hired). Internal Contractor resources, external resources (consultants, laboratories, etc.). Prior to construction: baseline monitoring and monitoring plans prepared. During construction: Monitoring plan implemented During operation: Monitoring plan implemented Monitoring plans documented and updated Monitoring results published Report on updates in AESR to EBRD 5

phases of the project. PC Motorways has to make publicly available the key monitoring results of the project. PR 2 Labour & Working Conditions 2.1 Assess accommodation needs for non-local workers and any required worker camps to be developed in-line with international good practice. Including: Workers accommodation processes and standards, EBRD/IFC Guidance Note, 2009. Managing impacts associated with influx of workers Ensuring adequate working conditions PR 2 and PR 4 Responsibility: Contractor Costs for worker accommodation Pre-construction phase. Limited number of grievances from community members, employees. 2.2 Ensure that the conditions of contract with Contractor meet EBRD PR 2 in relation to labour standards. The Contractor will ensure that sub-contractors/suppliers apply the same standards. Ensuring that the Project is implemented in line with EBRD s PRs PR 1 PR 2. In house resources Pre-construction During construction Report on performance of contractors in AESR to EBRD. PC Motorways will monitor contractor E&S performance including implementation of PR 2 standards by carrying out regular site visits. PR 3 Resource Efficiency and Pollution Prevention and Control 3.1 Implement existing Solid Waste Management Plan (given as Annex to national EIA Studies). Require from Contractors to develop and implement comprehensive Construction and Demolition Waste Management Plans for both sections. Soil and water pollution prevention, reduction of GHG emission National environmental and solid waste management laws and PR3 Responsibility: Construction and Demolition Waste Management Plans will be developed by Contractor. PC Motorways will carry out supervision of implementation. In house or Consultant support Before construction commences, Contractor has to develop Plans which have to be approved by PC Motorways. Contractor to implement all Plans during construction. Construction and Demolition Waste Management Plans documented Report on updates in AESR to EBRD 3.2 Construct drainage systems in line with Wastewater National Responsibility: Contractor During construction Drainage system in 6

final design. Any breaches of chloride discharge limits are to be noted and investigated. pollution control environmental and water laws and PR3 Costs for worker accommodation place and operational, discharge wastewater quality in line with national wastewater discharge limits. 3.3 Undertake an Initial Screening Assessment (following EBRD GHG Guidance) to determine if a GHG Assessment is required as it is not mandatory for all road schemes. Promotion of reduction of GHG emission. PR 3 In house or Consultant support Pre-construction phase. Initial Screening Assessment Report sent to EBRD PR 4 Health and Safety 4.1 Develop and implement an occupational health and safety management system in accordance with OHSAS 18001 standard in 2017 Improvement of HS management through a formalised system PR 4 In house and external consultant support Preferably prior to construction Implemented HSMS, certified to OHSAS 18001 4.2 complete a Road Safety Audit (RSA) in accordance with the EU Directive on Road Infrastructure Management. Following the RSA there should be mandatory inclusion of economically viable safety improvements into the design. Road Safety Audit will be conducted by a certified auditor. Where the road safety auditor recommendations are not implemented, the reason why each recommendation has been declined needs to be confirmed to the Bank. A road safety inspection shall be carried out on road once operational, and if appropriate action plans developed for low cost remedial road safety measures. Health and safety risks for consumers addressed in the design and operational phase Reduction of accident risks and improved road safety. PR 4, EU Directive on Road Infrastructure Safety Management (2008/96/EC) In house resources, external resources as appropriate (consultants, designers, etc.). Prior to commissioning of motorway sections Documented Road Safety Audit Report in AESR to EBRD 7

4.3 ensure that the Contractor establishes a Health and Safety Management Plan with special focus on (but not limited to): unexploded ordnances, movement of vehicles and traffic management, working at heights, working in confined spaces, working with hazardous material (e.g. explosives), management of electrical hazards, prevention of unintended ground movements and collapse, and biological hazards (poisonous snakes). Safe working environment and improved HS performance of contractors PR 4 Responsibility: Contractor In house or Consultant support Before construction commences the Plan must be approved by PC Motorways and Local H&S Authorities. Documented HS Plan Safety statistics and data report on updates in AESR to EBRD. Develop a Hazardous Materials Safety Plan as part of the H&S Plan. Include contractual conditions to ensure that all sub-contractors follow and implement the H&S Plan. 4.4 Health & Safety Operation Management Plan will have to clearly describe the HS requirements for both the Company and the sub-contractor s personnel during the road operation and maintenance. It should include (but not be limited to): hazardous materials management, traffic accidents, working at heights, working in confined spaces, electrical hazards, etc. Safe working environment and improved HS performance of contractors PR 4 In house or Consultant support Before operation phase Documented HS Plan Safety statistics and data report on updates in AESR to EBRD. Include contractual conditions to ensure all sub-contractors follow the H&S Operation Plan. 4.5 ensure that the Contractor develops and implements an Adequate emergency Responsibility: Contractor In house or Before construction commences the Plan Documented Emergency 8

Emergency Preparedness and Response Plan. response. PR 4 Consultant support must be approved by PC Motorways Preparedness and Response Plan report on updates in AESR to EBRD. 4.6 Construct all noise barriers foreseen in the Main Design for both sections Investigate and assess any complaints made to them in relation to noise or dust nuisance, both during construction and operation Health and safety of local communities PR 4 Responsibility: Contractor included in bid price During construction report on updates in AESR to EBRD. PR 5 Land Acquisition, Involuntary Resettlement & Economic Displacement 5.1 Update the Resettlement and Compensation Framework (RCF) from March 2009 and the PC Motorways Procedure for Managing Expropriation of Immovable Assets (November 2013), to reflect amendments in national legislation, particularly the Expropriation Law, as well as the new EBRD Policy from 2014. Update the RCF to fully comply with 2014 EBRD E&S policy PR 5 and PR 10. The revised framework should: Include detailed requirements for grievance management. Include updated information on consultations. Ensure that displacement is avoided or minimised. Reconsider the cut-off date for eligibility, compensation and assistance principles, as well as the timing of compensation and potential displacement resulting from use Management of displacement impacts. Ensuring that land acquisition and displacement are addressed as required under PR 5. PR 5 In house and Consultant support Prior to loan effectiveness Updated RCF approved by EBRD. Report on implementation in AERS to EBRD. 9

PR 6 restrictions. Retention of records relating to any disputes. Completion audit to be carried out. The updated RCF is to be publicly disclosed. Biodiversity and Living Natural Resources 6.1 Vegetation clearance activities to be restricted to the winter period (from 1st December to 28th February). Cutting of vegetation at other times of year should be done only for maintenance purposes and should be kept to a minimum to avoid disturbance of potential nesting sites. Avoiding destruction of nests PR 6, EU Birds Directive Responsibility: PC Motorways/Contractor Internal resources To be completed before the construction phase Documented by report on updates to EBRD. 6.2 Re-cultivation with indigenous plant species Ensuring successful re-cultivation in order to prevent erosion and support biodiversity Ensuring new nesting sites for common nightingale PR 6, EU Habitats Directive Responsibility: PC Motorways/Contractor Internal resources To be completed before the operational phase as soon as all construction machinery is moved from the construction site Documented by report on updates to EBRD. 6.3 share with Contractor the list of bird nesting sites as well as list of indigenous plant species prepared during rapid biodiversity assessment in the framework of the Project Ensuring successful re-cultivation in order to prevent erosion and support biodiversity Ensuring new PR 6, EU Habitats Directive Responsibility: PC Motorways Internal resources Prior to the construction phase Documented by report on updates to EBRD. 10

nesting sites for common nightingale 6.4 of measures for prevention of collision of birds with vehicles such as optical barriers or fences along the flyover sites and on bridges PR 8 Cultural Heritage 8.1 ensure the Contractor will develop and implement a Chance Find Procedure. This will include notification of competent authorities of found objects, alerting project personnel to the possibility of chance finds being discovered and preventing any disturbance or destruction. Ensuring no loss of animals on the road, as well as enhancing the safety of drivers Preservation on cultural heritage and minimising risks to archaeological remains. PR 6, EU Birds Directive PR 8 Responsibility: PC Motorways/Contractor Internal resources Responsibility: oversee. Contractor to develop. In house or external consultant support To be completed during construction phase, before the operational phase Prior to construction. To be implemented during construction. Documented by PC Motorways to report on updates to EBRD. Documented procedure report on updates in AESR to EBRD. PR 10 Information Disclosure & Stakeholder Engagement 10.1 Implement and regularly update the Stakeholder Engagement Plan (SEP), to ensure that all stakeholders are identified, that sufficient information about issues and impacts arising from the Project and proposed mitigation measures are disclosed in a timely manner and that all stakeholders are consulted in a meaningful and culturally appropriate way throughout project implementation. PC Motorways are to ensure that Contractor is involved in engagement with stakeholders and implements appropriate parts of the SEP. Management of risks and impacts on communities affected by the Project PR 1 and PR 10 Responsibility: PC Motorways and Contractor In house resources Pre-construction During construction During operation Stakeholder Engagement Plan in place prior to construction and regularly updated. Report on stakeholder engagement in AESR to EBRD Give clear responsibility for SEP 11

implementation. The responsible person will be assigned to the Department for Planning and Construction, which will coordinate activities of other departments, monitor implementation and report to PC Motorways management and EBRD. Determine whether any vulnerable / disadvantaged groups, including Vulnerable Road Users, or communities are likely to be disproportionately or permanently and adversely affected by the Project and identify and implement appropriate mitigation measures. 12