} SURVEY SR 429 STANDARD CLEARING & GRUBBING LIMITS OF FRICTION COURSE 8" 8" 8" 8" 12' VARIES 24'-36' VARIES VARIES * 4' SHLDR. PAVT.

Similar documents
PAVEMENT DESIGN MEMORANDUM

Plan Preparation Guide. Chapter 2. Typical Sections - Pavement Design

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

CHAPTER 3 SCOPE SUMMARY

B HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313

Design of rural and urban roads contributes a lot towards safety of users. Identify some low-cost

MISCELLANEOUS PAVING PROJECTS & SIGNAL INSTALLATION

LIST OF STANDARD DRAWINGS H2-2 - SERIES 2: Grading

ODOT District Roadway General Notes R401: LINEAR GRADING R402: ITEM RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS

TURNPIKE PLANS PREPARATION AND PRACTICES HANDBOOK (TPPPH) VOLUME 1

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

36 JASPER THPMAS ROAD CRAWFORDVILLE, FL.

CHESSIE BIKE-PED TRAIL - PHASE I TRUESDELL AVENUE TO KIAWANIS TELEDYNE PARK

Dial or (800)

LOCATION AND DESIGN DIVISION

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

Air Quality Analysis Technical Memorandum

Pavement Type Selection Report

2311 Egg Harbor Road Susan Shin-Angulo Lindenwold, NJ Freeholder Liaison Phone Fax

Black Creek Bridge Replacement FPN # USGS Topographic Quadrangle Map Clay County, Florida

IMPROVING I 81 IN MARYLAND

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

Value Engineering For Transportation Improvements. I-4 from 1 Mile East of State Road 434 to Volusia County Line

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

Value Engineering For Transportation Improvements. Interstate 4 from East of State Road 15/600 (US 17/92) to ½ Mile East of State Road 472

Construction Cost Estimation Preparation Manual (Metric Units)

B STEEL BEAM GUIDE RAIL - OPSS 552

B STEEL BEAM GUIDE RAIL - OPSS 721

CONCRETE CURB AND GUTTER

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST

313-1 HOT MIX ASPHALT - OPSS.PROV 313

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

WILL ROGERS TURNPIKE

CITY OF ANN ARBOR, MICHIGAN Public Services Area/Project Management Unit 301 E. Huron Street P.O. Box 8647, Ann Arbor, Michigan 48107

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION

Municipal DataWorks INVENTORY MANUAL for Municipal Transportation Networks

DRAFT AIR QUALITY TECHNICAL MEMORANDUM

Air Quality Analysis Technical Memorandum


B STEEL BEAM GUIDE RAIL - OPSS 721

CONCRETE BARRIER R-49-G TYPE A BARRIER MICHIGAN DEPARTMENT OF TRANSPORTATION 20'-0" MAXIMUM BETWEEN JOINTS 8'-0" TAPERED SECTION (SEE NOTES)

B HOT MIX ASPHALT - OPSS.PROV 313

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

FTBA 2018 Construction Conference Major Projects Update

CHAPTER 18 TEMPORARY ROADS AND BRIDGES

Roadway Profile Testing in North Carolina

THE GOLD STAR MEMORIAL HIGHWAY

FY 2019 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Value Engineering For Transportation Improvements. Interstate 4 from West of State Road 528 (Beachline) to West of State Road 435 (Kirkman Road)

5.0 Plan Development. 5.1 Introduction. 5.2 Design References

Chapter URBAN & RURAL FREEWAY DESIGN

313-1 HOT MIX ASPHALT - OPSS.PROV 313

I-35/I-80/Iowa 141 Interchange IJR and NEPA A Practical Approach to Resolving a Decades-Old Traffic Operations Challenge

Page 1D-1 Revised language to link from Project Management Manual to Project Management Online Guide.

TRANSPORTATION RESEARCH BOARD. Spatial Modeling for Highway Performance Monitoring System Data: Part 1. Tuesday, February 27, :00-4:00 PM ET

CONTRACT No.: E8M79 Date: 06/30/14 Page 1 of 5

LO R (CENTER RIDGE ROAD)

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No T-01 January 19, 2011

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING

CW 3240 RENEWAL OF EXISTING CURBS TABLE OF CONTENTS

B723 ENERGY ATTENUATORS - OPSS 723

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement


FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

B STEEL BEAM GUIDE RAIL - OPSS 721

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

ADDENDUM #4. WAKULLA COUNTY BOARD OF COUNTY COMMISSIONERS Invitation to Bid PROJECT NAME: New Light Church Road Widening and Resurfacing

B313-1 HOT MIX ASPHALT OPSS.PROV 313

49-2A Clear-Zone Width for New Construction or Reconstruction B Clear-Zone Adjustment Factor, K cz, for Horizontal Curve...

Select Subgrade Material, Compacted

Cold In-Place Recycling with Expanded Asphalt B-335 COLD IN-PLACE RECYCLING WITH EXPANDED ASPHALT OPSS 335

BRIDGE STANDARD PLANS AND SPECIAL DETAILS ADAM LANCASTER, P.E. FEB. 27, 2018

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

B351 - CONCRETE SIDEWALK - OPSS 351

ELEVATION PLAN HIGHWAY CLASSIFICATION

081 S-292 & 081 N

ANNUAL INSPECTION REPORT 2017 TABLE OF CONTENTS

Pavement Design Acronyms & Definitions

Community Advisory Committee Meeting No. 2. June 22, 2006

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

ADA Training Design Case Studies MnDOT

RESIDENTIAL DRIVEW AY APPROACH JOB NO. SHEET NO. DATE MARCH 2015 OF 2% MAX VARIES: 1% MIN TO 7% MAX EXISTING DRIVE EXIST. ROW PROPOSED 6" WALK

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

2017 Highway Safety Improvement Program Call

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION CONTRACT PLANS FINANCIAL PROJECT ID WASHINGTON COUNTY ( )

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019:

Intro. ADA Operations Contact Info

Nevada Department of Transportation. Road Design Guide Edition

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Table 8-2 Guidance for Landscape Plantings

CLA /10.54, PID Project Description:

St. Francis Drive through the City of Santa Fe Corridor Study

Transcription:

} SURVEY SR 429 { CONST. SR 429 (WEKIVA PKWY) R/W (15 MIN.) 0'-10.4' R/W (15 MIN.) STANDARD CLEARING & GRUBBING 24'-36' 24'-48' 94' BORDER (2-30.) (2-30.) 94' BORDER 10' 4' 10' NATURAL GROUND, MAX. CUT SLOPE DEPENDENT ON SOIL STABILITY & R/W CONSTRAINTS 3. 0'- 5 STABILIZATION FUTURE LANE 8' 6'- FUTURE WIDENING 1:10 GRADE POINT SINGLE FACE MISC. ASPHALT 1:10 6'- 8' STABILIZATION 0'-24' 5 FOR FILLS TO TO CZ & FOR FILLS TO 10' 2' 1:3 TO CZ & 1:3 FOR FILLS 10' TO 20' 1:3 (WITH AND 10' BENCH AT APPROX HALF THE HEIGHT OF FILL) FOR No. 1 SR 429 (WEKIVA PKWY) FILLS OVER 20' -AVOID 1:2 SLOPES EXCEPT WHERE IS NECESSARY WITH GROUND-IN RUMBLE STRIPS. GRADE POINT IS ATED AT THE THEORETICAL EOP OF THE FUTURE TRAVEL LANE. THE CROSS SLOPE OF THE FUTURE TRAVEL LANE IS THE SAME AS ADJACENT LANE ( ) STA. 1114+56.17 (BK) / STA. 1114+87.25 (AH) TO STA. 1217+80.71 (BK) / STA. 2169+83.96 (AH) 4-LANE URBAN EXPRESSWAY (1) THE AREA DISTURBED, 2' MIN. DS = 70 MPH SR 429 NEW CONSTRUCTION OPTIONAL BASE GROUP 10 TYPE SP STRUCTURAL (TRAFFIC D) (2 1/2") TYPE SP STRUCTURAL (TRAFFIC D) (1 1/2") (PG 76-22) (PMA) FRICTION FC-5 (3/) (PG 76-22) (PMA) TRAFFIC DATA ESTIMATED OPENING YEAR = 2020 AADT = 43,000 ESTIMATED DESIGN YEAR = 2040 AADT = 82,500 K = 9.00% D = 56.42% T = 10.52% (24 HOUR) DESIGN HOUR T = 7.72% DESIGN SPEED = 70 MPH SR 429 SHOULDER PAVEMENT TYPE SP STRUCTURAL (TRAFFIC D) (1 1/2") CERTIFICATE OF AUTHORIZATION : 24 P.E. : 43427 ROAD COUNTY FINANCIAL PROJECT ID 6 1:23:18 AM

EXIST. { CONST. & { SURVEY SR 417 EXIST. R/W (15 MIN.) R/W (15 MIN.) 24'-36' 30. 30. 24' STANDARD CLEARING & GRUBBING EXIST. SHLDR PAVEMENT MILLING & RESURFACING EXIST. SHLDR PAVEMENT MILLING & RESURFACING WIDENING 94' BORDER 8' 0'- 0'-24' 6' EXISTING 4' EXCEPT FOR UNDER 1:3 CONTROL POINT STABILIZATION SHOULDER GUTTER 2" MISC. ASPHALT UNDER 2' 1:3 WITH GROUND-IN RUMBLE STRIPS. No. 2 SR 417 FOR FILLS TO TO CZ & FOR FILLS TO 10' TO CZ & 1:3 FOR FILLS 10' TO 20' 1:3 (WITH AND 10' BENCH AT APPROX HALF THE HEIGHT OF FILL) FOR FILLS OVER 20' -AVOID 1:2 SLOPES EXCEPT WHERE NECESSARY STA. 1217+80.71 (BK) / STA. 2169+83.96 (AH) TO STA. 2198+78.76 MILLING AND RESURFACING 4-LANE URBAN EXPRESSWAY DS = 70 MPH MILL EXISTING ASPHALT PAVEMENT (2 1/) TYPE SP STRUCTURAL (TRAFFIC D) (1 1/2") (PG 76-22) FRICTION FC-5 (3/) (PG 76-22) SR 417 NEW CONSTRUCTION TRAFFIC DATA ESTIMATED OPENING YEAR = 2020 AADT = 43,000 ESTIMATED DESIGN YEAR = 2040 AADT = 82,500 K = 9.00% D = 56.42% T = 10.52% (24 HOUR) DESIGN HOUR T = 7.72% DESIGN SPEED = 70 MPH OPTIONAL BASE GROUP 10 TYPE SP STRUCTURAL (TRAFFIC D) (2 1/2") TYPE SP STRUCTURAL (TRAFFIC D) (1 1/2") (PG 76-22) FRICTION FC-5 (3/) (PG 76-22) SR 417 SHOULDER PAVEMENT TYPE SP STRUCTURAL (TRAFFIC D) (1 1/2") CERTIFICATE OF AUTHORIZATION : 24 P.E. : 43427 ROAD COUNTY FINANCIAL PROJECT ID 7 1:23:19 AM

} SURVEY SR 400 } CONST. WB SR 400 (I-4) { CONST. FUTURE EXPRESS LANES } CONST. EB SR 400 (I-4) R/W (150' MIN.) 0'-89' R/W (150' MIN.) } CD ROAD (OO1) STANDARD CLEARING AND GRUBBING 94' BORDER () 36' I-4 (WB) 36' - 48' GUL I-4 (EB) 36' - 48' GUL 94' BORDER () (1 MIN.) TRAFFIC RAILING 0'- 9' 10' SHLDR PGL 2' DEPTH AND WIDTH VARY SEE CROSS SECTION 11' 11' SHLDR PGL 1' 0.04 0'- (1 MIN.) TRAFFIC RAILING 10' () () RETAINING WALL SYS. () CONC. CAP AND GRANULAR FILL MEDIAN BARRIER WALL (4' MIN.) FULL DEPTH 24'EL (4' MIN.) FULL DEPTH 24' EL RETAINING WALL SYS. () 3' DEPTH AND WIDTH VARY SEE CROSS SECTIONS 10' 10' WITH GROUND IN RUMBLE STRIPS MEDIAN SHOULDERS TO BE SAME PAVEMENT AS ROADWAY MEDIAN BARRIER WALL FUTURE STABILIZATION (1) THE AREA DISTURBED, 2' MIN. CD ROAD (001) STA. 134+1 TO 214+90.00 3-LANE URBAN CD ROAD DS = 55 MPH No. 3 SR 400 (INTERSTATE 4) WB: STA. 2037+10.37 TO 2134+05.54 EB: STA. 1023+90.67 TO 1134+70.47 6-LANE URBAN FREEWAY DS = 70 MPH SR 400 & CD ROAD NEW CONSTRUCTION OPTIONAL BASE GROUP 10 TYPE SP STRUCTURAL (TRAFFIC E) (2") (PG 76-22) TYPE SP STRUCTURAL (TRAFFIC E) (1 1/2") TYPE SP STRUCTURAL (TRAFFIC E) (1 1/2") (PG 76-22) FRICTION FC-5 (3/) (PG 76-22) TRAFFIC DATA ESTIMATED OPENING YEAR = 2020 AADT = 159,000 ESTIMATED DESIGN YEAR = 2040 AADT = 207,000 K = 9.00% D = 54.30% T = 9.00% (24 HOUR) DESIGN HOUR T = 7.72% DESIGN SPEED = 70 MPH SR 400 & CD ROAD SHOULDER PAVEMENT OPTIONAL BASE GROUP 6 TYPE SP STRUCTURAL (TRAFFIC E) (1 1/2") CERTIFICATE OF AUTHORIZATION : 24 P.E. : 43427 ROAD COUNTY FINANCIAL PROJECT ID 8 1:23:19 AM

} RAMP STANDARD CLEARING AND GRUBBING FRICTION SELECTIVE CLEARING AND GRUBBING 10' STD. C & G R/W (94' ) (( + 10') MIN.) 4 6' 6' 2' 4' 1 GRADE POINT 6' () 6' () 3. RAMPS: "OO3" (STA. 10+00.00 TO 61+73.58) "OO (STA. 5+70.01 TO 35+45.62) "HH1" (STA. 10+00.00 TO 56+85.79) "HH2" (STA. 10+00.00 TO 20+57.78) "LL1" (STA. 10+00.00 TO 60+40.72) "LL2" (STA. 10+00.00 TO 54+54.22) "LL3" (STA. 8+68.82 TO 50+98.35) "MM1" (STA. 8+00.35 TO 24+19.22) "MM1" (STA. 42+08.43 TO 81+36.94) FOR FILLS TO TO CZ & FOR FILLS TO 10' STABILIZATION "MM2" (STA. 11+23.14 TO 35+65.28) "NN2" (STA. 10+00.00 TO 56+26.89) TO CZ & 1:3 FOR FILLS 10' TO 20' 1:3 (WITH AND 10' BENCH AT APPROX HALF THE HEIGHT OF FILL) FOR FILLS OVER 20' -AVOID 1:2 SLOPES EXCEPT WHERE NECESSARY "GG" (STA. 10+00.00 TO 40+04.15) "RR" (STA. 10+00.00 TO 18+10.78) SINGLE LANE RAMP DS = 35-50 MPH (1) THE AREA DISTURBED, 2' MIN. CONC. BARRIER & RETAINING WALL SYSTEM NEW CONSTRUCTION OPTIONAL BASE GROUP 11 TYPE SP STRUCTURAL (TRAFFIC C) (3") FRICTION FC-5 (3/) (PG 76-22) SHOULDER PAVEMENT TYPE SP STRUCTURAL (TRAFFIC C) (1 1/2") CERTIFICATE OF AUTHORIZATION : 24 P.E. : 43427 ROAD COUNTY FINANCIAL PROJECT ID 9 1:23:20 AM

} RAMP STANDARD CLEARING AND GRUBBING FRICTION SELECTIVE CLEARING AND GRUBBING 10' STD. C & G R/W (94' ) 8' 24' (( + 10') MIN.) 4' 10' GRADE POINT FOR FILLS TO TO CZ & FOR FILLS TO 10' TO CZ & 1:3 FOR FILLS 10' TO 20' 1:3 (WITH AND 10' BENCH AT APPROX HALF THE HEIGHT OF FILL) FOR FILLS OVER 20' -AVOID 1:2 SLOPES EXCEPT WHERE NECESSARY 10' () STABILIZATION () 3. 5 RAMPS: "MM1" (STA. 24+19.22 TO 42+08.43) "MM3" (STA. 10+00.00 TO 90+47.43) "NN1" (STA. 10+00.00 TO 76+94.13) "OO2" (STA. 10+00.00 TO 26+79.84) "CR 46A" (STA. 10+00.00 TO 43+32.21) (1) THE AREA DISTURBED, 2' MIN. CONC. BARRIER & RETAINING WALL SYSTEM TWO LANE RAMP DS = 35-50 MPH NEW CONSTRUCTION OPTIONAL BASE GROUP 11 TYPE SP STRUCTURAL (TRAFFIC C) (3") FRICTION FC-5 (3/) (PG 76-22) SHOULDER PAVEMENT TYPE SP STRUCTURAL (TRAFFIC C) (1 1/2") CERTIFICATE OF AUTHORIZATION : 24 P.E. : 43427 ROAD COUNTY FINANCIAL PROJECT ID 10 1:23:20 AM

{ CONST. SR 429 (WEKIVA PKWY) R/W (15 MIN.) R/W (15 MIN.) 101' BORDER 192' (MAXIMUM SPAN) 101' BORDER TOLL EQUIPMENT BUILDING CONCRETE BARRIER WALL FUTURE LANE GRADE POINT FUTURE LANE CONCRETE BARRIER WALL FUTURE WIDENING 1:10 1:10 NATURAL GROUND STABILIZATION SINGLE FACE STABILIZATION 2' 1:3 MSE WALL MAINTENANCE PULL OFF AREA No. 6 SR 429 (WEKIVA PKWY) GANTRY ATION STA. 1118+50.00 TO STA. 1119+50.00 FOR FILLS TO TO CZ & FOR FILLS TO 10' TO CZ & 1:3 FOR FILLS 10' TO 20' 1:3 (WITH AND 10' BENCH AT APPROX HALF THE HEIGHT OF FILL) FOR FILLS OVER 20' -AVOID 1:2 SLOPES EXCEPT WHERE IS NECESSARY 4-LANE URBAN EXPRESSWAY DS = 70 MPH WITH GROUND-IN RUMBLE STRIPS. (1) THE AREA DISTURBED, 2' MIN. SR 429 NEW CONSTRUCTION (MAINLINE AND SHOULDER) OPTIONAL BASE GROUP 11 (7") ( 12.5) TYPE SP STRUCTURAL (TRAFFIC D) (2") (PG 76-22) TYPE SP STRUCTURAL (TRAFFIC D) (2") (PG 76-22) FRICTION FC-12.5 (1 1/2") (PG 76-22) CERTIFICATE OF AUTHORIZATION : 24 P.E. : 43427 ROAD COUNTY FINANCIAL PROJECT ID 11 1:23:21 AM

EXIST. R/W LINE { CONSTRUCTION EXIST. R/W LINE R/W (75 MIN.) R/W (75 MIN.) 4' MILLING & RESURFACING 28' 32'-44' WIDENING (0'-) MILLING & RESURFACING 28' WIDENING (0'-) 4' 2' LEVEL 6' CONTROL POINT CONTROL POINT NATURAL GROUND 0.04 0.04 NATURAL GROUND CURB & GUTTER TYPE E STABILIZATION ( THICK) No. 7 INTERNATIONAL PARKWAY STA. 99+70.36 TO STA. 118+36.42 4-LANE URBAN ROAD DS = 45 MPH CURB & GUTTER TYPE F CONCRETE SIDEWALK 1:2 OR TO SUIT PROPERTY OWNER, NOT FLATTER THAN (1) IF LIMITS OF CONSTRUCTION EXCEED RIGHT OF WAY A PROPERTY AGREEMENT IS REQUIRED. WIDENING OPTIONAL BASE GROUP 9 TYPE SP STRUCTURAL (TRAFFIC C) (2") FRICTION FC-12.5 (TRAFFIC C) (1 1/2") (PG 76-22) MILLING AND RESURFACING MILLING EXISTING ASPHALT PAVEMENT (1 1/2") FRICTION FC-12.5 (TRAFFIC C) (1 1/2") (PG 76-22) CERTIFICATE OF AUTHORIZATION : 24 P.E. : 43427 ROAD COUNTY FINANCIAL PROJECT ID 12 1:23:22 AM

R/W (62. MIN.) R/W LINE LIMITS OF CONSTRUCTION LIMITS OF CONSTRUCTION STANDARD CLEARING AND GRUBBING { CONST. METZ AVE. 10' 10' GRADE POINT 2' MIN. 3' 2' MIN. 2. STABILIZATION (1) THE AREA DISTURBED, 2' MIN. DEPTH AND WIDTH VARY SEE CROSS SECTIONS 8 METZ AVE. STA. 5+09.51 TO STA. 11+55.72 2-LANE RURAL ROAD DS = 25 MPH NEW CONSTRUCTION OPTIONAL BASE GROUP 9 TYPE SP STRUCTURAL (TRAFFIC C) (2") FRICTION FC-12.5 (TRAFFIC C) (1 1/2") (PG 76-22) SHOULDER PAVEMENT TYPE SP STRUCTURAL (TRAFFIC C) (1 1/2") CERTIFICATE OF AUTHORIZATION : 24 P.E. : 43427 ROAD COUNTY FINANCIAL PROJECT ID 13 1:23:29 AM