Creative Engineers, Inc. Alkali Metal Experience

Similar documents
Radioactive Sodium Waste Treatment and Conditioning

U. S. DOE Experience with D&D of EBR-2 and FFTF. Andrew Szilagyi. US Department of Energy Office of Environmental Management

Expert Panel on Monju Decommissioning 6 th March 2018

How are Industry Standards, Engineering Codes, Best Management Practices and Other Measures of Compliance Being Met by Facilities?

RANCHO SECO TRANSITION TO FULL DECOMMISSIONING. Dennis E. Gardiner, Decommissioning Project Manager, SMUD John M. Newey, CHP, President, NewRad, Inc.

BHS-FILTRATION INC. BHS VACUUM BELT FILTER, CANDLE & PRESSURE PLATE FILTER TECHNOLOGIES FOR BIO-ENERGY APPLICATIONS

Waste Management Idaho Lessons Learned

Fast Reactor Operating Experience in the U.S.

Module 4 : Hydrogen gas. Lecture 29 : Hydrogen gas

Rocketdyne Liquid Metal and Molten Salt Component Development and Test History

Health Physics Aspects Of Processing EBR-I Coolant

Electricide HG Electrochemical Chlorine Generators

FFTF DECOMMISSIONING. FFTF Decommissioning Alternative 1: No Action. FFTF Decommissioning Alternative 2: Entombment

WM 03 Conference, February 23-27, 2003, Tucson AZ MLW, TRU, LLW, MIXED, HAZARDOUS WASTES AND ENVIRONMENTAL RESTORATION

GENERAL COMPANY FOR CHEMICAL INDUSTRIES

REVERSE OSMOSIS WATER TREATMENT

International Process Plants

BIO-WASTE SYSTEMS. Thermal & Chemical Effluent Kill Systems. Biotech & Pharmaceutical. Batch Process Systems. Continuous Process Systems

Custom Systems Built to Exacting Client Specification

Handling of Specific Chemicals

APPENDIX A OVERVIEW OF THE PUBLIC PARTICIPATION PROCESS

DOE Environmental Management Clean Up Focus for FY

Corrosion in GASCO Habshan CBA Units and its mitigation

Standard Operating Procedure PCB Fluorescent Light Ballast Management

The Benefits of Removing Oil from Water

The US Fast Breeder Reactor Development Programme

UNIT-5 NUCLEAR POWER PLANT. Joining of light nuclei Is not a chain reaction. Cannot be controlled

NaK HANDLING AND REMOVAL. Jacqueline DESREUMAUX, Grilles RODRIGUEZ, Alain GUIGON, Janick VERDELLI, Georges THOMINE,

Technology Development Opportunities. Elizabeth Phillips, Oak Ridge Office of Environmental Management

Valve Nest Filter with Time Clock Control Installation and Operation Manual

UTILIZING NON-REAL PROPERTY TO LEVERAGE CLEANUP ACTIVITIES AT U.S. DEPARTMENT OF ENERGY SITES

The Risk, Reality and Future of Nuclear Power. Gregory Jaczko April 17, 2015

PROCESS OPERATIONS. Introduction to Operations. Diagrams for the Operating Unit. Revised 11/30/18 1

Summary Description of FFTF Decommissioning Alternatives

2. Inventory of wastes you want to dispose of at this collection event

EXPERIMENTAL BREEDER REACTOR NUMBER I, EBR- I CRITICALITY ACCIDENT

ELEC / ELEX COMMITTEE Fiber Optic Component; remove, relocate, repair, and install Electronic Equipment; repair Rotating

Molten Salt Reactor Technology for Thorium- Fueled Small Reactors

Profile SFR-52 SWAT JAPAN. Japan Atomic Energy Agency, 4002 Narita, Oarai-machi, Ibaraki, Japan.

WASTE MANAGEMENT PROGRAM

Oregon State University s Small Modular Nuclear Reactor Experimental Program

The BN-350 sodium-cooled fast reactor was an industrial-scale

BN-1200 Reactor Power Unit Design Development

Profile SFR-42 SGTF INDIA EXPERIMENTAL FACILITIES FOR THE DEVELOPMENT AND DEPLOYMENT OF LIQUID METAL COOLED FAST NEUTRON SYSTEMS

CONTENTS CO-GENERATING WATER-DESALINATING FACILITY POWERED BY SVBR-75/100 NUCLEAR REACTOR DESIGN ORGANIZATIONS INVOLVED IN THE PROJECT

Nuclear Hydrogen for Production of Liquid Hydrocarbon Transport Fuels

SODIUM SULPHITE BASED WATER TREATMENT PROGRAM FOR CLOSED CHILLED WATER SYSTEMS

Organizational and Managerial Aspects of Decommissioning after an Accident

Automated Pure Water. Model 400 Non-Electric Dry Chlorine Pellet Feeder. Installation & Operation Information

Preparedness at PFBR Kalpakkam to meet the challenges due to Natural events Prabhat Kumar, Project Director, PFBR, Director construction BHAVINI

Asphalt-Rubber Blending Systems

Taravosh Jam Design & Engineering Co.

Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development

Agricultural Demand for Sulphur

Problems at the Cumene Production Facility, Unit 800

Copyright 2016 ThinkReliability. How a Reactor Works

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

METHODOLOGY FOR ENSURING THE INTEGRATION OF ALARA INTO THE DESIGN OF

Presentation Outline. Basic Reactor Physics and Boiling Water Design Sequence of Events Consequences and Mitigation Conclusions and Lessons Learned

Welcome! Water & Wastewater Utility Operation and Management for Tribes

A High Temperature Gas Loop to Simulate VHTR and Nuclear Hydrogen Production System

James D. Kopotic United States Department of Energy Oak Ridge Office P.O. Box 2001 Oak Ridge, TN

CO 2. Recovery AND PRODUCTION

A-2. An Inherently Safer Process Checklist

Experimental and Analytical Results on H 2 SO 4 and SO 3 Decomposer for IS Process Pilot Plant

CENTRIFUGAL SEPARATORS FOR INDUSTRIAL APPLICATIONS

Replacement Works for the Steam Generator and the Reactor Pressure Vessel Upper Head

Cleaning and Sanitizing

REACTION TANKS WATER PURIFICATION THROUGH SERVICE DEIONIZATION

THE AMERICAN REINVESTMENT AND RECOVERY ACT: U.S. DEPARTMENT OF ENERGY ENVIRONMENTAL CLEANUP OPERATIONS

Overview of Hanford Site Risk Assessment to Support Cleanup Decision Making

WASTE MINIMIZATION WITH POROUS METAL BACKWASH FILTERS

Current Situation of Fukushima- Daiichi Nuclear Power Plants and Difficulties in the Defueling Plan

Case Study of Lessons Learned from the Operation of the Fast Flux Test Facility

ROTOFORM-----PASTILLATION FOR----SULPHUR BENTONITE

Technical Information on the Carbonation of the EBR-II Reactor

CURRENT STATUS ON FAST REACTOR PROGRAM IN KAZAKHSTAN

DURING T H E M O S T recent planned

SYNTHETIC NATURAL GAS PLANT. Philadelphia, PA

REQUEST FOR PROPOSALS DESAL ANTISCALANT/CLEAN-IN-PLACE CHEMICALS BID NO: ADDENDUM 1

Waste Management for Decommissioning of Nuclear Power Plants An EPRI Decommissioning Project Report

The Westinghouse Advanced Passive Pressurized Water Reactor, AP1000 TM. Roger Schène Director,Engineering Services

Overview of Distillation Techniques and Process in Recovery and Reuse of Volatile Liquids

ZERO Pollution Discharge

Lessons learned from ongoing decommissioning project of Fugen NPS

CLOSING ROCKY FLATS BY

INDUSTRIAL SEPARATE BED DEIONIZER. FDI Series. High Purity Industrial Packaged System

Electricide CDE Electrochemical Chlorine Dioxide Generators

Mitton Industrial Cavitation Reactor Systems. Using Cavitation to Reclaim our World s Water

NAVSEA STANDARD ITEM NUMERICAL INDEX

PRESENTATION OF NUCLEAR APPLICATIONS OF CONDENSATE TREATMENT

50 Years of PSA Technology for H2 Purification

Nuclear Fuel Cycle Technologies for Long-term Stable Energy Supply

ENGINEERING CHALLENGES FROM THE LAB TO FACILITY

Integrated Process Engineers & Constructors, Inc.

DECOMMISSIONING STRATEGIES AND PLANS. By: Elna Fourie Necsa South Africa Manager: Decommissioning Services

Cook Nuclear Plant Unit 1 - Event and Recovery

Chlorine Scrubbing: Conversion from Batch to Continuous. Brent Hardman, P.E. Powell Fabrication & Mfg., Inc.

IAEA-TECDOC-1769 IAEA-TECDOC-1769

Governor s Pollution Prevention Award, 1999 Recipient American Electric Pow River Plant

Transcription:

Creative Engineers, Inc. Phone 443-807-1202 15425 Elm Dr. New Freedom, PA info@creativeengineers.com www.creativeengineers.com Creative Engineers, Inc. Alkali Metal Experience Background of Creative Engineers, Inc. Creative Engineers, Inc. (CEI) was formed in 1996 as a chemical process engineering company specializing in alkali metals. The founders of Creative Engineers, Richard VanLieshout and Kevin Berry, have extensive experience with potassium, sodium, NaK (sodium potassium alloy), and potassium superoxide because of their work at Callery Chemical Company (now a division of BASF), where they were responsible for the engineering and operations of all alkali metal processing areas. Callery Chemical Company (now BASF) is the world s largest manufacturer of all of these products (NaK, potassium and potassium superoxide). Seeing a need for specialized alkali metal engineering, Creative Engineers was formed. CEI s engineers have over 50 years combined experience working with NaK, sodium, potassium, and potassium superoxide as process engineers, project engineers, manufacturing managers and engineering managers. Early Projects Enrico Fermi (EF-1), Breeder Reactor, Primary and Secondary Systems Cleanout 1997-2008 CEI supported Detroit Edison Company in reacting sodium and NaK residues and other un-drainable pools and accumulations throughout the whole of the Enrico Fermi 1(EF-1) breeder reactor system. EF- 1, a 400 MW demonstration breeder reactor, was shut down in the early 1970 s and the bulk of the primary and secondary sodium and NaK was removed in the 1970 s and 1980 s and taken to other sites for future potential re-use. Components of the primary and secondary systems included the defueled nuclear reactor vessel, primary and secondary reactor pumps, intermediate heat exchangers, steam generators, two large secondary cold traps, six large bulk sodium storage tanks plus a myriad of auxiliary support systems containing sodium and NaK pools and residues. All equipment and systems have been cleaned and rendered sodium and NaK free. The large reactor vessel cleaning was completed in May 2008. All sodium reaction/passivation work was completed using the superheated steam process except for one small NaK auxiliary system. The NaK system was processed using a water vapor nitrogen (WVN) process.

This project illustrates CEI s long time experience with sodium and NaK deactivation work in the nuclear industry, and demonstrates the effectiveness of superheated steam for processing a myriad of equipment types. One of the highlights of the extended project was CEI s processing of two large (700 to 900 gallon) cold traps using melt-drain followed by a heat soak then superheated steam processing and flooding of the vessels with water. Oak Ridge Explosion NaK Cleanup 2000 A violent explosion occurred in the Arc Melt furnace at Oak Ridge s Y-12 facility in Oak Ridge, Tennessee. The explosion resulted when a force was applied to an accumulation of spilled sodium-potassium alloy (NaK), mineral oil and potassium superoxide lying at the bottom of the furnace. Several serious injuries occurred and a DOE Type A investigation was completed by DOE. After the Type A accident investigation was completed, CEI was contracted to, Stabilize the existing situation after the explosion, to assure that no further explosions could occur. This included remediating existing shock-sensitive mixtures. Completion of this activity allowed portions of the area to be re-opened to resume critical production operations which had been suspended for over a year. Safely react all remaining NaK liquid (approximately 1,400 pounds) at the Oak Ridge site. The NaK had been used for two different systems in the Y-12 Arc Melt area. Safely react all remaining NaK residues in the existing tanks, piping, cold traps, vessels, pumps, heat exchangers, and other equipment from the two systems. Chemically decontaminate the Arc Melt area (floors, walls ceiling, overhead cranes, etc.) that were splashed with debris from the explosion. Suspected chemicals in the debris included caustic (sodium and potassium hydroxides), un-reacted NaK, mineral oil, and possibly potassium superoxide. Included in the equipment was a small (15 to 20 gallon) cold trap which was also cleaned. The project work was completed safely and thoroughly to the customer s satisfaction.. CEI was nominated for Small Business Contractor of the Year, and received the Administrator s Award of Excellence for this project. The project illustrates CEI s unique experience with NaK and potassium superoxide. CEI founders were previously responsible for all NaK, potassium, and potassium superoxide manufacturing and design work while working for Callery Chemical Company (now BASF), the world s largest manufacturer of all of these Page 2 of 8

products. One of the reasons CEI was selected for this project was because of their extensive experience with NaK and potassium superoxide. All NaK processing activities were accomplished using superheated steam. Other Nuclear, DOE and NASA Alkali Metal Projects CEI has extensive experience working with nuclear facilities, primarily in the area of remediating alkali metals from breeder reactor systems. In addition to the two projects listed above, Creative Engineers has worked with the following customers in a variety of deactivation and decontamination projects. NASA, Marshall Space Flight Center o Design and fabrication of a skid-mounted alkali metal purification system o Design and construction of a customized small superheated steam system for decontamination and deactivation of alkali metal contaminated systems o Training of NASA technicians in safe handling of NaK. FFTF Hanford Nuclear Facility o Reaction of remaining sodium in their CRCTA vessel, a 55K gallon reactor mock-up o Processing and cleanup of a fully loaded sodium cold trap and its economizer o Processing and cleanup of remaining sodium residues in two vapor traps o Processing and cleanup of remaining NaK from a large auxiliary cooling loop o Design of two skid mounted systems that the FFTF facility will use for the final sodium cleanup at Hanford when funding is resumed Page 3 of 8

o Design, fabrication and operation of a unique alternating pressure/vacuum pump for removing the last quantities of sodium from the FFTF reactor. No other company provided a viable design. Oak Ridge National Laboratory o Full draining and destruction of the contained NaK from a SNAP nuclear reactor that was taken out of service but still loaded with nuclear fuel o Training of ORNL workers in the safe handling of NaK. Page 4 of 8

Oak Ridge ETTP 2006 o Cleanup of sodium spill and associated caustic spill from a protective shield that occurred when a previous contractor preformed the work incorrectly. o Some sodium was treated on-site and remaining spill materials were packaged into drums for customer disposal at a later date. SEFOR 2011 and 2017 o First contract was for sodium passivation of secondary side sodium storage tanks, equipment, piping, and other components for the experimental fast breeder reactor in West Fork, Arkansas. o Second contract was for sodium passivation of the reactor itself, along with primary side heat exchangers, sodium storage tank, piping, and other components. Argonne National Laboratory o Cleanup of remaining lithium and NaK from several components. UKAEA, United Kingdom o Conducted demonstration tests for processing bulk and residual quantities of NaK, converting them to sodium and potassium hydroxides. Page 5 of 8

Commercial Alkali Metal Experience CEI has completed a significant amount of work with alkali metals for non-nuclear applications. Listed below is a brief description of other projects that CEI has led or participated in. Australia Magnesium Corporation o Drained a large sodium heat transfer system and reacted residual quantities of sodium from a complex network of sodium contaminated piping, tanks, and heat exchangers using superheated steam processing. ASARCO o CEI cleaned (reacted to sodium hydroxide) the contents of a large storage tank bearing approximately 6,000 pounds of sodium metal using the superheated steam process SARA, Inc. (Scientific Applications and Research Associates Inc.) o Worked with SARA, Inc. to test a system to convert ocean wave energy to electricity, using magneto hydrodynamics (MHD) generators that use NaK as the working fluid. Dow Chemical Company o NaK was used as a catalyst to produce specialty rubbers. When the system was shut down, CEI reacted the remaining NaK and NaK residues to form hydroxides to clean out the system of tanks and pipe lines. ExxonMobil Company o CEI completed the final deactivation of suspected accumulation of sodium catalyst in a very large chemical storage tank. Nanoscale Products (NSP) o CEI has designed built feed systems for feeding sodium as a raw material for production of high value metals on the R&D scale. Recovery work often involved high temperature (1000 C) sodium removal techniques and equipment. Sodium Methylate o CEI has designed complete systems for making sodium methylate. Designs have included sodium handling, raw material storage, reaction system and product handling. Worldwide sodium methylate production has increased recently because of its pre-eminent use as the catalyst to make biodiesel. CEI has designed both batch and continuous processing techniques. Because of customer concerns for confidentiality, customer identities are not listed here. KMR Industries o Installation and operation of a unit for manufacturing sodium dispersion on CEI s plant site in New Freedom, PA. Page 6 of 8

o Creative Engineers, Inc., as part owner of KMR Industries, has operated the production facility for manufacturing sodium dispersion for over fifteen years. Sodium dispersion is primarily used in the treatment and remediation of PCBs (polychlorinated biphenyls). Sodium Handling Equipment o Design and manufacturing of specialty electromagnetic pumps and flow meters o Design and fabrication of a mobile, skid-mounted alkali metal destruction system which CEI takes to customer sites for on-site sodium and NaK treatment with superheated steam. Callery Chemical Company o Designed, installed and implemented a bulk NaK production facility which allowed Callery to increase the commercial supply for NaK, and improved the quality such that all NaK met high purity standards. o Designed, installed and implemented a system for safe deactivation of alkali metals (potassium, sodium and NaK) by reaction with steam to produce potassium and sodium hydroxides and hydrogen. The system was used to react alkali metals in vessels, drums and shipping cylinders to effect a thorough reaction of the alkali metal. This system has been safely used for 20+ years for cleanout of alkali metals with excellent reliability. o Upgraded an existing facility for production of potassium metal from 2,000 pounds per day to in- excess-of 10,000 pounds per day. o Designed installed and implemented an upgraded system to manufacture potassium superoxide using potassium as the primary raw material. The system has been used for over 20 years to produce up to 600 tons per year of potassium superoxide. o Redesigned the commercial potassium and NaK production facilities to eliminate > 99% of the impurities. This resulted in commercial grade potassium and NaK that met high purity standards. o Redesigned the NaK and potassium shipping container to make it safer, more rugged, and simpler to use. Secured a DOT exemption for use of the containers. o Designed, installed and implemented a large automated system for reaction of alkali metals such as potassium, sodium and NaK with alcohols for the production of alkali metal alcoholates. TerraPower, LLC. o CEI designed and built the complete test skid used to conducted R&D gathering data on test components to be used on the TP prototype traveling wave reactor. The system consisted of two 500 gallon sodium storage tanks, one EM pump, two EM flow switches, two mass flow meters, one plugging temperature indicator (PTI), several fine metal filters, and all of the valves Page 7 of 8

and instruments required to operate the sodium loop at temperatures in excess of 300 degrees C. Initial testing work was completed in early 2016. Other CEI Experience and Capabilities Creative Engineers, Inc. has expanded its core capabilities over the past several years to include other services such as, CEI is one of the few manufacturers in the world of electromagnetic (EM) pumps. These pumps are very unique and have no moving parts and no seals. EM pumps are used for pumping alkali metals and other fluids with very high conductivity properties. Design and fabrication of skid-mounted chemical handling and processing systems Design, fabrication and operation of pilot facilities for customers at our New Freedom PA facility Automation of batch and continuous chemical processes using DCS (Distributed Control Systems) and PLC s Page 8 of 8