Mapping and Legal Implications of Future Flooding in the Lamprey River Watershed of New Hampshire Due to Changes in Land Use and Climate

Similar documents
Assessing the Risk of 100-year Freshwater Floods in the Lamprey River Watershed of New Hampshire Resulting from Changes in Climate and Land Use

Assessing the Risk of 100-year Freshwater Floods in the Lamprey River Watershed of New Hampshire Resulting from Changes in Climate and Land Use

Climate and Land Use Consequences to 100-Year Flooding

Assessing the Risk of 100-year Freshwater Floods in the Lamprey River Watershed of New Hampshire Resulting from Changes in Climate and Land Use

Climate and Land Use Consequences to 100-Year Flooding

Climate and Land Use Consequences to 100-Year Flooding

Assessing the Risk of 100-year Freshwater Floods in the Lamprey River Watershed of New Hampshire Resulting from Changes in Climate and Land Use

Growing Your Green Infrastructure Program

Building Resilience to Flooding and Climate Change in the Moonlight Brook Watershed

Climate Change and Sea Level Rise in Coastal New Hampshire. Cameron Wake, Ph.D.

Hydrologic Calibration:

5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts

Surprise in Plymouth as flood floods floodplain in flooding season, 28 Feb 2017 (taken from Twitter)

Integrating HEC HMS generated flow hydrographs with FLO-2D. Nanda Meduri, PE, PMP, CFM Seth Lawler Venkata Dinakar Nimmala, CFM

IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL. Horry County, South Carolina

N.H. Sea Grant Research Project Progress Report For time period 2/1/15 1/31/16

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

SECTION IV WATERSHED TECHNICAL ANALYSIS

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

Green Infrastructure. Jesse Schomberg University of Minnesota Sea Grant Program

A Hydrologic Study of the. Ryerson Creek Watershed

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

Planning for New Hampshire's Changing Climate: Economic Development for a Sustainable Future. Blending Climate Change Solutions with.

Integrated Watershed Modeling of the Alewife Brook: Developing the Right Tools for Climate Change Preparedness

Climate Research Projects Brief. Steve Miller NH Coastal Adaptation Workgroup GBNERR Coastal Training Program

SECTION III: WATERSHED TECHNICAL ANALYSIS

Sunapee Watershed Stormwater Infrastructure Project. A Study of the Lake Sunapee Watershed. NOAA funded, 2-year grant

Climate Change in Southern NH

Impervious Surface Analysis for Durham Under Current and Build-Out Conditions In Support of Stormwater Management

Climate Change Implications for Stormwater Management in Massachusetts. Thomas Maguire, MassDEP March 2014

Recent Activities of the Maryland Hydrology Panel

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area

Hydrologic Study Report for Single Lot Detention Basin Analysis

PWD s Systematic Watershed-wide Approach to Stormwater Mgmt.

SEWRPC Staff Memorandum

PTAPP Meeting May 19, 2015 DRAFT PRELIMINARY MODEL RESULTS, NOT FOR DISTRIBUTION

Appendix A Watershed Modeling Technical Data

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

Urban Watershed Renewal in Berry Brook: An Examination of Impervious Cover, Stream Restoration and Ecosystem Response

Robert Wood, Associate Director & Watershed Steward Lake Sunapee Protective Association (LSPA)

MIDAS CREEK PROJECT. FINAL DESIGN REPORT SKR Hydrotech 4/11/2012

ACKNOWLEDGEMENTS. Sincerely, Executive Director and Staff. Rockingham Planning Commission. 156 Water Street Exeter, NH (603)

Engineering Report Preliminary Floodplain Study. Executive Summary

NEW HAMPSHIRE COASTAL RISK AND HAZARDS COMMISSION. Preparing New Hampshire for Projected Storm Surge, Sea-Level Rise, and Extreme Precipitation

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE

The Cost of Green Infrastructure: Worth the Investment?

COUNTY OF KANE. Kishwaukee River Headwaters Study Stakeholder Meeting Monday, February 26, :30 am Hampshire Village Hall

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

2016 New Hampshire Water & Watershed Conference Plymouth State University Friday, March 18, 2016

Beaver Brook Flood Study

BMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs

Estimating the 100-year Peak Flow for Ungagged Middle Creek Watershed in Northern California, USA

Office of Strategic Planning and Projects Connecticut Department of Transportation CLIMATE CHANGE & EXTREME WEATHER PILOT PROJECT

GISHYDRO: Developing Discharges and Watershed Parameters

Who s in Charge!? 8/9/2018. Houston Geological Society Presents. Peak Floods Brays Bayou

Reservoir on the Rio Boba

Margaret Walls. RFF First Wednesday Seminar. Green Infrastructure: Using Natural Landscapes for Flood Mitigation and Water Quality Improvements

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

Flood Control Planning Below Alluvial Fans

CEDAR RUN WATERSHED ACT 167 STORMWATER MANAGEMENT PLAN FINAL REPORT

Sea Level Rise and Recurrent Flooding Update

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD

Little Bear Brook Flood Hazard Assessment and Redevelopment Area Regional Stormwater Management Analysis. Progress Meeting

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models...

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

Building Partnerships for Climate and Health Programs FINAL REPORT

I(n)Kn. A Qp = (PRF) --- (8) tp Where A is the watershed area in square miles and PRF is the unit hydrograph peak rate factor.

Project Summary: - Hydrologic Models. - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall

Prepared for: City of Jeffersonville. November Prepared by

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017

FAST WATER / SLOW WATER AN EVALUATION OF ESTIMATING TIME FOR STORMWATER RUNOFF

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY

Hydrologic evaluation of flood flows from a burned watershed

Vulnerability of Infrastructure due to Climate Change

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification

HEC-17: Highways in the River Environment Flood Plains, Extreme Events, Risk, and Resilience

LIST OF TABLES.II LIST OF FIGURES.II LIST OF ATTACHMENTS.II I. INTRODUCTION.1 II. STUDY AREA.3 III

Climate Change Resilience and the Vermont Agency of Transportation

Technical Memorandum

DRAFT FOREST VIEW, ILLINOIS SECTION 205 FLOOD RISK MANAGEMENT APPENDIX E HYDROLOGY AND HYDRAULIC ANALYSIS

Sea-Level Rise Impacts on Drinking Water: A Groundwater Modeling Study in Newmarket, NH

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.

Are Flood Stages Rising? Our Fault or Mother Nature s?!

Stormwater Review Part 2. Rainfall and Runoff. Tom Seybert, PE and Andy Bennett, PE. Pennsylvania Surveyors Conference 2019

Creating a Flood Forecasting System for the San Diego River Watershed

Jacobi, Toombs, and Lanz, Inc.

The prioritization list along with the estimated probable construction cost and future cost index is shown in Table 1.

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation

Modeling Infiltration BMPs

SUMMARY OF BACKGROUND INFORMATION REVIEWED

Cokato Lake (86-263) Wright County. Hydrologic Investigation

DRAINAGE PLAN OF NAU S EASTBURN EDUCATION AND GAMMAGE BUILDINGS FINAL PROPOSAL

PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS

Transcription:

Mapping and Legal Implications of Future Flooding in the Lamprey River Watershed of New Hampshire Due to Changes in Land Use and Climate 2012 NH Water & Watershed Conference Cameron Wake & Fay Rubin, EOS, University of New Hampshire Steve Miller, Great Bay National Estuarine Research Reserve Robert Roseen, Ann Scholz, Tom Ballestero, UNH Stormwater Center Michael Simpson, Antioch University New England Julia Peterson, Lisa Townson, UNH Cooperative Extension John Echeverria, Katherine Garvey, Peg Elmer, Vermont Law School http://100yearfloods.org Funded by NOAA Cooperative Institute for Coastal & Estuarine Environmental Technology

Lamprey River Watershed, New Hampshire

5 Decades of Population Growth and Development 90,000 18,000 Population 80,000 70,000 60,000 50,000 40,000 30,000 Population (all towns with at least a portion of their area in the watershed) Urban & Developed Land (Lamprey River Watershed) 16,000 14,000 12,000 10,000 8,000 6,000 Acres of Urban & Developed Land 20,000 1960 1970 1980 1990 2000 4,000

4 Inch Precipitation Events by Decade 1948-2007 Durham, NH Lawrence, MA

100-year Rainfall Estimates TP-40 Rainfall Frequency Atlas used for effective conditions = 6.3 (1938-1957) Northeast Regional Climate Center Atlas for Extreme Precipitation for current conditions = 8.5 http://precip.eas.cornell.edu/

Daily Discharge, Lamprey River 1934-2012 8,000 FIS 100 year flood 1935-1987 (7,300 cfs) 4/7 1987 5/15-16 2006 Mothers Day Storm 4/17-18 2007 Patriots Day Nor'easter discharge (cubic feet per second) 6,000 4,000 2,000 3/15-17 2010 Nor'easter 0 1940 1950 1960 1970 1980 1990 2000 2010 Year

Costs from Presidentially Declared Disasters in NH

Changing Floodplains with Changing Climate & Land Use Revised 100 yr floodplain with climate change and buildout Revised 100 yr floodplain with buildout Revised 100 yr floodplain with climate change FEMA 100 yr floodplain( 05 conditions) FEMA 100 yr floodplain Stream Channel

Land Use & Climate Scenarios

Lamprey River Watershed - Build Out Rates 40,000 30,000 acres 20,000 Residential Development (239 acres per year) 10,000 Commercial and Industrial Development (35 acres per year) 0 1960 1980 2000 2020 2040 2060 2080 2100

Starting with total watershed acreage, eliminate: Developed land Mapping Buildout Hydric soils/wetlands/surface water Steep slopes (> 15%, based on soils) Conservation lands; public water supply protection areas Build out flat terrains first, moving incrementally to steeper slopes Within a slope category, build out areas closest to roads first

Hydrologic Methodology FIS: Annual peak flow frequency analysis peak annual stream flow standard deviation weighted coefficient of skewness Lamprey River Project: Rainfall-Runoff Model Watershed area Time of concentration Runoff curve number (CN) Hydrologic Modeling: HEC-GeoHMS & HEC-HMS Hydraulic Modeling: HED-GeoRAS & HEC-RAS 19

Curve Number: Rainfall Runoff Equation

Curve Number based on Land Use and Soil Type Subbasin CN W6510 62.5 W8600 63.0 W11900 64.2 W10910 61.2 W8380 63.5 W11020 62.5 W6730 65.4 W7060 63.9 W7920 67.7 W10250 66.0 W8590 71.0 W6510 W6730 W7060 W7920 W8600 W8380 W11020 W8590 W11900 W10910 W10250 21

Hydraulic Calibration Results for RT108 Durham Boat House

UNH Hydraulics Model Calibration & Results RT108 45 River = Beaudette Brook Reach = DS RT108 FP.06.07.06 40 April 2007: modeled=34.4 observed = 34.1 March 2010: modeled =33.6 observed = 33.3 Elevation (ft) 35 30 Current 100 yr flood = 35.8 FIS 100 yr flood = 33.0 25 45% increase in the 100-year flood flow from USGS gage: 7,300 cfs (FIS) to 10,649 cfs (NRCC) An increase in the base flood elevations by an average of 20-1000 0 1000 2000 3000 400 2.7 feet along the 36 mile study reach. Station (ft)

Implementing LID 24

Watershed Scale CN and Runoff Conventional build-out increases flood flow by 4.3% (0.3 BFE) LID build increases flood flow by 2.8% increase

Urban Scale CN, Runoff, and Discharge

Current Conditions CN=66.8 Moonlight Brook, Newmarket LID Build-Out CN=69.5 Forested Type C soil CN = 70 Forested Type D soil CN = 77 Conventional Build-Out CN=78.0 Comm./Ind. Type D soil CN = 80 Residential Type D soil CN = 80 Residential Type D soil CN = 84 Comm./Ind. Type D soil CN = 94

New Flood Plain Maps and Questions of Legal Authority, Measures and Consequences In Collaboration with Vermont Law School 1.What is the potential liability of government if they fail to reduce vulnerability to flood risk based on UNH s information? 2.What legal and policy approaches may communities adopt to reduce flood risks in the expanded flood hazard area? 3.Do NH communities have the legal authority under state legislation to design and implement regulatory controls based on current and projected flooding levels? 4.What legal standard of scientific and technical reliability must be met to support regulatory measures based on current and future environmental conditions? 5.What is the potential regulatory takings exposure of communities if they impose regulatory controls that are designed to address anticipated future environmental conditions?

FEMA and Current Conditions Lower Lamprey 1 June 2012 Lamprey River Watershed http://100yearfloods.org cameron.wake@unh.edu

Newmarket Effective 100 Year Floodplain

Assessing Flood Risk - Lamprey River Watershed Advisory Committee municipal, regional, state, federal and non-profit representation Cliff Sinnott, Rockingham Planning Commission (Chair) Joanne Cassulo, NH Office of Energy and Planning David Cedarholm, Durham Public Works Cynthia Copeland, Strafford Regional Planning Commission Michael Goetz, FEMA Region 1 Diane Hardy, Newmarket Planning Department Sharon Meeker, Lamprey River Advisory Committee Jack Munn, Southern New Hampshire Planning Commission Jennifer Perry, Exeter Public Works Ron Poltak & Becky Weidman, NEIWPC Keith Robinson, USGS Carl Spang/Dawn Genes, Lamprey River Watershed Association Eric Williams, NH Department of Environmental Services

Assessing Flood Risk - Lamprey River Watershed Technical Analysis Construct hydrologic and hydraulic model Develop land use and climate change scenarios Run model; plot cross-sections; map results Dissemination Advisory Group & Focus Groups Community Workshops Municipal & Regional Planners NH GRANIT website Evaluation and Feedback

Assessing Flood Risk - Lamprey River Watershed Project Objectives: Assess flood risk associated with combined land use and climate change scenarios out to 2100 Produce maps of the 100-year flood risk boundaries and river discharge at specific locations Demonstrate the use of our products to support land use decision-making in coastal communities Serve as a model for other New England watersheds Address legal issues of using projected flood information

Projecting Future Climate Change for the Northeast: Greenhouse Gas Emission Scenarios

Projecting Future Climate Change for the Northeast: Downscale Global Projections to Regional Level