ROOTY HILL REGIONAL DISTRIBUTION CENTRE MONTHLY ENVIRONMENTAL MONITORING REPORT Air Quality, Construction Noise and Meteorology

Similar documents
ROOTY HILL REGIONAL DISTRIBUTION CENTRE MONTHLY ENVIRONMENTAL MONITORING REPORT Air Quality, Construction Noise and Meteorology

Monthly Environmental Monitoring Report. March 2018

Monthly Environmental Monitoring Report. February 2018

Monthly Environmental Monitoring Report

Pollution Monitoring Data January 2013

Pollution Monitoring Data April 2013

Karuah East Quarry. Monthly Environmental Monitoring Report

Karuah East Quarry. Monthly Environmental Monitoring Report

Pollution Monitoring Data July 2014

SURFACE WATER, DEPOSITIONAL DUST, HVAS AND METEOROLOGICAL MONITORING Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA

Gunlake Quarry. Air Quality Management Plan

SURFACE WATER, DEPOSITIONAL DUST, HVAS AND METEOROLOGICAL MONITORING Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA

AIR, WATER AND METEOROLOGICAL MONITORING JUNE 2018 PINE DALE MINE, BLACKMANS FLAT

Bengalla Mine. State Significant Development 5170 Monthly Monitoring Data Summary

AIR, WATER AND METEOROLOGICAL MONITORING AUGUST 2018 PINE DALE MINE, BLACKMANS FLAT

AIR, WATER AND METEOROLOGICAL MONITORING MAY 2018 PINE DALE MINE, BLACKMANS FLAT

Bengalla Mine. State Significant Development 5170 Monthly Monitoring Data Summary

SURFACE WATER, DEPOSITIONAL DUST, HVAS AND METEOROLOGICAL MONITORING Prepared for Pine Dale Mine Community Consultative Committee Prepared by RCA

MONTHLY ENVIRONMENTAL MONITORING REPORT PORT BOTANY REDEVELOPMENT PATRICK STEVEDORES

MONTHLY ENVIRONMENTAL MONITORING REPORT PORT BOTANY REDEVELOPMENT PATRICK STEVEDORES

Peak Gold Mines MONTHLY ENVIRONMENTAL MONITORING SUMMARY REPORT. February 2018

GROUND WATER DEPOSITIONAL DUST HVAS AND METEOROLOGICAL MONITORING

Bengalla Mine. State Significant Development 5170 Monthly Monitoring Data Summary

LYNWOOD QUARRY AIR QUALITY MANAGEMENT PLAN FINAL

Environmental Monitoring Data Monthly Monitoring Results January 2014

BOUNDARY AIR MONITORING PLAN POT 1881 REVISION 0

WAMBO COAL PTY LIMITED MONTHLY ENVIRONMENTAL MONITORING REPORT. April 2011

PEAK GOLD MINES MONTHLY ENVIRONMENTAL SUMMARIES. April 2015

Ambient Air and Sound. Monthly Report

Environmental Noise Monitoring. Hanson Quarry Wagga Wagga, NSW. October 2012

Stage 2: WestConnex M5 King Georges Road Interchange Upgrade. Appendix B6 Construction Air Quality Management Plan

Ambient Air and Sound. Monthly Report

Environmental Protection Licence 2688

ENVIRONMENT PROTECTION LICENCE NO: October 2018 Monthly Report. Princes Highway Upgrade between Berry and Bomaderry

Drayton Management System Standard. Air Quality Management and Monitoring Plan

Incorporating an Air Quality Monitoring Protocol

1 Introduction. Mine EPL. report. Dear Leonard, J13083L2_24 assessment. operation of. the crusher, RASP Mine. 2015); and

Monthly Noise Monitoring Assessment

Air Quality Monitoring Plan

REPORT. Integra Underground Monthly Environmental Report March 2012 REPORT TITLE PREPARED BY. DATE 11 th May Signature DISTRIBUTION.

REPORT TITLE 2012 PREPARED BY

Air Quality Management Plan

Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 12 AIR QUALITY ASSESSMENT

Liddell Coal - Monthly Environmental Summary February 2018

GROUND WATER DEPOSITIONAL DUST HVAS AND METEOROLOGICAL MONITORING PINE DALE MINE. Prepared for PINE DALE MINE COMMUNITY CONSULTATIVE COMMITTEE

Air Quality Monitoring Program. for the. Integra North Open Cut Coal Mine

Ambient Air Quality and noise Measurements Report Gas pressure reduction station in Marsa Matrouh Governorate

Ambient Air Quality Monitoring

AUSTAR COAL MINE AIR QUALITY MANAGEMENT AND MONITORING PLAN

ASSESSMENT REPORT. ALBION PARK QUARRY Increased Production Rate Modification (10639 of 2005 MOD 2)

8. Appendix F Acoustic Assessment

Monthly Environmental Monitoring Report

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

Ambient Air Quality and noise Measurements Report Gas pipeline network at Farshout- Naqada, Waqf, and Qeft - Qena governorate

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

TOMINGLEY GOLD PROJECT. Monthly Environmental Monitoring Report

Rasp Mine Monthly Environment Monitoring Report INTRODUCTION TABLE OF CONTENTS

GLNG PROJECT - ENVIRONMENTAL IMPACT STATEMENT

November 2, Subject: Air Quality and Noise Monitoring Summary for October 13 to 23, 2015 Sydenham-Pearl Brownfield, Brantford

Monthly Environmental Monitoring Report. Yancoal Hunter Valley Operations April 2018

Environment Protection Licence 6538 Monthly Monitoring Data Summary

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY December, 2016

Sydney Port Botany Terminal 3 Project Out of Hours Works Protocol

Waterview Operational Air Quality Monitoring Report January 2018

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

Brisbane Motorway Services CLEM7 Ambient Air Quality Monitoring Report December 2017 Ref: DR.1712CLEM Issue Date: 19 January 2018

24 August Leanne Cross Senior Environmental Planner KDC Via

ENVIRONMENTAL MONITORING PROGRAMME

2014 Annual Environmental Management Report

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

Technical Report - Noise Monitoring OOHW: 5 to 7 March Sydney Metro City and Southwest North Corridor Works. Nathan Lynch; Paul Douglass

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

Woodlawn Mechanical Biological Treatment Facility. Project Approval (06_0239) Condition 28 - Noise Audit Report. Report Number 610.

Waterview Operational Air Quality Monitoring Report November 2017

Section 75J of the Environmental Planning & Assessment Act 1979

Monthly Environmental Data May 2016

AIR QUALITY MANAGEMENT PLAN CORAKI QUARRY

Decibell Consulting pty Ltd

NOISE MANAGEMENT PLAN

Environmental Noise Compliance Assessment Bass Point Quarry

Air and Dust Monitoring Summary Report

Air Quality Monitoring Program

Dust monitoring summary

OBERON WHITE GRANITE QUARRY

FUTURE AIR QUALITY MONITORING FOR LEAD IN METROPOLITAN ADELAIDE

1 18 August 2017 Version 2 (Noise and vibration)

WILPINJONG COAL PTY LTD. Environment Protection Licence (EPL) 12425

BAAL BONE COLLIERY. January to March 2015 Environmental Monitoring Summary. Baal Bone Colliery Q Quarterly Environmental Monitoring Report

Dust Management Procedure Environment

SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY October, 2016

Environmental Noise Assessment

CRANBOURNE LANDFILL. Environmental Noise Assessment. Rp ML. 10 May 2013

Centennial Ivanhoe No2 Colliery. Environmental Monitoring Data

Transcription:

ROOTY HILL REGIONAL DISTRIBUTION CENTRE MONTHLY ENVIRONMENTAL MONITORING REPORT Aspect Air Quality, and Meteorology Date January 2015 SUMMARY Monitoring period 1 January to 31 January 2015 Parameters monitored in period Dust (PM 10 ) / TSP Depositional Dust Local Meteorology Exceedance summary No exceedances of PM 10 criteria were recorded during January 2015. Depositional dust levels at all locations were below 4 g/m 2 /month, and annual averages at all three monitoring sites remain below criteria. No attributable exceedances of the construction noise management levels were recorded in January 2015. Action required None 1. Monitoring Locations The monitoring locations at the Rooty Hill Regional Distribution Centre (RDC) for air quality, construction noise and meteorology are shown in Figure 1 and consist of: Dust monitoring (PM 10 ): Blacktown International Sportspark (formally Olympic Park) Holcim Site offices Dust monitoring (Depositional): Locations 1 to 3 Noise monitoring: Locations 1 to 5b Meteorology: Blacktown International Sportspark (formally Olympic Park)

N Figure 1 Monitoring locations 2. Monitoring Methodology Dust Air quality (dust) monitoring was undertaken using two Ecotech High Volume Air Samplers (HVAS) 3000 with a Particulate Matter - 10 m (PM 10 ) sampling heads. The HVASs were operated on one-day-in-six in accordance with AS/NZS 3580.9.6:2003 Methods for sampling and analysis or ambient air, Method 9.6: Determination of suspended particulate matter (PM10) High volume sampler with size selective inlet - Gravimetric method. Calibration of the unit is checked on a monthly basis, in accordance with operating instructions for the unit and AS/NZS 3580.9.6:2003. TSP will not be directly monitored, and instead will be calculated by application of a conversion factor (PM10 x 2.5 = TSP), in accordance with the site Operational Monitoring Plan.

Depositional dust was monitored in accordance with AS/NZS 3580.10.1:2003 Methods for sampling and analysis of ambient air Method 10.1: Determination of particulate matter Deposited matter Gravimetric method. Construction noise was monitored for 15 minute attended periods in accordance with the requirements set out in the EPA (2000) Industrial Noise Policy and the DECC (2009) Interim Guidelines (ICNG). Monitoring was carried out using a SVAN 858 Type 1 Sound Level Meter by appropriately qualified personnel. Calibration of the unit was checked before and after each monitoring period, and the drift was below 0.5dB. Local Meteorology Meteorological conditions were monitored using a Davis Vantage Pro2 Plus monitoring unit. This unit was positioned in accordance with AS2923-1987 Ambient air Guide for measurement of horizontal wind for air quality applications. The Davis Vantage Pro2 plus meteorological station does not satisfy the accuracy requirements of AS 3580.14-2011 for wind speed and direction measurements. However, no monitoring standards are specified in the Project Approval and the accuracy of the proposed unit is considered sufficient for the purposes of construction impact management. The integrity of the meteorological monitoring station is checked every six days. 3. Guidelines Air Quality Air quality (dust) criteria within the Project Conditions of Approval, specifically Statement of Commitment (SoC) 4.1 and the Construction Dust Management Plan (CDMP) mirror those in the NSW EPA document Approved methods for the modelling and assessment of air pollutants in New South Wales (DEC 2005). The air quality assessment criteria are outlined in Table 1, which apply cumulatively (that is, due to all sources of emissions and not just the contribution from the project). Table 1 Air Quality Pollutant Averaging period Concentration PM 10 24 hours 50ug/m 3 Annual 30ug/m 3 TSP Annual 90ug/m 3 Deposited dust Annual 4 g/m 2 /month* * Depositional dust criteria contained in the NSW EPA methods specify a maximum contribution of 2g/m 2 /month, up to a maximum total depositional dust level of 4g/m 2 /month. This criterion assumes a typical existing load of 2g/m 2 /month, prior to the start of construction activities. TSP will not be directly monitored, and instead will be calculated by application of a conversion factor (PM 10 x 2.5 = TSP), in accordance with the site Operational Environmental Monitoring Plan.

The Noise Management Levels (NML) for construction of the Rooty Hill RDC are provided in Table 2. These are based on the requirements of the ICNG, Ministers Condition of Approval (MCoA) 2.2 and the measured background levels. Table 2 Management Levels Receiver Receiver Type Approximate Distance and Orientation from RDC boundary NML LAeq,15min / db(a) 1 132 Station Street Residential 650m west 58 2 54 Station Street Residential 650m west 58 3 63 Coghlan Street Residential 850m east 58 4 16 Mavis Street Residential 650m west 63 5a Lomandra Shelter Shed (Nurragingy Reserve) Recreational <100m east 60 5b Boronia Shelter Shed (Nurragingy Reserve) Recreational <100m east 60 A construction noise impact assessment undertaken for the Management Plan (CNMP) predicts no exceedance of the NMLs at residential receivers throughout the construction program. Within the reserve, occasional exceedances are anticipated such as during earthworks; vegetation clearing; and installation of building structures and equipment. Previous monthly monitoring reports have assessed compliance with MCoA 2.3. Jacobs has completed a detailed review of this MCoA alongside the CNMP approved under MCoA 5.3(b ) and concluded that MCoA 2.3 is related to the operational phase and does not need to be assessed from a compliance perspective during the construction phase. The NMLs and noise predictions in the CNMP are a more accurate indication of the likely impacts from Stage 2 construction works. Meteorology SoC 3.3, 10.4 and 15.3 requires Holcim monitor local meteorological conditions at the site. To comply with the SoC the following parameters must be monitored: Daily air temperature Solar radiation Daylight hours Daily rainfall Daily evaporation Continuous wind speed and direction

4. Monitoring results Air Quality PM 10 / TSP No exceedences of PM10, 24-hour criteria were detected during January 2015. During the first week of January the site was closed for the Christmas break, and as such no monitoring was carried out. Monitoring restarted on the 7 January 2015. Table 3 HVAS Unit 1 (BSC) January 2015 PM 10 and TSP Results Date Measured result PM 10 (ug/m 3 ) Calculated result (PM10 x 2.5) TSP 01/01/2015 Site closed HVAS did not run 07/01/2015 14.1 50 35.3 NA 13/01/2015 12.1 50 30.3 NA 19/01/2015 19.5 50 48.8 NA 25/01/2015 15.7 50 39.3 NA 31/01/2015 11.5 50 28.8 NA Annual average (to date) 22.1 55.2 Table 4 HVAS Unit 2 (Site office) January 2015 PM 10 and TSP Results Date Measured result PM 10 (ug/m 3 ) Calculated result (PM10 x 2.5) TSP 01/01/2015 Site closed HVAS did not run 07/01/2015 9.8 50 24.5 NA 13/01/2015 17.1 50 42.8 NA 19/01/2015 24.8 50 62.0 NA 25/01/2015 23.8 50 59.5 NA 31/01/2015 15.0 50 37.5 NA Annual average (to date) 27.4 68.6 Depositional Dust Depositional dust levels at all three locations were below 4 g/m 2 /month, and annual averages for all three DDG s remain below criteria

Table 5 Depositional Dust Gauge Results January 2015 Total Insoluble Matter (g/m 2 /month) Location 1 2 3 Goal (annual average) 05/01/2015 03/02/2015 1.0 0.9 1.3 N/A Annual average 2.1 2.5 1.7 4 g /m 2 /month No attributable exceedences of construction noise management levels were observed during January 2015 monitoring. Noise was only audible from the Site at locations 5a and 5b, which was primarily due to excavation of rock material in the northern areas of the site. The results of attended construction noise monitoring are presented in Table 6. Table 6 Monitoring Results Location Start Construction contribution L Aeq L Aeq L A10 L A90 NML L Aeq,15 min / db(a) 1 (132 Station St) 13:45 IA* 57 60 50 58 Notes Holcim inaudible. Traffic along M7 and M7 offramp dominant noise source [typically 45-55dB(A)]. 2 (54 Station St) 14:05 IA* 54 56 49 58 3 (63 Coghlan St) 11:40 IA* 62 65 50 58 4 (16 Mavis St) 14:30 IA* 52 53 48 63 5a (Lomandra Shelter Shed [Nurragingy Reserve]) 12:05 45 49 53 41 60 Holcim inaudible. M7 dominant noise source [typically 50-55dB(A)] and local traffic along Station St [up to 65 db(a)]. Holcim inaudible. Traffic along Knox Rd dominant noise source [typically 50-60dB(A)]. Holcim inaudible. M7 traffic dominant noise source [50-55dBA)]. Holcim audible (light vehicles, ratchet [51dB(A)], occasional beepers [44] and oxy work [47]) 5b (Boronia Shelter Shed [Nurragingy Reserve]) *IA - Inaudible 12:30 50 50 50 42 60 Holcim audible (Excavating [45-55], occasional beeper), birds, other industries and local traffic other dominant noise sources.

Local Meteorology A wind rose showing the proportion of direction and strength of winds throughout the reporting period is below. A complete data set, including, humidity, temperature and rainfall is provided separately. The wind rose shows that industrial receivers to the north and northwest of the site were the most likely to be impacted by construction generated dust. Figure 2 January 2015 Windrose, Blacktown International Sportspark Meteorological station