FirstEnergy Verification Team. Report on the Implementation of Recommendations from the FirstEnergy Readiness Audit of February 26 27, 2004

Similar documents
TRANSMISSION PLANNING ASSESSMENT METHODOLOGY AND CRITERIA

Wolverine Power Supply Cooperative, Inc. Senior Transmission System Operator

Comparison of IV.A.M2 and IV.A.M3 to EOP-005-1

Transmission Function Employees - Job Titles and Descriptions 18 C.F.R 358.7(f)(1)

TPL 001 AB 0 System Performance Under Normal Conditions

2015 Operational Practices Survey Questions

Table of Contents. To provide a methodology for determining the System Operating Limits (SOL) for the Planning Horizon at the California ISO.

Standard TPL-003-0b System Performance Following Loss of Two or More BES Elements

Standard TPL System Performance Following Extreme BES Events

Standard MH-TPL Transmission System Planning Performance Requirements

Standard TPL-003-0b System Performance Following Loss of Two or More BES Elements

Standard TPL-004-0a System Performance Following Extreme BES Events

SPP RTO Compliance Forum TPL Jason Terhune

Standard TPL-002-0b System Performance Following Loss of a Single BES Element

Standard Development Timeline

ASSOCIATED NERC STANDARD(S): TPL (referred to as TPL-001 in this document) IMPLEMENTATION: In effect when approved.

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER

Standard TPL (i) System Performance Under Normal Conditions

July 15 July 31. August First ballot September 1 10, Drafting Team considers comments and makes any revisions indicated

1.3 Planning Assumptions and Model Development

Standard EOP System Restoration from Blackstart Resources

Rochelle Municipal Utilities TRANSMISSION PLANNING CRITERIA. March 21, 2017

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER

Standard PRC-002-NPCC-01 Disturbance Monitoring

AESO System Operating Limits Methodology for the Planning Horizon (R1 FAC-010-AB-2.1)

Standard TPL Transmission System Planning Performance Requirements

Standard Development Timeline

Platte River Power Authority. Ten-Year Transmission Plan ( )

Stakeholder Communication. Inputs, Assumptions, and Preliminary Assessment. Base Model. Needs, Solutions, Sensitivity: Yr 5

Information Document Protection System Information ID# R

Review of Data Change Management Processes for RTCA and Planning Models (Recommendation 16) March, 2017

Operations and Maintenance Considerations for Underfrequency Relaying Design

POTOMAC ELECTRIC POWER COMPANY

Standard Development Timeline

Standard FAC System Operating Limits Methodology for the Planning Horizon

Generator Interconnection Affected System Impact Study. Plains & Eastern Clean Line Final Report

WESTERN ELECTRICITY COORDINATING COUNCIL GENERATING UNIT MODEL VALIDATION POLICY

Mapping Document for FAC-010-3

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 25, Electric Grid Operations

Standard EOP System Restoration from Blackstart Resources

ENTERGY FACILITY CONNECTION REQUIREMENTS March 2007

Standard Development Timeline

August 14, 2003 Blackout. Gerry Cauley Director Standards North American Electric Reliability Council

Standard Development Roadmap

Collaborative Approach for Wind Power Plant Model Data and Validation

NERC PLANNING STANDARDS

Seasonal Assessments and Modeling of Sub-100 kv Elements (Southwest Outage Recommendations 5, 6, 7 and NERC2) May 7, 2014

AESO TRANSMISSION PLANNING CRITERIA BASIS AND ASSUMPTIONS

A. Introduction. B. Requirements and Measures

Planning Coordinator and/or Transmission Planner TRANSMISSION SYSTEM PLANNING GUIDELINES

Connection Study Requirements

Northwest Power Pool Processes

INTERPRETATION REQUEST FORM

RCR-35 Reliability Coordinator Reliability Plan for the SaskPower Subregion of the Midwest Reliability Organization

EIPC Interconnection-wide Webinar and Stakeholder Discussion. November 17, 2015

Job Descriptions. Title & Job Functions: Transmission Function Employees

Standard 600 Determine Facility Ratings, System Operating Limits, and Transfer Capabilities

SYSTEM OPERATING LIMITS IN THE PLANNING HORIZON FAC-010 COMPLIANCE

PSE Attachment K Puget Sound Area Transmission Meeting

South Carolina Electric & Gas Company Transmission Function Employees Job Titles and Descriptions. Electric Transmission

Security Guideline for the Electricity Sector: Identifying Critical Assets

Facility Interconnection Requirements

B-R1 TRANSMISSION SYSTEM PLANNING PERFORMANCE REQUIREMENTS

NERC Reliability Functional Model

Approved RMWG Discussion was held. ??? John Simpson need to assign SMART rating

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements

Standard TPL-003-0a1a System Performance Following Loss of Two or More BES Elements

N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL

Distribution GIS & Grid Model Data Management

NERC-led Review Panel Decision on the Request by Orange Grove Energy, L.P.

Transfer Capability Methodology. for the Near-Term. Transmission Planning Horizon

Control Area Readiness Audit Report New York Independent System Operator April 14 15, 2004 Schenectady, NY

Southwest Power Pool CRITERIA

Standards de planification du NERC

System Impact Study and Facilities Study Process Manual For Cleco Power LLC

Implementation Plan for IRO Reliability Coordination Facilities Prerequisite Approvals Adoption of IRO-001-2, IRO-010-0, COM-001-2

NYSRC RELIABILITY RULE/NERC STANDARD CROSS-REFERENCE

April 26, PJM Mr. Mark J. Kuras Senior Lead Engineer NERC and Regional Coordination 2750 Monroe Blvd. Audubon, PA 19403

Bulk Power System Integration of Variable Generation - Program 173

Proposed Revisions to the Applicability of NERC Reliability Standards NERC Standards Applicability to Dispersed Generation Resources

Technical Analysis of Operational Events and Market Impacts During the September 2013 Heat Wave

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements

External Document Links

Grid Planning - Program 40

MATL Requirements Facility Interconnection Requirements

Proposed Revisions to the Applicability of NERC Reliability Standards NERC Standards Applicability to Dispersed Generation Resources

Project Single Points of Failure TPL-001 Cost Effectiveness

Remedial Action Scheme (RAS) Modeling Value Proposition

Project Revisions to TOP and IRO Reliability Standards Mapping Document Updated December 2014

Mapping Document. Project Phase 2 of System Protection Coordination. Revisions or Retirements to Already Approved Standards

Post SAR July day Formal Comment Period with Parallel Ballot July 2013

804 OFF-NOMINAL FREQUENCY LOAD SHEDDING AND RESTORATION

SIERRA NEVADA REGION TRANSMISSION FUNCTION EMPLOYEES

Designated Entity Design Standards Task Force (DEDSTF) Minimum Design Requirements for FERC Order 1000 Projects. System Protection Subgroup

MOD Steady-State and Dynamic System Model Validation

BULK ELECTRIC SYSTEM PLANNING CRITERIA

Pre-Qualification Submittal for Designated Transmission Entity Status Submitted to PJM September 5, 2013 Updated September 12, 2018

Methodology for Determining and Communicating System Operating Limits for the Planning Horizon (FAC-010 & -014) Revision Log

Performance Standards Issues. Donald Lamontagne Principal Engineer Arizona Public Service

Effective Management of Distribution Grid Model Data

Transcription:

FirstEnergy Verification Team Report on the Implementation of Recommendations from the FirstEnergy Readiness Audit of February 26 27, 2004 June 22 23, 2005 North American Electric Reliability Council

Table of Contents NERC-FirstEnergy Verification Team Members... 3 Introduction... 4 Executive Summary... 5 Status of Recommendations Contained in NERC Control Area Readiness Audit for FirstEnergy February 26 27, 2004... 6 Page 2 of 11

NERC-FIRSTENERGY VERIFICATION TEAM MEMBERS Lee Taylor Principal Engineer Southern Company Services, Inc. Michael Sanders Manager, EMS Operations Southern Company Services, Inc. Robert Mattey Superintendent of Electric Operations Ohio Valley Electric Corporation Benedict Deutsch Manager, Standards Midwest Reliability Organization Mahmood Mirheydar Federal Energy Regulatory Commission Richard Byrne Manager, Personnel Certification North American Electric Reliability Council Richard Schneider Manager, Organization Certification North American Electric Reliability Council Page 3 of 11

INTRODUCTION On February 26 and 27, 2004, the North American Electric Reliability Council (NERC) conducted a readiness audit of the FirstEnergy (FE) control area. The readiness audit team that conducted the audit identified a total of forty-four recommendations, which are contained in the FE audit report, NERC Control Area Readiness Audit for FirstEnergy February 26 27, 2004. 1 This report addresses recommendations 27 33, which FE was to implement before the summer of 2005. Recommendations 1 26 were to be implemented prior to the summer of 2004 and are the subject of another report. Recommendations 34 44 were directed at entities other than FE. NERC established the FE Verification Team (FEVT) to independently verify that FE had implemented the policies, procedures, and actions contained in recommendations 27 33 in the FE readiness audit report. The FEVT consisted of five subject-matter experts and two NERC representatives. It met on site with FE representatives on June 22 23, 2005, and conducted its verification through questionnaires, conference calls and discussion with FE staff, review of training and procedural documentation, viewing energy management system (EMS) displays, and interviews with management and transmission operators. The verification team also observed a thorough demonstration of the dispatcher training simulator (DTS) and a portion of a drill whereby the East Central Area Reliability Coordination Agreement (ECAR) portion of the FE system was transferred to and operated from the backup control center. This report provides independent verification of the status of the implementation of the recommended policies, procedures, and actions contained in the FE readiness audit report that were to be completed before the summer of 2005. 1 The FE readiness audit report is available at ftp://www.nerc.com/pub/sys/all_updl/rap/audits/fe_final_audit_report.pdf, or http://www.nerc.com/~rap/audits.html. Page 4 of 11

EXECUTIVE SUMMARY The readiness audit team that conducted the February 2004 FE audit recommended that FE implement seven recommendations prior to the summer of 2005. The FEVT concluded that FE implemented five of the seven recommendations. To meet the intent of the remaining two recommendations, FE has embarked on multiple year projects. The FEVT finds no fault with FE s multiple year approach. The team recommends that NERC check the progress on these two items prior to the summer of 2006 and include a full verification check as a component of the next FE readiness audit scheduled for 2007. The FEVT found FE to be very cooperative in the verification effort. FE personnel were knowledgeable about and responsive to the FEVT requests. The FEVT had full access to all requested documents and arrangements were made to observe requested activities. The FEVT commends FE for its openness and responsiveness to its requests. The FEVT also observed a strong common commitment to reliability between operating, planning, and other support functions exhibited through the real-time support and on-call capabilities that FE has developed. These include rotating engineering staff between operations and planning to enhance individual skill sets. As a result of the implementation of the readiness audit recommendations, the FEVT identified two positive points: A significant amount of unit reactive power capability testing has led to a substantial improvement in the accuracy of system models. FE has integrated and is using a DTS as part of its operator training program. FE demonstrated the use of the DTS in a training exercise. The FEVT was impressed by the depth and completeness of the developed scenarios, the interest and involvement of the trainees, and the positive and challenging environment maintained by the trainer. Page 5 of 11

STATUS OF RECOMMENDATIONS CONTAINED IN NERC CONTROL AREA READINESS AUDIT FOR FIRSTENERGY FEBRUARY 26 27, 2004 Recommendation 27 FE relies on independent power producers (IPP) to comply with the requirements in its interconnection agreements to ensure that FE meets ECAR and NERC testing for generator real and reactive power capabilities, unit ramp rate and dynamic response, modeling parameters, automatic voltage regulator status, and data submittal requirements. However, an explicit compliance verification program has not been developed. FE monitors its own generation and has a program in place to gather this information. The audit team recommends that FE establish policies and procedures to ensure that all generators within its control area provide all necessary information to comply with NERC Planning Standard II.B. Generator Equipment, including generator testing. FE Normal Operating Procedure No. 78 contains the policy and procedures to ensure that all generators within the FE control area comply with proposed Reliability Standards MOD-023-1 MOD-027-1 (formerly NERC Planning Standard IIB). FE s procedures include sending an annual questionnaire to each generator owner requesting it to verify and update specific generator data as necessary, provide dates of when equipment was last tested, and provide test data results for the generator testing. Test requirements, including the frequency that tests are to be conducted, are based on ECAR Document 4. The program was initiated in 2004 and the initial FE questionnaire included a request for all the aforementioned data and dates of tests. The questionnaire required responses to include dates of tests and/or validation of steady state data. Dates of tests and/or validation of data specifically required for dynamic simulation databases were optional. FE stated that the 2006 and subsequent questionnaires will require responses to include the dates of tests and/or validation of the dynamics data. Reports from the generator owners containing the above-mentioned data were made available to the verification team. STATUS: Completed. Recommendation 28 FE has a formal testing program that provides for the complete testing of all FE-owned fossil generators in accordance with NERC planning standards. Under the current schedule, FE will complete the reactive capability verification of its coal-fired generators, located near Lake Erie, before the summer 2004 operating season and submit the results to the control area operator. FE s nuclear plants will submit their reactive capability, based on operating data and/or calculations, in accordance Page 6 of 11

with ECAR requirements. The audit team recommends that FE complete testing of all FE-owned generators in a timely manner and that FE require and monitor testing of IPP-owned generators. All viable generating units in FE s ECAR footprint have undergone a reactive test. Due to system conditions, FE has not been able to operate some of its units at maximum reactive power as specified by the manufacturer. On some generators, they experienced high voltage conditions at the generator terminals when they attempted to run the units at maximum reactive power output. In some instances, the tests were rerun when the system conditions were more favorable. In the instances where the units were never able to reach maximum reactive power output due to system conditions, power flow simulations were performed to determine if the maximum reactive power output could be expected to be obtained under more favorable system conditions. ECAR Document 4 specifies that the system voltages should not be affected by lead/lag testing. Therefore, the reactive lag tests were run on high system load conditions and the reactive lead tests on light system load conditions. Reactive power limits are set based on the capability test and are reported to the generator owners. For nuclear units, FE uses reactive capability limits based on historical analysis. Positive point: A significant amount of reactive capability testing has been performed on generators interconnected to FE s transmission system. Physical capability testing gives confidence to plant operators about the true capabilities of the generators. FE holds a conference call every Monday morning with the generation owners/operators during which the condition of the units is discussed. Tuesday through Friday morning conference calls are held to discuss updates to generator unit conditions. FE has made significant improvements to its system models as a result of the reactive testing that was conducted. STATUS: Completed. Page 7 of 11

Recommendation 29 FE indicated that it updates generator model information when test information shows a difference between the original characteristics and actual performance. FE reported that it does not use disturbancemonitoring equipment to update models. The audit team suggested FE review this practice and use actual disturbance information to update its models. There have been no recent events on FE s system that would merit a postmortem dynamic simulation study. FE stated, however, that if an appropriate event occurred and was adequately captured, it would consider performing a postmortem study for model validation. FE has recently installed six digital fault recorders (DFR) with dynamic data recorder (DDR) capability and plans to install an additional ten in 2006. FE has undertaken other model-validation efforts. It uses DFR data to verify short-circuit impedances and relay operations. It also uses supervisory control and data acquisition (SCADA) data from the peak hour of the season to validate load power factor through direct load measurements. Where several substations are supplied from the same transmission line and there is no individual substation metering, the power factor is determined by the metered flows on each end of the line and the aggregated load supplied by the line. FE is participating in the Eastern Interconnection Phasor Project (EIPP). DFRs with phasor measurement units (PMUs) capability have been purchased and are presently being installed at two locations. Fourteen potential additional locations have been identified. FE expects captured data from the PMUs will be used to validate dynamic models. FE s position is that the best way to benchmark generator model data is to undertake actual generator testing using a program like the one used by the Western Electricity Coordinating Council (WECC). FE has said that it is working to develop and implement such a program, and has scheduled a vendor to make a presentation to FE transmission and generation personnel to discuss the procedures, benefits, and costs of on-site generator testing. STATUS: Not complete. Recommendation 30 FE performs transient stability analysis related to new generation interconnections and has supported regional transient stability and dynamic investigations. The audit team recommends that FE perform a transient stability analysis at least on an annual basis, to evaluate the effects of multiple contingency outages and the potential for transient stability problems. Page 8 of 11

A consultant has completed a system-wide stability study for FE that considered fault-induced single and multiple contingencies. A variety of load levels and transfer patterns were evaluated. For the single Category B contingencies, the consultant considered fault-induced outages of all 345-kV lines and all 345/138-kV transformers. As discussed below, selected Category C and D contingencies were also evaluated. Category C contingencies, as described in Reliability Standard TPL-003-0, are event(s) resulting in the loss of two or more multiple elements cascading outages are not acceptable. The type of Category C contingencies evaluated in the study were single-line-toground fault scenarios, with delayed clearing due to a stuck breaker or protection system failure. A Category D contingency, as described in Reliability Standard TPL-004-0, is an extreme event resulting in two or more (multiple) elements removed or cascading out of service. The type of Category D contingencies evaluated in the study were three phase-to-ground fault scenarios, with delayed clearing due to a stuck breaker or protection system failure. The consultant initially evaluated Category D scenarios. A few of the Category D scenarios resulted in units tripping but in no case did the tripping lead to cascading outages. The Category D scenarios that resulted in generator unit tripping were rerun by degrading the threephase fault to a single-phase fault (i.e., decrease the severity of the contingency to a Category C event). Results of this analysis indicated no unit tripping concerns for any of the single Category B or Category C contingency events. FE stated that it intends to perform dynamic simulations, on an annual basis, to assess the robustness of its under-voltage load shedding (UVLS), which inherently involves category C- and/or D-type scenarios. The study indicated the FE system encounters thermal or voltage limits prior to angular stability limits. FE is performing dynamic voltage stability analyses annually and is evaluating the need to perform additional annual stability studies. STATUS: Complete. Page 9 of 11

Recommendation 31 The audit team recommends that FE evaluate the use of a formal job task analysis (or use a similar tool) to identify tasks for each position in the System Control Center (SCC). This will target specific needs and the benefit of the training provided. FE used an internal audit team to perform a job task analysis (JTA) on the east and west transmission positions. Operator interviews have been completed. The results have been verified by management and are being incorporated into the JTA. FE has stated that the JTA will incorporate additional input from the supervisors and will be evaluated for future expansion. The FE Operations Training Department has reviewed the JTA and identified no critical gaps in the training program. Enhancements to the existing training program, however, have been implemented. STATUS: Complete. Recommendation 32 FE should research the personnel resource requirements for operating a DTS, looking particularly at the time and skills needed to run scenarios on the DTS. The audit team is concerned that FE may be underestimating the resources required to support this very important function. FE has developed a DTS at two separate locations, one in ECAR and the other in the Mid-Atlantic Area Council (MAAC). The DTS training sessions are designed so that operators work through scenarios as a team similar to actual operation. The DTS has dedicated trainers at both locations and the capability exists for mutual support. The DTS was operational in June 2004 with the first ECAR class presented in the fall. The DTS is in a series between the program development system (PDS) and the EMS. The EMS architecture requires that the DTS model be updated prior to the EMS being updated. Two full-time trainers are supported by as many as seven applications staff to accomplish these tasks. Positive point: FE demonstrated the use of the DTS in a training exercise. All phases of the demonstration were impressive, including the depth and completeness of the developed scenarios, the interest and involvement of the trainees, and the positive and challenging environment maintained by the trainer. STATUS: Complete. Page 10 of 11

Recommendation 33 The team recommends that the backup control center be functionally independent from the primary control center and that it not rely on the continued functionality of any computer or communications facilities located at the primary control center. The FE backup control center became operational in mid-april 2005 and a full-scale drill, whereby the ECAR portion of the FE control area was being operated from the backup site, was in effect during the FEVT site visit. The FEVT observed a portion of the drill inside the backup facility. The backup control center has the same real-time capabilities as the primary control center including the necessary support infrastructure. The FE backup control center is a viable option for many emergency scenarios. The transition from the primary to the backup control center is governed by procedures and working relationships with the generation company and the Midwest Independent Transmission System Operator (MISO). Further details relating to the backup control center have been redacted from the public version of this report due to critical infrastructure security concerns. STATUS: Not complete. Page 11 of 11