FB 16 Faculty of transport and communications, University of Sarajevo 5th Coordination meeting Project activities realisation: WP4 Pula, 10.06.2015.
I- QUESTIONNAIRES 16 WP4 OUTPUTS (FB16) II- DATABASE III- Assesment of the integration of the Adriatic port system with the hinterland: RAIL IV- Report on scenarios and investment needs: RAIL V- Guidelines: RAIL 16 1 16 16
I - QUESTIONNAIRES 4.1. Analysis of pass. traffic flows and ports capacity availability 4.2. Analysis of the existing and possible integration of Adriatic port system with the hinterland 4.3. Analysis of existing legislative and regulations 4.4. Analysis of the Scenarios of the pass.transport and infrastructure development 4.1.1. Basic port information 4.1.2. Passenger traffic volumes 4.1.3. Passenger facilities in ports 4.1.4. Multimodal connections 4.1.5. Enviromental aspect 4.1.6. SWOT analysis 4.2.1. Demografics data 4.2.2. Transport network data 4.2.3. General costs 4.2.4. Traffic flows 4.2.5. Capacities utilization 4.3.1. EU legistive of the sea pass. transport 4.3.2. National legisative and institutions 4.4.1. Ports construction and reconstruction plans 4.4.2. Expected traffics flows after improvements
II- DATABASE EA SEA WAY DB Relational Data base Microsoft Access2007: - 14 sections - 58 tables - 477 atributes - Quantitative monitoring and Project sustainability - Continuously updating of data - Sharing of data (partners, stakeholders) - Valuable tool for further researchs
P_ III PORT-RAIL CONNECTIONS III- Assesment of the integration of the Adriatic port system with the hinterland: RAIL Rail infrastructure in majority of A-I Region countries does not meet the standards required to satisfy the operational needs of the market. Rail traffic appears not particularly developed, mainly due to technical and infrastructure bottlenecks at border lines. - Lack of interoperability - Underinvestment
IV SCENARIOS IV- Report on scenarios and investment needs for the development of passenger traffic: RAIL Scenarios for rail traffic development by 2020 for the TER Master Plan Revision countries Country Passengers Bosnia and Herzegovina 400% Croatia 35% Italy 26% Slovenia 15% Serbia 156% Greece 25% 1. Assesment of different Studies on rail development scenarios (10-82%) 2. Development of scenarios for the 16 Project regions Methodology of proposed RAIL scenarios: - Basic scenarios for 2020 and 2030 -Pesimistic scenario -10% -Optimistic scenarios +10%
IV SCENARIOS 120.000.000 100.000.000 80.000.000 60.000.000 40.000.000 20.000.000 0 Domestic IV- Report on scenarios 800.000 900.000 and investment needs: RAIL Domestic 700.000 600.000 500.000 400.000 300.000 200.000 100.000 0 International International Table 19. Number of passangers scenarios devolpment of region Friuli-Venezia Giulia for 2020 and 2030 year Scenario Realisitic scenario Pessimisitic scenario (-10%) Optimisitic scenario (+10%) Year 2020 2030 2020 2030 2020 2030 Model N pass (mil) 17.537.947 20.233.828 15.784.152 18.210.445 19.291.742 22.257.211 Table 22: Number of passangers scenarios devolpment of region Ravenna Province for 2020 and 2030 year Scenario Realisitic scenario Pessimisitic scenario (-10%) Optimisitic scenario (+10%) Year 2020 2030 2020 2030 2020 2030 Model N pass (mil) 91.694.353 105.789.336 82.524.918 95.210.402 100.863.788 116.368.270
TEN-T priority project 29 (Railway axis of the Ionian/Adriatic intermodal corridor) and the connector links from Athens, V-GUIDELINES GUIDELINES FOR A MORE SUSTAINABLE PASSENGER MOBILITY The rail infrastructure development up to 2020(2030) should generate a significant improvement of main efficiency indicators of the rail network, specifically for the level of service, with functional benefits on the whole A-I rail network TEN-T priority projects (Railway axis of the Ionian/Adriatic intermodal corridor) and SEETO CN Interoperability improvements and positive effects in many cross border rail links Sustainable rail fleet management and rail network management, internalization and co-modality