CASE STUDY. NANKA RECENT LANDSLIDE PROJECT Phase 1 NOVEMBER OCTOBER 2016

Similar documents
CASE STUDY SERIES #10

CASE STUDY SERIES #14

CASE STUDY SERIES #24

CASE STUDY SERIES #10

ENVIROMESH DESIGN GUIDE SERIES VOLUME 3

B512 - GABIONS - OPSS 512

CASE STUDY SERIES #11

ENVIROMESH DESIGN GUIDE SERIES VOLUME 1

LINK MIDDLE EAST (LME) EARTH RETENTION AND PROTECTION SYSTEMS LME WELDED MESH GABION BOXES AND MATTRESSES

CONTRACT NO. : MTK11/2017 REHABILITATION OF MSAULI ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

Contact Details. Company Profile. Johannesburg Office. : Gabion (422466) :- :-

CASE STUDY SERIES #22

CONTRACT NO. : MTK 11/2018 REHABILITATION OF UITKYK ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

Section Gabions Tender No. [ ] Page The following detail drawings are appended hereto and form part of this section.

ITEM 750 ROCK FILTER DAMS

PVC COATED Welded steel wire mesh

Welded Mesh Gabions and Mattresses River Protection Design Guide Anping County Zhuoda Hardware Mesh Co.,Ltd. Wire Mesh Industrial Zone, Anping

RIVER MATTRESSES GABION BASKETS GEOTEXTILES TRAINING

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF GABIONS

Maccaferri Ltd 7400 The Quorum Oxford Business Park North Garsington Road Oxford OX4 2JZ Tel: Fax:

Embankments Gabions and Mattresses Ceranablok Redi-rock Cellular Confinement Rock Fall Protection Rockmat Rabbit / Badger Netting

GABIONS PVC Coated. Product Standard Specifications Installation Instructions Method of Measurement and Payment. Update: May 1999

GABIONS AND REVET MATTRESSES

A.2.a Random Riprap... Table

CONTRACT NO. : MTK 5/2018 REHABILITATION OF STEELPOORT ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

GABIONS - Galvanized

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES

Fabric Drop Inlet Protection

ROAD COMMISSION FOR OAKLAND COUNTY. SPECIAL PROVISION FOR GABION WALL RCOC/DESIGN: AB Page 1 of 8 RCOC12SP706F 10/28/2013

1:100 GABION WALLS LEGEND NOT FOR CONSTRUCTION TYPICAL DRAWING TEXT SETTING TYPE CHARACTER HEIGHT PEN SETUP FOR PLOTTING SUBTITLE

Diversion Dikes. Fe=0.95

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF GABIONS

Shoreline Erosion. How Erosion Occurs

ROADS: OPERATION AND MAINTENANCE

Click on image to enlarge.

LANE ENTERPRISES, INC. STANDARDS & SPECIFICATIONS

APPLICABILITY OF COMPOSITE SOIL REINFORCEMENT SYSTEM WALLS FOR HIGH RETAINING STRUCTURES.

421 - PIPE CULVERTS - OPSS 421 INDEX

ENGINEERING DIRECTIVE

SITE C14: H771:04 Slide and Culvert Distress

Bill of Quantity. Unit Price in words (Nu) Unit Price (Nu) Code Description Unit Quantity. Amount (Nu) CP-AR-

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR RIPRAP. Conditions Where Practice Applies

Gabions. Introduction

CHAPTER 15 - GABIONS, EROSION PROTECTION

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP

APPENDIX 5: CONSTRUCTION CHECKLISTS

MOA Project # Golden View Drive Intersection & Safety Upgrades

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Bill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No.

Earth Retaining System

Basal Reinforcement Constructing embankments over weak ground

This paper describes the salient features of a

GEOTECHNICAL SERVICES

Lake Lorelei Property Owners Association Rip Rap Standards Recommendations. Revision 0 February 2018

Appendix 11. Erosion and Sediment Control Management Plan. Appendix 11

STORM DRAINAGE DESIGN MANUAL

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2

SPECIFICATION FOR REINFORCED SOIL WALL

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

EverGuard Plaza Deck Roofing For Above-Grade Plaza Deck Applications

KEY MAP - SCALE 1:1,500,000 NOTE 1. SLIDE FEATURES RECORDED USING A HAND HELD GPS. SLIDE MOVEMENT DIRECTION 2014 PH26 INSPECTION PLAN

PHI GROUP RETAINING STRUCTURES A KELLER COMPANY. Gravity retaining walls Reinforced soil slopes and structures Design, supply and installation

CORRUGATED METAL PIPE Rugged, Dependable, Efficient

Seismically induced landslide mitigation using flexible slope stabilisation systems

Filter Tube Barriers (Instream)

earth retaining systems for slopes

Geoguide 6 The New Guide to Reinforced Fill Structure and Slope Design in Hong Kong

Flood Protection Work by Terramesh Wall

STANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS

SIEA LUNGGA POWER STATION RETAINING WALL

Plastic Piling Solutions

Earth Retaining Walls CIVL455 CHAPTER I: INTRODUCTION

CASE STUDY: Captain Cook Drive, NSW Ecoflex E Wall & E Pave Systems Project No: EAJ00264

410 PIPE SEWERS- OPSS 410

Permeable Pavement Fact Sheet

STANDARDIZATION IN GEOTECH SECTOR V.K.PATIL

HUITEX GEOCELL INSTALLATION MANUAL

Problems and solutions. Gravity earth retaining structures

Select Subgrade Material, Compacted

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent

ENGINEERING FEASIBILITY OF GABION STRUCTURES OVER REINFORCED CONCRETE STRUCTURES

SWPPP Cut Sheet: Filtrexx Vegetated Retaining Walls

Slope Stabilization: Slope Retention Systems

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION

Properly constructing and maintaining a road drainage system is the most effective ways to reduce flood damage

REINFORCED SYSTEMS LLP

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

CONSTRUCTION OF A TOE DRAINAGE STRUCTURE AT CABBAGE TREE HARBOUR

Applications. 5 reasons why you should choose Hebden X Grid cellular paving

Steel and Stones Architectural & Environmental-Friendly Applications of Maccaferri Wire Meshes

Appendix B.2. Construction Specifications for Infiltration Practices

Chapter 4. Main problems in a canal network 4.1 INTRODUCTION

The design and construction of a 60m high reinforced soil retaining wall in the UAE

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

A Complete Retaining Wall Solution >

CONSTRUCTION SPECIFICATION

B410 - PIPE SEWERS - OPSS 410

Module 4 Reinforced Soil Systems. Introduction To Geosynthetics In Transportation. Prepared by. For the Local Technical Assistance Program.

Transcription:

NOVEMBER 2011 - OCTOBER 2016 Location Nanka, Anambra State, Nigeria Client The Presidency, Ecological Fund Office, Abuja Project Large-scale erosion gully Lead designers Sani Mustapha and Partners

Project background In 2011 Rhino Construction Limited purchased the nationally advertised tender as part of a sealed bidding process. The procurement process was monitored by the Federal Ministry of Environment. 16 applications were submitted from competing construction companies. 14 companies submitted tenders for the project in June 2011. The procurement process was conducted under a sealed bid procedure which culminated in the public bid opening in July 2011. This preceded a further evaluation period, prior to the award of the final construction contract. In November 2011, the contract was awarded to Rhino Construction Limited by the Presidency, Ecological Fund Office in Abuja. Sani Mustapha and Partners were the appointed project designers to whom Rhino Construction would liaise throughout the various stages of construction. During November and December 2011, Rhino Construction initiated a number of pre-construction site surveys and then moved on to the site in January 2012, in order to commence works. Nanka Recent Landslide Erosion Project: mid-term construction, photographed in September 2012, showing landslides caused by seasonal storm water. Geologically, the area comprises friable, erodible and sandy soils which are further subject to the effects of extreme erosion caused by storm water run-off. The lack of proper drainage infrastructure would be addressed during the intial phase of groundworks and site preparation.

Project brief Phase 1 of the project is intended to provide gully base stabilisation through a combination of both hard and soft engineering solutions. This comprising of two mass gravity gabions walls with mattress toe protection coupled with extensive embankment planting on the slopes. Phase 2 is currently in planning to provide additional stability to Nanka and Oko embankments which will complete the scheme. The main challenges Local geology: friable, erodible and sandy soils which are further subject to the effects of extreme erosion caused by storm water run-off. Extremes of the local climate: here it is typically equatorial with six months of seasonal heavy rains. Training the local workforce: to assemble and install the large retaining walls to specification. Access for heavy machinery: break in to the gully through the Nanka side perimeter and create access to allow for the delivery of materials on site. The construction programme Groundworks Excavate drainage channels (for perimeter storm drains). Prepare ground, and install 3.9 km of reinforced concrete perimeter storm drains with stilling ponds. Cut and fill gully storm water damage. Shaping of the main embankments and groundworks preparation. Excavate site and prepare wall foundations. Install geotextile membranes. Rehabilitation of a 3.9 km long asphalted community road. Woven wire mesh mattresses and gabion baskets Installation of mattresses for ground stabilisation. 5m 2m 300mm woven mesh mattresses. 280 number supplied by Enviromesh UK. Installation of two stepped-face gabion retaining walls, 270 metres in length. 2m 1m 1m woven mesh baskets. 4,000 number supplied by Enviromesh UK. Substantial quantities of plastic coated lacing wire to joint the gabions and mattresses together to form one monolithic structure. Needle punched non-woven geotextile membrane to the rear of the walls and to their foundations. Remedial works Cut and fill and remove 240,000 cubic metres of landslide embankment material. Working with heavy machinery: to excavate site and prepare wall foundations, excavating drainage channels, with a build programme that would span three seasonal rains. Comprehensive programme of planting (fast-growing grasses, bamboo and cashew) to help reinstate landscaping to the embankments.

A community-wide initiative Prior to starting construction, Rhino Construction was keen to foster a good working relationship with the local community. By providing both training and employment to the local workforce, this local partnership approach contributed in a very positive sense to the success of the project as a whole. Geography, geology and climate Anambra State is situated in the south eastern belt, equidistant from Abuja (the capital), Lagos (the commercial capital) and Port Harcourt in the oil-rich area of the Niger Delta. The climate here is typically equatorial with six months of seasonal heavy rains. As a result of the climatic influences and local geological conditions (friable, erodible and sandy soils which are further subject to the effects of extreme erosion caused by storm water run-off and poor infrastructure planning), the area at Nanka has suffered; both in terms of the effects on the local community and housing, as well as through the inevitable land loss and the resultant drop in agricultural output. Preliminary works Our first challenge was to establish a clear plan for dealing with the heavy rain and the resultant storm water run-off. This involved a number of surveys and follow-up groundworks in the installation of the area s perimeter drainage channel systems. Storm water gully preparation: The site shown here during a survey to determine alignment and levels. The photo shows excavation and the first stages in blinding the drainage gullies (a total of 3.9 km of gullies would be constructed in total). These gullies were built to help manage and channel storm water run-off away from the main construction zone into a local creek.

The local Nanka construction team prior to initial training. Storm water drainage infrastructure Construction of the drainage infrastructure would need to consider the existing site topography, as well as providing an effective means to manage storm water and surface water run-off. The drains were designed and installed at the start of the project to carry heavy flood waters away from the main Nanka gully into the creek downstream. By improving communications with the rehabilitation of 3.9 km of local roadways, together with the associated drainage improvements, agricultural land would be once again freed-up to become productive. This would have the knock-on effect of providing reemployment for the local workforce at the end of the project. The concrete reinforcement steelwork prior to concrete pour, shown here during the early stages of the works. During the latter stages of gully construction, the completed and partly back-filled rectangular RFC drains. Remedial works included provision of asphalted community roads, fast-growing grasses and vegetation in order to reinstate areas affected by the site works.

The Nanka gully landslide erosion scheme Work in the main gully started in January 2012 and the initial, formidable challenge, was to break in to the gully through the Nanka side perimeter and create access for heavy machinery and trucks to the base of the gully. This was completed within three months with work proper starting on shaping the gully s embankments and preparing the wall foundations, from June 2012 onwards. Install hexagonal woven, wire mesh gabion mattresses for ground stabilisation/foundations. Individual mattress dimensions: 5m 2m 300mm 280 no. mattresses supplied by Enviromesh UK Install two, four-metre high stepped face gabion retaining walls, 270 metres in length (each wall). Individual basket dimensions: 2m 1m 1m 4,000 no. baskets supplied by Enviromesh UK Ongoing challenges Severe flooding occurred at the commencement of the seasonal rains in May 2012 as a result of a collapse of an existing storm water drain on the Oko side perimeter which created major landslides affecting the work in progress. An additional 240,000 cubic metres of landslide was cleared from the gully base, which inevitably delayed the build programme to the start of the following dry season. A view of one end of the Nanka gully ersoion scheme, with the construction of the first gabion wall underway. Shown here are the completed sections of the lowermost courses. As the project progressed, additional protection work was undertaken in the form of a lateral retaining wall installation at end of the two main structures. The scale of the project is evident to the far treeline.

Gabion wall installation Two parallel walls were constructed along the gully, each of which was 270 metres long by four metres high. The mass gravity walls were designed by the consultants and founded on a hexagonal woven wire mesh mattress apron. The courses of hexagonal woven wire mesh gabion baskets comprised a stepped face, with a geotextile membrane sited both behind and below the structure to prevent future erosion of the sub-soils through the walls. Working in the gully is subject to climate extremes of high humidity and temperature. The day-to-day welfare and safety of the workers was critical and keeping them hydrated was a major priority in order to maintain productivity. Typically, 200 cubic metres of gabions and mattresses were assembled, installed, jointed and filled with a granite 6G graded stone each day. Physical installation of the walls commenced February 2016 and were completed by September 2016. Gabion mesh wall installation: The build project in the Nanka gully at mid-term with the local workforce constructing the second gabion wall. High temperatures and humidity in this region required constant vigilance in monitoring the workers and keeping them properly hydrated.

SPECIFICATIONS GABION MESH BASKETS DOUBLE-TWIST 4,000 no. HEXAGONAL WOVEN MESH 80 mm 100 mm PVC COATED GREY GABION MESH MATTRESSES DOUBLE-TWIST 280 no. HEXAGONAL WOVEN MESH 60 mm 80 mm PVC COATED GREY GEOTEXTILE MEMBRANE 200 g/m 2 Three-dimensional rendering showing the location of the finished gabion retaining wall structure. The four-metre high walls were constructed to prevent further erosion of the gully and comprised four courses of gabion mesh baskets, four metres wide at the base tapering to one metre wide at the top. Each wall, 270 metres long is founded on 5.0m 2.0m 0.3m gabion mesh mattresses at the foot and backed with a geotextile membrane.

Material specifications Both the gabion mesh baskets and mattresses supplied by our UK technical partner, Enviromesh conformed to the following standards: BS EN 10223-3:2013 and has BBA certification Wire to have an ultimate tensile strength of between 350 to 550N/mm 2 Corrosion resistance: Zinc coated in accordance with BS EN 10244-2:2009 (Class A). Additional extruded organic polymer powder coating of nominal 0.5mm radial thickness Rockfill Granite: 6G grade (100mm to 200mm). Sourced from a local quarry in Ishiagu some 80 km away from the site. 16,000 tonnes at 35 tonnes per truck, two loads daily. Geotextile membranes Needle-punched, non-woven geotextile provided by our UK technical partners, Enviromesh. Heavy machinery Construction equipment included: Excavators, Caterpillar 960 Payloader and all terrain Volvo 35 tonne dumpers. Above, finished section of gabion mesh wall with dry stacked, hand-faced finish for consistent appearance and aesthetics; 6G graded stone being delivered to site via 35T dumper; mass gravity walls during construction phase with evidence of geotextile membrane in the foreground.

Above and left Mid term progress photo showing the fourth and final course of the wall under construction, using (6G) granite stone, with doubletwist hexagonal woven mesh gabion baskets. The finished quality of the facing stone having been hand-placed, is evident in the photo, left. The management and construction team (from left) Akins Awoyele, Procurement and Logistics Director, Rhino; Scot Kilgrow, Construction Manager Rhino; Neil Holmes, Director, Enviromesh; Trevor Jewitt, Managing Director, Rhino.

COMMENCEMENT NOVEMBER 2011 COMPLETION OCTOBER 2016 Location Nanka, Anambra State, Nigeria Client The Presidency, Ecological Fund Office, Abuja, Nigeria Lead Designers / Consultant Sani Mustapha and Partners Executing Agency Federal Ministry of Environment, Abuja Contractor, Port Harcourt, Rivers State, Nigeria Technical support Site training Gabion / mattress products Geotextile products Enviromesh, Etruria, Stoke-on-Trent, Staffordshire, United Kingdom Rhino Maritime Services & Construction Limited 229b Bodo Road, GRA Phase II, Port Harcourt, Rivers State, Nigeria Main Office +234 (0) 070 1229 1394 Email info@rhinonigeria.com Online www.rhinonigeria.com