NICK JOSCELYNE CONTRACTS MANAGER

Similar documents
JOHN THOMPSON JNR MANAGING DIRECTOR

MARTIN BARKER ENGINEER

DEMOLITION TRADE SPECIFICATION

Industrial Training Services Ltd

P r o f i l e A L Y A M A M A E N G I N E E R I N G C O M P A N Y ISO 9001

Environmental Policy

CONTRACT NO. : MTK 5/2018 REHABILITATION OF STEELPOORT ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

CONTRACT NO. : MTK11/2017 REHABILITATION OF MSAULI ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

CONTRACT NO. : MTK 11/2018 REHABILITATION OF UITKYK ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

CHRIS DOBSONMSc, BSc (Hons), CMIOSH, MIDE, ACQI, AACC HEALTH & SAFETY MANAGER

Appendix 15 Estimated costs of dams

MC2191 Rissington Bund and Pond Construction and Export of Excess Soils. Victory Field, Upper Rissington Report

engineering innovation

Level 2 NVQ Diploma in Demolition (Construction) Qualification Specification

CASE STUDY: Captain Cook Drive, NSW Ecoflex E Wall & E Pave Systems Project No: EAJ00264

Construction and Civil Engineering Operations Option Routes:

Industrial waste treatments, oil conditioners, soil stabilisation and solution providers

Method of Measurement for Road Works Series MM Earthworks

RE-USE AND RECYCLING OF UTILITY TRENCH ARISINGS. Introduction

Management Plan: Hazardous Materials Removal & Demolition

Project Portfolio. Demolition and Enabling Solutions for the Construction Industry. Demolition and Enabling Services for the Construction Industry

Civil Engineering Operations (Construction) v6

Civil Engineering Operations (Construction) v6

CIVIL ENGINEERING CONSTRUCTION SBC2253

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani

This qualification has been reviewed. The last date to meet the requirements is 17 December 2018.

D e m o l i t i o n demolition services

(Construction) Level 2 NVQ Diploma in Plant Operations (Cranes and Specialist Lifting) Level 2 NVQ Diploma in Plant Operations (Extracting)

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

CONSTRUCTION CONTRACTS SOLUTIONS

COMPANY PROFILE 2017

City Circle Recycling pty. ltd Construction & Demolition Waste Recycling Jones Rd Brooklyn

DURHAM DISTRICT SCHOOL BOARD. Property Report Former Grandview Public School Demolition Update

RIIMPO318A Conduct skid steer loader operations Unit descriptor. Employability skills Application of the unit. Competency field

RIIMPO323A Conduct civil construction dozer operations Unit descriptor

National Occupational Standards Development Pack for Plant Operations (Construction)

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

Construction and Demolition Waste Used as Recycled Aggregates in Concrete: Solutions for Increasing the Marketability of Recycled Aggregate Concrete

An indicative program for works to be conducted within the Sydney Park construction compound is provided in Table 6-20.

COSVR639 SQA Unit HL87 04 Install drainage

PERMEABLE GROUND STABILISATION TECHNOLOGY

ROCK HAWG TECHNOLOGY. Hardcore Solutions for the Toughest Applications

DEMOLITION Operate a hydraulic excavator on demolition sites

Resource efficient remediation

SPECIFICATION FOR EXCAVATING AND FILLING SECTION D20

CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES

This qualification is expiring. The last date to meet the requirements is 31 December 2010.

Design out. Waste Workshop. A guidance document produced by Network Rail in collaboration with:

Cambridgeshire County Council County Planning, Minerals and Waste

SECTION UNCLASSIFIED EXCAVATION AND GRADING

Special Provision Item P-152 Excavation and Embankment

APPENDIX A. A. Controlled hazardous substances as defined in COMAR ; C. Special medical waste as defined in COMAR

Waste Management Plan

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

Item No. Description Unit Quantity Rate (EUR) Amount (EUR) No 2

RIIMPO319A Conduct backhoe/loader operations Unit descriptor. Employability skills Application of the unit. Competency field

SECTION STRUCTURE EXCAVATION AND EARTHWORK

REPORT STATUS: DATE: Report n :

Earthwork Methods - Introduction. 1 Phase 1, Month 2

Quarries Skills Certification Scheme Candidate Pack for the Training and Assessment Programme 180 Degree Excavator

Level 2 NVQ Diploma in Piling Operations (Construction)

Waste Matters. Scott Hunter Head Waste Compliance Unit Coffs Harbour

SECTION 503 TEMPORARY PAVEMENT RESTORATION

m³ R R m 3.km R 8.00 R

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Highways Maintenance (Construction)

REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St.

NZQA Expiring unit standard version 3 Page 1 of 6

SECTION EROSION AND SEDIMENTATION CONTROL

Waste Management Plan Template (SC6.11)

Recycling in local authority highway works in Scotland Dr Mike Winter Regional Manager, TRL Scotland

Construction, Planning and the Built Environment Unit Content and Assessment Guidance (Attachments pathway)

TUTS are one of the most recognised brands in the construction training industry, with a passion of getting it right first time.

Capabilities Earthmoving Civil Engineering Commercial Development

13 Resource and Waste Management

13 Resource and Waste Management

20760/AS/ th December Mr Guy Titchmarsh Titchmarsh and Co. Ltd Prospect House Sovereign Street Leeds LS1 4BJ. Dear Guy

Demolition Permit Application

Quarries Skills Certification Scheme Candidate Pack for the Training and Assessment Programme Tracked Type Tractor/Dozer

Specialists in Earthworks and Excavation Services

New South Wales Concrete by-product Recycling and Disposal Industry Guidelines

Construction Waste Measurement Guide

METHOD STATEMENT. MVV O&M GmBH, South West Devon Waste Partnership & Kier Construction Limited. Document No: CMS/ E0788 /003 FOR

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL

SECTION DEMOLITION WASTE MANAGEMENT AND DISPOSAL

Health & Safety Plan DEMOLITION WORKS: No 2 Substation

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

55.3 AGGREGATE PRODUCTION AND STOCKPILING

Manningham Works Code of Practice

Working for the end of waste

Name Phone Logo. Construction Seta

Overview COSVR367. Lay modular pavement

The efficient use of materials in regeneration projects

Project # Brown County PCN i40h Replace Section Line Road Culvert

Project Portfolio. Demolition and Enabling Solutions for the Construction Industry. Demolition and Enabling Services for the Construction Industry

Training Standards COMPETENCE AND TRAINING STANDARDS

CONSTRUCTION. Plant Operations (Construction) Level 2 NVQ Certificate in. Qualification Specification

Elite SOIL TESTING PTY LTD

VertaseFLI. The UK experience and its applicability to the Irish market. Presented by Dr Chris Piddington

KENT BREEZE WIND FARMS

Transcription:

Thompsons of Prudhoe Ltd NICK JOSCELYNE CONTRACTS MANAGER Telephone: 01661 832 422 Mobile: 07919 491 726 EMail: info@thompsonsofprudhoe.com Year of birth: 1957 Nationality: British QUALIFICATIONS & TRAINING HSE Approved First Aid Certificate - British Red Cross Construction (Design & Management) Regulations - Neta Training Plant Safety Awareness - Construction Industry Training Board CITB 5 Day Site Management - Construction Industry Training Board Asbestos Awareness Chainsaw Safety & Safe Use Site Environmental Awareness Training Scheme (SEATS) CSCS PLANT INSTRUCTOR - Construction Industry Training Board Tracked Shovel Wheeled Shovel Ride on Roller Tracked Dozer 360o Excavator below 5t 360o Excavator above 5t CSCS PLANT OPERATOR - Construction Industry Training Board Dump Trucks below 10t Dump Trucks above 10t 180o Excavator below 5t 180o Excavator above 5t Rough Terrain Forklift Wheeled Loading Shovels Ride On Rollers 360o Excavator below 5t 360o Excavator above 5t Tracked Shovel Crawler Tractor / Dozer

Thompsons of Prudhoe Ltd EXPERIENCE 1998 Present Contracts Manager for earthworks projects Thompsons of Prudhoe Ltd 1990 1998 Foreman - W & M Thompson (Earthworks) Ltd Organised earthworks sites so that work was carried out to the appropriate standard with minimum risk to men, equipment and materials. Demonstrated a sound working knowledge of relevant legislation and approved codes of practice, including company policies and requirements. Ensured that statutory registers and records are correctly maintained, and that all relevant legislation, codes of practice and company rules are complied with. Provided constant supervision, information and instruction to employees, including the induction of new starters and sub-contractors. Ensured that all employees are fully conversant with requirements relevant to health and safety. Planned and maintained safe, tidy, and effective sites. Ensured that all plant and machinery, including power and hand tools, are maintained in good condition, and that staff are trained to a suitable level. 1980 1990 Plant Operative - W & M Thompson (Earthworks) Ltd Operated a wide selection of mobile plant on various earthworks contracts and a selection of demolition sites. Plant operated in a controlled and safe manner in accordance with company method statement and risk assessment, and in accordance with our clients requirements.

Thompsons of Prudhoe Ltd RECENT PROJECTS Excelsior Academy, Scotswood, Newcastle-Upon-Tyne Client :- Surgo Construction Ltd. Contract Value:- 685,000 Job Description:- Bulk Earthworks and filling works to enable the construction of buildings and pitches associated with the above academy. Work involves the excavation of approximately 120,000m3 of material to be cut and filled on site with approximately 30,000m3 to be removed offsite. Hard material excavated on site is to be crushed and re-used on site, approximately 3000m3, with a further 5,000m3 approximately of granular sub-base materials to be imported on to site. This work is to be completed in 12 weeks, by the end of March 2007. Ochre yard / Riverview, Gateshead. Client :- Bellway Homes Contract Value:- 700,000 Job Description:- Earthworks and demolition works carried out on the former railway stocking area to enable the construction of new housing and office development. Work included asbestos removal from, and demolition of, redundant buildings. All hard materials are to be crushed for reuse on site. Excavated materials to remain on site with contaminated materials removed offsite. Calders, Former Lead works, Newcastle Client :- Bellway Homes Contract Value:- 550,000 Job Description:- Demolition and clearance of former lead works to enable construction of new housing. rk involves the removal of all asbestos contamination and Japanese Knotweed contamination. The demolition of all buildings, dealing with any further above ground contamination removal. The excavation of slabs and foundations. All suitable material to be crushed to provide recycled aggregates. Approximate volume 25,000m3 Allotment Site, Walker Road, Newcastle Client :- Newcastle City Council Contract Value:- 1.2million Job Description:- Site Clearance of Old Allotments, Removal of Contaminated Material, Excavation, Importation, Mixing and Respreading of topsoil / subsoil (dilution of contaminants), Forming Clay Barrier, Validation Testing, Installation of Gabion Basket Retaining Structure, Construction of Internal Road / Footpath Scheme, Miscellaneous Civils Work

Thompsons of Prudhoe Ltd Site Remediation, Former Whessoe Engineering Works, Brinkburn Road, Darlington. Client :- Bellway Homes / Persimmon Homes Contract Value:- 1.2 million Engineer:- Hutter Jennings & Titchmarsh Mr Anthony Cowey 0191 2815617 Job Description:- Break out and crush all concrete within area of site, regrade contaminated material to suit new land profile, place crushed concrete in capillary break layer and cap site with imported clay, prior to construction of new housing. Bishop Middleham Landfill Site, County Durham Client:- Durham County Council Contract Value:- 650,000.00 Planning Supervisor Cleanaway Ltd Engineer:- Mr Phil Piper 01661 872640 Job Description:- Removal of contaminated material from infilled tip in disused quarry, contaminated material disposal of to a suitable licensed waste disposal sites. Backfill quarry with suitable material and cap site with imported clay. Topsoil and seed. Tees Estuary Environmental Scheme Brand Sands Access Road and Overbridge Phases 1 and 2 Primary Earthworks. Client:- Northumbrian Water Employer:- Entec UK Ltd Contract Value:- 900,000,00 Employers Rep:- Mr Alan Spedding Job Description:- Phase 1 consisted of the construction of a temporary access road, including regrade of existing ground and import of stone fill to form road, including associated ancillary works. Phase 2 consisted of stabilisation of ground through installation of band drains and importation of stone fill, to enable construction of permanent road and bridge... Broomhouse Link Road Construction of link road to new housing estate Client:- Bellway Homes Supervisor:- Fairhurst Environmental Division

Thompsons of Prudhoe Ltd Supervising Rep:- Mr B. Wardlaw Contract Value:- 300,000,00 Job Description:- Earthworks and ground treatments including excavation, reinforced soil mattress, grouting of mine works, storage, stockpiling, disposal, import, filling and compaction... Morrisons Superstore, Byker Client:- Morrisons Plc Supervisor:- Wates Construction Supervising Rep:- Alan Maskell Contract Value:- 600,000.00 Job Description:- Bulk excavations and removal of contaminated waste (5000m 3 ). On site crushing operations from concrete & brick left on site from the demolition works. Import backfill material to bring up to specified level... Job Title Music Centre, Gateshead Client Gateshead Council Planning Supervisor Laings Contract Value 300,00.00 Contact Brian Joyce Job Description Bulk Excavation, retaining wall & gabion basket construction. Backfill up to proposed level and behind wall structure... Job Title Scotswood Road, Newcastle upon Tyne Client South Benwell Regeneration Consortium Planning Supervisor Gleesons Contract Value 2.5 Million Contact Dave Fisher Job Description Bulk excavation, retaining wall construction, crushing excavated hardcore material. Backfill with crushed fill material and impact material up to proposed level.. Job Title A689 Sedgefield Client Durham County Council Planning Supervisor Balfour Beatty Construction Limited Contract Value 1 Million

Thompsons of Prudhoe Ltd Contact Job Description Phil Morgan Road widening - Bulk Excavations, Reduce Level dig, Import Backfill material