BROWARD COUNTY. Solicitation Bid #V P1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure

Similar documents
MEET THE AE TEAM YOUR CEI SOLUTION YOUR PARTNERS

CEI Services Transit Bus Stop Infrastructure

Construction Engineering and Inspection Services Pembroke Road from Dykes Road to Silver Shores Boulevard Broward County, FL

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

NOVEMBER 13, 2017 S O L I C I T A T I O N N O. V P

Introduction Who We Are

V P1 - CEI Services for Countywide Transit Bus Stop Infrastructure

Overview. Construction Engineering and Inspection Services for Wiles Road from Riverside Drive to Rock Island Road

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax

6/2017. Calvin, Giordano & Associates, Inc Eller Drive, Suite 600 Fort Lauderdale, FL 33316

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ARCHITECT - ENGINEER QUALIFICATIONS ESCAMBIA COUNTY, FL

City of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH)

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017

Bridge Design, Rehabilitation, and Management

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Fall 2018 Engineer Trainee Recruitment Preference Sheet

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

1/2017. Atkins North America, Inc W. Boy Scout Boulevard Tampa, FL 33607

TH 169/TH 494 DESIGN BUILD PROJECT

CITY OF SAFETY HARBOR ENGINEERING

CHAPTER 8 TRANSPORTATION ELEMENT

Table Related Arlington County Standards, Specification and Policies

TRANSPORTATION. Governmental Projects

Automated Machine Guidance

ADA Training Design Case Studies MnDOT

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees

ADDENDUM. DATE: 10/12/15 BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: BID DATE: 10/27/15 ADDENDUM No: 1

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report

RESURFACING, REHABILITATION, & RESTORATION

NW 47TH AVENUE PROJECT DEVELOPMENT & ENVIRONMENTAL

ADMINISTRATIVE AMENDMENTS TO THE TIP AND RTP

District 2 System Preservation Projects for FY 17 and FY 18

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director

SECTION 9000 MAINTENANCE SERVICES

1/2017. F&J Engineering Group, Inc North Lake Dasha Drive Plantation, FL 33324

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Florida Department of TRANSPORTATION FTBA CONSTRUCTION CONFERENCE January 17-18, 2019 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

NYSDOT TRANSPORTATION MAINTENANCE DIVISION PAVING PROJECT QUALITY ASSURANCE ASSESSMENT Rating Guidelines (Revision #1)

Design-Build and Design-Bid-Build

Project Type: Drainage and Storm Systems

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

CITY OF ANN ARBOR, MICHIGAN Public Services Area/Project Management Unit 301 E. Huron Street P.O. Box 8647, Ann Arbor, Michigan 48107

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

CITY OF NORTH ST. PAUL CITY COUNCIL WORKSHOP AGENDA JANUARY 2, :00 PM. North St. Paul City Hall Sandberg Room 2400 Margaret Street

Tangerine Road Dove Mountain Boulevard to La Cañada Drive

FY 2019 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Highway Construction Program

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Roadway Surfaces and Traffic Control Elements

} SURVEY SR 429 STANDARD CLEARING & GRUBBING LIMITS OF FRICTION COURSE 8" 8" 8" 8" 12' VARIES 24'-36' VARIES VARIES * 4' SHLDR. PAVT.

The Gateway Expressway FTBA Conference. February 2-3, 2017

Clinton Street Bridge over the Maumee River. ODOT Project DEF December 2, 2014 Stakeholder s Meeting

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Lesner Bridge Replacement

36 JASPER THPMAS ROAD CRAWFORDVILLE, FL.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

Project Status Report as of July 21, 2017

Greater Cleveland Regional Transit Authority

STU Funding Application Requirements

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012

June 5, Prepared By: Thompson Engineering, Inc Cottage Hill Road Ste. 190 Mobile, Al Office (251) Fax: (251)

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

Palm Coast-Daytona Beach-Port Orange Transportation Management Area (TMA) River to Sea TPO. TMA Federal Certification Review Closeout Presentation

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP &

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

L E T T E R O F R E S P O N S E

Farmington Metropolitan Planning Organization. Federal Fiscal Year Transportation Improvement Program (TIP)

MULTILANE RECONSTRUCTION State Road (SR) 30A (US 98) Panama City Beach Parkway from east of Nautilus Street to east of Richard Jackson Boulevard

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

EXHIBIT A SCOPE OF SERVICES MAINTENANCE PERSONNEL SUPPORT

CONSULTANT OF THE YEAR

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

Constructability Guidelines

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

Atlantic Street Bridge Project CTDOT Project Nos (Phase 1) & (Phase 2)

ADVERTISEMENT AUGUST 13, 2018 EXHIBIT A SCOPE OF SERVICES FOR DESIGN GROUP RESURFACING, REHABILITATION, & RESTORATION

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information

STAFF REPORT FOR MENDOCINO HISTORICAL REVIEW BOARD PERMIT MHRB # APRIL 4, LAKE MENDOCINO DRIVE UKIAH, CA 95482

BALFOUR INTERCHANGE PHASE 1 CONSTRUCTION PRE-BID MEETING

I-395 Reconstruction MDX SR Improvements I-95 Concrete Pavement Reconstruction

Transcription:

BROWARD COUNTY Solicitation Bid #V2114585P1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure YOUR CEI SOLUTION YOUR PARTNERS

Cory Nichols, P.E Quality Assurance Quality Control Roderick Myrick, P.E. Principal In Charge Ricardo Baraybar, P.E. Sr. Project Engineer Christina Yero, P.E. Contract Support Specialist Erica Valencia Resident Compliance Specialist Chris Morris Sr. Construction Inspector Israel Cabrera Sr. Construction Inspector Alex Baader Sr. Construction Inspector Torrance Thomas Construction Inspector Keith Perry Construction Inspector Expertise and Manpower Calvin Giordano + Associates, Inc.

Expertise Similar Experience Recent Projects: FDOT SR-A1A (Fort Lauderdale) 2017 FTBA Community Awareness Winner; Three roads from Mercedes River to Sunrise Blvd; FM 430601-1-52-01: Milling & resurfacing, widening, drainage including French drain, signalization improvements, sidewalk and curb ramp construction FDOT SR 441(Hallandale/Miami Gardens) New Construction with drainage, roadway widening, signalization, lighting, utility installations, sidewalk and curb, ADA ramps FDOT SR 441/US 700(Belle Glade/Pahokee) Major reconstruction/realignment to include de-muck and wick drain installations. Other improvements include drainage, base stabilization, geogrid and geosynthetic improvements. City of West Palm Beach; Clematis Street and Trolley Shelter Improvements; FDOT LAP Project FM 427652-1-58-01: Pedestrian, safety and landscape improvements including sidewalk construction and milling & resurfacing City of West Palm Beach; 15 th Street Beautification Project; FDOT LAP Project FM 431652-1-58-01: Scope included signalization and drainage improvements, milling & resurfacing, and bike lane striping FDEP; Knights Key and Spanish Harbor Historical Bridge Project FM 422628-1-58-01: Replacement of missing bridge span sections via proprietary pre-fabricated truss and precast concrete beams, existing deck milling and resurfacing, joint/crack cleaning and resealing, aluminum safety railing, auger cast piles, navigational lighting, striping and signage. The project also included the addition of two recreational multi-use shelters Expertise and Manpower Calvin Giordano + Associates, Inc.

BCT AND FTA EXPERIENCE Installation of Solar Powered Canopy Shelters throughout Broward County. I II III IV V VI BCT Bus Stop Improvements project. Coral Springs, City of Oakland Park, Sunrise, Fort Lauderdale. WO 44 SR 870 Commercial Boulevard. WO 158S B1 Fort Lauderdale. WO 268 City of North Lauderdale Transit Shelter program. WO 237 North Perry Airport Park and Ride. Design included over 175 parking spaces, new asphalt pavement, and ADA improvements YOUR CEI SOLUTION YOUR PARTNERS

SIDEWALK & ADA SAFETY Ensure contractor provide a safe permanent and temporary pedestrian sidewalks. This would include the addition of an ADA compliant TEMPORARY bus stop. We will maintain walkways free of hazards and ensure they are accessible to people with disabilities, including curb cuts, ramps, and railings where needed. YOUR CEI SOLUTION YOUR PARTNERS

MAINTENANCE OF TRAFFIC ( MOT) Ensure proper MOT will be installed for the sidewalks and travel lanes being closed. This includes sign spacing, barricade spacing, per FDOT INDEX 600 Experience with MOT on urban settings including driveways openings, business entrance, clear zone. Proper Public Information to ensure local businesses are aware of upcoming construction. YOUR CEI SOLUTION YOUR PARTNERS

INSPECTING AND DOCUMENTING Daily Field Logs Measuring installation for Quantities & Compliance Construction Photos. FDOT/ ACI concrete testing Shop Drawing review and implementation Verify field utility locates Compliance with project specifications YOUR CEI SOLUTION YOUR PARTNERS

AERIAL PHOTOGRAPHY YOUR CEI SOLUTION YOUR PARTNERS

AERIAL PHOTOGRAPHY YOUR CEI SOLUTION YOUR PARTNERS

QUESTIONS? - ISRAEL CABRERA SENIOR INSPECTOR - CHRIS MORRIS SENIOR INSPECTOR - ALEX BAADER SENIOR INSPECTOR - CHRISTINA YERO, P.E. CONTRACT SUPPORT SPECIALIST YOUR CEI SOLUTION YOUR PARTNERS