Permit No.: Will the lift take place on or near a road? Yes No

Similar documents
TLILIC3008A Licence to operate a slewing mobile crane (up to 20 tonnes)

2.19 FUMIGATION OF GRAIN VESSELS

Standard Operating Procedure Procedure Name: Handling of Precast Concrete Elements in Construction

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

BRITISH CONSTRUCTIONAL STEELWORK ASSOCIATION LIMITED

FORM Critical Lift Plan

Appendix 4A - SWMS Description

Port Authority of New South Wales Dangerous Goods Explosives Guidelines for Port of Eden

Operate a front end loader/backhoe

NZQA unit standard version 5 Page 1 of 5. Attach, lift, move, and place loads using mobile plant

State of Queensland (Department of Industrial Relations) 2006

IDENTIFICATION AND MANAGEMENT OF HAZARDS

Operate a dozer (wheeled and tracked)

CONTRACTOR WHS HAZARD STANDARD FORMWORK & FALSEWORK EXTERNAL USE ONLY

ESSENTIAL STANDARD no.1. Excavations

SITE SAFETY RULES - SILVERSTONE CLASSIC 2018

PrimePort Common User Safety Rules

KENNECOTT UTAH COPPER

HSEQ GUIDELINE FOR WORK

MID WEST PORTS TECHNICAL GUIDELINE

Golden Rule #5: Lifting & Mechanical Handling

Iron Ore Company of Canada Health, Safety & Environment

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

TLILIC2002 Licence to Operate an Order Picking Forklift Truck

Construction, Demolition & Excavation Works Doc Reference: DoMN-WHSMS 3.14 Version Number: 2.2

INTER PLANT STANDARD - STEEL INDUSTRY SAFETY PROCEDURE FOR WORKING AT HEIGHT BY REGULAR EMPLOYEES OF PLANTS / MINES

EPSILON (LOMS) LIFT PLAN. Date site visit carried out: Current Colour Code. Job Title:

Overhead Power Lines. Corporate Safety Policy Overhead Power Lines. (Cont.)

SAFETY FIRST: ZERO HARM

REFURBISHMENT DEMOLITION

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice)

Rigging Policy. Rigging Policy / Overhead Work. Worker Competency, Training and Certification. Equipment, Tools and Hanging Components

Corporate Safety Procedure Grid Mesh, Handrail and Flooring Removal. Table of Contents

Just What OSHA Ordered A quick look at Tuscaloosa s overall crane program.

Safe Work Method Statement

PHENIX PTY LTD OCCUPATIONAL HEALTH AND SAFETY POLICY. Date Policy will take effect

CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11

Modification History. Unit Descriptor. Application of the Unit. Licensing/Regulatory Information. Pre-Requisites

Permit to Work Manual

At Chimes Crane Hire, we are committed to the safety of our clients and to the reduction of risk factors that may occur during our operations.

SUP 02 Avoiding danger from underground services during ground works Unified procedures for use within NHSScotland

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) CS-OHS-11

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

HEALTH AND SAFETY GUIDANCE NOTE PERMIT TO WORK

PORT OF DAMPIER HANDLING OF GENERAL CARGO, GOODS AND EQUIPMENT PROCEDURE

CONSTRUCTION HEALTH AND SAFETY, AND INJURY PREVENTION Prevent hazards when working with cranes, lifting appliances and rigging on construction sites

WORK IN THE VICINITY OF UNDERGROUND ASSETS

This document should be read in conjunction with all other legislation, HSE and good practice guidance currently published -

BARRIERS AND BARRICADES STANDARD OPERATING PROCEDURE

PS 02 PLANT AND EQUIPMENT

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

Railway Interface Planning Scheme Rules (RIPS Rules)

LOADING UNLOADING OPERATIONS

WORK HEALTH AND SAFETY AUDIT STANDARD

BLUETEL NETWORKS PTE LTD 180 Paya Lebar Road #06-03 Yi Guang Building Singapore Tel Fax

OHS Regulations Reform. August 2016

Martins Mining and Civil [REGISTRATION OF INTEREST IN EMPLOYMENT]

Electrical Safety Management Plan (ESMP)

Safe Management of Contractors Policy

Perform basic scaffolding

SCAFFOLD PLAN SWMS & JSA also known as job safety analysis worksheet or scope of works

Document Revision Change Table Revision Number

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT

3. Why do we need an Identification Card? The Identification Card recognises you as being an employee of ARTC. The ARTC Identification Card also provi

Release: 1. CPCCBC4002A Manage occupational health and safety in the building and construction workplace

Meuangvang Development Co.LTD Standard Working Procedure 021 Vehicle Standards Operations and licensing

Work Integrated Learning Work-based Placement Agreement Form (WIL-WPAF)

Perform intermediate scaffolding operations

ANCHORAGE MUNICIPAL LIGHT & POWER ENGINEERING DIVISION

Work Health & Safety Procedure

WHS Management Plans

This involves the facilities on the site: A Transfer Station ( ktpa) Job Description for Site Supervisor

Blaster Trade Communication Study Guide Blasting Logs and Reports

BLU CODE - SHIP / SHORE SAFETY CHECKLIST

Construction Skills Certification Scheme

WORK IN THE VICINITY OF POWER POLES AND OVERHEAD LINES

Basic Service. This Section provides information regarding a. Introduction

Apply for Crane Permit

APPRENTICESHIP CODE OF PRACTICE

PROCEDURE. Revision: Operative Date: 01/06/2017 Department: Company. Author: D Steel CONTENTS

CPCCLSF3001A Licence to erect, alter and dismantle scaffolding intermediate level

WORK HEALTH AND SAFETY AUDIT STANDARD

Permits and authorisations

FATAL AND SEVERE RISKS CONTROLS STANDARD

Scaffolding and Raised Platforms

CORNER SLIDE RAIL OPEN PIT INSTALLATION INSTRUCTIONS

SAFE WORK METHOD STATEMENT. WORK ACTIVITY DESCRIPTION: Excavate and pour footing

iii. Statement(s) of the management commitment to health and safety that addresses physical, psychological, and social well-being of employees.

Safe planning and operation for Mobile Elevated Working Platforms (MEWPs)

SUPPLIER/SUBCONTRACTOR PURCHASING & RECEIPT PROCEDURE- PRO006.04

Marine Licence: 12/45/MLv1

Page1. Asbestos (Health & Safety) Policy. Issue Date 07/03/2017 Issue 1 Document No: 010 Uncontrolled when copied

WILLIAMS CRANES & RIGGING PTY LTD

PROCEDURE (Essex) / Linked SOP (Kent) Asbestos Management. Number: U 1005 Date Published: 22 July 2015

Franna Operations. This procedure applies to all Wheeler Cranes personnel operating Franna Cranes at any location at any time.

MOUNT RAINIER CHAPTER FEDERAL SAFETY AND HEALTH COUNCIL

COMPENDIUM OF TYPICAL HAZARDS ASSOCIATED WITH CLADDING WORKS AND THEIR CONTROL MEASURES IN THE CONSTRUCTION INDUSTRY CLADDING WORKS

SAFE WORK METHOD STATEMENT Part 1. Date:

Transcription:

Applicant Details Full Name: Email Address: Start Date/Time: Company: 24 hr Contact No.: Completion Date/Time: Reason for Lift Location of Lift Is the lift within the BHF/Mineral Storage area? Yes No Will the lift take place on or near a road? Yes No Do you require other permits to complete the lift? Yes No Attach all relevant documents e.g. Lift Plan (Attachment A), JSEA, Licences, Tickets etc. Type of Lift Multiple crane lift? Yes No Lift over operating facility/building? Yes No Lift over or near power lines? Yes No Lift on wharf/berth/jetty decks? Yes No Does exceed 85% of crane max load rating? Yes No Lift near overhead structures? Yes No Type of Crane Max Outrigger Or Axle Load (In Tonnes) Crane 1: Crane 1: Crane 2 (if multiple lift) Crane 2 (if multiple lift) Requirements Checklist A licensed and competent operator has completed a lift plan that has taken into account the crane s specifications, outrigger loads, soil bearing pressure and any other computations required to ensure the lift is safe and there will be no environmental incidents or damage to property (Attachment A provides a lift plan template for those operators without a company template of their own). A Job Safety and Environment Analysis (JSEA), including a pre-lift checklist has been completed and signed by all operators. The JSEA is to be provided to all adjacent leaseholders and operators, as well as held on site at all times during the works. All lifts will have barricading, signage and lighting as per legislation, regulations and standards. All operators associated with the lift are licensed and competent to carry out the work. All associated permits have been considered All applicable equipment and services are certified and meet all current legislation, regulations and standards. Works on or Adjacent to a Berth Will the works be undertaken on or adjacent to a berth, near bollards or close to mooring ropes? Yes No If Yes, I have read and understood the dangers/hazards associated with working close to moored ships as highlighted in the MWPA Induction. If the lift location is on Berth 1, 2, 3, 4,5 or 6 the exact proposed crane position must be clearly marked on the drawing included in Attachment B V10 31 July 2017 Page 1 of 5

Engineering Assessment Comments: Approved/Additional Mandatory Conditions Rejected Revise and Resubmit Applicant s Acceptance of Conditions/Requirements By signing this document, the undersigned has read, understood and accepted the terms and conditions of this application and declares that all information given is true and accurate. Applicant Approval issued only when signed by authorised MWPA representative and processed by the Duty Wharf Supervisor MWPA Final Approval & Processing Approved by: Maintenance Supervisor Project Engineer Operations Supervisor Wharf Supervisor Approvers Name of Processor: Signature: Date: Office Use Only Recorded in Work Permits Register Date: Notify Operations Supervisor if in BHF/Storage Area Completion advised and site checked Date: Add to Daily Works Update Application closed Date: Review if other Permits required MWPA Terms And Conditions 1. Applicants are responsible for ensuring they have a BHF Authority to Work Permit (F4.1m) which can be obtained through the Operations Supervisor ops@midwestports.com.au or 0407 797 311 when working on Berths 4, 5 and in the BHF area. When working on Berth 7, authorisation must be provided by Karara Mining Limited. 2. Minimum 1.2 m x 1.2 m rigid outrigger pads with pliant bottom layers to ensure uniform contact is required for all lifts on wharfs and berth decks in accordance with the MWPA Wharf Specifications Booklet. 3. To ensure timely approval, the application must be lodged at least 2 normal business days (Monday to Friday) prior to commencement of the work. 4. Multiple crane lifts, lifts over operating facilities or buildings, lifts over or close to power lines, lifts involving personnel cages and lifts which meet or exceed 85% of the crane s maximum rated load will require approval on each occasion. All other lifts may be approved for multiple occasions within a 1 month period at the MWPA s discretion. 5. To complete this application you will require a current copy of the MWPA Wharf Specifications Booklet to determine loading on berth decks, as well as a services plan of the area to ensure no damage to underground services. These can be arranged via request to the Duty Wharf Supervisor on (0) 9964 0510 or email permits@midwestports.com.au at least 2 days prior to your intention to lodge the application. 6. No lift can commence until a signed approved form from MWPA has been received (either in hard copy or via email) and any additional conditions/requirements have been accepted. 7. Any safety or environmental incidents, or damage during works must be reported to MWPA immediately. After hours please call the Duty Wharf Supervisor on 9964 0510. With regard to such incidents, you are responsible for making good the site and any other affected area to the satisfaction of the MWPA. 8. All personnel accessing MWPA sites are required to have completed the MWPA induction. Within the secure zone, individuals are required to carry their own Maritime Security Identification Card (MSIC) at all times. A visitor s pass may be obtained, although visitors must be escorted at all times by a holder of a current MSIC. 9. Any failure to gain approval for work, or failure to comply with MWPAs OHS-GUI-001 Contractor and Worker Requirements Handbook or Procedure 4.1 Permit to Work, may result in a penalty or permission to enter MWPA sites being withdrawn until all MWPA requirements are met. 10. No lift is to take place within 3 m of any wharf face, rock wall, retaining wall, excavation or similar without prior approval from the MWPA Engineering Department. 11. All appropriate measures to be taken to avoid damage to overhead or buried services and structures. 12. This permit is to be held on site at all times during the works. Should you have any queries, please contact MWPA Duty Wharf Supervisor on 9964 0510. Completed permits should be emailed to permits@midwestports.com.au. Custodian: HSEQ Manager V10 31 July 2017 Page 2 of 5

ATTACHMENT A - Crane Lift Plan 1. General Project: Location of lifting operation: Date/time of lifting operation: Who will be carrying out the lifting operation? 2. Details of the Load/s Description of the load/s: Overall Dimensions: Weight of Load: Kg/tonne Known Weight Estimated Weight Centre of Gravity: Obvious Estimated 3. Details of the Lifting Equipment Type of lifting equipment: Max SWL as Certified : Tonnes Date Last Certified: Max Boom/jib length: m Fly jib/offset: Max outrigger Loader: m Outrigger pad size: (refer to Wharf specification Book) Intended load radius: m SWL at this radius: Lift Percentage: (Distance between the load and the crane) 4. Personnel Involved in Lifting Operation Position Name Qualification/Experience Site Supervisor: Lifting Supervisor: Crane / Lifting Equipment Operator: Rigger: Dogman: Other: 5. Physical and Environment Consideration (Please Include Any Details In The Space Provided) Ground conditions: Yes N/A Ground made safe (e.g. placing steel plate)? Yes N/A Outriggers evenly extended? Obstacles: Yes No Are there any overhead obstacles such as power lines? Yes No Are there nearby buildings or structure, equipment or stacked materials that may obstruct lifting operation from being carried out safely? Lighting: Yes No Is the lighting condition adequate? Demarcation: Yes N/A Zone been barricaded (with warning signs and barriers) to prevent unauthorised access? V10 31 July 2017 Page 3 of 5

ATTACHMENT A - Crane Lift Plan Environment: Do not proceed with the lifting operation under the following circumstances: Thunderstorm and lightning strikes in the area. Ground condition checked after storm. Strong winds that may sway suspended load. Other circumstance (please specify): 6. Sequence / Special Precautions 7. Sketch of the Zone Operation (It is recommended that you include the initial location of the load, the final location and path of the load. It is also important to indicate any obstructions or equipment that may obstruct the lifting operation). If necessary, please use separate page for sketch to enhance detail. 8. Preparation And Review Prepared by: Time: Checked by: Time: V10 31 July 2017 Page 4 of 5

ATTACHMENT B Crane Location on Berth Note: Detailed berth deck crane load capacity plans can be viewed in the Wharf Specification Book available on the MWPA website under Publications & Forms: WHARF_SPECIFICATION_BOOKLET_Rev_H.pdf V10 31 July 2017 Page 5 of 5