Anacostia River Tunnel Briefing For: ANC 6B

Similar documents
Panel 2 Public Initiatives and Return on Investment. Clean Rivers Project

DC Clean Rivers Project

Synergy: Addressing Combined Sewer Overflows and Nitrogen

Bloomingdale Neighborhood Flooding Mitigation Washington, DC

DC CLEAN RIVERS PROJECT Northeast Boundary Tunnel and WMATA Coordination. Florida Avenue Site

6/25/2012. Overview. DC Combined Sewer System. Greening of DC Water s Infrastructure: Balancing Mandates, LID Options, and Stakeholder Interests

DC Water s Green Bond Report DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY FISCAL YEAR 2017

Technical Memorandum No. 1

Clean Rivers, Green District

Long Term Control Plan Consent Decree Status Report: Quarter No

The South Hartford Conveyance and Storage Tunnel

UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT FRIENDS OF THE EARTH AND SIERRA CLUB S MOTION TO INTERVENE AS PARTIES RESPONDENT

Foster Park Retrieval Shaft

E1/92. D.C. Water & Sewer Authority Series 2017 A Senior Lien Revenue Bonds. Green Evaluation. Transaction Overview. Green Evaluation Overview

Management of Aging Wastewater Infrastructure -- Challenges and Strategies --

Turning It Around: Lessons from the Anacostia Watershed Restoration

Contracting and Project Delivery Options

REDUCING COMBINED SEWER OVERFLOWS TO THE DISTRICT S WATERWAYS

District of Columbia Water and Sewer Authority George S. Hawkins, General Manager. Green Infrastructure Summit 2012

Green Infrastructure Modeling Strategies

Community Open House

DC STORMWATER PLAN CONSOLIDATED TOTAL MAXIMUM DAILY LOAD (TDML) IMPLEMENTATION PLAN

Federal Storm Water Requirements

Flood Hazard Mitigation at DC Water

Chesapeake Bay WIP Phase II Status in the COG Region

NJ Future CSO Permittee Meeting

Long-Term CSO Control Plan for North Dorchester Bay and the Reserved Channel

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Omaha CSO Program and the South Omaha Industrial Area Lift Station, Force Main and

Reducing Overflows using a Baffling Solution. OWEA AWWA 2014 Technical Conference & Expo August 28, 2014 Columbus, Ohio

Executive Summary. Introduction

Improvements to the Missouri River Wastewater Treatment Plant- Schedule BProject. Public Meeting June 4, 2013 South Omaha Public Library

Consent Decree Appendix 1. Control Measures and Performance Criteria

COG Region s Potomac Water Quality & Wastewater Treatment Fact Sheet (current draft, as of 7/28/09)

Fact Sheet. Chesapeake Bay Water Quality

Sanitary Sewer Rates Now and in the Future

Green Build-Out Model: Quantifying Stormwater Management Benefits of Trees & Green Roofs in the District of Columbia

Long-Term Control Plan Orientation. July 1, 2009

Hydraulic Modeling of Deep Tunnel Provides Cost Savings

Promoting Sustainable Cities

Turning a Negative into a Positive Negotiating a Consent Decree to Develop a Reasonable Endpoint

Chesapeake Bay Foundation 101. Robert Jennings

Chesapeake Bay Program in Pennsylvania. Karl G. Brown Executive Secretary PA State Conservation Commission

Sliplining 36-in. PCCP with Fusible PVC - DC Water's Long-Term Control Plan 'Division E'

LIMITED ENVIRONMENTAL REVIEW For. Northeast Ohio Regional Sewer District. Kingsbury Run Preliminary Engineering Early Action CSO CS

Municipal Separate Storm Sewer Systems (MS4) Implementation. Craig Carson Montgomery County Department of Environmental Protection

environment Natural Systems

FY 2018 Proposed Capital Improvement Program

Interim Interconnector Sewer Operational Plan

Chapter 5: Conveyance Assessment 2020 Baseline Conditions

RAINWATER HARVESTING RETURN ON INVESTMENT BENJAMIN SOJKA RAINWATER MANAGEMENT SOLUTIONS

Filtrate Treatment Facility Update

Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River

Newtown Creek Superfund Citizens Advisory Group Newtown Creek Combined Sewer Overflow Long Term Control Plan

This page is blank to facilitate double-sided printing.

YOUR DC WATER BILL WHAT S NEW? WHAT CHANGES CAN YOU EXPECT IN THE FUTURE? AOBA UTILITY COMMITTEE PRESENTATION APRIL 20, By:

Pre-Program Work. Omaha CSO Control Program. Agenda. City has worked on addressing CSOs for many years

Executive Budget Summary

Anacostia River Tunnel Design/Build Project Washington, DC

The Indianapolis Deep Tunnel Surge Analysis: Debugging Future Operational Issues in the Present

Community Dialogue Community Summit on Green Infrastructure Syracuse, New York. #ProjectCleanLake

LICK RUN WATERSHED MASTER PLAN. Community Design Workshop #1 August 11, 2011

Kings Run Project Public Meeting. July 31, 2014

Metropolitan Washington Regional Tree Canopy Workgroup

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by

UNITED STATES DISTRICT COURT for the DISTRICT OF MASSACHUSETTS

QUARTERLY OPERATIONS REPORT DISTRICT OF COLUMBIA COMBINED SEWER OVERFLOW FACILITIES FIRST QUARTER, 2011

Mill Creek/Peaks Branch/State- Thomas Drainage Relief Tunnel

For the reasons discussed in detail below, the Anacostia Riverkeeper, Anacostia

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Board of Directors

Restoring a National Treasure: Chesapeake Bay. Presented by Dan Nees, Director Environmental Finance Center University of Maryland April 27, 2007

Baltimore City Department of Public Works

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel

January 2019, Issue 77. PipeLine

The Chesapeake Bay TMDL -

Update: Anacostia Watershed Restoration: Prince George s County, Maryland

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD

Controlling CSO Discharges in the City of Toronto: Don River and Central Waterfront Project

Maryland. establishing ordinances.

Combined Sewer Overflow - Long Term Control Plan Update

CHESAPEAKE BAY TMDL PHASE III WIP NORTHERN VIRGINIA OPENING STAKEHOLDER MEETING AUGUST 17, 2018 NORMAND GOULET NVRC

Massachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan

QUARTERLY OPERATIONS REPORT DISTRICT OF COLUMBIA COMBINED SEWER OVERFLOW FACILITIES THIRD QUARTER 2007

Sanitary Sewer Overflow Consent Decree

Massachusetts Water Resources Authority. Combined Sewer Overflow Control Plan. Annual Progress Report 2005

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Board of Directors

Papillion Creek South Combined Sewer Backup and Major Street Flooding Recommended Approach TM

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

Meeting the Chesapeake Bay TMDL

Sustainability and Asset Protection at MWRA

Design and Implementation of the South Hartford CSO Tunnel

City of Columbus Update

QUARTERLY OPERATIONS REPORT DISTRICT OF COLUMBIA COMBINED SEWER OVERFLOW FACILITIES FIRST QUARTER, 2016

Metropolitan St. Louis Sewer District. CSO LTCP Update EXECUTIVE SUMMARY

Silicon Valley Clean Water Tunnels Sewer Tunnel Innovation in Silicon Valley

The Metropolitan District Status of LTCP Update. January 9, 2017

Building a Phase III WIP for Wastewater, Stormwater & Septic Systems

DC WATER CAPITAL IMPROVEMENT PROGRAM (CIP)

Draft CHESAPEAKE BAY TMDL Restoring West Virginia s waterways and Chesapeake Bay Public Meeting Romney, West Virginia November 4, 2010

Transcription:

District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing On: Anacostia River Tunnel Briefing For: ANC 6B October 26, 2011 Agenda Welcome and Introductions DC Water Organization and DC Clean Rivers Project (DCCR) Overview Importance of the Anacostia River Anacostia River Tunnel (ART) Project Overview Next Steps 2 1

Who We Are The District of Columbia Water and Sewer Authority (DC Water) Provides Drinking water distribution for DC Required wastewater collection and treatment Stormwater collection and conveyance Treats wastewater for a population of 2.1 million District of Columbia Montgomery & Prince George s counties, MD Fairfax & Loudoun counties, VA Operates the world s largest advanced wastewater treatment plant Average daily capacity, 370 mgd Peak daily capacity, 1 billion+ gallons Serves a regional area of approx. 725 Sq Mi Blue Plains Advanced Wastewater Treatment Plant 3 What is a CSO? 100% of Suburbs 67% of DC 0% of suburbs 33% of DC 2

DC Clean Rivers Project Overview What is our Purpose? Control combined sewer overflows to the Potomac River Anacostia River Rock Creek Relieve flooding in the Northeast Boundary Area Implemented under a Federal Consent Decree among US Environmental Protection Agency (US EPA)/ US Department of Justice (US DOJ) District of Columbia and DC Water 5 DC Clean Rivers Project Schedule Consent Decree Requirements Principal Consent Decree Milestones for Anacostia River CSO Control Projects Consent Decree Effective March 23, 2005 Submit Facility Plan (Complete) September 23, 2008 Start Design (Complete) March 23, 2009 Start Construction (Complete)* March 23, 2012 Place in Operation River Area Tunnels (South of RFK Stadium) Northeast Boundary Area Tunnels (North of RFK Stadium) March 23, 2018 March 23, 2025 * Construction began in February 2010 with the Division W Blue Plains Site Preparation Contract 6 3

DC Combined Sewer System 1/3 of DC area is served by combined sewers (12,478 acres) 53 CSO outfalls 15 to Anacostia 10 to Potomac 28 to Rock Creek Three receiving waters Anacostia River Potomac River Rock Creek 7 Importance of the Anacostia River Anacostia Native American Word (Anaquash) meaning village trading center Wetland loss, deforestation, and urbanization have significantly degraded the water quality of the Anacostia River Tidal waters flow 8.4 miles Joins Potomac at Hain s Point for 108 miles Empties into the Chesapeake Bay 8 4

Environmental Benefits of the DC Clean Rivers Project CSO Reduction 96% Reduction in CSO Volume: Anacostia: 2,142 to 54 mil gal/yr Potomac: 1,063 to 79 mil gal/yr Rock Creek: 49 to 5 mil gal/yr Number of Overflows Reduced: Anacostia: 75 to 2/yr Potomac: 74 to 4/yr Rock Creek: 30 to 4/yr Water Quality Improvement Reduced nitrogen Bacteria levels will be lower, dissolved oxygen will be higher Trash/Floatables Reduction Trash/floatables from CSOs will be practically eliminated Flooding Relief in Northeast Boundary Area 98% Reduction in CSOs to Anacostia River 9 DC Clean Rivers Project Funding Federal Funding $153.6 million since September 30, 2011 Working to get more funding Revenue from ratepayers Impervious Surface Charge Fiscal Year 2012 anticipated $302 million Wholesale Customers Customers in Maryland & Virginia pay approx. 7.1 percent on most of the project 10 5

Anacostia River Projects Project Snapshot 4 large storage/conveyance tunnels Dewatering pumping station at Blue Plains Pumping station replacement at Poplar Point Schedule LTCP = 20 years (2005-2025) Nitrogen = 2007-2015 Cost LTCP = $2.6 billion Nitrogen = $950 M Total > $3.5 billion 11 Anacostia River Tunnel Overview 23-foot diameter TBM tunnel Soft ground 100 ± feet deep and 12,500 feet long Mining from CSO-019 south to PP-JS 6 shafts (12 to 75-foot I.D.) 3 Adits (4.5 to 10-foot I.D.) 2 Diversion Structures 6 Odor Control and Venting Facilities Monitoring & Data Collection System System Start-up Design-build contract value: $200 $250 million CSO-019 CSO-018 M Street CSO-007 CSO-005 PP-JS 12 6

CSO-019 NPS property CSA: 3.75 Acres Two 75-foot ID shafts; ±105 feet deep to top of invert 100-foot long Inter-Shaft Connector Tunnel Odor Control and Venting Facility: Eastside Pumping Station Internal Hydraulic Structures in South Shaft Contractor interfaces CSO-019 Diversion and Overflow Facility 13 CSO-018 DDOT property CSA: 1.25 Acres 32-foot ID shaft; ±95 feet deep to top of invert 300-foot long, 10-foot ID adit Diversion Structure Odor Control and Venting Facility Internal Hydraulic Structures within Shaft Crossings: CSX Tracks and DDOT Retained Ramp 14 7

M Street DMPED property CSA: 1 Acre 62.5-foot ID shaft; ±110 feet deep to top of invert Odor Control and Venting Facility Internal Hydraulic Structures within Shaft Contractor interfaces M Street Diversions DMPED Development 15 CSO-007 DDOT property CSA: 2 Acres 12-foot ID shaft; ±100 feet deep to top of invert 30-foot long, 4.5-foot ID adit Diversion Structure Odor Control and Venting Facility Internal Hydraulic Structures within Shaft Contractor interfaces 11 th Street Bridge 16 8

CSO-005 NPS property CSA: 0.75 Acres 12-foot ID shaft; ± 105 feet deep to top of invert 20-foot long, 4.5-foot ID adit Diversion Structure Odor Control and Venting Facility Internal Hydraulic Structures within Shaft 17 Poplar Point DDOT property CSA: 0.80 Acres Internal Hydraulic Structures within Shaft Contractor interfaces Blue Plains Tunnel Poplar Point Pumping Station Replacement DDOT South Capitol Street Project. 18 9

ART Estimated Schedule Event Date Issue RFQ November 2011 Receive SOQ s January 2012 Shortlist January 2012 April 2012 Issue RFP April 2012 Collaboration period April 2012 Dec 2012 Receive proposals Dec 2012 Notice to proceed June 2013 Occupy site November 2013 Substantial Completion June 2017 Final Completion September 2017 19 Contact Us For more information about today s presentation, email: Emanuel Briggs; emanuel.briggs@dcwater.com For periodic program updates, visit us online at: www.dcwater.com/workzones/projects/cleanrivers.cfm District of Columbia Water and Sewer Authority 5000 Overlook Ave, SW Washington, DC 20032 20 10

Questions? 011 March 2012 11