Union County Vocational - Technical Schools Scotch Plains, New Jersey

Similar documents
ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

SECTION RESILIENT TILE FLOORING. A. Section includes vinyl composition floor tile and accessories indicated and as specified.

B. Store products in dry spaces protected from the weather, with ambient temperatures maintained between 50 and 90 deg F (10 and 32 deg C).

D. Maintenance data for resilient floor tile to include in Operating and Maintenance Manual specified in Division 1.

Bid No. B14-09 Building 900 Cafeteria, Multi-Purpose Room Renovation Flooring

STUDIO 2LR ARCHITECTURE + INTERIORS

B. Samples: For each exposed product and for each color and pattern specified.

SECTION RESILIENT FLOORING ACCESSORIES

Student Services & Classroom Addition

PART 1 GENERAL RESILIENT SHEET FLOORING

CONDUCTIVE RESILIENT FLOORING

SECTION RESILIENT ATHLETIC SURFACING. B. Related Sections: Section(s) related to this section include:

RESILIENT PHOTOLUMINESCENT STAIR TREADS

CONDUCTIVE RESILIENT FLOORING

LINOLEUM SHEET FLOORING

SECTION (09620) - RESILIENT ATHLETIC FLOORING

Section RESILIENT TILE FLOORING INCLUDING ECONATURALS RUBBER FLOOR TILE

RESILIENT ECO NATURALS, DEFIANT, AND PHOTOLUMINESCENT STAIR TREADS

Section RESILIENT TILE FLOORING INCLUDING VINYL COMPOSITION TILE

Section STATIC DISSIPATIVE RESILIENT FLOORING

SECTION TILE CARPETING

PART 1 GENERAL RESILIENT ACCESSORIES

RESILIENT ACCESSORIES

Section RESILIENT TILE FLOORING INCLUDING SOLID VINYL FLOOR TILE

RESILIENT RUBBER STAIR TREADS WITH RISER

ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE

Section RESILIENT SAFE-T VINYL SHEET FLOORING

End of Addendum No. 3

BuildingName The Description of the Project P DOCUMENTS

SPECIFICATIONS - CARPET TILE 09681

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

ARCHITECTURAL GUIDE SPECIFICATIONS

RESILIENT CORK TILE 3 PART SPECIFICATION #Z 624

SECTION RESILIENT TILE FLOORING

SECTION BROADLOOM CARPET

RESILIENT FLOORING

Section JOHNSONITE WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF THE USE OF ANY INFORMATION OR SPECIFICATIONS FOUND IN THIS DOCUMENT.

Chilewich 3-Part CSI Specifications 04 Format 01/17

SECTION (09650) - RESILIENT FLOORING

SECTION RESILIENT SHEET FLOORING

SECTION RESINOUS FLOORING

RESILIENT FLOORING: Hot and Heavy - Secoya

SECTION RESILIENT FLOORING

RESILIENT FLOORING: Select Step Wood

A. This section includes pre-finished Higuera Hardwoods bamboo flooring and accessories for floors and stairs.

Overall Thickness Wear Layer Thickness. Factory in. (2.0 mm) in. (2.0 mm) Diamond 10 Technology coatingcultured

A. Drawings and general provisions of the Contract apply to this Section including all documentation provided in RFP#

GUIDE SPECIFICATION

Section SECTION RESINOUS FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Product Size Thickness Installation direction Seams treatment

GUIDE SPECIFICATION

SECTION R CARPET PART 1 - GENERAL 1.1 SUMMARY

SECTION TERRAZZO FLOOR TILE

Technical Services. Product MM INCH Installation direction Seam treatment GTI CONTROL (welded) 625 X 625 mm 24.5 x 24.

*************************************************************************************

1. Review requirements in ANSI A for substrates and for preparation by other trades.

Sport M Plus / Full-Spread Standard Adhesive

A. Section includes hydraulic-cement-based, polymer-modified, self-leveling underlayment for application below interior floor coverings.

ARTIK ART & ARCHITECTURE STAGE FLOORING ASSEMBLY SECTION STAGE FLOORING ASSEMBLY

1. Material:Galvanized or aluminum-coated steel sheet or rolled zinc. 2. Shapes:

L AIR International manufactures a variety of pre-fabricated, modular sprung flooring systems for various applications, including:

Powerdek Fleck. SECTION Resilient Athletic Flooring

Student Services & Classroom Addition

A. General: Submit each item in this Article according to the Conditions of the Contract and Division 1 Specifications Sections

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

1. Division 09 Section "Rough Carpentry."

SECTION RESILIENT SHEET FLOORING

RESINOUS FLOORING

Technical Service. INSTALLATION INSTRUCTIONS FOR TARAFLEX SPORT PRODUCTS over Gypsum base Products. This document refers to the following products:

SECTION RESILIENT SHEET FLOORING

Control XT SECTION Resilient Athletic Flooring

1.6 QUALITY ASSURANCE A. Source Limitations for Tile: Obtain tile of each type and color or finish from one source or producer.

BENTLEY ELEMENTS COLLECTION LVT

LOOSE LAY INSTALLATION GUIDE PAGE 1 of 6

Installation Guide LVP Glue Down

LVP GLUE DOWN INSTALLATION GUIDE PAGE 1 of 6

WARNING: SHOULD THE INSTALLATION SEQUENCE NOT FOLLOWED. THE INSTALLATION WILL FAIL IMPORTANT: SEE PAGE 6 0F THIS DOCUMENT

FLEXMAR 3-Coat High-Build Colored Quartz System

StrataWorx Tile. Installation Guidelines 1. CONDITION YOUR SITE AND TEST 2. PREPARE THE FLOOR

Multi-Institutional Academic Health Science & Research Center Evansville, IN

SECTION RESILIENT TILE FLOORING PART 1 GENERAL

SECTION MOISTURE RESISTANT/WATER-PROOF FLOORING ADHESIVE FOR CONCRETE SLABS

Union County Vocational - Technical Schools Scotch Plains, New Jersey

SECTION WOOD STRIP FLOORING

FlexLok Adhesive Tabs for Carpet Tile

SECTION TILING

1.02 RELATED REQUIREMENTS NOTE:

1.02 RELATED REQUIREMENTS NOTE:

SECTION SUBSURFACE PREPARATION FOR FLOOR FINISHES

Suggested Specification for Tri-Patch Versatile Concrete Patching Compound

TILE TILE

Construction Specification

IVC US. Light Commercial Installation Guide - Sheet Vinyl. Leading the Way

SECTION and/or Resilient Sheet Flooring and/or Resilient Tile Flooring

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

UPOFLOOR Quartz Tile Architectural Guide Specification CSI/CSC Section Format [3-part] CSI Page Format

SECTION Resilient Athletic Flooring

Infinity Modular/Infinity Modular RE Carpet Tile Installation Guidelines

B. Related Sections: 1. Division 07 Section "Joint Sealants" for sealing of expansion, contraction, control, and isolation joints in tile surfaces.

SECTION Resilient Athletic Flooring

Transcription:

SECTION 096519 - RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Rubber floor tile. 2. Vinyl plank floor tile. 3. Vinyl composition floor tile. B. Related Sections: 1. Division 09 Section "Resilient Base and Accessories" for resilient wall and stair base. 2. Division 14 Section "Electric Traction Elevators" for elevator flooring. 1.3 ACTION SUBMITTALS A. Product Data: For each type of product. B. Samples: Full-size units of each color and pattern of floor tile required. C. Samples for Verification: Full-size units of each color and pattern of floor tile required. 1.4 CLOSEOUT SUBMITTALS A. Maintenance Data: For each type of floor tile to include in maintenance manuals. 1.5 MAINTENANCE MATERIAL SUBMITTALS A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Floor Tile: Furnish one box for every 50 boxes or fraction thereof, of each type, color, and pattern of floor tile installed. 1.6 QUALITY ASSURANCE A. Installer Qualifications: A qualified installer who employs workers for this Project who are competent in techniques required by manufacturer for floor tile installation and seaming method indicated. RESILIENT TILE FLOORING 096519-1

1. Engage an installer who employs workers for this Project who are trained or certified by floor tile manufacturer for installation techniques required. 1.7 DELIVERY, STORAGE, AND HANDLING A. Store floor tile and installation materials in dry spaces protected from the weather, with ambient temperatures maintained within range recommended by manufacturer, but not less than 50 deg F or more than 90 deg F. Store floor tiles on flat surfaces. 1.8 FIELD CONDITIONS A. Maintain ambient temperatures within range recommended by manufacturer, but not less than 70 deg F or more than 95 deg F, in spaces to receive floor tile during the following time periods: 1. 48 hours before installation. 2. During installation. 3. 48 hours after installation. B. After installation and until Substantial Completion, maintain ambient temperatures within range recommended by manufacturer, but not less than 55 deg F or more than 95 deg F. C. Close spaces to traffic during floor tile installation. D. Close spaces to traffic for 48 hours after floor tile installation. E. Install floor tile after other finishing operations, including painting, have been completed. PART 2 - PRODUCTS 2.1 PERFORMANCE REQUIREMENTS A. Fire-Test-Response Characteristics: For resilient tile flooring, as determined by testing identical products according to ASTM E 648 or NFPA 253 by a qualified testing agency. 1. Critical Radiant Flux Classification: Class I, not less than 0.45 W/sq. cm. 2.2 RUBBER FLOOR TILE B. Tile Standard: ASTM F 1344, Class I-A, homogeneous rubber tile, solid color. C. Hardness: Not less than 85 as required by ASTM F 1344, measured using Shore, Type A durometer per ASTM D 2240. D. Wearing Surface: Refer to Finish Schedule. E. Thickness: Refer to Finish Schedule. RESILIENT TILE FLOORING 096519-2

F. Size: Refer to Finish Schedule. 2.3 SOLID VINYL FLOOR TILE B. Tile Standard: ASTM F 1700. 1. Class: Class I, monolithic vinyl tile. 2. Type: A, smooth surface. C. Thickness: 0.120 inch. D. Size: As shown on Finish Schedule. E. Colors and Patterns: As indicated by manufacturer's designations. 2.4 VINYL COMPOSITION FLOOR TILE <Insert drawing designation> B. Tile Standard: ASTM F 1066, Class 1, solid-color tile. C. Wearing Surface: Smooth. D. Thickness: 0.125 inch. E. Size: 12 by 12 inches. F. Colors and Patterns: As indicated by manufacturer's designations. 2.5 INSTALLATION MATERIALS A. Trowelable Leveling and Patching Compounds: Latex-modified, portland cement based or blended hydraulic-cement-based formulation provided or approved by floor tile manufacturer for applications indicated. B. Adhesives: Water-resistant type recommended by floor tile and adhesive manufacturers to suit floor tile and substrate conditions indicated. C. Floor Polish: Provide protective, liquid floor-polish products recommended by floor tile manufacturer. 1. Joint-Sealant Color: Match floor tile. RESILIENT TILE FLOORING 096519-3

PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrates, with Installer present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work. B. Verify that finishes of substrates comply with tolerances and other requirements specified in other Sections and that substrates are free of cracks, ridges, depressions, scale, and foreign deposits that might interfere with adhesion of floor tile. C. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Prepare substrates according to manufacturer's written instructions to ensure adhesion of resilient products. B. Concrete Substrates: Prepare according to ASTM F 710. 1. Verify that substrates are dry and free of curing compounds, sealers, and hardeners. 2. Remove substrate coatings and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, using mechanical methods recommended by manufacturer. Do not use solvents. 3. Alkalinity and Adhesion Testing: Perform tests recommended by manufacturer. Proceed with installation only after substrates pass testing. 4. Moisture Testing: Perform tests recommended by manufacturer and as follows. Proceed with installation only after substrates pass testing. a. Perform anhydrous calcium chloride test, ASTM F 1869. Proceed with installation only after substrates have maximum moisture-vapor-emission rate of 3 lb of water/1000 sq. ft. in 24 hours. b. Perform relative humidity test using in situ probes, ASTM F 2170. Proceed with installation only after substrates have a maximum 75% relative humidity level measurement. C. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound and remove bumps and ridges to produce a uniform and smooth substrate. D. Do not install floor tiles until they are same temperature as space where they are to be installed. 1. Move resilient products and installation materials into spaces where they will be installed at least 48 hours in advance of installation. E. Sweep and vacuum clean substrates to be covered by resilient products immediately before installation. 3.3 FLOOR TILE INSTALLATION A. Comply with manufacturer's written instructions for installing floor tile. RESILIENT TILE FLOORING 096519-4

B. Lay out floor tiles from center marks established with principal walls, discounting minor offsets, so tiles at opposite edges of room are of equal width. Adjust as necessary to avoid using cut widths that equal less than one-half tile at perimeter. 1. Lay tiles in pattern indicated. C. Match floor tiles for color and pattern by selecting tiles from cartons in the same sequence as manufactured and packaged, if so numbered. Discard broken, cracked, chipped, or deformed tiles. D. Scribe, cut, and fit floor tiles to butt neatly and tightly to vertical surfaces and permanent fixtures including built-in furniture, cabinets, pipes, outlets, and door frames. E. Extend floor tiles into toe spaces, door reveals, closets, and similar openings. Extend floor tiles to center of door openings. F. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on floor tiles as marked on substrates. Use chalk or other nonpermanent, nonstaining marking device. G. Install floor tiles on covers for telephone and electrical ducts, building expansion-joint covers, and similar items in finished floor areas. Maintain overall continuity of color and pattern between pieces of tile installed on covers and adjoining tiles. Tightly adhere tile edges to substrates that abut covers and to cover perimeters. H. Adhere floor tiles to flooring substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other surface imperfections. 3.4 CLEANING AND PROTECTION A. Comply with manufacturer's written instructions for cleaning and protection of floor tile. B. Perform the following operations immediately after completing floor tile installation: 1. Remove adhesive and other blemishes from exposed surfaces. 2. Sweep and vacuum surfaces thoroughly. 3. Damp-mop surfaces to remove marks and soil. C. Protect floor tile products from mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period. D. Floor Polish: Remove soil, visible adhesive, and surface blemishes from floor tile surfaces before applying liquid floor polish. 1. Apply two coat(s). E. Cover floor tile until Substantial Completion. END OF SECTION 096519 RESILIENT TILE FLOORING 096519-5