Country Breakout Group 4 3R in Pakistan

Similar documents
Country Report. (Draft) < Islamic Republic of Pakistan>

Prospects of Renewable Energy in Pakistan

WASTE TO ENERGY POTENTIAL IN PAKISTAN

Wastewater Treatment Update

A SHARED VISION OF NAMAS: PRACTICAL EXAMPLES FROM LATIN AMERICA AND ASIA

PRO-POOR INITIATIVES IN WATER SUPPLY AND SANITATION BY GOVERNMENT OF PUNJAB PUBLIC HEALTH ENGINEERING DEPARTMENT

Irfan Yousuf, Director (CDM) Alternative Energy Development Board

Overview of energy portfolio in Pakistan

INDONESIA COUNTRY REPORT ON HA NOI 3R DECLARATION PROGRESS

In 1989, the United Nations Environment Program (UNEP) first introduced the concept of

IMPLEMENTATION OF SMM IN INDONESIA PERSPECTIVE

Colombia Waste NAMA. Strengthening the Solid Waste Sector while Reducing Emissions

PROMOTING DECENTRALIZED AND INTEGRATED RESOURCE RECOVERY CENTERS

Country Analysis Paper. < Cambodia>

City Report. (Draft) < Shimla, India>

STRATEGIES FOR SUSTAINABLE WASTE MANAGEMENT Ministerial round table Commission for Sustainable Development (CSD-18) United Nations, New York May 2010

Country Report on Waste management in Sri Lanka Status, Achievements and Challenges

Pre-Feasibility Study. (Injection Molding Plastic Products)

Review and Analysis of Current Solid Waste Management Situation in Urban Areas of Pakistan

Adopting better water management practice towards a more sustainable growth path in Pakistan

SUMMARY SECTOR ASSESSMENT: ENERGY 1

3R Portfolio - Good Practices to Promote the 3Rs - Country: Thailand

Urbanization in Pakistan: Urbanization in Pakistan: Challenges and Options Paki ki I stan nstitute of Devel E opment conomics (PIDE) Pakistan

3R Implementation in Indonesia. Mohammad Helmy Tri Bangun Laksono Dida Gardera

Waste Management in Thailand

LAHORE WASTE MANAGEMENT COMPANY

78% 94% Improved water 75% 4 hrs average water 49% Water, sanitation & hygiene (WASH) fact sheet. Punjab. province. WASH access 1. Punjab.

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1

Municipal Solid Waste Management Policy in Thailand. Pollution Control Department (PCD) Ministry of Natural Resources and Environment Thailand

GIZ Support to Ministry of Urban Development Training on Preparation of City Sanitation Plan Part III State of Telangana

Country Report. (Draft) < Afghanistan>

Form 3R Portfolio - Good Practices to Promote the 3Rs - Country: Thailand

Integrated Waste Management in Chiang Mai Province

Country Report. (Draft) < Indonesia>

Local Governmental Laws National Environmental Act Police Department

Solid Waste Management in Thailand: Policy and Implementation

Waste management in the Netherlands. Herman Huisman RWS Environment

Country Report. (Draft) < Republic of Kazakhstan >

Punjab - An Emerging Investment Hub. Seminar on investment opportunities in Pakistan Rome, Italy April 2016

MAHINDRA WORLD CITY, JAIPUR CLIMATE POSITIVE ROADMAP SUMMARY

UNIDO s Interven.ons for Industrial Development in Pakistan Ali Yasir Na.onal Project Manager Biomass Energy Project

EMPLOYERS FEDERATION OF PAKISTAN

Towards a Circular Economy in NL

Closing the Loop: Unlocking an inclusive circular economy approach. Learnings from Case Study in Pune 2018

Ministry of Power & Energy, Sri Lanka

Country Report Presentation: Pakistan Energy Crisis and Solution

City Report. (Draft) < Dhaka South>

Research Output in Natural Sciences and Agriculture during 2010 ( ***revised 9/12/2011) University Name

Toyama Framework on Material Cycles

Legal framework and policy issues for the management of municipal organic waste

Preparation of City Sanitation Plan Part III. Session 2: Technical Options for CSPs

Renewable Energy Technologies by PCRET. by Engr. Anwer Aziz Saeed Hussain PCRET

Introduction to Integrated Resource Recovery Center (IRRC) Approach

Pacific, 4-6 th March , India Bangkok, Thailand

Olufunto Boroffice Founder/CEO Chanja Datti Ltd Nigeria

NASUKA Center of Industrial Pollution Prevention Technology Semarang, Central Java, Indonesia

Experience of small-scale sanitation systems from Pakistan and Bangladesh: what can we learn?

Thailand Policy and Strategy for. Waste Management. Taweechai Jiaranaikhajorn. Environmentalist, Professional Level

Converting Waste Management Problems into Opportunities Presentation by UNEP

Opportunity Brief Horticulture Processing Facility in Sindh, Pakistan

PAKISTAN MARKET MONITORING BULLETIN

Country Questionnaire Prior to the Senior Officials Meeting On the 3R Initiative -THAILAND

EUROCITIES response to the circular economy package. February 2016

Strategies of Circular Economy in the Netherlands

Waste to Energy Options in Developing Countries: The GIZ Perspective

Overview of Wastes Management in Mauritius

Yohko MAKI Executive Director Kawasaki Environment Research Institute City of Kawasaki, JAPAN

SBP s Refinancing Scheme for Renewable Energy (Revised) Dr. Muhammad Saleem Additional Director State Bank of Pakistan

The Polish National Waste Management Plan 2014

NTRC. Pakistan Country Presentation

United Nations Statistics Division (UNSD) and United Nations Environment Programme (UNEP) QUESTIONNAIRE 2016 ON ENVIRONMENT STATISTICS

Waste management action plan for the municipality of Prishtina : [presentation given August 23, 2010]

Preserving scarce resources. Cesare Spreafico Director General, COREPLA, Italy

Environment Act: A Tool for Pollution Control. By: Araya Nuntapotidech Pollution Control Department Ministry of Natural Resources and Environment

CROP BULLETIN CONTENT

Systemic Waste Management Example: EcoVecindarios - Eco Neigbourhoods (Bolivia)

FOSTERING RESOURCE EFFICIENT & ZERO WASTE SYSTEMS IN NIGERIA: THE INDISPENSABLE ROLE OF THE PRIVATE SECTOR LAFARGE GLOBAL EXPERIENCE

(SIDE EVENT) Toward the Establishment the Bilateral Offset Credit Mechanism (BOCM) Utilisation to Support the NAMA Implementation

Powerful Waste Triple Bottom Line pillars of sustainability: Economical Social Environmental

Country Report. (Draft) < Solomon Islands>

Energy recovery from waste. Circular Economy meets Energy Union. Carsten Spohn German Association of Waste-to-Energy Plants

PAKISTAN Renewable Energy Distributed Generation NAMA

Resource Efficient Greening of Industry Initiative for Pakistan

CPEC: From Dream to Reality

COUNTRY PRESENTATION. Regarding PAKISTAN. TARIQ QAZI Chief Executive Officer NATIONAL TRANSMISSION & DESPATCH COMPANY PAKISTAN

Central America Actions taken by governments to improve air quality

Country Report of The Islamic Republic of Pakistan

WORKING PAPER. 1. Title of the Project: Construction of Landfill Site at Lakhodair, Lahore. 2. Introduction:

QUESTIONNAIRE 2018 ON ENVIRONMENT STATISTICS

David Hone World Business Council for Sustainable Development Energy and Climate

Country Report. (Draft) < Malaysia >

SOLID WASTE MANAGEMENT PROGRAM of QUEZON CITY

Low-carbon society development in Bangkok

Why Plan? Why we need to plan:

Resource Recirculation Policy of Korea In Moving towards a Resource efficient Economy

Leader in Media and Consumer Research

Saskatchewan Solid Waste Management Strategy (SWMS) November 9, 2017 SWRC Moose Jaw Workshop

Municipal Solid Waste Management Practices and Challenges in Cambodia

Country Report. (Draft) < Tonga >

Flood Related Activities:

Transcription:

Country Breakout Group 4 3R in Pakistan Achievements/initiatives, challenges and major plans National Productivity Organization

Outline Country Profile Major achievements/new initiatives in 3R areas Critical challenges Major plans, including mega-projects and master plans, in pipeline for future action

Pakistan s Country Profile Population (Million) 188.92 Population Density (People Per Sq. KM) 245 GDP, Per Capita (US$) 1,430 GDP Per Capita PPP (US$) 5,040 GDP (Billion US$) 270 CO2 emissions (metric tones per capita), 2013 Fossil fuel energy consumption (% of total), IEA Stats 2014 Renewable energy consumption (% of total final energy consumption), IEA Stats 2013 0.85 60.08 45.49 (Source: World Bank and International Energy Agency (IEA). Data is for Year 2015 except where year mentioned)

National Policies addressing 3R Policies directly and indirectly addressing 3R: The Pakistan Environmental Protection Act 1997 National Environment Policy 2005 National Sanitation Policy 2006 National Climate Change Policy 2012 National Development Strategy 2012 Hospital Waste Management Rules 2005 & 2014 Punjab Environmental Policy 2015 Draft Hazardous Waste And Hazardous Substances Rules, 2016 Draft Pakistan Environmental Protection Motor Vehicle Regulations 2016

The concept of 3Rs is managed through combination of formal (public and private) and informal sector. Key Ministries/Institution working on 3R related areas: Ministry of Climate Change, Ministry of Industries & Production, Ministry of Water & Power, Pakistan Environmental Protection Agency (Pak-EPA), Pakistan Council Of Renewable Energy Technologies (PCRET), Alternate Energy Development Board (AEDB), National Productivity Organization (NPO), National Energy Conservation Centre (ENERCON), Others 3R Stakeholders

Major Achievements / Initiatives Public Sector Establishment of Lahore Waste Management Company (LWMC) in cooperation with Turkey. Responsible for Solid Waste Collection, Transportation and Disposal etc. Modern corporate practices New era of modern integrated Solid Waste Management (SWM) Manual Cleaning Storage Waste Collection & Transportation Door to door collection Mechanical Sweeping & Washing

Major Achievements / Initiatives Public Sector ( contd) Establishment of following companies by Government of Punjab in collaboration with different stakeholders Multan Waste Management Company Rawalpindi Waste Management Company Sialkot Waste Management Company Bahawalpur Waste Management Company Gujranwala Waste Management Company Faisalabad Waste Management Company

Major Achievements / Initiatives Public Sector ( contd) Solid Waste Management Strategy for Tehsil Municipal Administration (TMA) Barikot, Khyber Pakhtunkhwa (KPK) Project implemented in 2014 by GIZ (German Cooperation) at Barikot, KPK. To transform Solid Waste into a viable and competitive industry relying upon a locally generated resource base. The strategy was developed to be implemented for five years and targeted 50% waste efficiency. The Barikot SWM strategy is based upon following four-pronged approach: Strengthening the institutional capacity of the Tehsil Municipal Administration (TMA) Barikot to better manage their solid waste problem Engaging major local stakeholders in the implementation of the strategy Utilisation of appropriate technical options to reduce, reuse & recycle waste The promotion of good governance and utilization of available legal frameworks

Major Achievements / Initiatives Public Sector ( contd) Resource Efficiency / Clean Technology Projects Energy Standards and Labeling Scheme National Energy Efficiency and Conservation Awards 2015-16 A study on Sustaining Growth: Cleaner Production in Pakistan Energy Efficiency Project for Textile Sector Energy Efficiency Project for Steel Sector Energy Efficiency in Buildings Cleaner Technology Program for Korangi Tanneries Environmental Technology Program for Industry Introduction of Cleaner technologies in Punjab Tanneries

Major Achievements / Initiatives Public Sector ( contd) Energy Generation Projects FFC Energy, 50 MW Wind project, Jhampir, District Thatta. ZorluEnerji, 56.4 MW Wind Project, Jhampir, District Thatta. Three Gorges Pakistan 50 MW Wind Project, Jhampir, District Thatta. Foundation Wind Energy I & II Pvt. Ltd, 100 MW, Gharo Sindh. Sapphire Wind Power (Pvt) Limited, 49.5 MW, Sindh Quaid-e-Azam Solar Power (Pvt.) Limited, 100 MW, Bahawalpur. Pakistan Parliament, 80 MW, Islamabad

Major Achievements / Initiatives Public Sector ( contd) Energy Generation Projects 2x660 MW Coal Fired Power Project, Sahiwal Coal Fired Power Project, Muzaffargarh Coal Fired Power Project, Rahim Yar Khan Soalr PV Power Plant at Punjab Marala (Lucky HPP)(Chenab)District Sialkot

Major Achievements / Initiatives Contribution of Private Sector Establishment of Lahore Compost (Pvt.) Ltd. A public private project; utilizes organic content of Municipal Solid Waste of Lahore City, mainly consisting of household kitchen waste, to convert it into compost (organic soil supplement), commonly known as Compost Fertilizer, through a process of 60 to 90 days of aerobic composting. Saving in waste handling cost (USD 6,500 per day) Environmentally safe waste disposal

Major Achievements / Initiatives Contribution of Private Sector ( contd) Establishment of Waste Busters Waste Busters is an independent private sector waste Management Company Offices located at Lahore, Karachi, Islamabad, Faisalabad, Gujrat, Peshawar, Quetta Segregate and recycle all the collected waste into various product streams such as Refuse Derived Fuel, organic fertilizers as well as recycled plastic and tetrapak products.

Major Achievements / Initiatives Contribution of Private Sector ( contd) Sale of Waste Contract (Refused Derived Fuel) LWMC signed an agreement with the M/s DG Khan cement in August 2011 for sale of waste. M/s D G Khan cement has built a Refuse Derived Fuel (RDF) plant for processing of 1000 tons of municipal waste. RDF is largely combustible components of municipal waste such as plastics and biodegradable waste. DG Khan Cement uses RDF in its cement plants as an additive fuel with coal.

Major Achievements / Initiatives International Agencies The Global Cleantech Innovation Programme (GCIP) Aims at developing a sustainable entrepreneurship ecosystem while supporting clean technology innovations in SMEs and startup entrepreneurs. Funded by the Global Environment Facility (GEF) and implemented by the United Nations Industrial Development Organization (UNIDO) with the support of local and international partners. Green Jobs promotion program for construction, tourism and energy sectors by International Labour Organiztion (ILO) WWF- Pakistan Green Office Initiative aims to greening office and business practices including green and socially responsible procurement. Some of petrochemical plants are already on Green Office.

Lack of awareness of polices Development of Policies Implementation mechanisms Massive population growth Industrial Development A lack of technical know-how Waste Agriculture Biomass (WAB) management capacities need to be built primarily within the agricultural sector. Awareness and understanding of the use of WAB is very poor, given that many farmers are illiterate and environmental education is non-existent Illegal e-waste trafficking Critical Challenges

Critical Challenges ( contd) The development of a functional SWM system requires a major investment and it may be difficult to give it priority over other resource demands such as energy. Funding from donor agencies to take lead in Waste Management can bring in a replicable moment by municipalities. Development of Strategy/Policy and Facilitation for establishing recycling plants including financial and institutional mechanisms needs to be focused; Promotion of Public Private Partnerships (PPP) and various incentives (providing land at low cost, Tax rebate, easy delivery of waste to recycling facility, etc.) needs to be realized to attract private investments. Source separation, Extended Producers Responsibility (EPR), awareness of people and capacity of government and private sector need to be improved. Already developed huge informal recycling sector should be brought under formal setting with necessary support of the government Lack of modern Waste Electrical and Electronic Equipment (WEEE) management facilities and mechanism

Pakistan Vision 2025 Major Plans 11th Five Year Plan 2013-18 Projects for promotion of generation of energy from waste Urban waste water treatment plants for its reuse will be encouraged through the public-private partnership. Provincial Cleaner Production Centers will be established to promote waste minimization, recycling and waste exchange. To treat and recycle industrial effluents, a Wastewater Treatment Programme will be initiated in the country in collaboration with the provincial governments. Installation of composting plants and scientific landfill sites Bio-remedial measures will be adopted for the waste water treatment. Sustainable monitoring and implementation of hospital (hazardous) waste management

Major Plans ( contd) Government aims to develop more waste to energy (wte) projects such as Khairpur wte, LWMC wte projects Plans of Lahore Waste Management Company (LWMC) Establishment of a Construction & Demolition (C&D) Waste recycling facility PET recycling (collect and crush plastic (PET) bottles transforming in PET flakes, which is a raw material for a range of products) To identify the informal waste pickers and engage them to raise their living standard, which will be achieved through cooperative (coop) model. A project on slaughtered animal waste disposal and thus generating biogas from the organic waste Exploring into the potential of generation of biogas from cattle s dung. A plant has been set up at DunyaPur, Chak 342 and Ichogil. The aim is to generate biogas and provide it to the residents of the respective villages. Government aims to replicate the model of LWMC to other parts of the country

Thank you