University of Michigan: Central Plant Distributed Control System Upgrades

Similar documents
DETERMINING THE RIGHT TIME TO UPGRADE

Control Systems. Engineering and Technical Services. From conception to completion, we are ready to make your control system project a success.

CONTROLS MODERNIZATION AT Entergy's Louisiana Station Cogeneration Facility Baton Rouge, LA

City of San Mateo Clean Water Program Programmable Logic Controller (PLC) and Human Machine Interface (HMI) Programming Services

Yokogawa Ends 2014 with a Bang: New CENTUM Release with Network-IO

Al Qaim IRAQ - Steam Turbines Control System AUTOMATION

ADDENDUM TO RFP DOCUMENTS. Date: November 5, 2018

An Evaluation of the Impact of Electronic Marshalling on a Process Safety Project Execution Process

Using Assessments to Improve System Availability

Optimal Control Systems Company Profile

Savannah River Section. DCS Migration: Overview of Practical Approach to Mitigating Risk

Christy Wegener, Director of Planning and Operations

POWER ENGINEERS We Help You Succeed

REQUEST FOR QUALIFICATIONS. Design/Build Project Number CP Power Plant - Boiler 10 Gas Burner Replacement

Han MK, Business Development (Power Generation), 23rd March 2010 ABB Power and Automation Days ABB in Power Generation

Value Driven Control System Migration

Ovation GE LM6000 Control System Retrofit

CONTROL SYSTEMS MIGRATIONS IN PHOSPHATE PLANTS: A ROAD MAP FOR SUCCESS. Richard Brooks & John O Toole. Hatch Queen Palm Drive Suite 100

Facilities Management Department Division and Unit Goals

Steps to a Successful SCADA Upgrade

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX N - Campus Utilities Assessment Findings

This document becomes a fully incorporated part of the specifications, and this letter constitutes legal notice of this requirement.

Water & Sewer Commission

Unified control system in power plant TCE approach for implementation in Indian context

Upgraded Controls Position McIntosh Plant for Efficient Operations

RECITALS TERMS AND CONDITIONS. Consultant will perform the services described in Exhibit A.

A Case Study of Latham Water District s Mohawk View High Lift Pump Station Rehabilitation

ICX-CMOS-E-2003 I&C Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

600 - Phase C Intermediate Review Checklist for the Architect- Engineer

MATERIAL AND WORKMANSHIP

Contracting 3 rd Party Major Maintenance Field Services K Pope & W Davis. 6/16/2010 6F Conference SA, Texas

This document describes how Austin implements projects using The Austin Method. Step 1 Preliminary Design and Engineering

Ohlone Community College District

Guideline HVAC&R Technical Requirements for The Commissioning Process

Step 1 Preliminary Design and Engineering

RECITALS TERMS AND CONDITIONS. The scope of work is contained in Exhibit A, attached hereto and incorporated herein.

Hands-on EPC Energy Solutions. Engineering, Procurement and Construction for Institutional, Industrial and Municipal Energy Centers

MINUTES OF THE MEETING SDSU CENTRAL HEATING PLANT BOILER REPLACEMENT AND PLANT UPGRADES June 17, 2011

AUTOMATED PEOPLE MOVER

COUNTY OF ROCKLAND Department of General Services Purchasing Division

Coen s Turnkey Retrofit Advantage

SERVICE OFFERINGS FOR POWER PLANT FINGERPRINT

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

Trinity Well Field and Production Facilities Project Management Using CMAR

REQUEST FOR QUALIFICATIONS CONSULTING EXECUTIVE ELECTRICAL ENGINEER FOR UNIVERSITY OF CALIFORNIA, SAN DIEGO

Information Technology Infrastructure Upgrades Advance Planning, Design, & Construction Administration Services Code Item 303

Objectives and Task Analysis for a Professional Small Wind Energy System Installer

RFP Questions and Answers 1 (Pre-Bid Meeting)

On-Line Performance at SaskPower Presented by: Scott McLeod January 13-16, 2009 Clearwater, Florida

IGSS at Odense Municipal District

TECHNOLOGY SOLUTIONS

Commissioning Guide. Transportation and Works Building Design and Construction Division

Exploring a University Based Microgrid

WENTWORTH INSTITUTE OF TECHNOLOGY

REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System

Virtual Integrated Plant Simulator (VIPS)

EXHIBIT 6 Preconstruction Work

The successful players in the next wave will adapt their development process and address these core issues. PATENT AND COPYRIGHT STATEMENT

Facilities Management Department Division and Unit Goals

Electronic document management offers many advantages

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

2012 Honeywell Users Group Americas Sustain.Ability. Ben Comtois Marjorie Ochsner 3rd Party Migration to Experion Sustainable and Flexible Solutions

EXHIBIT I SCOPE OF SUPPLY

Request for Bids. At The Greenville-Spartanburg International Airport

DIVISION 1- GENERAL REQUIREMENTS

CITY OF FERNDALE, WA PAGE 1

DIVIN MADAKKARA Engineer Loss Control, KOC

Pre-Bid Conference Agenda

STEAM TURBINE AND COMPRESSOR CONTROL RETROFIT

Process Automation Upgrade of the Gilder Creek WWTP: Results

SMART Platform Independent Design& Application Programming Tool

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

OPS WIFI UPGRADE REQUEST FOR PROPOSAL: ADDENDUM - 1

REQUEST FOR PROPOSAL ARCHITECTURAL & ENGINEERING SERVICES OTTAWA COUNTY ROAD COMMISSION COOPERSVILLE AREA MAINTENANCE COMPLEX

DeltaV OTS Express: A New Approach to Operator Training

CLEAN WATER SERVICES AND CAROLLO ENGINEERS, INC. RECITALS. 1. District and Consultant previously entered into the Master Contract.

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard

Gloucester Parkway Extension RFQ Information Meeting

Successful Migration of a Legacy Control System At Marathon Petroleum Company LLC

ADDENDUM NO. 2 Page 1 of 13

FACILITIES MANAGEMENT

Scope of Work Bid Package C-8 - West Overhead Doors

TABLE OF CONTENTS II. MISSION VISION & OBJECTIVES... 4 III. SERVICES ) INDUSTRIAL AUTOMATION SOLUTIONS... 5 I.

Job Title: Engineer Automation & Controls- Level I SCADA

Exhibit A - Scope of Services AMI Implementation Project Management Services

Large Scale Governor System Retrofits U.S. Army Corps of Engineers, North Pacific Region

SPECIFICATIONS SYSTEMS NEW INSTALLATION

DESIGN AND CONSTRUCTION STANDARDS OUTLINE SPECIFICATIONS

Proposal Data. Submittal Form

DATE: July 27, 2018 TO: All Bidders FROM: Jo Nell Miller, Purchasing Specialist SUBJECT: Addendum 2 Bid 550 Moorpark College Gymnasium Renovation

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016

Electrical services for cement plants

Ovation Simulation Solutions

DRAFT RESEARCH SUPPORT BUILDING AND INFRASTRUCTURE MODERNIZATION WORK BREAKDOWN STRUCTURE DICTIONARY. April 2009 SLAC I

Kent Morrisey, Business Development Manager Bailey Systems Evolution Planning Considerations. ABB Group March 26, 2012 Slide 1

Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017

REQUEST FOR QUALIFICATIONS

METERING INSTALLATION

Elgin/Lake Huron SCADA Upgrades SCADA Standards Section 300 Detailed Design and Construction

Transcription:

International District Energy Association University of Michigan: Central Plant Distributed Control System Upgrades Presented by Thomas J. Mergen, P.E. Stanley Consultants, Inc.

Agenda Background Predesign Phase Design Development Construction Document Bid/Award Phase Construction Phase Commissioning Phase

Background Central Power Plant Components Five Multi-Burner Dual Fuel Gas Boilers Two Combustion Turbines with HRSGs Three Turbine Generators

Background (continued) Existing DCS ABB Infi90 DCS Installed in 1990s ABB Letter Intent to Phase-Out Infi90 DCS University of Michigan Evaluated Control System Platforms and Chose Emerson Delta V (Competitive Bid)

Background (continued) University of Michigan Upgrade 2006 Delta V Connect PCU 9 PCU 19

Background (continued) Control System Goals Interface with Smart Field Devices Redundancy and Reliability Partitioning Equipment Power Supply Redundancy Open Source Communication Standards Incorporate Redundant Plant Master Controllers and Individual Boiler Master Station

Background (continued) Project Goals Project Schedule - Complete Project in Two Years (Design and Construction) Adhere to Planned Maintenance Schedule Increase Redundancy and Reliability Implement Project through Three Contracts Electrical Installation DCS Procurement Include Start-Up Control Room Upgrade

Predesign Phase Design Intent Document Held with Key Decision-Makers Project Scope and Goals Schedule and Phasing Identification of Problem Areas Identify Critical Issues Identify Key Personnel Field Survey

Design Development Develop Preliminary Documents and Construction Documents Location Plans Cable Schedules Panel Arrangement Drawings As-Built I/O Listing Construction Specifications Network Diagrams

Design Development (continued) NFPA 85 Audit Compliance Reports Single Burner Dual Fuel Boilers Multi-Burner Dual Fuel Burners HRSG FM Global Requirements Michigan State Inspector

Design Development - Keys Complete Field Survey Accurate I/O Listing Accurate Network Diagram Existing and New Keep Design Intent Current Identify Project Schedule Issues Cost Estimate Board of Regents Approval Package

Construction Document Finalize Design Development Documents Detailed Delta V Panel Layout Wiring Diagrams Cable Schedule I/O Listing Specifications Project Schedule

Construction Document Keys Close Coordination with Project Team Accurate Project Schedule Phasing Plan Week 1 Demo Week 2 Installation Week 3 Loop Checks Week 4 Start-Up and Commissioning

Construction Document Schedule/ Phasing Construction Execution Plan Identification of Key Resources Loop Checkout Teams Number of Operators Commissioning Team DCS Cabinet Procurement Phases Remove Delta V Connect Blocks Remove ABB Configurations Update Graphics-Remove Custom

Bid/Award Phase Prior to Issuing Bids Prequalify Acceptable Bidders Interview Potential Candidates Prebid Meeting Emphasis on Key Design Features in Contract Control Narratives Importance of Central Power Plant

Construction Phase Goals Maintain Schedule Finger on the Pulse Flexibility with Central Plant Operations

Construction Phase Phase 1 Partitioning Equipment among BOP Cabinets PCU 10 to PCU 9 and 19 Required to Turn Off PCU 10 and Still Run the Plant Procure PCU 10 Cabinet Hardware Factory Acceptance Test PCU 10, 9, and 19 Software Acceptance Test PCU 10, 9, and 19

Construction Phase (continued) Hardware Group 2 Completed Parallel with Phase 1 Shop Drawing Submittals and Review Procurement and Hardware Assembly Hardware Factory Acceptance Test Ship Hardware Group 2 Software Acceptance Test Held On-Site

Construction Phase (continued) Phase 2 Boiler 4 Phase 3 Boiler 3 Phase 4 Turbine Generator 1 Phase 5 Turbine Generator 7

Construction Phase (continued) Hardware Group 3 Completed Parallel with Phases 2 through 5 Shop Drawing Submittals and Review Procurement and Hardware Assembly Hardware Factory Acceptance Test Ship Hardware Group 3 to Site to Support Next Software Acceptance Test Held On-Site

Construction Phase (continued) Phase 6 Turbine Generator 8 Phase 7 Boilers 1 and 2 Phase 8 CT9 and Boiler 7 Phase 9 CT10 and Boiler 8 Phase 10 Boiler 6

Construction Phase (continued) Hardware Group 4 Completed Parallel with Phases 6 through 10 Shop Drawing Submittals and Review Procurement and Hardware Assembly Hardware Factory Acceptance Test Ship Hardware Group 4 Software Acceptance Test Held On-Site

Construction Phase (continued) Phase 11 Plant Master A Phase 12 Plant Master B Phase 13 Data Links Phase 14 Control Room

Construction Phase Schedule September '12 October '12 November '12 December '12 January '13 February '13 March'13 April'13 May'13 June'13 July'13 PCU 10 Completed DCS 9/17/2012 Boiler 1 PM Completed DCS 3/12/13 Boiler 2 PM Completed DCS 3/08/13 Boiler 3 PM completed DCS 11/16/12 Boiler 4 PM Completed DCS 10/26/12 Boiler 6 PM PM Completed Boiler 6 DCS 5/23/13 Boiler 7 PM PM Completed Boiler 7 DCS 4/11/13 T/G 9 PM PM Semi-Annual Completed T/G 9 DCS 4/11/13 Boiler 8 PM PM Completed Boiler 8 DCS 4/5/13 T/G 10 PM PM Semi-Annual Completed T/G 10 DCS 4/5/13 T/G 1 PM DCS Completed 1/18/13 T/G 7 Semi-Annual PM Completed DCS 12/21/12 T/G 8 Semi-Annual PM Completed DCS 2/15/13

Construction Phase Challenges Combustion Turbine Outage Moved Up in Schedule Dedicated Loop Check Teams

Construction Phase Control Room Upgrades New Versus Retrofit New Evans Consoles Retrofit University of Michigan Cabinet Shop Static Ground Carpet Quad-Monitor Workstations Two 60-Inch Monitors

Commissioning Phase Independent Commissioning Participated in Each Phase Provided Documentation

Project Keys Identifying Project Goals Upfront Design Intent Accurate Demolition Drawings Prequalifying DCS Contractors Factory Acceptance Testing

Project Keys Bi-Weekly Project Meetings Team Environment Design Team and University Plant Support

Thank you