STORM DRAINAGE CHAPTER 11

Similar documents
STORM DRAINAGE CHAPTER 11

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE Subsoil drains shall be piped to a storm Where it is not possible to convey the

CHAPTER 11 STORM DRAINAGE

CALIFORNIA PLUMBING CODE MATRIX ADOPTION TABLE CHAPTER 11 - STORM DRAINAGE

SANITARY DRAINAGE CHAPTER 30

for plumbing regulations.

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter X X X Adopt Entire Chapter as amended (amended sections listed below) X X X X X X

Amendments to the 2012 International Plumbing Code

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following storm drainage piping inside the building.

DIVISION 22 PLUMBING SECTION INTERIOR SANITARY WASTE AND VENT PIPING SYSTEM

AN ORDINANCE ADOPTING THE STATE OF ILLINOIS PLUMBING CODE AS THE PLUMBING CODE OF THE CITY OF ELGIN

Recommended Amendments to the 2015 International Plumbing Code North Central Texas Council of Governments Region

Charlottetown - Water & Sewer Utility Minimum Standard of Acceptability for Water, Sewer & Sprinkler Connections

Daytona Beach Pier Building Renovation Jun 2010

SANITARY WASTE AND VENT PIPING

GRAY WATER RECYCLING SYSTEMS

ORDINANCE NO. 14,490

SECTION FACILITY STORM DRAINAGE PIPING

CITY OF BRANSON MUNICIPLE CODE Chapter 18 BUILDINGS AND BUILDING REGULATIONS ARTICLE V. RESIDENTIAL CODE

Amendments to the 2006 International Plumbing Code

2012 International Plumbing Code. Exhibit D

WATER SUPPLY AND DISTRIBUTION Reserved

HYDRONIC PIPING CHAPTER 12

AN ORDINANCE ADOPTING THE STATE OF ILLINOIS PLUMBING CODE AS THE PLUMBING CODE OF THE CITY OF ELGIN

Amendments To. City of Chicago Plumbing Code. Feb. 27, 2002

BUILDING & FIRE CODES & AMENDMENTS Effective January 1, 2017

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

Town of Cornwall Water & Sewer Utility Corporation

Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12

SECTION (15150) - SANITARY WASTE AND VENT PIPING

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS IAPMO GUIDE CRITERIA FOR RECLAIMED WATER CONSERVATION SYSTEM FOR FLUSHING TOILETS

Building By-law #11996: Book II (Plumbing) - Insert Pages Set 3

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings

STANDARD SPECIFICATIONS

1 Exam Prep Florida Building Code- Plumbing, 2014 Tabs and Highlights

SUPPLEMENTAL MECHANICAL CORRECTION SHEET FOR SEWAGE EJECTORS AND SUMP PUMPS 2011 LAPC

HYDRONIC PIPING CHAPTER 12

A. This Section includes the following sanitary drainage piping specialties:

Errata for the 2003 Uniform Plumbing Code Study Guide (5th Printing)

Quarterly CEU Training - Pipe 05/08/ Isolation valves & bypass End Current Events Isolation valves important upstream and downstream (ACV can

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD

PLAN CHECK CORRECTION SHEET FOR METHANE MITIGATION SYSTEMS 2017 LAPC

SECTION SANITARY UTILITY SEWERAGE PIPING

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

City of Logan Sanitary Sewer Design Standards

SECTION PLUMBING PIPING SYSTEM

A. Piping materials shall bear label, stamp, or other markings of specified testing agency.

SEWER SYSTEM DESIGN GUIDELINES

Section 8.7 Building Storm Drainage Systems

University of Delaware

Student Services & Classroom Addition. A. This Section includes the following sanitary drainage piping specialties:

Union County Vocational - Technical Schools Scotch Plains, New Jersey. A. This Section includes the following sanitary drainage piping specialties:

A. This Section includes sanitary waste and vent piping inside the building and to locations indicated.

SECTION FACILITY STORM DRAINAGE PIPING

Ice Rink Renovation & New Clubhouse

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

ICC Plumbing Update. St Louis Missouri ASPE Chapter March 5, 2013

CHAPTER 7 SANITARY DRAINAGE SYSTEMS

PLAN CHECK CORRECTION SHEET FOR METHANE MITIGATION SYSTEMS 2014 LAPC

Summary of the 2011 Changes

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1

Copper-Type K soft Drawn 40, 50 HDPE 100 and larger

FLORIDA BUILDING CODE PLUMBING Revisions

A. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated.

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

DUKE UNIVERSITY CONSTRUCTION & DESIGN STANDARDS

GRAYWATER STANDARD PLAN For Simple Residential System

SUPPLEMENTAL 2011 PLUMBING CORRECTION SHEET FOR HIGH-RISES

SECTION FACILITY STORM DRAINAGE

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)

Level III Chapter 1 Worksheet

Table of Contents Rules Concerning Uniform Plumbing Code

International Plumbing Code 2006 Study Guide

WATER SUPPLY AND DISTRIBUTION

List of products of harmonised standards Code 28: PIPES-TANKS AND ANCILLARIES NOT IN CONTACT WITH WATER INTENDED FOR HUMAN CONSUMPTION

DONALA WATER AND SANITATION DISTRICT

PORT OF SAN FRANCISCO PLUMBING CODE. Based on the 2010 California Plumbing Codes

WATER SUPPLY AND DISTRIBUTION

SECTION PUBLIC WATER SERVICE CONNECTIONS

CHAPTER 7 SANITARY DRAINAGE

Beacon Hill Water & Sewer District Standard Specifications

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

T a b l e o f C o n t e n t s

TENOCHCA HALL - PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

SECTION PLUMBING PIPING

SPECIAL SPECIFICATION 3504 Septic Tank System

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

CHAPTER 7 SANITARY DRAINAGE

SECTION SANITARY SEWER SYSTEM

WASHOE COUNTY COMMUNITY SERVICES DEPARTMENT GRAVITY SEWER COLLECTION DESIGN STANDARDS

ROOF DRAINS TABLE OF CONTENTS

SECTION STORM DRAINAGE PIPING SPECIALTIES PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION PLUMBING PIPING SYSTEMS

NC State University Design and Construction Guidelines Division 33 Utilities

Transcription:

CHAPTER STORM DRAINAGE SECTION 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage, except in one- and two-family dwellings. 0.2 Where required. All roofs, paved areas, yards, courts and courtyards shall drain into a separate storm sewer system, or a combined sewer system, or to an approved place of disposal. 0. Prohibited drainage. Storm water shall not be drained into sewers intended for sewage only. 0. Tests. The conductors and the building storm drain shall be tested in accordance with Section 2. 0. Continuous flow. The size of a drainage pipe shall not be reduced in the direction of flow. 0. Fittings and connections. All connections and changes in direction of the storm drainage system shall be made with approved drainage-type fittings in accordance with Table 70.. The fittings shall not obstruct or retard flow in the system. 0.7 Roof design. Roofs shall be designed for the maximum possible depth of water that will pond thereon as determined by the relative levels of roof deck and overflow weirs, scuppers, edges or serviceable drains in combination with the deflected structural elements. In determining the maximum possible depth of water, all primary roof drainage means shall be assumed to be blocked. 0. Cleanouts required. Cleanouts shall be installed in the storm drainage system and shall comply with the provisions of this code for sanitary drainage pipe cleanouts. Exception: Subsurface drainage system. 0.9 Backwater valves. Backwater valves installed in a storm drainage system shall conform to Section 7. SECTION 02 MATERIALS 02. General. The materials and methods utilized for the construction and installation of storm drainage systems shall comply with this section and the applicable provisions of Chapter 7. 02.2 Inside storm drainage conductors. Inside storm drainage conductors installed above ground shall conform to one of the standards listed in Table 702.. 02. Underground building storm drain pipe. Underground building storm drain pipe shall conform to one of the standards listed in Table 702.2. 02. Building storm sewer pipe. Building storm sewer pipe shall conform to one of the standards listed in Table 02.. TABLE 02. BUILDING STORM SEWER PIPE MATERIAL Acrylonitrile butadiene styrene (ABS) plastic pipe Asbestos-cement pipe ASTM C 2 Cast-iron pipe Concrete pipe Copper or copper-alloy tubing (Type K, L, M or DWV) Polyvinyl chloride (PVC) plastic pipe (Type DWV, SDR2, SDR, SDR, PS0 or PS00) STANDARD ASTM D 2; ASTM D 27; ASTM F 2 ASTM A 7; ASTM A ; CISPI 0 ASTM C ; ASTM C 7; CAN/CSA A27.M; CAN/CSA A27.2M ASTM B 7; ASTM B ; ASTM B 2; ASTM B 0 ASTM D 2; ASTM D 0; ASTM F 9; CSA-B2.2; CAN/CSA-B2. Vitrified clay pipe ASTM C ; ASTM C 700 Stainless steel drainage systems, Type L ASME A2.. 02. Subsoil drain pipe. Subsoil drains shall be open-jointed, horizontally split or perforated pipe conforming to one of the standards listed in Table 02.. MATERIAL TABLE 02. SUBSOIL DRAIN PIPE Asbestos-cement pipe ASTM C 0 STANDARD Cast-iron pipe ASTM A 7; ASTM A ; CISPI 0 Polyethylene (PE) plastic pipe ASTM F 0 Polyvinyl chloride (PVC) Plastic pipe (type sewer pipe, PS2, PS0 or PS00) ASTM D 2729; ASTM F 9; CSA-B 2.2; CAN/CSA-B2. Vitrified clay pipe ASTM C ; ASTM C 700 Stainless steel drainage systems, Type L ASME A2.. 02. Roof drains. Roof drains shall conform to ASME A2.2.2M or ASME A2... 02.7 Fittings. Pipe fittings shall be approved for installation with the piping material installed, and shall conform to the respective pipe standards or one of the standards listed in Table 02.7. The fittings shall not have ledges, shoulders or reductions capable of retarding or obstructing flow in the piping. 200 NORTH CAROLINA PLUMBING CODE 7

Threaded drainage pipe fittings shall be of the recessed drainage type. MATERIAL Acrylonitrile butadiene styrene (ABS) plastic Cast-iron Chlorinated polyvinyl chloride (CPVC) plastic TABLE 02.7 PIPE FITTINGS STANDARD ASTM D 2; ASTM D 2 ASME B.; ASME B.2; ASTM A ; CISPI 0; ASTM A 7 ASTM F 7; ASTM F ; ASTM F 9 ASME B.; ASME B.; Copper or copper alloy ASME B.22; ASME B.2; ASME B.2; ASME B.29 Gray iron and ductile iron AWWA C0 Malleable iron ASME B. Plastic, general ASTM F 09 Polyethylene (PE) plastic ASTM D 209 Polyvinyl chloride (PVC) plastic Steel Stainless steel drainage Systems, Type L ASTM D 2; ASTM D 2; ASTM D 27; CSA-B7.2; ASTM D 2; ASTM F (0 inches diameter and larger) ASME B.9; ASME B.; ASME B.2 ASME A2.. SECTION 0 TRAPS 0. Main trap. Leaders and storm drains connected to a combined sewer shall be trapped. Individual storm water traps shall be installed on the storm water drain branch serving each conductor, or a single trap shall be installed in the main storm drain just before its connection with the combined building sewer or the public sewer. 0.2 Material. Storm water traps shall be of the same material as the piping system to which they are attached. 0. Size. Traps for individual conductors shall be the same size as the horizontal drain to which they are connected. 0. Cleanout. An accessible cleanout shall be installed on the building side of the trap. SECTION 0 CONDUCTORS AND CONNECTIONS 0. Prohibited use. Conductor pipes shall not be used as soil, waste or vent pipes, and soil, waste or vent pipes shall not be used as conductors. 0.2 Combining storm with sanitary drainage. The sanitary and storm drainage systems of a structure shall be entirely separate except where combined sewer systems are utilized. Where a combined sewer is utilized, the building storm drain shall be connected in the same horizontal plane through a single-wye fitting to the combined sewer at least 0 feet (0 mm) downstream from any soil stack. 0. Floor drains. Floor drains shall not be connected to a storm drain. SECTION 0 ROOF DRAINS 0. Strainers. Roof drains shall have strainers extending not less than inches (02 mm) above the surface of the roof immediately adjacent to the roof drain. Strainers shall have an available inlet area, above roof level, of not less than one and one-half times the area of the conductor or leader to which the drain is connected. 0.2 Flat decks. Roof drain strainers for use on sun decks, parking decks and similar areas that are normally serviced and maintained shall comply with Section 0. or shall be of the flat-surface type, installed level with the deck, with an available inlet area not less than two times the area of the conductor or leader to which the drain is connected. 0. Roof drain flashings. The connection between roofs and roof drains which pass through the roof and into the interior of the building shall be made water tight by the use of approved flashing material. SECTION 0 SIZE OF CONDUCTORS, LEADERS AND STORM DRAINS 0. General. The size of the vertical conductors and leaders, building storm drains, building storm sewers, and any horizontal branches of such drains or sewers shall be based on the 00-year hourly rainfall rate indicated in Figure 0. or on other rainfall rates determined from approved local weather data. 0.2 Vertical conductors and leaders. Vertical conductors and leaders shall be sized for the maximum projected roof area, in accordance with Table 0.2. 0. Building storm drains and sewers. The size of the building storm drain, building storm sewer and their horizontal branches having a slope of one-half unit or less vertical in 2 units horizontal (-percent slope) shall be based on the maximum projected roof area in accordance with Table 0.. The minimum slope of horizontal branches shall be one-eighth unit vertical in 2 units horizontal (-percent slope) unless otherwise approved. 0. Vertical walls. In sizing roof drains and storm drainage piping, one-half of the area of any vertical wall that diverts rainwater to the roof shall be added to the projected roof area for inclusion in calculating the required size of vertical conductors, leaders and horizontal storm drainage piping. 0. Parapet wall scupper location. Parapet wall roof drainage scupper and overflow scupper location shall comply 7 200 NORTH CAROLINA PLUMBING CODE

FIGURE 0. 00-YEAR, -HOUR RAINFALL (INCHES/HOUR) NORTH CAROLINA FOR PRIMARY ROOF DRAINS For SI: inch = 2. mm. Source: National Weather Service, National Oceanic and Atmospheric Administration, Washington D.C. 200 NORTH CAROLINA PLUMBING CODE 77

FIGURE 0.(a) continued 00-YEAR, -MINUTE RAINFALL (INCHES/HOUR) NORTH CAROLINA FOR SECONDARY ROOF DRAINS For SI: inch = 2. mm. Source: National Weather Service, National Oceanic and Atmospheric Administration, Washington D.C. 7 200 NORTH CAROLINA PLUMBING CODE

with the requirements of Figure 07. from the International Plumbing Code Commentary. 0. Size of roof gutters. The size of semicircular gutters shall be based on the maximum projected roof area in accordance with Table 0.. SECTION 07 SECONDARY (EMERGENCY) ROOF DRAINS 07. Secondary drainage required. Secondary (emergency) roof drains or scuppers shall be provided where the roof perimeter construction extends above the roof in such a manner that water will be entrapped if the primary drains allow buildup for any reason. 07.2 Separate systems required. Secondary roof drain systems shall have the end point of discharge separate from the primary system. Discharge shall be above grade, in a location which would normally be observed by the building occupants or maintenance personnel. 07. Sizing of secondary drains. Secondary (emergency) roof drain systems shall be sized in accordance with Section 0 based on the rainfall rate indicated in Figure 0.(a). Scuppers shall be sized to prevent the depth of ponding water from exceeding that for which the roof was designed as determined by Section 0.7. Scuppers shall not have an opening dimension of less than inches (02 mm). The flow through the primary system shall not be considered when sizing the secondary roof drain system. SECTION 0 COMBINED SANITARY AND STORM SYSTEM 0. Size of combined drains and sewers. The size of a combination sanitary and storm drain or sewer shall be computed in accordance with the method in Section 0.. The fixture units shall be converted into an equivalent projected roof or paved area. Where the total fixture load on the combined drain is less than or equal to 2 fixture units, the equivalent drainage area in horizontal projection shall be taken as,000 square feet (72 m 2 ). Where the total fixture load exceeds 2 fixture units, each additional fixture unit shall be considered the equivalent of. square feet (. m 2 ) of drainage area. These values are based on a rainfall rate of inch (2 mm) per hour. SECTION 09 VALUES FOR CONTINUOUS FLOW 09. Equivalent roof area. Where there is a continuous or semicontinuous discharge into the building storm drain or building storm sewer, such as from a pump, ejector, air conditioning plant or similar device, each gallon per minute (L/m) of such discharge shall be computed as being equivalent to 9 square feet (9 m 2 ) of roof area, based on a rainfall rate of inch (2 mm) per hour. SECTION 0 CONTROLLED FLOW ROOF DRAIN SYSTEMS 0. General. The roof of a structure shall be designed for the storage of water where the storm drainage system is engineered for controlled flow. The controlled flow roof drain system shall be an engineered system in accordance with this section and the design, submittal, approval, inspection and testing requirements of Section 0.. The controlled flow system shall be designed based on the required rainfall rate in accordance with Section 0.. 0.2 Control devices. The control devices shall be installed so that the rate of discharge of water per minute shall not exceed the values for continuous flow as indicated in Section 09.. 0. Installation. Runoff control shall be by control devices. Control devices shall be protected by strainers. 0. Minimum number of roof drains. Not less than two roof drains shall be installed in roof areas 0,000 square feet (929 m 2 ) or less and not less than four roof drains shall be installed in roofs over 0,000 square feet (929 m 2 ) in area. SECTION SUBSOIL DRAINS. Subsoil drains. Subsoil drains shall be open-jointed, horizontally split or perforated pipe conforming to one of the standards listed in Table 02.. Such drains shall not be less than inches (02 mm) in diameter. Where the building is subject to backwater, the subsoil drain shall be protected by an accessibly located backwater valve. Subsoil drains shall discharge to a trapped area drain, sump, dry well or approved location above ground. The subsoil sump shall not be required to have either a gas-tight cover or a vent. The sump and pumping system shall comply with Section.. SECTION 2 BUILDING SUBDRAINS 2. Building subdrains. Building subdrains located below the public sewer level shall discharge into a sump or receiving tank, the contents of which shall be automatically lifted and discharged into the drainage system as required for building sumps. The sump and pumping equipment shall comply with Section.. SECTION SUMPS AND PUMPING SYSTEMS. Pumping system. The sump pump, pit and discharge piping shall conform to Sections.. through..... Pump capacity and head. The sump pump shall be of a capacity and head appropriate to anticipated use requirements...2 Sump pit. The sump pit shall not be less than inches (7 mm) in diameter and 2 inches (0 mm) deep, unless otherwise approved. The pit shall be accessible and located such that all drainage flows into the pit by gravity. The sump pit shall be constructed of tile, steel, plastic, 200 NORTH CAROLINA PLUMBING CODE 79

TABLE 0.2 SIZE OF VERTICAL CONDUCTORS AND LEADERS DIAMETER OF OF LEADER (inches) a HORIZONTALLY PROJECTED ROOF AREA (square feet) Rainfall rate (inches per hour) 2 7 9 0 2 2 2,0,0 90 720 7 0 0 0 20 290 20 20,00,00 2,90 2,200,70,70,20,00 90 0 00 70,00 9,200,0,00,0,070 2,0 2,00 2,0,0,7,0,00 7,00,0,0,920,7,9,2,,0, 2,0,000 27,000 7,99,00 0,00 9,000 7,7,70,000,00,90,00,000,000,0 29,000 2,200 9,,70,00 2,90,00 0, 9,00 For SI: inch = 2. mm, square foot = 0.0929 m 2. a. Sizes indicated are the diameter of circular piping. This table is applicable to piping of other shapes provided the cross-sectional shape fully encloses a circle of the diameter indicated in this table. TABLE 0. SIZE OF HORIZONTAL STORM DRAINGE PIPING a SIZE OF HORIZONTAL PIPING (inches) HORIZONTALLY PROJECTED ROOF AREA (square feet) Rainfall rate (inches per hour) 2 / unit vertical in 2 units horizontal (-percent slope) 0 2,2 7,20,0 2,00,000 2,00,200 2,000,,70,0 0,700 2,000,00,00 09,000,09 2,0, 7,,0 27,00,00 72,00 22,00,0,0,00 20,700,00 9,00 7,0 2,72,20 9,200,0 2,0 7,00,2 2,227, 7,00,00 22,200 9,0 / unit vertical in 2 units horizontal (2-percent slope) 0 2,0 0,00,0 0,200,200,00,000,000 2,20,00 9,0,00 2,00,00 9,000,000,,,29 0,0 2,7,90 2,00 2,000,0 2,0,720 7,0,00 29,200 7,000,000 92 2,20,77,00,00 2,0 7,00 7,20 77,7,,0 0, 9,0,0,000 / 2 unit vertical in 2 units horizontal (-percent slope) 0 2,7,00 2,720 2,00 92,000 7,00 2,00 7,000,2 7,20,0 2,00,000,00,200 2,000 2,29,00,900,700 0,0,200,00,00,,70,0 0,700 2,000,00,00 9,000,0,00,20,0,00,0,200 9,00,09 2,00,0 7,0,20 27,00,00 79,20 For SI: inch = 2. mm, square foot = 0.0929 m 2. a. For Tables 0. and 0., when rainfall rates exceed inches per hour, then the figures for roof area shall be adjusted proportionally by multiplying the figure by six and dividing by the maximum rate of rainfall in inches per hour (see Figure 0.(a). 0 200 NORTH CAROLINA PLUMBING CODE

TABLE 0. SIZE OF SEMICIRCULAR ROOF GUTTERS a DIAMETER OF GUTTERS (inches) HORIZONTALLY PROJECTED ROOF AREA (square feet) Rainfall rate (inches per hour) 2 / unit vertical in 2 units horizontal (0.-percent slope) 7 0 0,0 2,00,0,20 7,90,00 0 720,20,920 2,70,90 7,200 22 0,20,0 2,,00 70 0 2 90,0,990,00 2 00 7,00,90 2,0 20 0 9,2 2,00 / unit vertical 2 units horizontal (-percent slope) 7 0 90 2,00,20,0 7,00,200 20,00 0,020,70 2,720,900,00 0,200 20,72, 2,00,70,00 20 0 0,0,90 2,00,00 92 0 70,0,0 2,20,00 0 0 7 90,00,70,00 / unit vertical in 2 units horizontal (2-percent slope) 7 0,0 2,0,000 7,0,00,920 2,00 0,0 2,00,0,20 7,90,00 90, 2,0,0,0 9,00 0 720,20,920 2,70,90 7,200 272 7,000, 2,20,0,70 22 0,20,0 2,,00 / 2 unit vertical in 2 units horizontal (-percent) 7 0,920,00 7,00,00,00 22,00 0,000 90 2,00,0,0 7,00,200 20,000 0,0 2,0,9,200 7,0,0 0,020,770 2,770,900,00 0,000 For SI: inch = 2. mm, square foot = 0.0929 m 2. a. For Tables 0. and 0., when rainfall rates exceed inches per hour, then the figures for roof area shall be adjusted proportionally by multiplying the figure by six and dividing by the maximum rate of rainfall in inches per hour (see Figure 0.(a)., 2,220,20,0,000 20 0,0,0 2,00,70,0 cast-iron, concrete or other approved material, with a removable cover adequate to support anticipated loads in the area of use. The pit floor shall be solid and provide permanent support for the pump... Electrical. Electrical service outlets, when required, shall meet the requirements of the ICC Electrical Code... Piping. Discharge piping shall meet the requirements of Section 02.2, 02. or 02. and shall include a gate valve and a full flow check valve. Pipe and fittings shall be the same size as, or larger than, pump discharge tapping. Exception: In one- and two-family dwellings, only a check valve shall be required, located on the discharge piping from the pump or ejector. 200 NORTH CAROLINA PLUMBING CODE

2 200 NORTH CAROLINA PLUMBING CODE