Frederic Chopin Elementary School

Similar documents
Charles H Wacker Elementary School

Louis A Agassiz Elementary School

Velma F Thomas Early Childhood Center

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621

Stephen Decatur Classical Elementary School 7030 N Sacramento Ave Chicago, IL 60645

Charles H Wacker Elementary School 9746 S Morgan St Chicago, IL 60643

Perkins Bass Elementary School 1140 W 66th St Chicago, IL 60621

Harold Washington Elementary School 9130 S University Ave Chicago, IL 60619

Inter-American Elementary Magnet School 851 W Waveland Ave Chicago, IL 60613

James E McDade Elementary Classical School 8801 S Indiana Ave Chicago, IL 60619

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619

Henry R Clissold Elementary School 2350 W 110th Pl Chicago, IL 60643

Walter Q Gresham Elementary School

Donald Morrill Math & Science Elementary School 6011 S Rockwell St Chicago, IL 60629

Minnie Mars Jamieson Elementary School 5650 N Mozart St Chicago, IL 60659

Walter S Christopher Elementary School 5042 S Artesian Ave Chicago, IL 60632

John D Shoop Math-Science Technical Academy ES S Bishop St Chicago, IL 60643

George Armstrong International Studies ES 2110 W Greenleaf Ave Chicago, IL 60645

Jane Addams Elementary School S Avenue H Chicago, IL 60617

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630

Edgar Allan Poe Elementary Classical School S Langley Ave Chicago, IL 60628

Thomas J Higgins Elementary Community Academy S Morgan St Chicago, IL 60643

Eugene Field Elementary School 7019 N Ashland Ave Chicago, IL 60626

Ole A Thorp Elementary Scholastic Academy 6024 W Warwick Ave Chicago, IL 60634

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630

Horace Greeley Elementary School 832 W Sheridan Rd Chicago, IL 60613

Paul Laurence Dunbar Career Academy High School 3000 S King Dr Chicago, IL 60616

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

FACILITY COMPONENTS - ELEMENTARY SCHOOL

Appendix J - Custom Uniformat for EDU Migration

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205

POWELL ELEMENTARY SCHOOL

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

COOLIDGE SENIOR HIGH SCHOOL

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

GFW Schools Task Force Meeting 1/23/19 R.A. MORTON & ASSOCIATES GLT ARCHITECTS 1

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

RAYMOND EDUCATION CAMPUS

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

Timberglen Recreation Center Summary

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

NALLE ELEMENTARY SCHOOL

Lake Highlands North Recreation Center Summary

Hinsdale Township High School District 86 Referendum Project Listing April 2, Approved

SEATON ELEMENTARY SCHOOL

BALLOU SENIOR HIGH SCHOOL

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Warnica PS, 9283

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016

LASALLE - BACKUS EDUCATION CAMPUS

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Delco Activity Center Site Summary

Alabama Home Inspections

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School

SHEPHERD ELEMENTARY SCHOOL

Reilly Elementary School Site Summary

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

Mills Elementary School Site Summary

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

NYC Department of Education

BARNARD ELEMENTARY SCHOOL

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

Analysis 4: Building Reuse

KEY ELEMENTARY SCHOOL

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Facility Improvements

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI

6 Holub Middle School Overall Site Plan Gymnasium Floor Plan Exterior Perspective Before Exterior Perspective - After

HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014

2016 BOND INFORMATION

NYC Department of Education

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

NYC Department of Education

NYC Department of Education

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

NYC Department of Education

NYC Department of Education

CODE COMPLIANCE PLAN REVIEW PROCEDURES

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018

A/E Design Deliverable Checklist

Building Permit Application

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

BVSC BVSC. Midwest Technical Inspections Survey Worksheet. Account / Account Code: Insured: Policy #: Building Data - Section 1

March 2018 Progress. Work Completed, Week Ending 3/23/18:

GARFIELD ELEMENTARY SCHOOL

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

Harry Stone Recreation Center Summary

STUART-HOBSON MIDDLE SCHOOL

General Building Information

NYC Department of Education

NYC Department of Education

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

NYC Department of Education

Deferred Maintenance Plan

NYC Department of Education

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. : The item/system requires general cleaning and/or routine maintenance. : The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CHIMNEY Brick Chimney - Concrete/ Mortar Liner CORNICE 1 GRE 6 54 7 54 LF $27,027 $27,027 Cornice - Cast Stone 1 7 GRE 7 770 770 LF Assessment Date: 7/20/2012 Page 1 of 14

DOORS Exterior FRP Door Exterior Steel Door Overhead Rolling / Garage Door Transom Lite 1 7 4 GRE 6 5 4 14 EA 5 EA $1,652 14 EA $1,652 ENTRANCE Concrete Exterior Stairs Concrete Ramp Entrance Controls - Audio Entrance Controls - Audio and Video Power Door Operator and Controls Stair Handrails 1 GRE 6 45 GRE 6 26 7 GRE 6 101 45 LF $4,826 26 LF $3,625 101 LF $8,451 FOUNDATION Concrete Foundation 1 7 GRE 7 770 770 LF LIGHTING Exterior Lights - Wall Mounted 1 7 GRE 6 2 17 19 EA $3,146 $3,146 LINTELS Lintels - Steel 1 7,190 1,190 LF Assessment Date: 7/20/2012 Page 2 of 14

PARAPET Coping - Stone Parapet < 16" Height ROOF SYSTEM 1 GRE 6 904 GRE 6 904 7 904 LF 904 LF $140,777 $140,777 Asphalt Gravel Ballast Roof Exterior Downspouts Roof Structure: Steel with Clay Tile Arch 1 ORA 3 36,292 GRE 6 200 7 GRE 7 36,292 36,292 SF $924,815 200 LF $3,718 36,292 SF $928,533 SUPERSTRUCTURE Steel with Clay Tile Arch 1 7 GRE 7 93,600 93,600 SF WALLS Brick WINDOWS 1 GRE 6 47,005 7 47,005 SF $310,543 $310,543 Window - Guards perforated Window - Guards wire guard Windows - Sash Aluminum Double-pane EXTERIOR 1 GRE 6 1,432 7,300 GRE 6 12,500 1,432 SF 1,300 SF 12,500 SF $107,250 $107,250 $1,527,379 Assessment Date: 7/20/2012 Page 3 of 14

ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - Intrusion detection MAIN SERVICE 1 YEL 4 1 GRE 6 5,146 GRE 6 25,690 GRE 6 2,952 GRE 6 42 GRE 6 5 GRE 6 32 GRE 6 16 YEL 4 1 GRE 6 93,600 7 $8,866 5,146 SF $6,991 25,690 SF $11,021 2,952 SF $1,562 42 EA $4,505 5 EA $536 32 EA $7,459 16 EA $3,729 $17,160 93,600 SF $331,943 93,600 SF $87,001 $480,773 Main Electrical service 2000 A 120/208/3PH 1 7 POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp ELECTRICAL 1 GRE 6 1 15 7 BLU 5 1 2 16 EA $16,159 3 EA $18,590 $34,749 $515,522 Assessment Date: 7/20/2012 Page 4 of 14

FIRE PROTECTION FIRE ALARM 1 7 Fire Alarm System 93,600 SF $330,605 $330,605 FIRE PROTECTION $330,605 MECHANICAL AIR CONDITIONING Window A/C 1 7 GRE 6 1 24 5 30 EA $6,221 $6,221 AIR HANDLING SYSTEMS Air Intake - Built Up Air Handling Multi Zone Built Up Air Handling - Steam 25,001 to 35,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam 25,001 to 35,000 cfm Multi Zone Double Delivery Built Up Air Handling Auxiliaries - Steam 45,001 to 60,000 cfm Return Duct Work - Masonry and Ducts - Existing or Missing Exterior Shaft BOILER SYSTEMS Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler 101-150 HP Boiler Auxiliary - Steam Boiler 101-150 HP Chemical Feed System (Steam Boilers) Combustion Dampers Feed Water Pumps and Tank - Steam Boilers 1 YEL 4 1 1 YEL 4 1 YEL 4 1 ORA 3 2 BLU 5 60 1 BLU 5 2 BLU 5 2 GRE 6 2 GRE 6 2 GRE 6 1 7 7 2 EA $27,599 $128,700 $40,040 2 EA $108,680 60 LF $25,740 $330,759 2 EA $125,840 2 EA $22,880 2 EA $4,290 2 EA $572 $8,437 $162,019 Assessment Date: 7/20/2012 Page 5 of 14

HEATING DEVICES Heater - Gas Wall Heater - Electric 1 7 GRE 6 1 1 YEL 4 14 2 2 EA $4,290 16 EA $14,620 $18,910 MECHANICAL PLUMBING Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Steam - Steel or Galvanized TEMPERATURE CONTROL 1 GRE 6 2 GRE 6 350 GRE 6 350 7 2 EA $1,430 350 LF $2,402 350 LF $3,103 $6,936 1 7 Pneumatic System ORA 3 93,600 93,600 SF $669,240 Thermostats - Pneumatic ORA 3 55 55 EA $36,179 Zone Dampers ORA 3 51 5 $43,029 $748,448 VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 500 to 1,500 cfm Type I Exhaust Hood - Kitchen or Culinary Arts MECHANICAL 1 7 GRE 6 3 1 YEL 4 2 ORA 2 1 4 EA $5,577 2 EA $4,576 $26,884 $37,037 $1,310,329 Assessment Date: 7/20/2012 Page 6 of 14

PLUMBING HOT WATER Hot Water Heater - Gas more than 300,000 BTU/HR PIPING 1 GRE 6 1 7 $6,721 $6,721 1 7 Domestic Piping - Cold Water from Risers to Fixtures 93,600 SF $30,785 Domestic Piping - Cold Water Risers 93,600 SF $60,232 Domestic Piping - Hot Water from Riser to fixtures 93,600 SF $20,077 Domestic Piping - Hot Water Return Risers 93,600 SF $42,831 Domestic Piping - Hot Water Risers 93,600 SF $50,862 Domestic Piping Cold Water Horizontal lines 93,600 SF $223,526 Domestic Piping Hot Water Horizontal lines 93,600 SF $184,710 Domestic Piping Hot Water Return Lines 93,600 SF $107,078 Sanitary Piping ORA 3 93,600 93,600 SF $89,678 Storm Piping BLU 5 93,600 93,600 SF $44,170 Vent Piping BLU 5 93,600 93,600 SF $33,462 $887,412 PUMPS 1 7 Domestic Booster Pump simplex YEL 4 1 $17,160 $17,160 PLUMBING $911,293 INTERIOR ADMINISTRATIVE SUITES Ceiling - Plaster/Drywall 1 GRE 6 3,874 7 3,874 SF $10,969 Assessment Date: 7/20/2012 Page 7 of 14

Flooring - Tile/Sheet Flooring - Wood Lighting - Pendant/Surface Walls - Plaster/Drywall AUDITORIUM - DEDICATED GRE 6 1,081 GRE 6 2,793 YEL 4 61 GRE 6 10,072 1,081 SF $1,546 2,793 SF $21,088 61 SF $401 10,072 SF $23,765 $57,769 Balcony Seating Main Floor Seating Sound System Stage Curtains Stage Lighting System Stage Platform 1 BLU 5 578 BLU 5 725 7 GRE 7 2 GRE 6 1,200 578 EA $70,206 725 EA $88,062 2 EA 1,200 SF $5,097 $163,364 CORRIDOR Ceiling - Plaster/Drywall Flooring Asphalt Flooring Tile/ Sheet Lighting - Pendant/ Surface Stair Handrails Stairs - Tile Walls - Plaster/Drywall DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Transom Window 1 GRE 6 25,690 GRE 6 21,586 GRE 6 4,104 GRE 6 25,690 GRE 6 712 GRE 6 376 GRE 6 45,572 1 GRE 6 2 GRE 6 152 GRE 6 645 7 7 25,690 SF $72,739 21,586 SF $30,868 4,104 SF $5,869 25,690 SF $18,368 712 LF 376 LF $2,839 45,572 SF $107,527 $238,210 2 EA $566 152 EA $43,037 645 SF $11,991 $55,594 Assessment Date: 7/20/2012 Page 8 of 14

DRINKING FOUNTAINS Double Fountain GYMNASIUM / AUDITORIUM Flooring - Wood Lighting - Metal Halide/Sodium Vapor Walls - Plaster/Drywall KITCHEN Ceiling - Plaster/Drywall Flooring - Tile/Sheet Lighting - Pendant/Surface Wall - Plaster/Drywall LIBRARY Casework Flooring Carpet Lighting - Pendant/ Surface Walls - Plaster/Drywall LUNCHROOM Ceiling - Plaster/Drywall Flooring - Tile/Sheet 1 GRE 6 2 4 1 GRE 6 2,952 GRE 6 16 BLU 5 4,874 1 GRE 6 928 GRE 6 928 GRE 6 15 GRE 6 1,236 1 GRE 6 56 GRE 6 1,536 GRE 6 1,536 GRE 6 2,407 1 GRE 6 1,570 GRE 6 1,570 7 7 7 7 7 6 EA $9,209 $9,209 2,952 SF $22,289 16 EA $2,860 4,874 SF $69,698 $94,847 928 SF $3,503 928 SF $1,327 15 SF $11 1,236 SF $2,916 $7,757 56 LF $1,718 1,536 SF $2,196 1,536 SF $1,098 2,407 SF $5,679 $10,692 1,570 SF $4,445 1,570 SF $2,245 Assessment Date: 7/20/2012 Page 9 of 14

Lighting - Lay-In Serving Line Wall - Plaster/Drywall MDF/IDF GRE 6 24 8 GRE 6 2,152 24 SF $17 18 LF 2,152 SF $5,078 $11,785 Finishes Ventilation and Cooling MECHANICAL/SERVICE ROOMS Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room STAFF RESTROOM 1 GRE 6 120 GRE 6 1 1 BLU 5 1,634 GRE 6 3 GRE 6 4,724 GRE 6 642 7 7 120 SF $408 $1,401 $1,810 1,634 SF $18,506 3 SF $14 4,724 SF $22,293 642 SF $3,030 $43,842 Accessories Ceiling - Lay-In Ceiling - Plaster/Drywall Floor Drain Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Lavatory Lighting - Pendant/ Surface Partitions Urinals Wall - Plaster/Drywall Wall - Structural Glazed Tile 1 GRE 6 2,481 GRE 6 45 7 GRE 6 2,223 142 GRE 6 6 1 GRE 6 2,281 GRE 6 200 GRE 6 26 GRE 6 34 1 GRE 6 37 GRE 6 23 GRE 6 1,464 GRE 6 2,880 2,481 SF $19,158 45 SF $97 2,365 SF $6,294 7 EA $1,802 2,281 SF $5,806 200 SF $286 26 EA $9,667 35 SF $24 37 EA $6,635 23 EA $8,551 1,464 SF $3,454 2,880 SF $20,592 Assessment Date: 7/20/2012 Page 10 of 14

Wall - Tile Ceramic/ Porcelain Water Closet THEATER Ceiling - Plaster/Drywall Flooring - Wood Lighting - Lay-In Wall - Plaster/Drywall INTERIOR ROOM CASEWORK Casework CEILING GRE 6 1,484 GRE 6 43 1 GRE 6 5,146 GRE 6 5,146 GRE 6 52 GRE 6 7,958 1 GRE 6 255 7 7 1,484 SF $3,777 43 EA $15,987 $102,131 5,146 SF $44,006 5,146 SF $38,854 52 SF $59 7,958 SF $68,280 $151,199 $948,211 255 LF $9,116 $9,116 Ceiling Plaster/Drywall 1 BLU 5 870 7 GRE 6 7,074 12,051 6,173 870 SF $4,927 25,298 SF $74,180 $79,106 CHALK BOARD 1 7 Chalk Board YEL 4 856 856 LF $104,047 $104,047 Assessment Date: 7/20/2012 Page 11 of 14

FLOOR Wood 1 7 GRE 6 22,136 4,032 26,168 SF $167,136 $167,136 GYM_CEILING Gymnasia Ceiling LIGHTING 1 GRE 6 2,952 7 2,952 SF $25,244 $25,244 Lay-In Lighting Pendant/Surface 1 GRE 6 9 7 GRE 6 20 14 GRE 6 268 68 9 EA $644 34 EA $1,859 336 EA $19,162 $21,665 MARKER BOARD Marker Board 1 7 GRE 6 58 30 88 LF $1,659 $1,659 RESTROOM_CEILING Restroom Ceiling 1 7 GRE 7 71 71 SF WALL Wall 1 GRE 6 1,158 39,477 7 40,635 SF $98,611 $98,611 Assessment Date: 7/20/2012 Page 12 of 14

ROOM $506,583 SITE CIVIL/DRAINAGE Catch Basin Site Manhole 1 7 GRE 7 2 GRE 7 6 2 EA 6 EA FENCING Chain Link Iron and Concrete Post LANDSCAPE 1 GRE 6 630 GRE 6 1,089 7 630 LF $9,036 1,089 LF $30,834 $39,870 Asphalt Play Area/Hardscape Benches Hardscape - Concrete Parkway trees Trash Receptacles 1 YEL 4 46,942 GRE 6 2 GRE 6 6,940 7 GRE 7 24 46,942 SF $402,762 2 EA $472 6,940 SF $13,100 24 EA $416,334 PARKING LOT Asphalt PLAYGROUND Playground Equipment - School Age 5-12 1 GRE 6 21,760 1 GRE 6 3 7 7 21,760 SF $18,670 $18,670 3 EA Assessment Date: 7/20/2012 Page 13 of 14

Playground Surfacing - Square Rubber Mats SIDEWALKS YEL 4 4,705 4,705 SF $104,286 $104,286 Perimeter Sidewalks SIGNAGE 1 GRE 6 1,220 7 1,220 SF $2,303 $2,303 Flag Pole Marquee - Free Standing Back Lighted SITE Campus Need ² ³ 1 7 $581,463 $6,631,385 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 7/20/2012 Page 14 of 14