Area under GMADA Sector 66, 67, 68, 69, 76, 77, 78, 79, 80, Bulk Material Market, Aero City, Eco City, U.E. Anandpur Sahib, Knowledge Park (I.T. City) Since two departments namely GMADA and Department of Water Supply and Sanitation Pb. are involved in operation maintenance and upkeep of Public Health Services in different sectors in Mohali, the water connection for construction at any particular site is sanctioned by the respective Department after the building plans are approved by GMADA. The application forms for water supply connection are available in the respective department for the areas under their jurisdiction. Tapping Ferrule on the street water supply line for making house water connection without getting the water connection sanctioned from the competent authority, is illegal which will attract penalty and other suitable action. After obtaining occupation certificate from Estate Office, GMADA and Sewerage connection from the competent authority of GMADA, the allottee is required to intimate the concerned office/ department about the date of sanction of sewerage connection/ occupation, make, reading and Sr. No. of water meter installed at its premises so that water bill may be issued on the basis of meter reading, thereafter. CHECK LIST FOR WATER SUPPLY CONNECTION i) Application Form ii) iii) iv) Self attested copy of the sanction letter of building plans with its reference in the respective column of application form. Self attested copy of the Allotment letter and GPA, if applicable. Demand Draft towards road cutting charges, if any, as per the following norms. Road Category Water Supply Sewerage Up to 40 feet wide road Rs. 4500/- Rs. 9000/- 60 feet wide road Rs. 9500/- Rs. 19000/- 80 feet wide road Rs. 12500/- Rs. 25000/- v) Certificate from a plumber registered with the Authority in the prescribed form. List of such plumbers is placed at page 9.
------------------------------------------------------------------------------------------------------------------------- FOR OFFICE USE ONLY Certified that I have checked and found all the documents in order. Signature of Receipt Clerk Name Date Signature of Superintendent Name Date
APPLICATION FORM FOR WATER CONNECTION Name Plot No./House No. Sector Address Category (Residential/ Commercial/Institutional) (Tick the appropriate one) Size of Plot i. I / We the undersigned hereby apply for seeking water connection for the aforesaid plot. We hereby undertake to pay the water charges as per the rates fixed by GMADA from time to time. ii. iii. iv. We undertake to abide by the rules and regulations framed/ amended by GMADA from time to time w.r.t. supply of water. I/We undertake to abide by the decision of Chief Administrator GMADA/ Divisional Engineer (PH) GMADA for disconnecting the water connection to my plot after/ without serving me any notice for any reason. I/We undertake to get the ferrule connection made through the officials of GMADA and will undertake the rest of work relating to water connection on my/our own. v. I/We undertake to pay the service connection charges and security deposit to the office of Divisional Engineer (PH) GMADA Mohali before actually taking the water connection at site. Security Deposit Rs. 1000/- Service connection charges: Rs. 1500/- Total - Rs. 2500/- vi. vii. viii. That the aforesaid property was allotted to me/ us by the Estate Officer GMADA Mohali vide his memo No. dated (Self attested copy attached) That the building plans for this property were approved by the competent authority of GMADA vide memo no. dated (Self attested copy attached) That I /we taken over the possession of said property and will carry out the construction work as per the building bylaws and the plumbing work will be got executed through registered plumber Signature of Owner(s)
CERTIFICATE BY PLUMBER (To be issued by a plumber registered with the authority) Name of plumber Licence Number Address of the Plumber The information regarding the sanitary work in this site is as follows:- i) Length and size of service pipe ii) No. and size of taps iii) Size of Ferrule iv) Detail of sanitary fittings. v) Detail of hot water fittings vi) Purpose for getting water connection 1. It is certified that any change in the aforesaid information will be intimated to Divisional Engineer (PH) GMADA Mohali in advance. 2. I will ensure that the water connection will be made at site only after its sanctioned by the competent authority of GMADA, otherwise GMADA authority may take appropriate action against me. Date: Signature with seal (FOR OFFICE USE) No. Date inch dia ferrule connection is hereby approved for this site and Sub Divisional Engineer (PH), Sub Division No. GMADA SAS Nagar is requested to allow the water connection at site after getting the requisite amount of service connection charges and security deposit
Please Note: 1) Before releasing the water connection, It should be ensure that the owner has constructed duly covered water meter chamber at site of work. 2) In case the underground water tank (constructed for construction purpose) is not properly filled up, the water connection will be disconnected. 3) The owner will be responsible for installing water meter and other allied fittings at his own cost. In case of any fault, these will be replaced by the owner himself and GMADA will not be responsible for any repair and replacement. 4) In case of faulty water meter, the water bill will be sent on flat rates basis. In case after two consecutive water bills, the water meter is not got rectified, the water connection will be disconnected and it will be reconnected after getting the reconnection charges deposited. If the water connection is disconnected for any reason, Rs. 500/- will be charged as Disconnection Charges and in case reconnection is allowed by the competent authority Rs. 500/- will be charged as Reconnection Charges. 5) The allottee will be required to get the water connection regularized within 15 days after completion of work and sanction of sewerage connection. Divisional Engineer (PH) (FOR OFFICE USE) Detail of security deposit and service connection charges. Receipt No. Date Book No. Amount MAY ALLOW FOR FERRULE CONNECTION AT SITE Signature of cashier Junior Engineer (PH) Sub Divisional Engineer (PH) Returned in original with remarks that inch dia ferrule connection was made on dated Sub Divisional Engineer (PH) Junior Engineer (PH)
WATER AND SEWERAGE CHARGES 1) Water Charges = Rs. 1.80 per Kilo Liter. 2) Sewerage Cess = Rs. 15/- per WC per month UN-METERED WATER CONSUMPTION CHARGES DURING CONSTRUCTION Plot size Basement Ground First Floor Second Floor Floor 4 Marla 1900/- 1900/- 1900/- 1000/- Third Floor 5 Marla 2400/- 2400/- 2400/- 1300/- 6 Marla 2850/- 2850/- 2850/- 1550/- 7.5 and 8Marla 3800/- 3800/- 3800/- 2100/- 10 Marla 4750/- 4750/- 4750/- 2550/- 12 Marla 5450/- 5450/- 5450/- 1350/- 14 Marla 6150/- 6150/- 6150/- 1500/- 16 Marla 6950/- 6950/- 6950/- 750/- 1 Kanal 8400/- 8400/- 8400/- 1450/- 2 Kanal 12000/- 12000/- 12000/- 3000/- Booth 600/- 600/- - - - SCF 3000/- 3000/- 2000/- 2000/- 2000/- SCO 5000/- 5000/- 5000/- 5000/- 5000/-
List of Empanelled Plumbers Sr. Registrati Name No on No Father Name 1 77 Diwakar Bhaskar 2 110 Harminder 3 111 Sukhdev Hari Kishan Bahadur 4 42 Sham Lal Shankar 5 46 Jagdev Gupta Phaguni Gupta 6 61 Doodh Nath Gobind 7 112 Surinder 8 88 Kirpal 9 113 Tejinder 10 58 Mangal 11 57 Pritam 12 93 Smruti Ranjan Nayak 13 115 Gurdeep 14 117 Vijay Kumar 15 6 Ram Kumar Udai 16 118 Kamaljit 17 119 Satinder Tiwari 18 120 Rajesh 19 121 20 122 Balwinder, Sukhwinder, Davinder Jagdamba Parshad Bawa Pritam Amar Shiv Nath Makhan Choudhari Nayak Sarvan Ram Ji Shah Surinder Prabhu Nath tiwari Raghbir Ajit Ram Sahay Address 1307/17, Phase-11, Vill-Tarkhan Majra, PO-Sarhind, Tehsil & Distt.-Fateh Garh Sahib, Pb. VPO-Daun Majra, Kharar, 256, Nehru Colony, LIG 1424/13, Phase- 11, SAS Nagar, Pb. HE-170, Phase-7, Vill-Matour, Sector- 70, 609, Phase-10, 592, Phase-10, 46, Phase 3B1, Vill.-Daun, Tehsil & Distt.- 45, Vill.-Palsora, U.T. 210/1, Sector-55, 1426/9, Sector-65, 3104, Vill-Maloya, UT, Vill-Manakpur Tehsil-Rajpura, District-Patiala, Pb. 1397/2, Phase-11, 1657, Sector-52, 624, Phase-1, 20215 Nehru Colony, Kajheri, Certificate Issue date 12-Nov-2007 12-Nov-2007 17-Mar-2008 31-Mar-2008 1-Apr-2008 17-Jun-2008 21-Jul-2008 17-Oct-2008 14-Nov-2008 5-Dec-2008 12-Dec-2008 6-Jan-2009 19-Mar-2009 14-May-2009 27-Jun-2009 1-Jul-2009 5-Apr-2010 16-Apr-2010 6-May-2010 15-Jul-2010 Certificate Valid upto 10-Nov-2012 10-Nov-2012 16-Mar-2013 30-Mar-2013 31-Mar-2013 16-Jun-2013 20-Jul-2013 16-Oct-2013 13-Nov-2013 4-Dec-2013 11-Dec-2013 5-Jan-2014 18-Mar-2014 13-May-2014 26-Jun-2014 30-Jun-2014 4-Apr-2015 15-Apr-2015 5-May-2015 14-Jul-2015
21 123 Rajesh 22 130 Bachan Lal 23 126 Suresh kumar 24 127 Suman kumar Ram Chander Bishtar nath Ram Chander Jagdev 25 104 Ram Hit Ram Sajan 26 97 Parminder Ajaib 27 103 Jaswinder Kumar Ram Ji Das 28 128 Davinder Gurmukh 29 102 Avtar Deep 30 86 Bikram 31 129 Om parkash Bachan Bholla Shah 32 124 Ram Chander Kaura Ram 33 131 Gurdev 34 132 Mann 35 133 Ram Sarik 36 134 Baljit 37 135 Gulshan Kumar 38 136 Mohammad Shafiq Alam Pritam Karnail Sidhu Bharatwaj Avtar Sohan Shah Jastar Asari 39 137 Jaswinder Jagir 40 137 Jagtar Anup 41 83 Sant Ram Horil 1441/26, Phase-11, 150, Phase-2, LIG 1426/9, Phase- 11, 481, Phase-10, 72, Phase-7, Mohali, Pb. Chunni Kalan, Distt.-Fatehgarh Sahib, Pb. 1504, Phase-10, 1149, Sector-71, Chunni Kalan, Distt- Fatehgarh Sahib, Pb. 1493, Sector-42 B, 1068/2, Colony No- 5, Sector-45, 3468, Sector-46 C, Vill-Khuda Ali Sher, 158, Vill-Hulka, 4088, Sector-56, LIG 775/B, Phase-9, HE 252, Phase-5, SAS Nagar, Pb. 388, Ward No-4, Gali No.-13, Mohali, Pb. Timber, Distt.-Fateh Garh Sahib, Pb. 3475, Sector-37-B, 453, Phase-3 A, 6-Sep-2010 17-Jan-2011 20-Apr-2011 28-Apr-2011 2-Jun-2011 24-Jun-2011 27-Jun-2011 1-Jul-2011 27-Jul-2011 4-Sep-2011 20-Sep-2011 5-Oct-2011 17-Oct-2011 4-Nov-2011 21-Dec-2011 6-Jan-2012 23-Feb-2012 27-Feb-2012 28-Feb-2012 28-Mar-2012 12-Jun-2012 5-Sep-2015 16-Jan-2016 18-Apr-2016 26-Apr-2016 31-May-2016 22-Jun-2016 25-Jun-2016 29-Jun-2016 25-Jul-2016 2-Sep-2016 18-Sep-2016 3-Oct-2016 15-Oct-2016 2-Nov-2016 19-Dec-2016 4-Jan-2017 21-Feb-2017 25-Feb-2017 26-Feb-2017 27-Mar-2017 11-Jun-2017