Project: Rama Phosphates Ltd., Udaipur Document: EES/RAMA/001/138-EC/ IND./2016. Executive Summery. Enkay Enviro Services PVT Ltd 28

Similar documents
COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE

Rajasthan State Pollution Control Board

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

Six Monthly Compliance Status Report

Rajasthan State Pollution Control Board

Six Monthly Compliance Status Report

PRE-FEASIBILITY REPORT

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017

Hind Energy & Coal Beneficiation (India) Ltd.

fgunqlrku ftad fyfevsm PIN Code

PRE FEASIBILITY REPORT

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

Dated: 22 nd June, To The Director, Mjs Vulcan Waste Management Pvt. Ltd., 1046, Sector-31, Gurgaon, Haryana

BRIEF DESCRIPTION OF THE PROJECT

PROJECT FEASIBILITY REPORT

Pre-Feasibility Report

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

PRE-FEASIBILITY REPORT

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

BRIEF SUMMARY OF THE PROJECT

PRE-FEASIBILITY REPORT

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

PREFEASIBILITY REPORT

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

PRE FEASIBILITY REPORT

J.K. Cement WORKS, MANGROL (RAJ) 25 MW Captive Power Plant & 10 MW Waste Heat Recovery Boiler

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

ANNEXURE: MOU BETWEEN CLARIANT CHEMICALS (INDIA) LIMITED AND STAHL INDIA PVT LTD

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,ABU ROAD, DIST: SIROHI, RAJASTHAN FORM 1 ANNEXURES

Scanned by CamScanner

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

M/s Tiffin s Barytes Asbestos and Paints Ltd (VIGNESHWARA BARYTES MINE) Near Ramalayam, Velpula (V&P) Y.S.R. Disrict.

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

EXISTING PROJECT FOR ORDINARY SAND MINING

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

PRE-FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT

Additional Proposed (TPA) Total after Expansion (TPA) 3,500 2,500 6, ,880 2,720 5,600 As above under item No. 1.

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

BRIGADE RESIDENTIAL DEVELOPMENT

: Industrial Projects - 2. : 26th October, 2016

Accord Energy Corporation India Pvt. Ltd.

JAYPEE NIGRIE SUPER THERMAL POWER PLANT

M/S. HETERO INFRASTRUCTURE SEZ LIMITED

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

Capacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB)

Pre-Feasibility Report For

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

Synthetic Organic Chemicals 5(f)

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

.,~) si.j Encl.: As above W ~Z. CIN No,-U40104TG2001PTC Ref.: MoE&F, LKN/KPBK/l040124/340 Date:

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd.

AGENDA ITEMS FOR 63rd MEETING OF TECHNICAL REVIEW COMMITTEE (TRC)

Amendment required in the existing EC

SIX MONTHLY COMPLIANCE REPORT ENVIRONMENTAL CLEARANCE FOR. Plot No. 1, GIDC Industrial Area, Vilayat, Taluka: Vagra, District: Bharuch (Gujarat)

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT

FORM-V (See Rule - 14) Part-A

COMPLIANCE STATUS REPORT

PRE FEASIBILITY REPORT

Hind Energy & Coal Beneficiation (India) Ltd.

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PRE-FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

PREFEASIBILITY REPORT

Sub: - An application for obtaining Environment Clearance for New Unit.

meeting held on meeting held on The SEAC observed that:

ENVIRONMENTAL STATEMENT REPORT (FORM-V)

PRE- FEASIBILITY REPORT terms of provision of EIA Notification. For

PRE FEASIBILITY REPORT

EXECUTIVE SUMMARY. (Approved Consultant)

M/s Malur Effluent Treatment Plant., Malur, Kolar Karnataka

REQUIREMENTS FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE JUSTIFICATION FOR MODIFICATION IN THE SCHEME FOR SPENT WASH HANDLING IN THE DISTILLERY PLANT

Pre- Feasibility RepoRt

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

PRE-FEASIBILITY REPORT

UNSATURATED POLYESTER RESIN

For TOR New. 1. Basic Information of the Project:

Ministry of Environment, Forests & Climate Change Northern Regional Office Dehradun

PRE FEASIBILITY REPORT

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

M/s. COROMANDEL INTERNATIONAL LIMITED

M/S. Dain Colour Chem

J-11011/45/2009- IA II (I)

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

Mangalam Cement Ltd. (Unit-II) Stack No.

Transcription:

Executive Summary 28

INDEX S. No. CONTENTS PAGE No. 1.1 INTRODUCTION 30 1.2 SALIENT FEATURES OF THE PROJECT 32 1.3 RAW MATERIAL 34 1.4 PRODUCT 35 1.5 SOLID WASTE 35 1.6 FINANCIAL AND SOCIAL BENEFITS 35 1.7 CONCLUSION 36 29

EXECUTIVE SUMMARY 1.1 INTRODUCTION Rama Phosphates Ltd. is an existing phosphate fertilizer manufacturing unit, which is situated at # 4807/11, Jhamarkotra Road, Village-Umra, Tehsil-Girwa, Distt.-Udaipur (Raj.). The unit was established in the year 1995. The ministry of Environment, Forests vide letter no F.No J-11011/116/2009-IA-II(I) dated 05/05/2009 has accorded Environmental Clearance for the Expansion project of Single Super Phosphate /Granulated Single Super Phosphate Fertilizers manufacturing plant from 132000 MT/Annum to 181,000 TPA and setting up of NPK mixed fertilizer plant (Annexure-D). Further, MoEF&CC, GoI vid eletter no J-11011/292/2011-IA-II (I) dated 18/09/2014 granted Environmental Clearance for Expansion project of Single Super Phosphate (1,81,000 to 3,15,000 TPA) and 300,000 TPA converted in Granular SSP), NPK (60,000 TPA), and additional Boronated SSP (25,000 TPA) and LABSA (20,000TPA)of M/s Rama Phosphates Ltd at 4807/11, Jhamar Kotra Road village Umra Girva District Udaipur Rajasthan.(Annexure-E) Now since Micronutrient (Zinc & Boron) deficiency can be overcome by use of Fortified Fertilizer (SSP fortified with Zinc, SSP fortified with Boron, DAP & NPK.) (Annexure E), therefore our unit is proposing to produce ( a )SSP fortified Zinc (75000 TPA) from the same SSP produced at Unit, no additional SSP will be produced for fortification and ( b) to increase the capacity of Boronated SSP from 25000 TPA to 75000TPA. Further after the approval of E.C. for the above desired SSP fortified with Boron and SSP fortified with Zinc, the total productio4 of SSP ( powder /granular ) will be unchanged. The status of the E.C. after proposed amendment in EC would be as below:- S.No. Details Existing 1. SSP 3,15,000 --- 3,15,000 2. GSSP 3,00,000 --- 3,00,000 3. NPK 60,000 --- 60,000 4. Boronated SSP 25000 50000 75000 5. LABSA 20,000 --- 20,000 Total after Expansion/amendment 30

6. Zincated SSP Nil 75,000 75,000 If we consider the process of producing SSP fortified with Zinc, its only mixing in proper proposition with already produced SSP (powder) after curing and ready to pack. The details of the process is given below with equipment and flow chart, it is visible from the process only powder Zinc Sulphate will be mixed with SSP, which is totally a physical mixing process and no chemical reaction is involved. The proposed capacity is 75000 TPA the raw materials are Zinc Sulphate (ZnSO4) and cured SSP powder. SSP is available in house and Zinc Sulphate will be procured either from local market or imported from outside. The existing project cost is Rs.3019.94 Lakh. The proposed project cost for modernization (amendment in EC) of Boronated SSP &Zincated SSP (only) is Rs. 11.50 Lakh. Thus, after Amendment in EC the capital cost will be Rs.3031.44 Lakh. As per the Gazette Notification dated Sept.14 th 2006 and subsequent amendment in the Gazette Notification on dated 1 st Dec. 2009, under 5(a), all fertilizer units except SSP will be treated as A category project. Thus, the project is treated as A. The proposed modernization (Amendment in EC) and addition is coming up within the same premises; hence no additional land will be required. The total land area of the unit is 73,200 sq.m. REGULATORY COMPLIANCE Consent to Establish granted for implementation for Pollution Control scheme for proposed SSP unit by RSPCB vide letter no. F 12(30-139)RSPCB/Gr.IV dated 29/06/1995. Consent to Operate for Single Super Phosphate & GSSP powder issued by RSPCB vide letter no F (Tech)/Udaipur(Girwa)/82(1)/2009-2010/6303 dated 16/3/2010. The ministry of Environment, Forests vide letter no F.No J-11011/116/2009-IA-II(I) dated 05/05/2009 has accorded Environmental Clearance for the Expansion project of Single Super Phosphate /Granulated Single Super Phosphate Fertilizers manufacturing plant from 132000 MT/Annum to 181,000 TPA and setting up of NPK mixed fertilizer plant at 4807/11, Jhamar Kotra Road village Umra Girva District Udaipur Rajasthan. MOEF GOI Regional Office, Central Region Lucknow vide letter F No IV/ENV/R/IND- 109/742/2009/453 dated 23/11/2012 has certified the compliance report. Consent to Operate for Expansion project of Single Super Phosphate /Granulated Single Super Phosphate Fertilizers manufacturing plant from 132000 MT/Annum to 181,000 TPA and setting up of NPK mixed fertilizer plant issued by RSPCB vide letter no F (Tech)/Udaipur(Girwa)/4(1)/2010-2011/3733-3735 dated 22/09/2010 31

Corrigendum in Consent to Operate for Expansion project of Single Super Phosphate /Granulated Single Super Phosphate Fertilizers manufacturing plant from 132000 MT/Annum to 181,000 TPA and setting up of NPK mixed fertilizer plant issued by RSPCB vide letter no F(HDF-125)RPCB/553 dated 7/10/10 Authorization under HWMHR 2008 has been issued by RSPCB vide letter no F (HSW)/Udaipur(Girwa)/44(1)/2010-2011/4290-4293 dated 22/10/2010. MoEF&CC, GoI vid eletter no J-11011/292/2011-IA-II (I) dated 18/09/2014 granted Environmental Clearance for Expansion project of Single Super Phosphate (1,81,000 to 3,15,000 TPA) and 300,000 TPA converted in Granular SSP), NPK (60,000 TPA), and additional Boronated SSP (25,000 TPA) and LABSA (20,000TPA)of M/s Rama Phosphates Ltd. Consent to Establish (stage-iii) for Expansion project of Single Super Phosphate (1,81,000 to 3,15,000 TPA) and 300,000 TPA converted in Granular SSP), NPK (60,000 TPA), and additional Boronated SSP (25,000 TPA) and LABSA (20,000TPA)issued by RSPCB vide letter no F (PLG)/Udaipur(Girwa)/25(1)/2014-2015/8911-8913 dated 16/03/2016 The existing one time water demand is 413.5 KLD. Daily fresh water demand for industrial purposes is 300.5 KLD and domestic water is 13 KLD.Therefore total fresh water is 313.5. Recycled water is 100 KLD. After modernization no additional water will be required. The existing water demand is being met through water tanker supply There is no legal issue against the project in the court of law. 1.2 SALIENT FEATURES OF THE PROJECT S. No. Parameter Description 1. Plant S.No. Details Existing Total after modernization /amendment 1. SSP 3,15,000 --- 3,15,000 2. GSSP 3,00,000 --- 3,00,000 3. NPK 60,000 --- 60,000 4. Boronated SSP 25000 50000 75000 5. LABSA 20,000 --- 20,000 6. Zincated SSP Nil 75,000 75,000 32

S. No. 2. Parameter Total area of the plant 3. Capital cost 73,200 sq.m. Description The existing project cost is Rs.3019.94 Lakh. The proposed project cost for modernization of Boronated SSP &Zincated SSP (only) is Rs. 11.50 Lakh. Thus, after expansion the capital cost will be Rs.3031.44 Lakh. The proposed modernization project is located # 4807/11, Jhamarkotra Road, Village-Umra, Tehsil-Girwa, Distt.-Udaipur (Raj.) and the modernization will take place within the existing premises. The geographical location of the unit is as under:- NW NE 4. Location Latitude-24 0 31 54.93 (N) Latitude-24 0 32 01.16 (N) Longitude-73 0 47 41.56 Longitude-73 0 47 43.11 (E) (E) SE SW Latitude-240 32 00.34 (N) Latitude-240 31 52.90 (N) Longitude-730 47 49.35 Longitude-730 47 46.27 (E) (E) 5 Water Requirement/Source S. Particulars Water Demand (KLD) No. Existing Total 1. One time water 413.5 NIL 413.5 demand 2. Industrial daily fresh 300.5 300.5 A Requirement water demand 3. Domestic purposes 13 13 Total Fresh water 180 313.5 demand 4. Recycled water 100 100 demand B Source of Existing water source - Tanker supply water C Total waste water generation Purpose Existing (KLD) (KLD) Total (KLD) Industrial 95 NIL 95 Domestic 8 8 Total 103 103 6. 7. Waste Water Management Employment generation The industrial waste water will be reused completely Domestic waste water will be treated in Sewage treatment plant. Existing = 84 workers No additional manpower will be required 33

S. No. Parameter Description S.No Particulars Existing Total () () () 1 Connected Load 2550 Nil 2550 8. Power Supply/ Start up Power S.No. Equipment Existing 1. D.G Set 500 and 1000 2. Transformer 1600 NIL NIL After Expansion 500 and 1000 1600 1.3 RAW MATERIAL SSP SSP S. No Plant Existing NIL Total 3,15,000 TPA 3,15,000 TPA 1. Rock Phosphate 1,76,400 1,76,400 2. Sulphuric Acid (98%) 1,13,400 1,13,400 3. Water 50,400 50,400 4. Less Evaporation 25,200 25,200 Net SSP 3,15,000 3,15,000 GSSP GSSP (86-92 % of Total SSP production) S.No. Existing TPA TPA Total TPA Plant 3,00,000 3,00,000 1. Feed SSP 3,22,078 3,22,078 2. Water 13,140 13,140 3. Total 3,35,218 3,35,218 4. Less evaporation 35,218 NIL 35,218 5 Net GSSP 3,00,000 3,00,000 Boronated SSP BORONATED SSP 75000 Feed SSP 74865 Boron 135 Total 75000 MTA 34

LABSA (Linear Alkyl Benzene Sulphonic Acid) Zincated SSP LABSA Plant ---- 60.6 MT/day INPUT OUTPUT LAB* 4121 Kg. LABSA 60,606 Kg. Con. H 2 SO 4 55090 Kg. Dilute H 2 SO 4 8871 Kg. Water 10266 Kg. Total 69477 Kg. Total 69477 Kg. *Linear Alkyl Benzene Zincated SSP 75000 Feed SSP 74865 Zinc 135 Total 75000 MTA 1.4 PRODUCT S.No. Details Existing 1. SSP 3,15,000 --- 3,15,000 2. GSSP 3,00,000 --- 3,00,000 3. NPK 60,000 --- 60,000 4. Boronated SSP 25000 50000 75000 5. LABSA 20,000 --- 20,000 6. Zincated SSP Nil 75,000 75,000 Total after Expansion/amendment 1.5 SOLID WASTE S. No. Particulars Category under HWMR Existing Quantity TPA Quantity TPA Total after Modernizati on Disposal 1. Wet scrubber sludge 36.1 391 NIL 391 Reused in the process 2. Used oil 5.1 0.8 KLPA 0.8 KLPA Reused as lubricant 3. Spent acid 12.1 2927 2927 Reused in SSP plant 4. Dust from dust collector (bag filter) 34.1 0.07 TPA 0.07 TPA Reused in the process 1.6 FINANCIAL AND SOCIAL BENEFITS 35

The existing project cost is Rs.3019.94 Lakh. The proposed project cost for expansion of Boronated SSP &Zincated SSP (only) is Rs. 11.50 Lakh. Thus, after modernization (amendment in EC) the capital cost will be Rs.3031.44 Lakh. 1.7 CONCLUSION The unit is already an existing one. All adequate preventive measures are being / will be adopted to keep the various pollutants within permissible limits imposed by Regulatory Bodies. Green belt development in & around the area will increase aesthetic property, as tool for effective pollution mitigate measure, and will also serve as biological indicators for that particular site. 36