Palm Beach MPO Board Meeting December 7, 2015

Similar documents
Stakeholder Interview Information Packet December 14-17, 2015

Florida Department of Transportation District Four KICK-OFF MEETING. I-95 at Southern Boulevard (SR 80) Project Development and Environment Study

ENGINEERING DEPARTMENT

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SIS 2045 Multimodal Unfunded Needs Plan: FDOT District Four Projects. Project Review with Metropolitan/ Transportation Planning Organizations

TBARTA 2015 Regional Transportation Master Plan 2040 Regional Long Range Transportation Plan AUGUST 2015

Published by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc.

DAKOTA COUNTY PHYSICAL DEVELOPMENT COMMITTEE OF THE WHOLE

Livability 2050 Regional Transportation Plan Update. Transportation Policy Board (TPB) August 23, 2018

GUIDING PRINCIPLES MPO TRANSIT STUDY

APPENDIX H NEPA TRANSITION REPORT

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Florida Department of Transportation. Lane Elimination

ENVIRONMENTAL ADVISORY GROUP MEETING NO. 2

Final Recommendations Identification of Improvements, Strategies, and Solutions

AIR QUALITY TECHNICAL MEMORANDUM

Alternatives Evaluation Methodology

2050 VISION WORKSHOP

Moving Forward 2040 Long Range Transportation Plan Bicycle Mobility Master Plan Transit Master Plan

GENERAL PLAN UPDATE. Joint Study Session April 13, 2017

Inland Port Cargo Complex

SR 60 Grade Separation over CSX Railroad Traffic Technical Memorandum

connections 2040 the waco metropolitan transportation plan amendment 1

Livability 2050 Regional Transportation Plan Update. RTPAC #3 July 26, 2018

2016 Cape Cod Regional Transportation Plan Development

CAPITAL- ALAMO CONNECTION STUDY

CAPITAL- ALAMO CONNECTION STUDY

Livability 2050 Regional Transportation Plan Update. RTPAC #4 October 16, 2018

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report

Joint Meeting- Stakeholder Committee & Technical Committee

NORTH I-75 MASTER PLAN Summary Report

INTERCHANGE MODIFICATION REPORT

FDOT D7 Local Agency Traffic Safety Academy September 21, FHWA - Kevin Burgess, Chimai Ngo, Esther Strawder, and Jim Thorne

FTP/SIS Steering Committee Work Plan and PPI Update

PALM BEACH COUNTY FIVE YEAR ROAD PROGRAM - EXHIBIT A

US 27 MULTIMODAL CORRIDOR TREASURE COAST REGIONAL PLANNING COUNCIL SOUTH FLORIDA REGIONAL PLANNING COUNCIL

Kathleen Marie Lacey, Chief Comprehensive Planner Boise City Planning and Development Services Department. State Street Memorandum of Understanding

US 301 / Rte 207 Arterial Management Plan Kick-off Meeting

Space Coast TPO. ITS Master Plan and Project Overview in Brevard County. FSITE/District 10 & ITS FL 2017 Joint Annual Meeting

Under recently updated FHWA guidelines, the LRTP must be updated every four (4) years. The most recent LRTP is the 2035 Plan, adopted in early 2009.

I-10 KENDALL EXTENSION. Open House

Alexandria Area Transportation Study. Douglas County Comprehensive Plan - Transportation January 14, 2010

BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EXISTING AND PLANNED SECTIONS OF US 19

TECHNICAL MEMORANDUM: FREIGHT CONGESTION CONSIDERATIONS

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 10

North Carolina Statewide Freight Plan

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4G. Intergovernmental Coordination and Review Log

Integrated Transportation Plan. TAC Meeting September 16, 2014

Community Conversations for the I-35 Ramp Metering Project Begin This Month

US 27 Transportation Alternatives Study

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES

CENTRAL FLORIDA EXPRESSWAY AUTHORITY. SR 408 Eastern Extension PD&E Study

Air Quality Analysis Technical Memorandum

Florida Park Drive. City Council Workshop February 12, 2019

Lake~Sumter Metropolitan Planning Organization (MPO) Corridor Constraint Policy February 27, 2008

MEETING SUMMARY FOR APRIL 13, 2017

FACT SHEETS LOS ANGELES COUNTY

ARC Freight Advisory Task Force Meeting. SOUTH FULTON COMMUNITY IMPROVEMENT DISTRICT Multi-Modal Study

MOBILITY 2045: A FOCUS ON TRANSPORTATION CHOICE:

Jacksonville Urban Area Metropolitan Planning Organization LONG RANGE TRANSPORTATION PLAN. Draft

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

VISION STATEMENT, MISSION STATEMENT, AND GOALS AND OBJECTIVES

TABLE OF CONTENTS. Section Section 2 Alternative A...7 Section 2 Alternative B...7

Interchange Workshop Report (August 2004)

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014

Central Manatee Network Alternatives Analysis

Intelligent Transportation Systems Master Plan

1.4 Analysis of Alignment Alternatives

2040 Long Range Transportation Plan

CMNAA. Central Manatee Network Alternatives Analysis Alternatives Public Meeting CMNAA STUDY PROCESS. STUDY AREA 17th St. W

EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD

WHITNEY ROAD 10% CORRIDOR PLAN. Open House Meeting #1 November 8, 2017

5.3 Noise Impact Analysis

FACT SHEETS SAN BERNARDINO COUNTY

Goal 1 Provide for a balanced and multimodal regional transportation system that meets existing and future needs.

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

MPO Member Communities:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

WELCOME COMMUNITY ADVISORY GROUP MEETING #2

Identifying Key Issues

NOISE STUDY REPORT. for the WEKIVA PARKWAY (SR 429)/SR 46 REALIGNMENT PD&E STUDY. Orange, Lake, and Seminole Counties, Florida

TRANSPORTATION. Governmental Projects

Preliminary Draft REGIONAL TRANSPORTATION OPERATIONS PLAN. Chapter III

Community Development Department

2040 Long Range Transportation Plan

GUIDING PRINCIPLES MEMORANDUM

DECEMBER P R O G R E S S R E P O R T

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

Fuller /Fuller Heights Road Improvements

Freight & Modal Data Program. MPOAC Freight Committee Quarterly Meeting January 26, 2017 Sunrise, Florida

Mobility and System Reliability Goal

Air Quality Analysis Technical Memorandum

M E M O R A N D U M. To: Council Members AGENDA ITEM 7

Final Air Quality Report

TOWN OF HALTON HILLS TRUCKING STRATEGY STUDY

Joe Santos Transportation Safety Engineer Florida Department of Transportation

Develop Guidelines for Access Management in Las Vegas

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination

Transcription:

Palm Beach MPO Board Meeting December 7, 2015

Overview 1 Background and History 3 Public and Agency Engagement Strategy 2 Overview of Scope and Schedule for the Study 4 Next Steps 2

1 Background and History

Study Area 45 Mile Corridor Traverses the following communities & governments: 1. City of South Bay 2. City of Belle Glade 3. Town of Loxahatchee Groves 4. Village of Royal Palm Beach 5. Village of Wellington 6. Town of Haverhill 7. Town of Glen Ridge 8. Town of Cloud Lake 9. City of West Palm Beach 10. Palm Beach County 4

Background and History SR 80 is part of the Strategic Intermodal System and traverses 10 different communities Between 2003 and 2008 major capacity improvements were completedalong the SR 80 corridor Widened to 8-lanes between Royal Palm Beach Boulevard to I-95 Grade separated intersections including SR-7, Jog Road, Haverhill Road, and Military Trail SR 80 from west of Lion Country Safari Road to Forest Hill Boulevard is programmed to be widenedfrom 4 to 6 lanes in fiscal year 2018 SR 80 is expected to see a significant increase in traffic volumes over time due to anticipated development Department seeks to maintain the SR 80 adopted level of service and access classification over the 20-year planning horizon Department seeks to work with local governments to investigate a broad range of transportation alternatives and land use strategies for the near and longterm 5

2 Overview of Scope and Schedule for the Study

Overview of Scope 1 2 3 4 5 6 7 Partner and Public Involvement Activities Corridor Data Collection Prepare Traffic Memorandum Prepare Facility Enhancement Element (Develop Alternatives) Prepare Facility Operations and Preservation Element (Develop Interim Improvements) Prepare Environmental Element Prepare Action Plan Report 7

Study Timeline 2-Year Study Period 7

Overview of Schedule Partner and Public Involvement Activities Summer 2015 through Summer 2017 TRC Meetings: ~ Every 3 months Stakeholder Interviews: December 2015 MPO presentations: December 2015, Summer 2016, Summer 2017 Alternatives Public Workshop: Summer 2016 Corridor Data Collection Summer 2015 through Spring 2016 Roadway characteristics, traffic, land use, transit, ped/bike, crash, related plans, environmental Prepare Analysis and Documentation Fall 2015 through Summer 2017 Traffic Memorandum Alternative Development Interim Improvements Environmental Element Produce Action Plan 9

3 Technical Review Committee Roles and Responsibilities

Technical Review Committee Roles and Responsibilities 1. Provide Information and Data 2. Provide Input to the Project Team 3. Share Information with their Agency Help get word out to constituents Provide guidance for interacting with Commissions and City departments 4. Act as a Feedback Loop to the TRC and Project Team 11

3 Public and Agency Engagement Strategy

Public Involvement Plan 13

Public and Agency Engagement Strategy Proactive process Provides a variety of opportunities for interested parties Creates a meaningfulprocess that is transparent Facilitates effective communication about how public contribution influences decisions Continuously evaluated and improved Gives under-represented communities a voice 14

Phase 1 Key Questions to be Asked 1. What is the purpose and need of this Corridor Action Plan? 2. What problemsare we trying to solve? 3. What are the issues, opportunities, goals and objectives? 4. What are the community needs and vision for this corridor? 9

Phase 2 Key Questions to be Asked 1. Which alternatives best meet our corridor needs and study objectives? 2. What are the opportunities and constraints with each alternative? 3. What are the potential mobility vs. livability trade-offs with each alternative? 4. Are there potential conflicts between local and regional vision for the corridor? 5. Which alternatives promote the livability goals of the communities along the corridor? 16

Phase 3 Key Questions to be Asked 1. Which alternatives and actions do we want to carry forward? 2. What implementation and funding strategies should we use to advance the preferred alternative? 3. What are the specific recommended actions to be taken by each implementing agency? 17

5 Decision-making Framework

Decision-making Framework FDOT Executive Team FDOT Management Team Stakeholders and Interested Public Technical Review Committee Palm Beach MPO Committees 19

4 Next Steps

Next Steps 1. Conduct Stakeholder Interviews December 14 th through 17 th 2. Assess Existing Conditions Now through March 3. Confirm Goals & Objectives Winter/Spring 2016 4. Develop Alternatives Spring/Summer 2016 5. Gather Feedback on Alternatives Summer 2016 Present to MPO 11