Nairobi, Mombasa and Kisumu

Similar documents
AVAILABLE Projects TRANSPORT

Advantage Forum, Milan: Italy By Carole Kariuki CEO Kenya Private Sector Alliance (KEPSA)

Presentation on Initiatives to Improve Cargo Handling at the Port of Mombasa. Muhamad A. Jezan Resident Representative

This project sought a partner to run the Nairobi Commuter Rail and to provide the rolling stock. Provision Of INFRASTRUCTURE

LOCATION Situated on the equator on the East African East Coast Between Somalia and Tanzania Area;, 582,650 sq km Highest point, Mt Kenya at 5,199 m a

Introduction. Expansion of the Construction Sector

Development of Geothermal Resources in Kenya

SHOWCASE FOR GEOTHERMAL IN KENYA

Facilitation of Landlocked Transit Cargo. IAPH Conference Abuja 18 th Sep, 2018

Investments in Transport Infrastructure Projects

Renewable energy: Investing in Africa

Power Africa Geothermal Road Show. Presented by David Kagiri

SECOND TRANSPORT AND ECONOMIC CORRIDOR. Lamu Port South Sudan Ethiopia Transport (LAPSSET) Corridor

KENYA COUNTRY UPDATE PEKETSA MANGI & DR. PETER OMENDA

KENYA PORTS AUTHORITY PO Box MOMBASA KENYA. Phone Fax Web:

Small Hydropower Development 3 rd June, 2018 Hangzhou, China

THE PPP INITIATIVE IN GHANA

Tanzania Ports Authority. TPA PORT PROJECTS TO BE SUPPORTED BY DEVELOPMENT PARTNERS AND PPPs

Sectors of operation. Capacity building & skill set development. Area development. Agri and food infrastructure. Industrial infrastructure

Introduction of Project for Formulation of Master Plan on Logistics in Northern Economic Corridor

TMS CONSULTANTS LTD TARGETED PARTICIPANTS FOR TANZANIA INTERNATIONAL PUBLIC-PRIVATE PARTNERSHIP (PPP) EXHIBITIONS AND CONFERENCES

PAST, PRESENT AND FUTURE MW additional geothermal capacity Drilling ongoing

DIRECT USE OF GEOTHERMAL ENERGY FOR FOOD SECURITY Towards achieving Kenya s BIG4 Agenda

SCALING-UP RENEWABLE ENERGY PROGRAM (SREP) COUNTRY INVESTMENT PLAN KENYA

INVESTMENT POTENTIAL INVEST IN PORT TERMINALS AT THE PORT OF WALVIS BAY NORTH PORT PROGRAM DATE: 29 AUGUST 2016 REVISION: 1

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

Breakout Session 2: Development of the Dar es Salaam Port March 17, :30 12:30

Water and Energy Resource Potential of Ethiopia Status of Development and Investment Opportunities. Ethiopian Investment Forum 07 June, 2011

PRESENTATION ON THE BIG 4 AGENDA: WHICH WAY FOR THE NATION ON THE 34 TH ICPAK ANNUAL SEMINAR

GEOTHERMAL DEVELOPMENT IN KENYA COUNTRY UPDATE. Cornel Ofwona Geothermal Development Company

Special Economic Zone At Duqm

Value Proposition & Investment Opportunities

BRIEF OF THE KENYAN ENERGY SECTOR AND CURRENT STATUS OF NUCLEAR POWER PROGRAM

MRMR Hambantota Port

KENYA S PLANS FOR GEOTHERMAL DEVELOPMENT A GIANT STEP FORWARD FOR GEOTHERMAL

Resourcing. the African Development Bank for accelerated performance and effective delivery: Eastern Africa Regional Perspective

Policy Research Corporation

Click to edit Master title style

Country Action Plan-Proposed Outline

BLUE ECONOMY BANKABLE PROJECTS

REPUBLIC OF KENYA MINISTRY OF ENERGY AND PETROLEUM KENYA PETROLEUM TECHNICAL ASSISTANCE PROJECT (KEPTAP) PROJECT MANAGEMENT UNIT (PMU)

INTERSESSIONAL PANEL OF THE UNITED NATIONS COMMISSION ON SCIENCE AND TECHNOLOGY FOR DEVELOPMENT (CSTD)

TABORA INVESTMENT FORUM 19 th JULY 2013 AT SERENA HOTEL DAR ES SALAAM

Monthly Port Community Charter Report. September 2016

(3) Lao PDR EIA projects list. Group 1. Shall prepare IEE

Ministry of Infrastructure The Republic of Rwanda AFRICA ENERGY FORUM JW MARRIOTT HOTEL, DUBAI 9 th JUNE, 2015

Overview of Kenya Power Situation

Energy Infrastructure as an Economic Development Enabler in a Devolved Government Structure

THE MOMBASA PORT STAKEHOLDERS 2 ND THINK TANK FORUM AND ANNUAL REVIEW OF THE PORT COMMUNITY CHARTER

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District

TICAD VI SITE VISITS. Introduction

Monthly Port Community Charter Report

Sierra Leone & Liberia Business Day. The Hague, Netherlands Tuesday, SEPTEMBER 11, 2018

Short Project Brief Resort Development South Denarau Island Project Fiji. Prepared by. Cocciardi Holdings Pty Ltd

Working With Cost Reflective Tariffs-The Kenyan Experience

A NATIONAL ENERGY STRATEGY FOR LEBANON LEBANESE NATIONAL ENERGY (LNE) CONFERENCE

STATUS OF GEOTHERMAL DEVELOPMENT IN KENYA. Dr. Peter Omenda

KENYA: NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (P126321)

SILVER SPRINGS HOTEL,NAIROBI,2ND NOVEMBER,2015

Presentation on Energy Statistics for Kenya

TENDER FOR COMPLETE REPAIR OF OLKARIA 1 UNIT 3 GENERATOR ROTOR AT GEOTHERMAL POWER PROJECT. KGN- GDD : CLARIFICATION REQUEST

STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR ENERGY SECTOR: CASE STUDY OF OLKARIA GEOTHERMAL EXPANSION PROGRAMME IN NAKURU COUNTY, KENYA.

TO UNDERTAKE A REVIEW OF THE STATE OF STOCKS OF PRIORITY FISHERIES IN KENYA

b. Develop urban roads/states highways and National highways for the development of tourism, trade and commerce.

Environmental and Social Impact Assessment [ESIA] for Proposed Liquefied Natural Gas (LNG) Project at Tema in the Greater Accra Region of Ghana

Food security primarily remains stable with the early end of the long rains in May

SOUTHWEST LOUISIANA PORT NETWORK THE ENERGY CORRIDOR S PATH TO GROWTH & SUCCESS

Examples of Eligible Projects. Project Category Description Examples

LAPSSET PRESENTATION

Regional Logistics Corridor. Georgian National Investment Agency (GNIA)

Suez Canal. The Suez Canal Zone represents a new chapter in the economic development of

PRESENTATION BY PATRICK OBATH, DIRECTOR, KEPSA ANNUAL ADVANTAGE FORUM APRIL 27TH, 2015, VENICE, ITALY

Domestic seaborne distribution systems in Asia

SHARING THE EXPERIENCES IN MODERNIZATION OF IRRIGATION SYSTEMS IN KOREA POPULATION IN THE WORLD

The principal Investment Promotion Agency of the province of Sindh to facilitate Foreign & Local Businesses

1 Name of project POWER PLANT VINKOVCI. 2 Location of project City of Vinkovci, Vukovar-Srijem County ,00

Presented By. Samuel Muriithi KENYA FOREST SERVICE

15 TH ANNUAL EAST AFRICAN POWER INDUSTRY CONVENTION

SECTOR ASSESSMENT (SUMMARY): URBAN TRANSPORT 1

Energy in Kenya. Energy Scenarios Workshop July 24, 2013 Stanley Hotel

Analysing how. Kenya. instituted its REFIT and investigating future solar plans. By Eng. David Mwangi Energy Consultant. Kenya

Project for Master Plan on Logistics in Northern Economic Corridor. Final Report

Avalon Airport Rail Link. Community and Stakeholder Issues and Ideas Report Understanding what s important. December 2011

EXPERIENCE AND LESSONS LEARNED IN ADDRESSING THE CHALLENGES OF TRAINING IN KENYA

Agenda. Scope of Work. Next Steps. CEOs Project Status Update Forum 24 June Job. Evaluation & Grading & Salary.

Indian Railways : Opportunities for Investment. Mukul Saran Mathur Executive Director /PPP September 2016

Study on the Plan of Taipei Port

Denmark. Ulla Fabricius and Christian Benedictsen-Nislev. NJORD Law Firm

MARITIME INDIA SUMMIT Anchored for Growth

AT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017.

Stakeholder Consultation Outcomes

Renewable energy: Investing in Africa

WATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen months)

KENYA REVENUE AUTHORITY (KRA)

REFORMS IN ACTION 28/07/2016 DONOR COORDINATION MEETING MINISTRY OF INFRASTRUCTURE OF UKRAINE

terms of sections 24(2), 24(5), 24D and 44, read with section 47A(1)(b) of the

ENVIRONMENTAL IMPACT ASSESSMENT (BASIC ASSESSMENT) PROCESS: PROPOSED REVERSE OSMOSIS PLANT, IRON ORE HANDLING FACILITY, PORT OF SALDANHA

The height of structure and building in each zone must not exceed the following:

Collaborative Meeting for Geothermal Risk Mitigation Facility (GRMF) in EA Region

Transcription:

KENYA INVESTMENT AUTHORITY VISION 2030PROJECTS SUBMITTED Sector Name of Institution Project Investment Plan Location Estimated Investment cost Project Description Status TRANSPORT AND INFRASTRUCTURE Kenya Railways Corporation Nairobi Commuter Rail Private Equity and Private Debt Nairobi Private equity: US $ 68 million Private Debt: US $70 million This project sought a partner to run the Nairobi Commuter Rail and to provide the rolling stock. The government has already invested in the rehabilitation of the rails. The project will provide for expanded, safe, affordable and efficient rail commuter services in Nairobi with the additional benefit of decongesting the capital city's roads. The project has been done in sections with the completion of Syokimau, Imara Daima and Makadara. The Emabakasi line is yet to be done. Kenya Railways Corporation Railway Cities (Nairobi, Mombasa & Kisumu) Joint Venture (85% private & 15% KRC) Nairobi, Mombasa and Kisumu US $ 2,150 Million This initiative will include the redevelopment of existing rail stations into mini cities which include business parks for light manufacturing, hotels, shopping arcades, restaurants and parking garages Apart from the Kisumu Railway city, the others have feasibility studies and land is readily available for investor uptake Kenya Railways Corporation Dry Port at Voi Private Equity and Private Debt Voi Kshs 698,392,640.00 An inland intermodal terminal directly connected The feasibility study is complete and the by rail to the sea port and will operate as a centre project is ready for uptake. for transshipment of sea cargo to inland destinations. In addition this port would also include storage, maintenance for road/railcargo carriers and customs clearance services. Kenya Railways Corporation Lake View Resort Kisumu Joint Venture Kisumu Yet to be determined The project will involve development of a five-star Feasibility study is in progress and would hotel (400 rooms), two three star hotels (300 be finalized once the land encroachment rooms), conference facilities, office park, car park, issue has been soughted out. entertainment and recreation areas, shopping mall and BPO park.

TRANSPORT AND INFRASTRUCTURE Kenya Ports Authority Lamu Port (LAPSSET) BOT Lamu US $664 Million The project aims to achieve the construction of 3 additional berths and a draft of 18 meters to accommodate bigger ships of 100,000 tons and more. The first 3 berths are under construction through funding by the Government of Kenya. The port will be linked to Ethiopia and South Sudan through a road network and a standard gauge railway line via Garissa, Isiolo to Moyale and Lokichoggio respectively. Construction has been awarded and due to begin in the next financial year and completed in 3 years Kenya Ports Authority 495 LNG Power plant at Dongo Kundu PPP Mombasa USD $200 Million 495MW liquefied natural gas (LNG) power plant project is being spearheaded by the Ministry of Energy & Petroleum. KPA is leasing 300 acres to the Ministry to construct the plant. KPA has initiated the legal process of leasing the land for the project to the Ministry of Energy. Kenya Ports Authority Kisumu Sea Port and other Lake Victoria BOT Kisumu USD $250Million The project involves development of Kisumu Port Though the Feasibility study has not been into a modern commercial lake Port to serve the growing trade in the East African Community done, the concept has been approved and are currently procurring a Transaction region.the goal is to develop these ports, provide Advisor through the National Treasury requisite physical and super infrastructure, develop a mechanism to effectively manage and is meant to be engageged by June 2014. these ports and ensure their effecient utilization Kenya Ports Authority Mombasa 2nd Container Terminal Phase 2 & 3 PPP Mombasa USD $600 Million The construction of phase 1 costed $250 Million and was funded by the public. Its expected to have a capacity of 450K TEU/annum Phase 1 is to be completed by March 2016. It is expected that once the construction of the terminal is complete a private party will take over the operations of the terminal. A draft concession plan has been submitted to PPP-unit. For Phase 2&3 a consultant has been procured to conduct the feasibility study. EOI will be announced soon.

Kenya Ports Authority Conversion of Berth 11-14 PPP Mombasa TBD Conversion berths 11-14 general cargo to container terminal The project has been put on hold as KPA is focusing on gettting the 2nd Container terminal off the ground. Kenya Airports Authority Special Economic Zones PPP scheme or Private (SEZs), Airport City, equity or private debt Specialised Cargo Cargo terminal, Airport hotel, Terminal building area, Duplicate greenfield8 Second Catering, hangars, Embakasi housing JKIA TBD The project envisages to have various projects available for investors. Based on the Master plan developed the Institution The Authority is organizing a forum aimed at introducing investors to the opportunities in the JKIA Investment Zones Kenya Ferry Services Limited (KFSL) Multi-Storey Terminal at Likoni PPP Mombasa TBD Development of a multi-storey terminal on 1.6Ha in Mombasa to provide a modern ferry terminal, parking, bus terminal as well as a variety of commercial services to maximize revenue potential of the site. On 1st August 2013, KFSL engaged M/s Infrastructure Investment Facilitation Company of Bangladesh, as a Transaction Advisor. The feasibility study is expected to be submitted by May 2014. Kenya Ferry Services Limited (KFSL) Intergrated Marine Transport System (IMTS) PPP Mombasa TBD Development of an IMTS on the vast Indian Ocean involving the provision of regular ferry services with landing on the Mombasa Island, mainland north, and south west i.e water bus; leisure ferry services around Mombasa- cruise vessels; water taxis; coastal ferry services linking all coastal towns between Mombasa and Lamu and associated islands; and floating hotels The concept was approved by PPP committee on 27th November, 2013 and are currently preparing the timetable in consultation with PPP Ports Advisor Kenya National Highways Authority (KeNHA) Nairobi-Thika road PPP Nairobi USD$ 9M This involves the operation and maintenance of 40 Km section of the 8-12 lanes road between Nairobi & Thika towns maintenance, operation and collection of tolls to be tenderd to the private sector The EOI has been issued

Kenya National Highways Authority (KeNHA) Dualling of Mombasa -Nairobi Highway PPP Nairobi-Mombasa USD$ 1800M Expansion and construction of the dual carriageway from Nairobi to Mombasa Project approved by the PPPSC.An advert for the EOI of a Transaction advisor has been placed and would close in March 2014, Its plannned that an EOI for private investor to take up the project will be announced this year. Kenya National Highways Authority (KeNHA) Dualling of Nakuru -Nairobi Highway PPP Nairobi-Nakuru USD$ 400M Expansion and construction of the dual carriageway from Nairobi to Nakuru Project approved by the PPPSC. An advert for the EOI of a Transaction Advisor has been placed and would close in March 2014. Its plannned that an EOI for private investor to take up the project will be announced this year. Kenya National Highways Authority (KeNHA) Nairobi Southern Bypass ppp Nairobi USD$ 200M Concessioning for O&M is being considered for the 30km Bypass under construction EOI issued. ENERGY KenGen 2 x 70MW Olkaria V Joint Venture Naivasha US $ 504 Million KenGen was seeking a joint venture partner to build a geothermal power plant in Naivasha. EOI Is expected to be advertised in April 2014 KenGen Isiolo 50MW Wind Power by 2016 Joint Venture Isiolo :$ 400 Million This is the first phase to be followed by 100MW installation. EOI Is expected to be advertised in April 2014 KenGen 2 x 140MW Olkaria VI & VIII Joint Venture TBD TBD Six production wells have been drilled out of the target for 5 EOI Is expected to be advertised this year date will communicated

Geothermal Development Corporation (GDC) Implementation of 400MW Menengai Phase I Geothermal Development Project PPP Menengai TBD The project is a greenfield electricity generation project whose objective is to increase the installed national capacity by an additional 400MW Drilling on Phase 1 of the 400MW plant commenced in 2011 with 20 wells having been drilled so far. GDC advertised for the 1st 90MW plant in July 2013 and the tenders awarded to 3 firms (30MW each) in december 2013 and will be operational indec 2014. An advert for the remaining 60MW is expected in the coming months. Geothermal Development Corporation (GDC) Implementation of 800MW Menengai Phase 2 Geothermal Development Project PPP Menengai TBD The project is a greenfield electricity generation project whose objective is to increase the installed national capacity by an additional 800MW Scientific exploration studies on phase 2 of the 800MW plant were completed in mid-2011. Exploratory drilling is envisaged to commence in 2015 Geothermal Development Corporation (GDC) Implementation of 800MW Bogoria-Silali Phase 1 GDC PPP The Bogoria-Silali TBD block comprises of Bogoria, Baringo, Arus, Korosoi, Chepchuk, Paka and Silali The project is a greenfield electricity generation project whose objective is to increase the installed national capacity by an additional 800MW. The 1st phase has configured each of the eight geothermal plants with an output of 100MW and is expected and is expected to reach the grid by 2017. Presently, related infrastructure work including roads, water and evacuation lines are ongoing Geothermal Development Corporation (GDC) 300MW Geothermal Plant PPP Suswa TBD The project is aimed at contributing up to 300MW Concept approved by the PPP committee towards the least coat power development plan. IPPs will be invited to buy the steam from GDC on 27/11/13. Feasibility study is yet to be undertaken. under a Steam Purchase Agreement, and sell the electricity it generates to KPLC under PPA, thereby recouping its investment cost Ministry of energy and Petroleum (MoE) 980MW Coal Plant BOT Lamu TBD Generation of 980MW of power by IPPs for 20 to 25 years It had originally been based in Kilifi but had to be moved to Lamu in a order to provide sufficient power for the LAPSSET development programme. On 22/01/14 feasibility study was approved and the bidding process was launched which is to be concluded on 23 April, 2014 Ministry of energy and Petroleum (MoE) 800MW LNG Power plant at Dongo Kundu BOT Mombasa TBD 800MW liquefied natural gas (LNG) power plant to be awarded to an investor for the design, finance construction, operation and maintainence for a period of 20 years On 22/1/14 by the PPP committee approved feasibility study report. Tendering process was concluded on 15th April, 2014.

National Oil Mombasa Petroleum Trading Hub-Single Buoy Mooring (SBM) Joint Venture Mombasa $514 Million The trading hub will be a modern petroleum EOI Is expected to be advertised this year terminal comprising two offshore petroleum jetties date will communicated with one dedicated to loading/offloading of crude oil and black fuels, and the other dedicated to refined products. A modern Greenfield Petroleum tank farm with a design capacity of 800,000MT is to be developed in phases from an initial minimum capacity of 300,000MT. REGIONAL DEVELOPMENT AGENCIES LAKE BASIN DEVELOPMENT AUTHORITY LAKE BASIN DEVELOPMENT AUTHORITY LAKE BASIN DEVELOPMENT AUTHORITY Magwagwa multipurpose dam development project Nandi Multipurpose Dam Project Webuye multipurpose dam development project A build-operate- Transfer model under a PPP agreement where the private partner finances, constructs maintains and transfers the facility to LBDA at the end of an agreed period of time A build-operate-transfer model under a PPP agreement where the private partner finances, constructs maintains and transfers the facility to LBDA at the end of an agreed period of time A build-operate-transfer model under a PPP agreement where the private partner finances, constructs maintains and transfers the facility to LBDA at the end of an agreed period of time NYANZAmagagwa/muhoron i 979.8 Million USD comprises the construction of a 95m high and 450m long concrete faced rock fill dam with a design total plant output of 120 MW and an annual energy production of 510 GWh/y. It also comprises a reservoir with a maximum capacity of 106 m3. The reservoir is expected to supply water to 19 service centres starting with Magwagwa town and also provide water for irrigation and fisheries. Kisumu ksh.348315601.99 Involves establishment of a large- Scale Multipurpose Water Réservoir catering for Public / Industrial Water Supply, Irrigation, River Régulations, Flood Control and Power Production (20MW). Promotion and development of Tourism, Inter - Basin Water Transfers, Fisheries, flood control and Downstream Ecosystem Conservation are also components of the Project. The project comprises of a 58m high earth/rock embankment dam located in the Nandi Forest. It would impound water with a live storage capacity of 275 Million m³ and surface area extending to some 12.5 square kilometers. The project will see the irrigation of 16,000 17,000 hectares of land in Miwani and Chemelil areas of Kisumu County. BUNGOMA 60 Million USD comprises the construction of a 54m-earth embankment dam located at 2.5 km upstream of Webuye falls. It also comprises a reservoir with a full supply level with a live Storage of 200x106 cubic meters. The dam is expected to supply a single 30MW power station that will ensure rural electrification and value addition of products. Water Supply, Rehabilitation and Stocking of dams for Improvement of Inland Fish are also components of the Project farming, and environmental conservation ; PRE-FEASIBILITY STUDY IS COMPLETE PRE-FEASIBILITY STUDY IS COMPLETE PRE-FEASIBILITY STUDY IS COMPLETE

TOURISM Tana and Athi Rivers Development Authority MASINGA DAM TOURISM COMPLEX Level of government involvement and reasons, Level of participation by third parties, PPP mode e.g. leasing, owning, operations and management, etc. Masinga area Details to be provided at design stage. The proposed project intends to develop a Feasibility study stage. tourism complex at the Masinga dam. The tourism project will have the following components; Masinga Dam hotel a 200 bed 5 star facility Tented camp on an island within the dam World Water entertainment facilities Holiday homes Wildlife sanctuary A forestation and golf course Cultural Tourism Irrigated Agriculture Alternative access ( Air strip and Ferry) INTERGRATED PROJECT Tana and Athi Rivers Development Authority MUNYU MULTIPURPOSE RESERVOIR AND KIBWEZI IRRIGATION SCHEME Level of government involvement and reasons, Level of participation by third parties, PPP mode e.g. leasing, owning, operations and management, etc. Kibwezi Ksh.13, 719,936 ( An estimation from 2006) The Munyu-Kibwezi Project is envisaged to FEASIBILITY STAGE comprise the following A river-regulating reservoir at Munyu with a capacity of 575 million cubic metres of live storage. Three hydro-electric power stations with an aggregated capacity of the order of 40mw A major irrigation scheme at Kibwezi covering about 13,000 ha, with two river intake structures and some 80 km of canal ranging up to 20m3/s capacity ENERGY Tana and Athi Rivers Development Authority Solar Development Project PPP Model Kiambere, Masinga, Emali and Tana Delta Details to be provided at design stage. The Solar Energy Development is to generate Feasibility study stage. Solar Power as an alternative energy source and for agricultural production to meet national energy demand, improve food security and to generate income. The Projects are located within TARDA region i.e Kiambere, Masinga, Emali and Tana Delta. Access to the Kiambere and Masinga farms is through Kangonde - Kivaa roads approx. 200kms and 160kms from Nairobi respectively, Emali farm is along Nairobi Mombasa road approx. 120 kms and Tana Delta farm approx. 220kms Malindi-Mombasa road. INTERGRATED PROJECT Tana and Athi Rivers Development Authority TANA DELTA INTERGRATED SUGAR PROJECT PPP Model in Garsen county, coast province about 100km from north of Malindi The total cost for financing the joint venture is estimated as $ 106, 417,260 and $ 13, 985,000 for the ethanol plant. The main feature of the proposed project are Feasibility study phase irrigated sugarcane production through estate (16,000 ha) and out growers systems (4,000 ha), water supply to the project,sugar factory, cogeneration faccility of about 34MW power capacity,75 KLPD ethanol production plant.

AGRICULTURE Mandera County Government Modern & State of the Art Abbattoir PPP Model Mandera Town 1.8 million USD The project comprises the development of a modern state of the art abbatoir with capacity to slaughter over 200 heads of livestock, under Islamic tradition. The abbatoir will be equiped for product processing/utilization, meat preservation, processing, butchering and development of meat market. Other components include production of biogas from animal waste and solar energy. The project requires 5-10 acres of land. PRE-FEASIBILITY STUDY IS COMPLETE