Space Coast TPO. ITS Master Plan and Project Overview in Brevard County. FSITE/District 10 & ITS FL 2017 Joint Annual Meeting

Similar documents
Intelligent Transportation Systems Master Plan

Intelligent Transportation Systems Master Plan

Intelligent Transportation Systems Master Plan

2035 Long Range Transportation Plan space coast transportation Planning organization

Project Evaluation Criteria

I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012

EXECUTIVE SUMMARY OVERVIEW OF THE 2035 PLAN DEVELOPMENT PROCESS ANTICIPATED YEAR 2035 SYSTEM CAPACITY. Executive Summary

SPACE COAST TRANSPORTATION PLANNING ORGANIZATION

Decision Support Systems for FDOT District 4 TSM&O

VISION STATEMENT, MISSION STATEMENT, AND GOALS AND OBJECTIVES

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009

Final Air Quality Report

2040 Addendum Performance-Based Planning November 2018

Long Range Transportation Plan Update Scenario Planning. AMPO Annual Conference, October 22, 2015

Chapter 12: Transportation Safety & Security CHARLOTTE COUNTY PUNTA GORDA MPO 2035 LONG RANGE TRANSPORTATION PLAN

Statewide Bluetooth Data Collection

Chapter 2 Transportation Element Goals, Objectives and Policies

Freight Planning and Performance Measures: Historical Context and Statewide Perspectives

SIS 2045 Multimodal Unfunded Needs Plan: FDOT District Four Projects. Project Review with Metropolitan/ Transportation Planning Organizations

TBARTA 2015 Regional Transportation Master Plan 2040 Regional Long Range Transportation Plan AUGUST 2015

TSM&O Consortium Meeting

North I-75 Master Plan Summary

TIM Strategies for Intracoastal Waterway Drawbridges

INDIANA S INTERMODAL MANAGEMENT SYSTEM Stephen C. Smith Planning Manager, Transportation Planning Division Indiana Department of Transportation

SR 60 Grade Separation over CSX Railroad Traffic Technical Memorandum

CHAPTER 8 TRANSPORTATION ELEMENT

NORTH I-75 MASTER PLAN Summary Report

Proposed Comprehensive Update to the State of Rhode Island s Congestion Management Process

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018

Mobility and System Reliability Goal

US 27 MULTIMODAL CORRIDOR TREASURE COAST REGIONAL PLANNING COUNCIL SOUTH FLORIDA REGIONAL PLANNING COUNCIL

INTERSTATE CORRIDOR PLANNING

P4.0 Highway Quantitative Scoring Workgroup Recommendations

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

Surface Transportation Resiliency Planning in Hillsborough County, FL

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS

Chapter 3 - Goals, Objectives, & Strategies

SIS Policy & Implementation

CENTRAL FLORIDA EXPRESSWAY AUTHORITY. SR 408 Eastern Extension PD&E Study

VISION. 4. Vision. 31 Page

CHAPTER 8. Congestion Management

Florida s Approach to Maximizing Advances in Data and Technology for Performance Management

District One Freight Mobility & Trade Study and Implementation Plan Joint Charlotte & Sarasota/Manatee MPO Board Meeting January 25, 2016 Keith

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS

HILLSBOROUGH COUNTY METROPOLITAN PLANNING ORGANIZATION

MEETING SUMMARY FOR APRIL 13, 2017

Future of Transportation in Florida

FROM THE CHAIR By: Michael Dorweiler, AICP 2007 Chairman for the Tampa Bay Applications Group DATES TO REMEMBER

Contents i Contents Page 1 A New Transportation Plan Community Involvement Goals and Objectives... 11

ARC Freight Advisory Task Force Meeting. SOUTH FULTON COMMUNITY IMPROVEMENT DISTRICT Multi-Modal Study

REVIEW OF MPO LONG RANGE TRANSPORTATION PLANS AND REGIONAL MPO PLANNING ACTIVITIES AND PRODUCTS

Chapter 10 Goals, Objectives + Policies

Autonomous/Connected Vehicle Guidance. Dan Beaty, AICP HNTB

Florida Department of Transportation. Lane Elimination

G U I D E. Planning for Travel Time Reliability. Florida Department of Transportation

Regional Performance Measures Annual Progress Report TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner

Kentucky River Area Development District. Regional Transportation Planning Committee

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA

Los Angeles Region s Connected/Automated Vehicle Efforts

Inland Port Cargo Complex

METROPOLITAN PLANNING ORGANIZATION FOR THE MIAMI URBANIZED AREA BLOCKS RIBBONS EXERCISE

MARC Congestion Management Process Policy

CORRIDOR ALTERNATIVES EVALUATION SUMMARY REPORT

Space Coast Transportation Planning Organization Adopted 7/12/2018. FY 2019 Strategic Intermodal System (SIS) Projects

AGENDA ITEM #17: VIRGINIA S 2025 TRANSPORTATION NEEDS ASSESSMENT AND HB2: OIPI CONSULTANT

Appendix K: Project Prioritization Criteria

GDOT-Office of Planning Update

CORRIDOR ALTERNATIVES EVALUATION SUMMARY REPORT

Statewide Achievements

M E M O R A N D U M. To: Council Members AGENDA ITEM 7

Introduction... 1 Florida s Rail System... 1 Rail Freight... 3 Rail Passengers... 5 Conclusions... 9

Performance Measures for Transportation Planning Part 1

Chattanooga Regional ITS Architecture Update Workshop. September 24, 2013

Safety and Security for Residents, Visitors, and Businesses

Tri-County Regional Planning Commission 2045 Regional Metropolitan Transportation Plan Goals and Objectives Adopted March 22, 2017

HIGHWAY 14 NEW ULM TO NICOLLET 4-Lane Expansion Open House

Scope of Services Traffic Signal Retiming Contract FM NO Florida Department of Transportation District Four

GUIDING PRINCIPLES MEMORANDUM

INCIDENT MANAGEMENT TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (TSM&O) FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT SIX

DESIGNATED US DOT AVPG MEETING

Kentucky River Area Development District

AIR QUALITY TECHNICAL MEMORANDUM

Linking Planning to Programming

Funding Intelligent Transportation Systems in the Los Angeles Region

Project Initiation Form

SR 524 Corridor Planning Study Existing Conditions Report. May 2017 Re

Florida s Market for New Transportation. New Corridors Charrette August 14-15, 2006

Adopted: February 3, 2016

CORE MPO Freight Transportation Plan. Project Advisory Committee December 3, 2014

Denver Traffic Management Center - Using Technology to Increase Operational Capabilities

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES

INTEGRATED CORRIDOR MANAGEMENT Enhancing personal mobility for all travelers

Hillsborough MPO Surface Transportation Resiliency Planning

SECTION 1 PURPOSE AND NEED FOR ACTION 1.0 PURPOSE AND NEED FOR ACTION 1.1 PROJECT PLANNING CONSISTENCY AND FUNDING 1.

Indian River County Truck Traffic Routing Plan

FDOT FREIGHT PERFORMANCE MEASURES

PORT OF FERNANDINA TRUCK CIRCULATION STUDY

MOBILITY AND ALTERNATIVES ANALYSIS

SADIQ A. PIRANI, P.Eng.

Congestion Management Process 2013 Update

Transcription:

Space Coast TPO ITS Master Plan and Project Overview in Brevard County FSITE/District 10 & ITS FL 2017 Joint Annual Meeting

2

Presentation Outline Space Coast Overview The SCTPO s Role in TSM&O Success and Next Steps 3

Space Coast Overview 4

We are Quintimodal

Space Coast Urbanized Area Boundaries Population 579,130 1 county 72 miles long 16 cities and towns Two airports One seaport One spaceport Geographically Constrained 6

Existing Land Use Primarily urban sprawl Auto as primary source of transportation Limited North South connections 7

2040 Land Use Not much is planned to change Some additional development in North and South Up to local comprehensive plans to approve higher densities Lots of conservation land We are planned out! 8

9 Operations Overview # of Signals/Intersections Not on ITS On ITS TOTAL State (Maintained by County) 84 122 206 County 55 54 109 City, Maintained by County 15 4 19 SUB TOTAL 154 180 334 City, Not Maintained by County Titusville 40 40 Melbourne 56 10 66 Palm Bay 43 43 SUB TOTAL 139 10 149 TOTAL 293 190 483

Operations Overview TMC s 51 Miles of Fiber 79 CCTV Cameras 48 Bluetooth readers 1325 Wireless pucks 10

Local Needs Future Planning Funding for M&O Staffing Resources Centralized operations 11

The SCTPO s Role in TSM&O 12

TPO/MPOs can help! Planning for operations Neutral 3 rd party Existing municipal relationships Exist to enhance transportation systems! 13

ITS Master Plan for the Space Coast TPO The Space Coast TPO ITS Master Plan: Evaluated the existing systems in the Brevard County Area Determined future needs and formulate an implementation strategy for the future development and maintenance of the ITS A comprehensive report that contains: All essential technology information Recommendations System-wide implementation methodology Operations and Maintenance Plan 14

Task 1: ITS Vision, Goals and Objectives Primary Objectives: Increase the number of roadway miles under surveillance by 50% Reduce system wide delay for cars, trucks, and transit Reduce corridor delay for cars, trucks, and transit with traffic management Improve reliability and predictability of travel Improve real time transit management Improve real time traffic and transit information Secondary Objectives: Maintain the connectivity of intermodal hubs (seaport, airport, spaceport, transit and rail stations) Reduce average response times by 10% for each priority crash type (aggressive driving, intersection crashes, vulnerable road users and lane departures) Improve ability to evacuate during an emergency event with reduced clearance times and increased capacity during evacuations. Reduce greenhouse gas emissions 15

Task 1: Summary of Goals, Objectives and Performance Measures

Task 1: Summary of Goals, Objectives and Performance Measures

Task 2: Existing Conditions/ Infrastructure Brevard County contains hundreds of miles of roadways including limited access highways, and arterials Important to understand and document existing conditions and infrastructure to form a foundation from which to build ITS-related solutions to resolve current and future traffic related issues 2013 State of the System (SOS) Review Top employment sites, access to jobs via roadway network & transit, Park & Ride, intermodal, freight, airport, seaport, spaceport, hurricane evacuation routes)

Task 3: Identify Transportation ITS Needs ITS Scoring Methodology Scoring factors: Existing congestion (out of 40 pts.) Future activity (2035 LRTP) (max 15 pts.) Existing traffic volumes (max 10 pts.) Intermodal/economic significance (max 10 pts.) Safety (max 15 pts.) Hurricane evacuation (max 5 pts.) Transit (max 10 pts.) Each roadway segment went through an evaluation process and were given points for each category. Roadways with the highest points were ranked first and are considered as priority for future capital and operational improvements Overall network connectivity and redundancy was also a consideration. 19

ITS Rank Road ITS Master Plan and Project Overview in Brevard County Segment 2013 AADT Capacity V/C Existing Volume to MAV Future-LRTP Existing Volume Intermodal/ Economic Hurricane Route Transit Safety Total Task 3: Identify Transportation ITS Needs ITS Needs Corridors 1 BABCOCK PT MALABAR-PALM BAY 32,262 35,700 0.90 27.11 15 7.5 7 5 10 14.1 85.7 2 BABCOCK EBER-FLORIDA 31,283 35,700 0.88 26.29 15 7.5 7 5 10 14.1 84.9 3 US 1 SARNO-EAU GALLIE 52,106 49,200 1.06 31.77 15 10 7 5 5 9.9 83.7 4 SR AIA FISHER DR-ST LUCIE 32,474 34,500 0.94 28.24 15 7.5 7 5 5 15.0 82.7 5 SR 520 BRIDGE-N.TROPICAL 44,390 49,200 0.90 27.07 15 10 7 5 5 13.7 82.7 6 BABCOCK PALM BAY-EBER 29,664 35,700 0.83 24.93 15 5 7 5 10 15.0 81.9 7 BABCOCK CHARLES-PT MALABAR 33,507 35,700 0.94 28.16 15 7.5 7 5 5 14.1 81.8 8 9 SR 520 (Causeway- US 1 (WB)) SR 520 (US 1- Causeway (EB)) DELANNOY-BREVARD 23,970 17,340 1.38 40.00 15 5 7 5 5 4.7 81.7 DELANNOY-RIVEREDGE 21,860 17,340 1.26 37.82 15 5 7 5 5 6.6 81.4 10 SR AIA SHEPARD-MCKINLEY 32,465 34,500 0.94 28.23 15 7.5 7 5 5 13.5 81.2 Top Ranked Regionally Significant Roadway Segments 20

Task 3: Identify Transportation ITS Needs Traffic Management Center (TMC) Options Existing City of Melbourne TMC Existing Brevard County TMC Future Regional TMC Co-locate agencies (local maintaining agencies, emergency responders, FHP, etc.) Determine location, operating software, staffing hours & responsibilities Brevard County TMC Example of a Future TMC 21

Task 4: Identification of Applicable ITS Strategies Regional Staffing Needs Future additional recommended staffing to effectively operate and maintain the region s collective infrastructure Position Existing Regional Staff Recommended Regional Staff Additional Regional Staff Needed Traffic Engineering Operations Manager 1 1 0 Senior Traffic Signal Engineer 3 3 0 Traffic Signal Engineer 0 3 3 Traffic Signal Analysts/Technician 0 3 3 Network Engineer 0 1 1 TMC Manager/ITS Engineer 0 1 1 Traffic Signal Maintenance /ITS Fiber Technician 14 24 10 Electronics Specialist (L2 Network Tech) 1 4 3 TMC Operator (for arterial application) 1 4 3 Public Information OfficerTotal Number of Recommended 1 Brevard County Staff 1 0 22

Task 5: Regional ITS Architecture (RITSA) and Implementation Plan 23

Task 6: Concept of Operations Updated the existing Concept of Operations that defines the roles and responsibilities for maintenance and operation of ITS and also includes the level of information sharing, status and control between agencies. 24

Task 7: Final ITS Master Plan - Completed in July 2015 Fed into FDT D5 ITS Master Plan Next update begin in the Spring of 2019 25

Success and Next Steps 26

ITS Master Plan and Project Overview in Brevard County Projects Funded by TPO As-Built Cabinet Drawings Updated TPO continues to contribute 225K to Brevard County for ITS operational support 3 City of Melbourne Expansion funded for design and construction in FY19 and FY 20 Design funded for a centralized traffic management center in FY 19 27

Coordination efforts Regional TSM&O representation for local agencies Advocate for operational improvements to included with other projects Coordinate with FDOT D5 staff to take advantage of district contract opportunities Resource Sharing 28

Pursue Programmatic Approach 29

Future Preparation 30

31