ENVIRONMENT MANAGEMENT PLAN

Similar documents
ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

DHANWADA CRUSHER STONE QUARRY

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

Environment Management Plan

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

Piplyakamil Murrum Quarry located at Khasra No 90/2, near Village Piplyakamil, Tehsil- Dharampuri, District Dhar M.P

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

ENVIRONMENTAL MANAGEMENT PLAN

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

ENVIRONMENT MANAGMENT PLAN

PRE FEASIBILITY REPORT

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

GRAVEL & ROUGH STONE QUARRY

Chapter- V MANAGEMENT PLAN (EMP)

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village,

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

2. PRE-FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

ENVIRONMENT MANAGEMENT PLAN

PRE- FEASIBILITY REPORT

PRE-FEASIBILITY REPORT

M/s.NEERAJ KUMAR JAIN

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

2. PRE-FEASIBILITY REPORT

1. PRE-FEASIBILITY REPORT

Environment Management Plan

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

ENVIRONMENTAL MANAGEMENT PLAN

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

ENVIRONMENTAL MANAGEMENT

Environmental Management Plan. For Mining of. Building Stone & Road Metal

SHRI.LAKSHMAN NAMDEV KOLI

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE

PRE FEASIBILITY REPORT

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.

Pramod S. Kambli. Page 1

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

ENVIRONMENT MANAGEMENT PLAN

Environment Management Plan For B 2 Category Project

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

Environment Management Plan For B 2 Category Project

Environmental Management Plan

EXECUTIVE SUMMARY. 1.1 Executive Summary

Pre- Feasibility RepoRt

EnvironmEntal management Plan

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN. For Excavation of Brick Earth (Total Mining Area Ha.) (for Manufacturing of Bricks)

ENVIRONMENTAL MANAGEMENT PLAN PHASIGUDA SAND QUARRY. For Sri Kalu Charan Behera. Prepared By AMARESH RATH RQP/OD/076/2017

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT

PRE-FEASIBILITY REPORT

State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests)

EXECUTIVE summary. Khasra No. Area Ownership/Occupancy Hects. Govt. Land

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Environmental Management Plan Report

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

Hind Energy & Coal Beneficiation (India) Ltd.

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

EXISTING PROJECT FOR ORDINARY SAND MINING

PRE-FEASIBILTY REPORT

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

Hind Energy & Coal Beneficiation (India) Ltd.

GREENCINDIA Consulting Pvt. Limited

Scanned by CamScanner

(A govt. of Kerala Undertaking)

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD

Gurha PF - NNE - 7.0km 11. Nearest major city with Nil population within 10km radius 12. Nearest Town / City within 10km radius

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION. 1.1 Introduction

EIA Report for ha Bhatia Limestone Mine EXECUTIVE SUMMARY

PREFEASIBILITY REPORT

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

Environmental Management Plan. For Mining of. Rough Stone & Road Metal

M/s Budwa Minerals, Village-Budwa, Tehsil-Beohari Dist. Shahdol (MP) Executive Summary ha Sathni Laterite, Ochre & White Clay Mine

PRE FEASIBILITY REPORT For SILICA SAND MINE. At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh ha.

EXECUTIVE SUMMARY TABLE 1.2 PROJECT SITE DETAILS

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

Larsen & Turbo Limited ENVIRONMENTAL MANAGEMENT PLAN

M/s. Bharat Clays Private Limited Pre-Feasibility Report

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara

ENVIRONMENT MANAGEMENT PLAN

PRE-FEASIBILIY REPORT

PRE FEASIBILITY REPORT

TOR (564/PS-MS/MPPCB/SEAC/TOR

INDEX S.NO ITEM PAGE NO 1. INTRODUCTION 3 2. DETAILS ABOUT THE MINE LEASE AREA 4 3. MINING ACTIVITY 5 4. ENVIRONMENTAL MANAGEMENT PLAN 8

Transcription:

ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP : 10000 Cu.mt/year Stone APPLICANT Shri Rashid Khan S/o Shri Munshi Khan A-54, Bhawani Dham, Phase -1, Narela Shankar, Ayodhya Bypass, Bhopal (MP) Prepared by Amit Saxena RQP/DGMMP/032/2013 12, Vinayak Nagar,Bohra Ganeshji, Udaipur, Rajasthan

CONTENTS Sr No PARTICULARS Page No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 INTRODUCTION NAME OF THE LESSEE DETAILS OF THE AREA DETAILS OF THE MACHINES TO BE USED IN MINING OPERATION DETAILS OF MEASUREMENT OF QUARRY PIT EARLIER EXCAVATED IN THE AREA TO BE SANCTIONED AND DETAILS OF MINERAL CONCESSIONS SITUATED WITHIN 100 METERS PERIPHERY OF THIS AREA SCHEME OF THE PLANTATION DETAILS OF APPROXIMATE DISTANCE OF NATIONAL PARK, SANCTUARY, BIODIVERSITY AREA, INTERSTATE BOUNDARY SITUATED WITHIN PERIPHERY OF 10 KM FROM THE AREA TO BE SANCTIONED PROPOSED ANNUAL PRODUCTION OF MINERAL EFFECT ON GROUND WATER LEVEL DUE TO MINING OPERATION AND ITS PREVENTIVE MEASURES: DETAILS OF SCHEME OF CONTINUOUS RECLAMATION AND REHABILITATION OF THE LAND DEGRADATION DUE TO MINING OPERATION: DETAILS OF PREVENTIVE AND CONTROL SCHEME OF AIR AND WATER POLLUTION: PROVISIONS FOR SEPARATE STACKING OF SURFACE SOIL EXCAVATED FROM MINING OPERATION AND IT S UTILITY: DETAILS OF SOCIAL AND ECONOMIC UP GRADATION OF MINING EFFECTED AREA DUE TO PROPOSED PROJECT DETAILS OF BUDGETARY ARRANGEMENT FOR ENVIRONMENTAL MANAGEMENT ANY OTHER DETAILS DESIRED TO BE SUBMITTED BY MINERAL CONCESSION HOLDER 4 5 6 7-8 9 9 9-10 11 11 12 12-13 13 14-15 16 16 17 Page 2 of 14

SCHEME FOR ENVIRONMENTAL MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP : 10000 Cu.mt/year Stone INTRODUCTION Nature is very kind on the human to provide all kind of materials on earth. All kinds of minerals are available in their raw form in the earth. Mining operations disturb the terrestrial configuration and natural beauty of the area. The magnitude of disturbance depends upon how the minerals are extracted from the mining area and the environmental impact depends upon the location and size of deposits and the methods adopted for its exploration. By adopting good mining practices it is moving towards harmonious development where both the operational and environmental aspects are accorded due weightage. Every quarry lease holder shall take all possible precautions for the protection of environment and control of pollution while conducting quarry operation. Under the mining operation the this management plan is required. The mining plan has been approved by Directorate of Geology & Mining Madhya Pradesh vide letter no. 21308 on dtd. 24/11/2014. The Collector office (Khanij Shakha) Katni vide letter No. 1999/Khanij/2010, dated-36/06/2010. Page 3 of 14

NAME & ADDRESS OF LESSEE: Shri Rashid Khan S/o Shri Munshi Khan A-54, Bhawani Dham, Phase -1, Narela Shankar, Ayodhya Bypass, Bhopal (MP) Individual Owner SALIENT FEATURES OF THE PROJECT: Particulars Name of the project Land use pattern Mineral Mining Lease area Details Individual Owner Stone 2.00 Hect. Khasra No. 177/1/2 Land Use Private Land Lease Validity Production Capacity Village Tehsil District Latitude& Longitude 10 Years StoneProduction: 10000 Cu.mt/year Pathari Basouda Basouda Vidisha (A) 77 53'56.81"E 23 50'08.55"N (B) 77 54'02.02"E 23 50'08.82"N (C) 77 53'56.31"E 23 50'17.42"N (D) 77 54'01.74"E 23 50'17.46"N Estimated project cost 22 Lacs EMP Cost 120000/- Man Power 10 Water demand and supply 4 KLD Nearest habitation/town The nearest village is Pathari Basouda which is about 2.0 KMS from mine site. Nearest Airport The nearest Airport is Bhopal which is about 117 KMS from mine site. Nearest Connectivity Village Road, which is about 420 mtr from mine site. Nearest Railway Station The nearest Railway Station is Ganj Basouda which is about 8 KMS from mine site. Power Supply No electricity is required. Page 4 of 14

1. DETAILS OF THE AREA VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP Period : 10000 Cu.mt/year Stone : 10 Years The details of the lease area to be grant, ownership etc. is as below: District & State Tehsil Village Area in Khasra Mineral Lease hect. No. Name Period Vidisha, Madhya Basouda Pathari 2.00 177/1/2 Stone 10 Years Pradesh Basouda Whether area is recorded in forests Existance of Public road TOPO SHEET : No : No public road passes : Area falls in survey of India Page 5 of 14

EMP: Khasra Map: Page 6 of 14

Satellite Image of the mining area: 2. DETAILS OF MACHINE TO BE USED IN MINING OPERATION: Proposed Mining/excavation will be done according to the proposed manner of Manual & Semi Mechanized workings and some machineries i.e. Hydraulic Excavator, Dumpers, Tractor & Water Tank, Jack, Hammer, Wagon Drill will be required to deploy on hire basis for transport purpose. Details given in Mining Plan. 4. DETAILS OF MEASUREMENT OF QUARRY PIT EARLIER EXCAVATION IN THE AREA TO BE SANCTIONED AND DETAILS OF MINERAL CONCESSIONS SITUATED WITHIN 100 METER PERIPHERY OF THIS AREA No seasonal perennial drainage exists within the lease area One pit was excavated in the past. Page 7 of 14

The area in surroundings up to 100 meters forms a plain topography with miner undulations of waste land form. 5. SCHEME OF TREE PLANTATION: Main objective of green belt is to provide a barrier between the source of pollution and the surrounding areas. Green belt helps to capture the fugitive emission and to attenuate the noise generated apart from improving the aesthetics. While making choice of plant species for cultivation in green belts priority is to be given to create bio climate. The authorities responsible for making green belt must ensure proper selection of plant species and adequate provision of watering and protection of saplings exist at site. Healthy tree species will be recommends for plantation. Each plant must cover 2.5 x 2.5 meter and its 100 % survival should be achieved Suitable Mali will take care of survival conditions. During the plan period about 0.2Ha area will be used for plantation purposes with in 7.5m barrier zone & plantation will be undertaken towards the southwest slope. The lease area is marked by large exposure of barren land. The lease area is rocky terrain so it is only feasible to undertake the plantation with in lease hold area under 7.5 m barrier after spreading top soil over the strip plantation shall also be undertaken over complete benches. 30 no. trees will be planted per year. The tree species recommended are Tactonagrandis (Teak), Azadirachtaindica (Neem),Mangiferaindica (Aam), Acacia Catechu (Khair), Emblicaofficinalis (Amla), MahuncaLatitolia (Mahua), Planting should be done in large sized 90 cm x 90 cm.pits dug in advance and filled with manure about 50 days before planting. The plantation raised earlier should be carefully maintained. Mortalities should be replaced by fresh saplings. Post Plantation Care: Green belt area must be guarded by suitable fencing to avoid damage by cattle grazing. Page 8 of 14

PROPOSED PLANTATION DURING FIRST FIVE YEARS YEAR NO OF TREES AREA COVERED SURVIVAL RATE 1ST 2ND 3RD 4TH 5TH 30 30 30 30 30 PER HECTARE PER HECTARE PER HECTARE PER HECTARE PER HECTARE (ANTICIPATED) 100 % 100 % 100 % 100 % 100 % SPECIES OF PLANTS MANGO, SUBABOOL KARANJ, TEAK, NEEM, KHAIR OR AS SUGGESTED BY FOREST DEPARTMENT 6. DETAILS AND APPROXIMATE DISTANCE OF NATIONAL PARK, SANCTUARY, BIODIVERSITY AREA, INTERSTATE BOUNDARY SITUATED WITHIN PERIPHERY OF 10 KM FROM THE AREA TO BE SANCTIONED Sr No Proposed project is located in whole or in part within 10 km. from the boundary of YES/NO 1 Protected areas notified under the Wild Life (Protection) - Act, NO 1972 2 National Park NO 3 Critically polluted areas as notified by the Central Pollution NO Control Board from time to time 4 Notified Eco-sensitive areas NO 5 Inter-state boundaries and international boundaries NO 7. PROPOSED ANNUAL PRODUCTION OF MINERAL The yearly production from the quarry is proposed Stone is 10000 Cu.mt/year with Semi Mechanized opencast mining system. Entire details are given in the mining plan. Page 9 of 14

8. EFFECT ON GROUND WATER LEVEL DUE TO MINING OPERATION AND ITS PREVENTIVE MEASURES: Mining will not be done below the water table. Mining will be done in non- monsoon period. There is no perennial water body in the area. Therefore mining activities will not cause adverse impacts as the mineral is non toxic in nature. Lease area is fairly flat reducing the possibility of soil erosion. Garland drains and check dams shall be constructed with appropriate settling tanks to prevent any run-offs from mine. As the manpower likely to be deployed from nearby village, therefore discharge of domestic waste water is not much and will be easily controlled with the provision of septic tank and soak pit. The stored water will be used for dust suppression and greenbelt development, etc. The pit exposed due to mining will become a source for catchment of rain water and in future it will be helpful to improve the water table of the area. 9. DETAILS OF SCHEME OF CONTINUOUS RECLAMATION AND REHABILITATION OF THE LAND DEGRADATION DUE TO MINING OPERATION: Land degradation is one of the major adverse impacts of open cast mining activities and any effort to control adverse impacts would be incomplete without appropriate land reclamation strategy. It is a mining below five hectares lease area, which is very small in nature therefore no damage of the land is anticipated. The area is likely to be degraded due to quarrying, pitting & roads. The impact on the land form or Physiography will be limited to the modification of the slope. The landscape and land use will undergo a radical change due to open cast mining. The impact during plan period is limited as benches will be formed on the already degraded land. Besides these benches, roads will also modify the Physiography. By the completion of project period plantation will grow up and will form green belt around the Quarry Land area. During the plan period, benches will reach the ultimate pit limit. The total exploited Stone shall be transported to plant of making aggregates therefore no waste shall be generated. Page 10 of 14

Reclamation and rehabilitation will be started at the end of mine life which required sufficient quantity of waste etc. for back filling. Availability of waste at the closing time of mine will be very less to meet requirement; hence the mined out pit will be developed as water reservoir in future. Experience of scientific mining work will be achieved by the applicant and workers which can be utilized for further achievements related to mining. 10. DETAILS OF PREVENTIVE AND CONTROL SCHEME OF AIR AND WATER POLLUTION: Air Pollution Control: The proposed site is located in the remote area having a clean atmosphere. Therefore the quality of ambient air will be as good as heaven. As the mining is of small scale, the potential sources of air pollution arising from mining operations would be Drilling, haul roads, exhaust fumes of internal combustion machines, combusting of fuel oil and transportation of Gitti. Due to this mining activities air quality will undergo certain significant change. The present level of mining is not anticipated to raise the concentration of the pollutants beyond the prescribed limits. However, the following measures are being adopted in the proposed mining activity to mitigate the PM levels in ambient air. Mitigation Measure: Mining activities will generate certain quantities of dust during drilling, blasting, loading and transportation operations. The following measures willbe taken to mitigate the fugitive dust from different operations: To avoid the dust generation from the drilling operations, wet drilling method will be adopted. Proper mitigation measures like water sprinkling will be adopted to control dust emissions. Drill machines will be equipped with dust collectors. Dust mask will be provided to all workers. Provision of dust filters/ mask to workers working at highly dust prone and affected areas. Page 11 of 14

Provision of green belt all along the periphery of the lease area. Periodical monitoring of ambient air quality in and around the lease area. Lying of haul road as per the standards Regular maintenance of haul road and service road to reduce air borne dust. Watering of haul road and other road at regular intervals. Dense plantation being carried in and around the proposed mines will help in combating air pollution. In case of long transportation the trucks after loading will be covered with tarpaulin sheets. Speed of the vehicles will be maintained within the prescribed limits. Trucks will not be over loaded and will be maintained to the optimum body level. Water Management and Water Pollution Control: Mining activities will not cause adverse impacts as the mineral is non toxic in nature. Lease area is fairly flat reducing the possibility of soil erosion. Garland drains and check dams shall be constructed with appropriate settling tanks to prevent any run-offs from mine. As the manpower is likely to be deployed from nearby village, therefore the discharge of domestic waste water will not be much and will be easily controlled with the provision of septic tank and soak pit. The stored water will be used for reduction of Particular Matter of Ambient Air, and for the development of greenbelt etc. Following control measures will be taken to minimize water Pollution due to mining activity; The stored water will be used for reduction of Particular Matter of Ambient Air, and for the development of greenbelt etc. A drain should be created around the quarry land and proposed water body. connected to the Water Consumption (Avg.) Waste Water Generation Source of water 4.0 KLD Only from domestic section, taken care by Soak pit/ Septic tank arrangement Nearby Village Page 12 of 14

Noise Environment: Movement of truck/ dumper will create the transitional noise level. However noise generated by these will be of low level and will be within the prescribed desired limit. Following control measures will be taken to minimize negative impact due to mining activity. Machinery and equipments of improved designs Proper maintenance of all machines will be carried out which will reduce noise generation during operations. Use of PPE,s personal protective devices i.e. earmuffs and earplugs by workers, working in high noise areas. Provision of green belt all along the periphery of the lease area. Conducting periodical medical checkup of all workers for any noise related health problems Proper training to personnel to create awareness about adverse noise level effects. Noise barriers, silencers and enclosures shall be incorporated in the equipments, which emit noise levels. Unnecessary use of horns by the drivers of the vehicles shall be avoided. 11. PROVISIONS FOR SEPARATE STACKING OF SURFACE SOIL EXCAVATED FROM MINING OPERATION AND IT S UTILITY: Top soil in the lease area is very scanty. Available soil will be removed and kept stacked for utilizing for plantation in the backfilled area, when the mine reaches the ultimate limits. Grasses will be planted on the soil along the slopes to prevent wash offs during monsoon and prevent landslides. Page 13 of 14

12. DETAILS OF SOCIAL AND ECONOMIC UP GRADATION OF MINING EFFECTED AREA DUE TO PROPOSED PROJECT: 2.00 Hectares of Shri Rashid Khan S/o Shri Munshi Khan Mine has undertaken community development works in order to improve the amenities in nearby villages as a part of commitment towards social and economic up liftment of the area. Mining is expected to have positive impact on socio-economic life of people living in nearby villages. No impact on agricultural lands has been reported due to mining, nor has mining affected the climate of the area. There has been rather an improvement in the status of the people because of increase in income due to direct or indirect employment Mining has created awareness amongst the people for education and general upliftment particularly in the womenfolk. 13. ENVIRONMENTAL MANAGEMENT IMPLEMENTATION BUDGET: Pollution control and monitoring Rs. 30000/- Occupational health Rs. 20000/- Green belt Rs. 30000/- Other: CSR Activity like separate toilets for girls in school, potable water tank in school, medical/first aid facility in the school Rs. 30000/- Miscellaneous (Fencing etc.) Rs. 10000/- Total Rs 1,20,000/- 14. ANY OTHER DETAILS DESIRED TO BE SUBMITTED BY MINERAL CONCESSION HOLDER: All information regarding EMP has been mentioned above point. Other information is given in Form-1, PFR & Mining plan. Page 14 of 14