Second Avenue Subway

Similar documents
Second Avenue Subway

Second Avenue Subway. Quarterly Public Workshop. February 25, 2015

COMMUNITY BOARD EIGHT

COMMUNITY BOARD EIGHT

Funding was provided by the City of New York via the Hudson Yards Infrastructure Corporation and Hudson Yards Development Corporation.

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Eglinton Crosstown LRT Construction Liaison Committee

Progress update (November to March) 03/23/2009 2

Photos by Susie Fitzhugh. BEX IV Projects Update: Arbor Heights, Genesee Hill, Pinehurst, Thornton Creek

CTA Capital Construction Update August 8, 2007

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction

Auburn University Construction Project April

Customer Service and Operations Committee. Board Information Item III-B. October 9, 2014

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Capital Projects Progress Report. January Presented by

MTA CAPITAL CONSTRUCTION NEW YORK BUILDING CONGRESS NOVEMBER 7, MTA Capital Construction 0

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Schedule of Values Cruise Terminal 2 Expansion

Seattle Public Schools Building Excellence IV Projects Under Construction

4.0 CONSTRUCTION METHODS AND ACTIVITIES

Woodbine Station Upgrades

Arbor Heights Elementary School. Concrete for South Building Foundation Stem Walls

Construction Update. May 2016

July 15, 2010 Report No. 11 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY

Second Avenue Subway Phase 2. NEPA Supplemental Environmental Assessment. Public Meeting. July 31, 2018

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits

Construction Project Briefing. May 9, 2018

NEW MIDDLE SCHOOL PROJECT

Description of Phase 2 Modified Design

Building Excellence IV Capital Levy Projects Under Construction

Engineering & Construction -- Transit Status Report. Significant Issues

Project Manual Index of Specifications Shenandoah Schools Concession Building

3.6 Construction Methods

CROSSTOWN LRT Construction Liaison Committee November 1, 2017

Capital Rail Constructors a Clark & Kiewit Joint Venture Jim Ansari Senior Vice President & General Manager

Tonight s Agenda. 6:00 pm Open House 6:30 pm Presentation. 7:45 pm Return to Open House 8:30 pm Close. Introduction. Roosevelt Station Construction

PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today!

Installing sidewalk pavers along Race Street.

Capital Projects Update

Building Architecture

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

PROJECT COMPLETED. Bayside High School. Comprehensive Additions and Renovations

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY

BILL NO. 1 GENERAL ITEMS. Item No. Description Lump Sum Prices Excluding HST

Construction Project Briefing. October 10, 2018

I-91 Viaduct Public Information Briefing

Second Avenue Subway - A Status Report

INSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process.

Woodbridge Redevelopment Update. CLC Meeting #6 Wednesday, December 13, 2017

Capital Projects Update

CATAMARAN TOWER - 1 Seef Area Plot 19, 20

BILL NO. 1 GENERAL ITEMS. Item No. Description Lump Sum Prices Excluding HST

Second Avenue Subway (SAS) Project. Construction on Second Avenue. Interim Report. Prepared for: MTA Capital Construction.

CARVER ELEMENTARY SCHOOL PROJECT May 2017 Monthly Status Report

Update on FCPS Construction/Renovation Projects. June 2016

Construction Update. April 2016

March 24, 2011 Report No. 17 MONTHLY CONSTRUCTION PROGRESS REPORT

Auburn University Construction Project Update June 2010

Section 5 - Project Logistics

Construction Project Briefing. July 11, 2018

Brooklyn Station Construction Open House

June 10, 2010 Report No. 10 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:

Purple Line Extension. Beverly Hills Community Meeting August 22, 2016

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

ROOSEVELT ISLAND OPERATING CORPORATION OF THE STATE OF NEW YORK DESIGN OF TWO NEW ELEVATORS FOR MANHATTAN TRAM STATION

Construction Project Briefing. June 14, 2017

New Main Hospital, Site Park, and Underground Garage Construction Progress Update #16

ADDENDUM 2 - JULY 14, 2015

Civic Center Renovation News

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

TOWN OF BELMONT, NH - TOWN CENTER FACILITIES - CONCEPTUAL PROJECT BUDGET December 20, 2018

Technical Assignment 2

Tracy Lo Terrell Place th Street NW Washington DC November 4, 2002 Construction Management

Construction Update. November 2015

CAC Meeting Construction Update April 8, 2014

Wissahickon School District Natatorium & Central Plant Project. Project Update March 27, 2017

Technical Report II. The Office Building. Rendering courtesy of DAVIS. Brett Miller. Dr. Gannon Construction

13.1 INTRODUCTION 13.2 CONSTRUCTION METHODS

Hamilton Rapid Transit Preliminary Design and Feasibility Study

Hunter s Point South Project

Minneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C

Construction Project Briefing. November 19, 2014

Construction Update. March 2018

UPCOMING DESIGN & CONSTRUCTION PROJECTS 3 rd Quarter 2018 Rev 2 (Project & Construction Management)

Southwest Health System Construction Newsletter October 21, 2017

City of Westerville Guide to Commercial Inspections

Update on FCPS Construction/Renovation Projects. December 2015

Perimeter Site Improvements

Outreach Meeting September 29, 2016

Metro Purple Line Extension

KU West Campus LEEP II High Bay Facility Project # , A (c)

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey

I-91 Viaduct Public Information Briefing

HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District

Construction Look Ahead February 2018

Town of Kingsville. Building Department

Oconomowoc Area School District Facility Construction Update July 27, 2018

Transcription:

Second Avenue Subway Community Board 8 Second Avenue Subway Task Force Update January 22, 2015 Tom Peyton Second Avenue Subway Project Director 0

Scope: Q train service Tunnels from 92nd St to 63rd St New Stations at 96th St, 86th St, and 72nd St 63rd St Station Connection Track & Systems from 105th St to 63rd St Phase 1 Overview Service between 96th St & Brooklyn via Broadway Line 96th Street Station (Cut-and-Cover) 96th Street Station 3 Entrances 63rd Street / Lexington Ave Station 86th Street Station 2 Entrances 63rd Street Station 4 New Entrances 72nd Street Station 3 Entrances Phase 1: Target Cost-$4.451B--- Ridership 200,000 --- Target Completion Date-2016 11

Current Project Status Overall Construction Progress is 78% Complete (as of January 1, 2015) All 10 SAS Contracts have been awarded for Phase 1 5 Construction Contracts Completed: Tunnel Boring Machine Tunneling 86 th St Excavation, Utility Relocation, and Road Decking 96 th St Site Work and Heavy Civil 72nd St Cavern Mining, Tunnels and Heavy Civil (1/14/14) 86 th St Cavern Mining & Heavy Civil (12/16/14) 2

5 Active Contracts 96 thst. Station Finishes, Systems, Ancillary 59% Buildings and Entrances 86 thst. Station Finishes, Systems, Ancillary 27.3% Buildings and Entrances 72 nd St. Station Finishes, Systems, Ancillary 45.5% Buildings and Entrances 63 rd St. Station Upgrade 85.9% All Stations Track, Power, Signals & Communications 45.1% Systems 3

Stations 4

96 th Street Station Heavy Civil, Structural and Utility Relocation Contract Percent Complete: 100% Contract Value: $325,000,000 Award Date: May 28, 2009 Substantial Completion: November 5, 2013 Finishes, MEP Systems, Ancillary Buildings and Entrances Contract Percent Complete: 58.7% % Contract Value: $324,600,000 Award Date: June 22, 2012 Forecast Completion: July 2016 5

96th Street Station Progress Contract C2B is 58.7% complete as of January 1, 2015 Continued surface utility work on the east side of Second Avenue between 92 nd and 99 th Streets. Installed 2 of 9 escalator trusses in the main station. The contractor also began installing the chains, steps, escalator skirts, and wiring for these two escalators. Concrete for the floor slabs at Ancillary buildings 1 & 2 were poured in December 2014. Concrete pours have begun above street level. Milestones 6, 7, & 8 (full access communications rooms, signal rooms & traction power rooms) are on track to be achieved by the end of January 2015. Backfill over utility installations 96 th Street looking south 6

Utility installation 93rd 94th Street and 2nd Avenue 7

Formwork for Ancillary 2 walls (Northwest corner 97 th Street ) 8

Formwork for Ancillary 1 walls (Northeast corner 93 rd Street ) 9

Platform level viewed from mezzanine 95 th Street looking north 10

Three-Month Look Ahead Deck beam & roadway decking removal. Surface utility work on the east side of Second Avenue between 92 nd and 99 th Streets. Concrete pours above street level for walls and floors at Ancillary 1 & 2. Installation of HVAC ducts, masonry walls, and electrical conduit throughout the station. 11

Three-Month Look Ahead Waterproofing installation, concrete pours, and installation of escalator trusses at entrances. Water main work in conjunction with DEP (reduction of Second Avenue travel lanes). Partial MPT switch to west side of Second Avenue (select locations). 12

96 th Street Entrance 3 rendering NW corner 96 th Street and Second Avenue 13

Rendering of 96 th Street Station proposed art installation Artist Sarah Sze, MTA Arts and Design 14

83 rd Ancillary 1 86 th Street Station Ancillary 2 2 84 th 85 th 86 th 87 th 2nd Avenue Entrance 2 (outside) Entrance 1 (Inside) Cavern Mining and Lining Contract Percent Complete: 100% Contract Value: $332,860,000 Award Date: August 4, 2011 Substantial Completion: December 16, 2014 Finishes, Entrances, Ancillaries, and MEP Systems Contract Percent Complete : 24% Contract Value: $208,376,000 Award Date: June 12, 2013 Forecast Completion: May 2016 15

86 th Street Station Milestones 86 th Street Station heavy civil contract work was completed by Skanska-Traylor J.V. on December 16, 2014. The finishes contractor, Schiavone-Picone J.V. has access to all areas of the 86 th Street Station. Removal of the employee trailers between E. 87 th and E. 88 th Streets. Restoration of the sidewalk and installation of the Bishop s Crook light poles on the north side of E. 86 th Street between 1 st and 2 nd Avenues. Build out of the station entrances on E. 86 th Street. 16

86 th Street Station Sidewalk Restoration 17

86 th Street Station Mezzanine Level Looking north from below 86 th Street 18

19

Three Month Look Ahead 86 th Street Station Area E. 78 th to E. 79 th Streets (center of Second Avenue) Temporarily reduce traffic to two lanes east of the center work zone and two lanes west of the center work zone as a means for placing concrete in the tunnels below. E. 83 rd to E. 85 th Streets South Cavern Construction of mezzanine levels and Ancillary 1 structure. E. 86 th to E. 87 th Streets - North Cavern Begin construction of the Ancillary 2 building on the northwest side of 86 th Street. 20

86 th Street Entrance 1 Rendering 83 rd Street and Second Avenue 21

Rendering of 86 th Street Station Art Installation Artist Chuck Close, MTA Arts and Design commissioned work Portraits in mosaic and tile representing NYC cultural figures & family 22

72 nd Street Station Cavern Mining, Tunnels, and Heavy Civil Contract Percent Complete : 99% Contract Value incl. AWOs: $469.5 M Finishes, MEP Systems, Ancillary Buildings and Entrances Contract Percent Complete : 45.5% Contract Value incl. AWOs: $276.4 M Award Date: October 1, 2010 Substantial Completion: January 14, 2014 Award Date: February 14, 2013 Forecast Completion: October 2016 23

Milestones Entrance 1 excavation 67% complete as of January 1 st Platform concrete pours 100% complete as of January 14 th Rail installation commenced in October 2014 MTA Capital Construction 24

Current Progress Main Cavern Mezzanine level masonry wall installation MTA Capital Construction 25

Current Progress Main Cavern (platform level) Installation of precast wall panels MTA Capital Construction 26

Ancillary#2 NW corner 72 nd Street Current Progress Installation of rebar and forms MTA Capital Construction 27

Current Progress Entrance 1 escalator/stairway incline viewed from main cavern MTA Capital Construction 28

Current Progress Entrance 1 excavation underway 301 East 69 th Street garage MTA Capital Construction 29

Three-Month Look Ahead Main Station Cavern: Platform pours, installation of precast wall panels at the platform level, installation of conduits Mechanical, electrical and plumbing systems installation Installation of new operations and maintenance rooms, and precast panels within mezzanine areas Entrance 1: Excavation work for Entrance 1 construction within garage at 301 E. 69 th Street Installation of Support of Excavation wall for street entrance and commencement of excavation on Second Avenue Work zone reconfiguration to allow for excavation and construction on the surface Street work hours: 7 a.m. 10 p.m. MTA Capital Construction 30

Three-Month Look Ahead Ancillary 1, Ancillary 2, Entrance 3 Installation of waterproofing and building the Ancillary 1, Ancillary 2 and Entrance 3 structures Concrete pumping at Ancillary 1, Ancillary 2 and Entrance 3 Installation of new rough terrain crane at Ancillary 1 to replace existing crane Miscellaneous Work zone changes at Ancillary 1 and Entrance 1 to facilitate street excavation for new entrance and placement of new crane for ancillary structure Concrete truck staging as needed between 74 th and 76 th Streets MTA Capital Construction 31

72 nd Street Entrance 2 / Ancillary 2 Rendering NW corner 72 nd Street and Second Avenue 32

Rehabilitation of Existing 63rd Street Existing Elevator Entrance Existing Entrance Station Plaza Ancillary 2 New Elevator Entrance 2 Entrance 3 (Outside) 63rd Street 3rd Ave Lexington Ave Ancillary 1 124 E 63 rd St Top of Hahn Garage Existing Entrance Entrance 4 (Outside) Station Upgrade Contract Percent Complete: 85.9% Contract Value incl. AWOs: $190.8 M Award Date: January 13, 2011 Forecast Completion: November 2015 Entrance 1 (Inside) 33

Milestones Excavation and installation of permanent structural supports for Entrance 1 (200 East 63rd Street) was completed January 5 th. Construction for Entrance 3 (NE corner of 63rd Street and Third Avenue) Completed 100% of concrete pours for columns. Complete platform finishes Summer 2015 Condo Royale plaza restoration (NW corner of 63rd Street and Third Avenue) To begin summer 2015 pending approval of construction agreement by Food Emporium. MTA Capital Construction 34

Current Work Zones (SE corner of 63 rd Street & Third Avenue) Entrance 1 looking east MTA Capital Construction 35

Current Work Zones (NW corner of 63 rd Street & Third Avenue) Entrance 2 and Ancillary 2 MTA Capital Construction 36

Current Work Zones (NE corner of 63 rd Street & Third Avenue) Entrance 3 MTA Capital Construction 37

Current Progress Demolition at Entrance 1 (200 East 63 rd Street) MTA Capital Construction 38

Current Progress Installation of track wall tile framing at upper platform (On 63 rd St and Lexington Av) MTA Capital Construction 39

STATION Three-Month Look Ahead Installation of service carrier, ductwork and electrical conduit at the upper platform level Installation of platform finishes, including ceilings, track wall tile framing, column covers, platform paving, and lighting fixtures Masonry wall, ceiling panel, and door installation throughout station Mechanical, electrical and plumbing systems installation in new station area MTA Capital Construction 40

Three-Month Look Ahead ENTRANCE 1 (200 East 63rd Street) Concrete and steel installation for new entrance way ANCILLARY 2 (Northwest corner of 63 rd Street and Third Avenue) Construction of elevator shaft within plaza work zone area Receive materials via sidewalk access hatch and reconfigure MPT along 63 rd Street MTA Capital Construction 41

Three-Month Look Ahead OTHER SURFACE WORK Reopen 63 rd Street sidewalk grates along 139 East 63 rd Street and 140 East 63 rd Street Entrance 4 (southwest corner of 63 rd and Third) work will commence with the modification of the pedestrian walkway here next week. THIRD AVENUE STORAGE/WORK ZONE (Third Avenue between 63 rd and 64 th Streets) Work zone will remain until (Summer 2016) for materials storage and small office trailer for systems installation contractor MTA Capital Construction 42

Proposed Rendering of 63 rd Street Plaza (design not finalized) SW corner of 63 rd Street and Third Avenue 43

Rendering of 63 rd Street Station Art Installation, Mezzanine Level (Area 5) Artist Jean Shin, MTA Arts and Design commmissioned work 44

Systems Installation Low Vibration Track (LVT) System Being Installed Track to be installed: 22,000 ft. Track installed to date: 5,080 ft. Aluminum 3 rd rail installed: 3,400 ft. Track delivered to site: 14,600 ft. Note: Track as reported here consists of 2 rails Traction Power work ongoing for three substations and four circuit breaker houses Signal equipment being installed Communications systems work is ongoing Track, Power, Signals and Communications Systems Contract Percent Complete: 45.1% Contract Value incl. AWOs: $282.8 M Award Date: January 18, 2012 Forecast Completion: October 2016 45 LVT Track installed with Aluminum 3 rd rail

Questions 46