Flat Racks heavy weight champions with a catch. Christian Bohlken, Graduate Engineer 12 December 2017, Webinar

Similar documents
GUIDELINES FOR THE PREPARATION OF THE CARGO SECURING MANUAL

IMO GUIDELINES FOR THE APPROVAL OF OFFSHORE CONTAINERS HANDLED IN OPEN SEAS

Cargotec improves the efficiency of cargo flows on land and at sea

Project cargo Pre-Planning for Heavy Lift Transport

JF (Bangladesh) Limited Topic: Project Cargo and/or Unique/Unusual Task

Project Cargo and/or Unique/Unusual Task

Guideline for Crated and Boxed Cargo

IMO AMENDMENTS TO THE CSS CODE

International Project Logistics Planning & Execution of Specialized Transports. Thorben Schulz May 24th, 2012

Chapter 53. Stowage of Breakbulk Cargo (General Cargo)

Industry guidance for the safe operation of tilt-tray vehicles

MOL Liner Ltd. Guidelines for Improving Safety and Implementing the SOLAS Container Weight Verification Requirements

IGTPL will release container only after verifying following documents.

How To Secure & Mark Packed Static Cargo

LLW Repository Ltd. Loading Plan. Low Level Waste Repository Standard Waste Loading Plan LLWRJSWLP/0018/C

Project Cargo Stowage and Securing. Bangkok, Thailand, 13 th March 2018 Capt. Simon Rapley

The Training Material on Project Transportation has been produced under Project Sustainable Human Resource Development in Logistic Services for ASEAN

SECTION 20 LOADING AND SECURING OF LOADS

GUIDE TO CARGO TRANSPORTATION BY ROAD

LOAD SAFETY SERIES Information Sheet

LLW Repository Ltd. Loading Plan. Low Level Waste Repository Standard Waste Loading Plan LLWRJSWLP/0019/C

Sustainable Human Resource Development in Logistic Services for ASEAN Member States

INSTALLATION. General. Important Note. Design. Transport

Weight Verification Amendments to SOLAS Chapter VI

HANDLING OF BRIDGE BEAMS ON SITE

Load security for. Sheeted paper Paper reels. Stand: Feb. 2012

FAQs - New SOLAS regulation

Ore Carriers Part 4, Chapter 11

LIU Technical Bulletin. What is a Transformer?

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Deck: Cargo Handling and Stowage

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Deck: Cargo Handling and Stowage

FAQs - New SOLAS regulation

Verified Gross Mass (VERMAS)

Weatherdeck Hatch Covers Lift-Away Types

CONCENTRATED INSPECTION CAMPAIGN (CIC) ON CARGO SECURING ARRANGEMENTS From to

MARITIME AUTHORITY OF JAMAICA. DRAFT Guidelines on the Verification of Gross Mass of a Packed Export Container

Mihai Cuciureanu, Chief Transport of Dangerous Goods Office ROMANIAN ROAD TRANSPORT AUTHORITY - ARR

Restraint Guideline. Multi-product. 1. Introduction. 2. Essential trailer/rigid requirements. 3. Loading overhead

South African Maritime Safety Authority

CONTAINER SAFETY SYSTEMS GMBH MEC CATALOGUE. MEC Container Safety Systems GmbH

SOLAS. Verified Gross Mass Shipper Guide. nagel.com

Pipes, Piles, and Accessories

Teacher s Manual: Cargo Securing at Rail Transport

Dispatch and packing instructions

Is assistance available for the new generation container vessels? 26/09/2011 1

Small on hassle, big on solutions.

PARIS 12 October 2011

NPCA Precast Learning Lab. Dunnage, Loading & Shipping. Precast Show 2017 NPCA 1

General Shipping Terms and Conditions for Sea Freight

Design guideline for pallets within Ericsson

ANNEX 5 DRAFT MSC CIRCULAR DUE DILIGENCE CHECKLIST IN IDENTIFYING PROVIDERS OF CTU-RELATED SERVICES

Gold Mine Project Altyn Land transportation of mills from Luoyang, China to South-Eastern Kazakhstan for a gold mine project

SOLAS Amendment: Container Mass Verification. TPT Durban 3rd June 2016

AMSA overview. OSV Safe deck, cargo operations. Capt. Carlo Di Meglio Principal Port Marine Surveyor

Recommended Best Practices for TRANSPORTATION of NON ROUTINE or SPECIAL CARGO ITEMS TO OR FROM SITE

Code of Practice for Packing of Cargo Transport Units (CTUs) (CTU Code) 2013 Draft version

TRADE SERVICES PLUS Our expertise Your success

VERIFIED GROSS MASS (FACT) S & FAQS

5 Concrete Placement

Verified Gross Mass (VGM) in HMM Process. 1 st FAQ. Updated on May 31, Customer Advisory. Continue to next page.. 1 of 8

The Training Material on Multimodal Transport Law and Operations has been produced under Project Sustainable Human Resource Development in Logistic

SPECIFICATIONS FOR THE CONSTRUCTION OF NEW PASSENGER EQUIPMENT CARS PREFACE

How to meet the SOLAS Container Weight Verification Requirements

\"-.t-...flh\ REPUBLIC OF THE UI{ION OF MYANMAR IVIINIST'RY 0F T'RAI',{SPORT DEPARTMEI\T OF NIAR.INE ADMINISTRATION. .6#nmii.d*a)l

Weather-restricted Sea Transports Aboard Heavy Lift Ships

CSS CODE CODE OF SAFE PRACTICE FOR CARGO STOWAGE AND SECURING

You ll be surprised what we can carry

First Freight Logistics. Company profile. Air freight. Sea freight. Trucking

PORT OF BREMEN: NEUSTÄDTER HAFEN EUROPE S LARGEST TERMINAL FOR BREAKBULK CARGO

ACT Burgas Terms of Business

RESOLUTION A.863(20) adopted on 27 November 1997 CODE OF SAFE PRACTICE FOR THE CARRIAGE OF CARGOES AND PERSONS BY OFFSHORE SUPPLY VESSELS (OSV CODE)

BRUNEL GLOBAL PROJECT CARGO SOLUTIONS. brunelprojectcargo.co.uk

Technical Circular. No.: 018/2015 Date: 10 th July 2015

Position Paper. of the Gesamtverband der Deutschen Versicherungswirtschaft (German Insurers' Association)

Stowage of Explosives on Vessels and issues noted with Small Ships

SOLAS VGM FAQs Frequently asked questions about the new verified gross mass requirement from the Safety of Life at Sea convention

1.15 Chemical Tanker Longitudinal corrugated bulkhead (vertical type).

Automation and Blockchain: A New Freight Distribution Paradigm for the Shipping Industry?

IMO DEVELOPMENTS ON MEASURES TO PREVENT THE LOSS OF CONTAINERS

Institute of International Container Lessors IICL

Appendix 1 Detailed Recommendations and Considerations for Working in Foreign Ports and Obtaining Marine Science Research Clearances

15,000 t on their way to Longkou, China

Safety of Life at Sea Convention (SOLAS) Verified Gross Mass (VGM) ~ Frequently Asked Questions ~ As of 27 th May 2016

II. Second International Ecuadorian Mango Congress

Carriage of Break-Bulk Cargoes

EUROGATE Container Terminal Limassol Limited

Guideline No.: G-01(201510) G-01 CRANES. Issued date: October 20,2015. China Classification Society

ACT Burgas Terms of Business

Although tremendous efforts have been made in worldwide port development following issues are still on the agenda in many (container) ports:

DHL GLOBAL FORWARDING

A Guide for Exporters FOR THE EXPORT OF CONTAINERS AT PORT OF TOWNSVILLE

Safe Transport of Steel Coils in Standard Dry Van and Open Top Containers

-65- INDIA GATEWAY TERMINAL PRIVATE LIMITED SCALE OF RATES FOR INTERNATIONAL CONTAINER TRANSHIPMENT TERMINAL Jan-Dec

-65- INDIA GATEWAY TERMINAL PRIVATE LIMITED SCALE OF RATES FOR INTERNATIONAL CONTAINER TRANSHIPMENT TERMINAL Jan-Dec

VERIFIED GROSS MASS (VGM) REQUIREMENTS DURING PSC INSPECTIONS

Guidelines for the Carriage of Metal Scrap in Containers

Iranian Classification Society Convention and Legislation Department Code: Tech GENERAL: 2- Amendments to the CSS Code:

DAIMLERCHRYSLER CORPORATION Design Standard Category Code: N/A EASL Requirement: Yes RESTRICTED: Yes

Correct. On-site truss erection and handling

Transcription:

Flat Racks heavy weight champions with a catch Christian Bohlken, Graduate Engineer (christian.bohlken@ba-ty.com) 12 December 2017, Webinar

Project Cargo on Container Vessels Agenda 1. Introduction 2. Advantages/ Disadvantages of cargoes on flat racks 3. Planning Requirements 4. Planning & Preparation 5. Stowage 6. Cargo Securing 7. Summary

Out of gauge cargo on flat racks Introduction - Definitions Definition Flat Racks: Portable, open-topped, open-sided units that fit into existing belowdeck container cell guides. Flat Racks provide high payloads and the opportunity to load cargoes from top or side. Definition Out Of Gauge Cargo: Term used to broadly describe cargo which exceeds the internal dimensions of a container either by length, width or height. OOG cargo might be loaded on an open top container or onto a flat rack.

Introduction what is at topic Billions of dollars of project-critical equipment is shipped around the world annually. High levels of risk are associated with these shipments due to the nature of the cargo, transport logistics, and tight timeframes. (Source: http://www.agcs.allianz.com/services/marine/project-cargo/)

Introduction Advantages / disadvantages for the Freight Forwarder Advantages Disadvantages + Fast vessels/routes + Terminals with inland connection/infrastructure + Reputable shipping lines + Standardised transport methods + Costs for single parts are affordable/calculable Knowledge in regard to safe securing is often not available and the relevant regulations are not duly observed. Not all packing facilities are able to provide appropriate lifting equipment Larger quantities are not economical Usually it is difficult to get hands on the cargo during transport, e.g. in transshipment ports

Introduction Advantages / disadvantages for the Underwriter Advantages Disadvantages + Large companies/shipping lines (terminals) Claims handling department (worst case) / availability + Always the same structure easily plannable + Low risk of collateral damage from other cargo, i.e. containers Packers need considerable knowledge of stowage and securing principles High risk of collateral damage to other cargo Increased risk due to possible transshipment handling No continuous checking of cargo possible during ocean transit

Introduction Advantages / disadvantages for the Manufacturer/Shipper/Cargo Owner Advantages + Generally horizontal transport process (delivery, packing, transport) + Stowage is often below deck (protective aspect) Disadvantages Almost no possibility of checking the stowage and securing arrangements during transport at sea - Limited number of units per flat rack + Length usually limited by flat rack length (up to 11,50 m) - High risk of losing project critical items + Weekly departures + Costs for single parts are affordable/calculable

Planning requirements Relevant Regulations 1. CSC-Code (International Convention For Safe Containers) Regulations for testing, inspection, approval, and maintenance of flat racks Applies to new and existing flat racks

Planning requirements Relevant Regulations 2. CTU-Code (Code of Practice for Packing of Cargo Transport Units) Non-mandatory, global code of practice for handling and stuffing of shipping containers

Planning requirements Relevant Regulations The applicable regulations provide only basic information and advice in connection with stowage and securing requirements for loading of out of gauge cargoes on flat racks. Room for mistakes and faulty procedures Need to look further ahead!

Planning and Preparation Required information Timely compilation of information and inspection of necessary equipment is critical! - Cargo details - Dimensions and weight of cargo - Pre-existing packaging - Manufacturer s requirements - Suitability of handling equipment - Requirements of shipping companies - Flat Racks have to be fit for purpose

Planning and Preparation Inspection of flat racks Prior to loading, the flat rack must be visually inspected in order to ensure: that the flat rack is suitable/fit for purpose the validity of its certification status its structural integrity See: CTU CODE Chapter 8, Part 2 - Checks

Planning and Preparation Load bearing components Flat Racks are designed in such a way that the permissible payload can safely be transferred to the four corner posts under all conditions of carriage, if the payload is homogenously distributed into the entire load area. See: CTU CODE Annex 7, Part 3.1.1 Principals of packging

Planning and Preparation Longitudinal Load Distribution The shape and number of the transverse girders depends on the individual design of the respective manufacturer.

Planning and Preparation Load bearing components Transverse girders underneath the wodden panelling should not be exclusively strained.

Planning and Preparation Transverse Load Distribution Where the nature of a cargo does not allow the distribution of weight directly into the main frame it is necessary to transfer the weight by support of suitable timber or steel beams. The support by beams is called bedding.

Planning and Preparation Longitudinal Load Distribution Individual design limits of Flat Racks loads limits are calculated for dynamic loads The details of appropriate load distribution are not only subject to international regulations but also to manufacturers data.

Loading center of gravity requirements Rule of thumb: 60 % of cargo weight is distributed over half the length See: CTU CODE Annex 2, Part 4 - Safety and security checks prior to entry

Loading Examples of improper stowage

Securing General Principles 1. Flat Racks may be subjected to vertical, longitudinal and transverse accelerations that also act on the cargo unit. 2. Forces are proportional to the mass of a cargo item. Therefore, cargo units will move regardless of their weight! 3. The exerted forces may exceed restraining force provided by the cargo unit, i.e. its static friction or tilting stability. In this case, items will shift or

Securing General Principles 4. Simultaneously acting vertical accelerations cause either an increase of weight or reduction of friction forces, depending on the direction into which they work.

Securing CTU CODE requirements Acceleration forces have to be considered according to tables of CTU Code chapter 5.3. 0.8 g upward directed force See: CTU CODE Chapter 5.3 General transport conditions

Securing Major mistakes

Securing Major mistakes tie- down lashings The CTU Code does not recommend tie- down lashings as means of sliding prevention. Securing of cargoes with overwidth is even prohibited. See: CTU CODE Annex 7, Chapter 4.3.5 Securing of cargoes in CTU s

Securing Major mistakes improper lashing of protruding cargoes Cargo with overwidth must not be secured with vertical half loop lashings! Cargo is only secured by the applied pre-tension force, i.e. approx. 20% of the full lashing capacity of nylon lashings. Transversal shifting by at least protruding distance is only prevented by the increased weight generated by the half loop lashings.

Securing Major mistakes improper lashing of protruding cargoes NO: vertical half loop lashings! YES: horizontal half loops lashings

Securing Major mistakes improper lashing of protruding cargoes Where horizontal half loops are used, a means should be provided to prevent the loops from sliding down the item. Position of horizontal half loops shall be as low as possible See: CTU CODE Annex 7, Chapter 4 Securing of cargoes in CTU s

Securing Major mistakes improper anti-slip material Entire contact area has to be covered with anti-slip material! Always the worst material combination must be considered! e.g. Static friction! Rubber timber = µ 0.6 Rubber steel= µ 0.6 Timber timber = µ 0.3 Timber steel = µ 0.3 Steel steel = µ 0.1 See: CTU CODE Annex 7, Appendix 2 Friction Factors

Securing Major mistakes improper timber blocking Securing in longitudinal direction can be easily achieved by timber blocking Loads must be introduced into load bearing components corner posts of end walls Blocking must be appropriately connected by nails Long blockings should be devided by transverse intersections to reduce buckling loads of timbers Blockings must be strenghtened by dunnage or similar means

Securing Major mistakes improper lashing material Only the weakest component must be considered in the calculation of the lashing forces.

Securing Major mistakes limitations of flat racks are not observed Individual limitations of flat racks must be duly observed!

Securing Potential risks in connection with huge cargoes Insufficient clearance between cargo and end walls: Flat racks might turn and/ or tilt during loading due to: Improper trim (> 1-2 ) / and list (> 2 ) of vessel Means of loading, i.e. gantry crane, mobile crane, vessels own gear Weather conditions, i.e. visibility, wind speed Experience of crane operator Damage cellguides consequences Without sufficient clearance between cargo and end walls, direct contact between cargo and cellguides cannot excluded damage to packaging and cargo.

Securing Potential risks in connection with huge cargoes Elongation of lashing materials: Elongation depends on lashing material, e.g. nylon lashings elongate up to 7% when under load Length of the lashing is to be kept as short as practicable Direction of the lashing is as close as possible to the direction of the intended restraining effect E.g.: a case with a length of 8 m and a width of 3 m needs to be secured by horizontal half loop lashing of a length of approx. 15 m. With an elongation factor of 7% the lashing will elongate by 1,05 m before the MSL is reached. (Remark: the pre- tension reduces the elongation partially but a major amount still remains.)

Summary Failure of a shipment to arrive intact can quickly turn a $10 million cargo loss into a $100 million Delay in Start-Up (DSU) loss when factors such as re-fabrication, shipping, expenses, lost profits and other operational costs are considered. (Source: http://www.agcs.allianz.com/services/marine/project-cargo/) Handling of Out Of Gauge cargoes on flat racks is not daily routine, but requires specific care, expertise and meticulous attention to detail.

Thank you very much for your kind attention!