Instructional Science Facility Phase I

Similar documents
Instructional Science Facility Phase I

BOYERTOWN AREA SCHOOL DISTRICT February 28, Boyertown West Middle School Renovation Project

Fixed equipment shall generally be furnished and installed by the General Contractor as part of the construction contract.

New York State Contract Reporter

Major Project Request Biennium

TOP 10 STRATEGIES FOR NEW AND EXISTING BUILDINGS

THE CORPORATION OF THE CITY OF OWEN SOUND

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

BUREAU Joe Iuviene, AIA January 20, 2017

6 Holub Middle School Overall Site Plan Gymnasium Floor Plan Exterior Perspective Before Exterior Perspective - After

APPA Institute for Facilities Management

City High Middle School pre-design recommendations. March 29, 2017

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Integrated Practice and Collaboration


2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY


2012 IRC Sections R303 R310 Building Planning II

EMD SERONO RESEARCH CENTER EXISTING

Architectural & Engineering Services for Air Conditioning Alleghany High School

PROJECT UPDATE August 28, 2014

FEASIBILITY STUDY SEPTEMBER 1 8,

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

MINUTES OF THE MEETING SDSU CENTRAL HEATING PLANT BOILER REPLACEMENT AND PLANT UPGRADES June 17, 2011

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

2) These Standards are available on the University s website at:

Technical Assignment 2 Building and Plant Energy Analysis

How We Obtained LEED Certification pertaining to the Indoor Environmental Quality Category. Ron Fields, CAFS, NCT General Dynamics C4 Systems

Stevens High School Pre Bond Presentation Claremont, NH

Facility Emergency Power Plan

Space Program & Concept Design

University of Wisconsin La Crosse Science Lab Building DFD# 13B3H / RA# 1290.A December 3, 2014

Addendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018

TABLE OF CONTENTS Public Safety Building

Facilities Management Services & Funding Guide Centrally Funded and Recharge Services

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards

Capital Projects Update

CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621

State College Area School District Memorial Field Phase 2 Update

Lemm Elementary. Restoring the Heart of the Community. Klein Independent School District

Energy 10/19/2011. Inc. New. Castle, DEE. Image. By: Skanska

Dec Board of Education: Approve Educational Specifications. Dec Jan. 2016

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

S CHEDULE G - D OCUMENTS S UBMITTAL R EQUIREMENTS

Minuteman Regional Vocational Technical School

How to Prepare Your LSE Report

Columbia County Health Care Center Added Amenities

CODE COMPLIANCE PLAN REVIEW PROCEDURES

The following terms should be understood prior to review of the Energy Management Policy:

PROJECT INFORMATION REPORT INFORMATION. Date: February 25, Owner s Rep: Alrich Lynch. 123 Project Address Drive, Savannah GA 31404

University of Central Florida Downtown Campus / Dr. Phillips Academic Commons Pre-Bid Phase II Package Structural, Architectural and MEP

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

Project Status Report Property and Finance Committee Meeting August 6, 2013

NOTE: Significant revisions or additions to the previous standards are highlighted in italics.

Solar Energy Technologies

PIERCE HALL RENOVATION

A Key Component of Environmental Sustainability Efforts and a Source of Substantial Cost Savings for FCGU. Dr. Simeon Komisar

Janice Reedus, Director of Business & Auxiliary Services Campus Center Building A, Room Houbolt Road Joliet, IL 60431

Village of Glen Ellyn Basement Remodeling Project Guidelines

Facility Assessment Report, Montgomery Independent School District

DESIGN & CONSTRUCTION GUIDELINES

2018 IRC Sections R303 through R310 Building Planning II

Executive Summary. Sample Company. BETA Engineers, P.C. 36 W. Main Street Mechanicsburg, PA PHONE: FAX:

Sample Reports. for. HAP v4.80 Example Problem

SOLICITATION ADDENDUM

Bronx Community College. Five-Year Capital Plan FY through FY

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

Retrocommissioning (RCx)

PROJECT UPDATE SEPTEMBER 11, 2014

Louis A Agassiz Elementary School

ADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION)

DIVISION 11 - EQUIPMENT FOOD SERVICE EQUIPMENT LABORATORY FUME HOODS. A. Design Considerations

SECTION ADDENDA

Project Scope & Budget Breakdown. Mandatory Scope Recommended Additional Scope Wish List Scope

2019 Construction

GH Phipps Construction Co. OAC 17D Thistle-Valmont Square Interior & Exterior Renovation Thursday, November 2, :00 AM

CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS

UTAH STATE UNIVERSITY A&E DESIGN MANUAL DIVISION 0 USU GENERAL DESIGN CRITERIA THE CRITERIA ARE GENERAL GUIDELINES BASED ON PAST EXPERIENCES AND

Hunter s Point South Intermediate School & High School

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619

ENERGY AUDIT. 123 Main Street Mississauga, Ontario. January 1, Report To: Mr. John Smith Smith Printing Company.

Retrofit of an Existing Californian Hospital to Immediate Occupancy Standards One Year Later Again R. Jay Love, S.E.

Design and Construction

Sample Reports. for. HAP v4.90 Example Problem

date: 10 july 2012 the pennsylvania state university: burrowes building

If this link does not work, please go to and enter the access key: 61bd832e4bbf162

October 20, 2017 CAPITAL PROJECT AND PLANNING UPDATE MURDAUGH HALL:

Major construction projects current and upcoming. March 19, 2018

OPTIMIZATION OF ICE THERMAL STORAGE SYSTEM DESIGN FOR HVAC SYSTEMS

Building Permit Application

ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015

Welcome Center, New Student Services, and Career and Employment Services

Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD Phone: 605/ FAX: 605/

Transcription:

Instructional Science Facility Phase I University of Wisconsin La Crosse Campus August 26, 2015 UWL Science Lab Building Phase 1 1

Project Schedule Timeline July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Jan Construction Documents Bid Docs Bidding Contract Construction July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June Construction Documents Bid Documents Bidding Contract Development Construction Final Review Revisions Exec Meeting Aug 26, 2015 UWL Science Lab Building Phase 1 2

Project Schedule August 2015 - April 2016 Item/Description Schedule Executive Committee Meeting August 26, 2015 Classes Begin September 8, 2015 Executive Committee Meeting September 15, 2015 Design Committee Meeting September 17, 2015 Executive Committee Meeting October 6, 2015 Design Committee Meeting October 8, 2015 Executive Committee Meeting October 27, 2015 Design Committee Meeting October 29, 2015 UWL Science Lab Building Phase 1 3

Project Schedule August 2015 - April 2016 Item/Description Schedule Final Review Documents to DFD/UW-La Crosse November 12, 2015 Final Review Comments to AE December 10, 2015 Bid Documents to DFD January 7, 2016 Bid Documents to Bidders January 21, 2016 Bid Date February 18, 2016 Commence Construction April/May 2016 UWL Science Lab Building Phase 1 4

Additional Information Required Task List Access Control Plans to be circulated to UWL for review and comment Provided by security vendor (FFE) Approx. 205 doors Equipment Moving Access Access to basement spaces Cowley Hall Exhaust/Air Quality Emissions from existing Cowley Hall upon completion of Phase 1 Interior Signage/Wayfinding Contractor furnished & installed Digital/Cable TV Furnishings Expectation of design team Security (future camera locations) Plans received from UWL Microbiology/Biochemistry Lab Room name has been changed to Microbial Genetics Fume Hoods/Emergency Power Quantity of hoods Percent ventilation Emergency Generator Quantity Location Fuel Type South Corridor Enclosure Corridor to remain UWL Science Lab Building Phase 1 5

Additional Information Required Task List Microbiology Lockers Previous design quantity: 128 Quantity requested: 144 Quantity achieved: 144 Locker size: 15 W x 18 D x 36 H Science on Display Location Quantity Type: window, display case, 2-sided display case Lighting Controls Wall mounted switches or through AV system? Site Located Emergency Phones Campus to provide locations Well vs City Water City water to be provided and treated appropriately for River Studies use Pad Mounted Switch Relocation Funded by this project or campus project? UWL Science Lab Building Phase 1 6

PR Submittal Review Comments How did we do? Civil Removal of stone seat walls Bike parking quantity Architectural Revise NW stair window Add door to east stair exit Remove laboratory niche detail Structural No comments received HVAC Laboratory exhaust concerning emergency power and controls functionality (VAV vs 2-position hoods) East area well for basement located generator and mechanical and electrical room ventilation. Snow infiltration at intake louvers further detailing and discussion required. Process loop to be provided at each floor to serve lab equipment lab equipment cut sheets required for flow rates and acceptable process chilled water temperatures. Plumbing/Fire Protection DFD requested changes to plumbing system Well water omitted treated city water UWL Science Lab Building Phase 1 7

PR Submittal Review Comments How did we do? Electrical/IT Relocate exterior padmount switchgear into Basement of Wimberly Hall Emergency generator sizing and location. DFD requests the generator be located outdoors and be sized to handle all the fume hood exhaust for safety reasons. DFD requests natural gas, but in the case of generators over 200kW, justification and / or understand by the Agency is required due to the additional costs. The fume hood / generator matrix provides the information necessary for a decision. Lab Planning Review Radiation Center plan revision Numerous casework revisions Front of room variations Anatomy Lab ventilation Clean Room: Class 10,000 No perchloric acid hoods needed Work in hood will be Class 1,000 Safety shower quantity Audio-Visual Class 1 Notice to be developed for equipment UWL Science Lab Building Phase 1 8

Outstanding Issues Emergency Generator Generator Selection Issues Fuel type Location Interior (basement space) Exterior (site constraints) Fume hood exhaust Cost Phase 1 capital cost Phase 2 capital cost Operational costs Future capacity Safety Current site plan UWL Science Lab Building Phase 1 9

Outstanding Issues Emergency Generator Current Design (1) 400 kw natural gas generator located in the basement 50% of fume hoods on emergency exhaust @ 60% exhaust flow Design Option 1 (1) 400 kw natural gas generator located in the basement 50% of fume hoods on emergency exhaust @ 60% exhaust flow Add automatic sash closer (+) $171,000 Design Option 2 (1) 400 kw natural gas generator located on site 50% of fume hoods on emergency exhaust @ 60% exhaust flow Add automatic sash closer (+) $171,000 Remove basement area (-) $TBD Add masonry screen wall (+) $TBD Design Option 3 (3) 400 kw natural gas generators located on site 100% of fume hoods on emergency exhaust @ 60% exhaust flow Add automatic sash closer (+) $330,000 Electrical cost increase (+) $420,000 Remove basement area (-) $TBD Add masonry screen wall (+) $TBD Exterior generator location option (3) natural gas shown UWL Science Lab Building Phase 1 10

Outstanding Issues Emergency Generator Design Option 4 (1) 1,000 kw diesel generator located on site 100% of fume hoods on emergency exhaust @ 60% exhaust flow Add automatic sash closer (+) $330,000 Electrical cost increase (+) $20,000 Remove basement area (-) $TBD Add masonry screen wall (+) $TBD Design Option 5 (1) 1,250 kw diesel generator located on site 100% of fume hoods on emergency exhaust @ 100% exhaust flow Electrical cost increase (+) $140,000 Remove basement area (-) $TBD Add masonry screen wall (+) $TBD Design Option 6 (1) 1,500 kw diesel generator located on site 100% of fume hoods on emergency exhaust @ 100% exhaust flow Electrical cost increase (+) $150,000 Remove basement area (-) $TBD Add masonry screen wall (+) $TBD Exterior generator location options 1,500 kw units shown UWL Science Lab Building Phase 1 11

Design Details Stair Railing Examples UWL Science Lab Building Phase 1 13

Interior Science on Display UWL Science Lab Building Phase 1 14

Interior Microbiology Lockers Previous Design: 128 lockers @ 18x18x36 Requested: 144 lockers New Design: 144 lockers, sized 15x18x36 30 6 36 36 36 UWL Science Lab Building Phase 1 15

Plan Updates Confluence Level 1 UWL Science Lab Building Phase 1 16

Plan Updates Confluence Level 2 UWL Science Lab Building Phase 1 17

Plan Updates Confluence Level 3 UWL Science Lab Building Phase 1 18

Plan Updates Confluence Level 4 UWL Science Lab Building Phase 1 19

Plan Updates Confluence Basement UWL Science Lab Building Phase 1 20

Next Steps UWL Science Lab Building Phase 1 21