SECTION CONCRETE TOPPING SLAB. formed concrete. 3. Division 03 Section "Ground and Polished Concrete Finishing."

Similar documents
A. Submittal Procedures: See Article 13 of the General Conditions.

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE

SECTION CONCRETE PAVING PART 1 - GENERAL 1.1 REFERENCES

SECTION CONCRETE PAVING FOR PEDESTRIAN AREAS. A. This Section includes exterior cement concrete pavement for the following:

SECTION CONCRETE PAVING

SECTION CAST IN PLACE CONCRETE PART 1 GENERAL 1.01 RELATED DOCUMENTS

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes.

Page 1 of 1 ADDENDUM NO. 2 PROJECT: THE SALVATION ARMY, THIFT STORE 601 N. EUCLID AVE., BAY CITY, MI WILLIAM A. KIBBE & ASSOCIATES, INC.

1. Cast-in place structural concrete including footers, foundations, and other non-slab applications. 2. Formwork 3. Reinforcement

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes.

1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production Facilities."

B. W/C Ratio: The ratio by weight of water to cementitious materials.

SECTION CONCRETE PAVING

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB

SECTION RIGID PAVEMENT

SECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION

SECTION CAST-IN-PLACE CONCRETE

SECTION CEMENT CONCRETE PAVEMENT PART 1 GENERAL 1.01 RELATED DOCUMENTS

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 03 - CONCRETE

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

A. Qualification Data: For qualified ready mix concrete manufacturer and testing agency.

METRO PARKS TACOMA SECTION FIRST CREEK MIDDLE SCHOOL BUS REVISIONS

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL

2. Exterior Concrete Exposed to Freeze/Thaw: 4500 psi minimum. i. Water Cement Ratio < 0.45 for exterior concrete exposed to freeze/thaw

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans.

SECTION CAST-IN-PLACE CONCRETE

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

SECTION STAMPED CONCRETE PAVING

.1 Formwork for cast-in-place concrete with shoring, bracing, and anchorage.

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS

A. Prepare formwork shop drawings using qualified professional engineer. Include detail of fabrication, assembly, and support of formwork.

Columbia Public Schools Shepard Elementary School Classroom Building Addition PWA I 1 CONCRETE REINFORCEMENT ~4 ASSURANCE

SECTION CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES

Division 03 Concrete Section includes various guidelines for general concrete use, curing, forming, reinforcing, finishing and concrete accessories.

A. Section includes cast-in-place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes.

SECTION SITE CONCRETE

PWA PROJECT NUMBER: Attn: Chris Davis, AIA

Public Works Manual. Revised September Concrete & Asphalt

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

Custom Polishing Systems

LITHOCRETE ARCHITECTURAL CONCRETE PAVING

MO: T RSA: 1406B

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

SECTION CONCRETE PAVING

REINFORCED CONCRETE MASONRY SECTION

SECTION PRECAST CONCRETE COVER SYSTEM

CITY OF SAN ANGELO ITEM 360 CONCRETE PAVEMENT

SECTION CONCRETE. B. ACI 318 Building Code Requirements for Structural Concrete and Commentary

SECTION BRICK MASONRY ASSEMBLIES

MATERIALS A Concrete A.1 Concrete Walk... Mix No. 3F52. A.2 Concrete Walk, Exposed Aggregate Finish... Mix No.

DIVISION 2400 CONCRETE

SECTION ARCHITECTURAL PRECAST CONCRETE. A. American Society for Testing and Materials (ASTM):

DIVISION 4400 CONCRETE

KU Medical Center 2018 PAVEMENT RESTORATION PROJECT Project No May 4, 2018

5 Concrete Placement

SECTION CONCRETE CURB AND GUTTER, SIDEWALKS, AND DRIVEWAYS

PART1 GENERAL SECTION CAST IN PLACE CONCRETE TRIAD PARK PHASE 8 AMPHITHEATER AREA PROJECT NO

***************************************************************************************************************

SECTION PORTLAND CEMENT CONCRETE PAVEMENT. All subsurface utilities must be inspected, tested, and accepted prior to any paving.

P-1346 Simulator Center / Range Control Building Work Order Number USMC Base Camp LeJeune, Jacksonville, North Carolina SECTION

CONCRETE FORMING. A. Submittals for Review: 1. Shop Drawings: Diagram of proposed construction joints not indicated on Drawings.

6 The Paving Operation

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION STONE FLOORING

SECTION UNIT PAVERS

CELCORE CELLULAR INSULATING CONCRETE SPECIFICATION FOR RETROFIT PLACEMENT OVER EXISTING ROOF MEMBRANES

SECTION ASPHALT PAVING

DIVISION 3 HEAVY DUTY CONCRETE FLOOR TOPPING SECTION 03340

A. Drawings and general prov1s1ons of the Contract, including General and. A. Section Includes: 1. Cold milling of existing hot-mix asphalt pavement.

1. Review methods and procedures related to concrete paving, including but not limited to, the following:

Multi-Institutional Academic Health Science & Research Center Evansville, IN

1.02 RELATED WORK: Refer to the following sections for related work:

Construction Standard Specification Section Exposed Aggregate Concrete. Exposed Aggregate Concrete

SECTION UNIT MASONRY

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS. A. Formwork complete with shoring, bracing and anchorage.

SECTION PORTLAND CEMENT PLASTER (STUCCO) WITH ACRYLIC FINISH

SECTION CAST-IN-PLACE CONCRETE

Construction Specification for Concrete Curb and Concrete Curb and Gutter

CHAPTER 9 - PORTLAND CEMENT CONCRETE

SPECIAL SPECIFICATION 4491 Type CAC Concrete

D. Construction Joint Layout: Indicate proposed construction joints required to construct the structure.

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

SPECIAL PROVISION Concrete Pavement

CONSTRUCTION SPECIFICATION FOR CONCRETE ROAD BASE

ROWAN COUNTY AIRPORT APRIL 2017 TERMINAL EXPANSION

Union County Vocational - Technical Schools Scotch Plains, New Jersey

SECTION SPECIALTY PLACED CONCRETE - SHOTCRETE

SECTION 12 INDEX CONCRETE CURBS AND GUTTERS

SECTION INTERLOCKING PRECAST CONCRETE UNIT PAVERS

9 Concrete Pavement Patching

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

SECTION CAST-IN-PLACE CONCRETE

2. Determine Random Numbers: Determine random numbers for testing locations using the Probing, Coring, Texture and MIT-SCAN T2 Report.

Transcription:

SECTION 035300 PART 1 - GENERAL 1.1 SUMMARY Section includesconcrete topping slab with the following finish: 1. Abrasive-blast finish. Related Sections: 1. Division 03 Section "Cast-in-Place Concrete" for general building applications of concrete. 2. Division 03 Section "Architectural Concrete" for general building applications of specially finished formed concrete. 3. Division 03 Section "Ground and Polished Concrete Finishing." 4. Division 03 Section "Concrete Fill". 5. Division 07 Section "Protected Membrane Roofing." 1.2 G. SUBMITTALS Product Data: For each type of product indicated. LEED Submittal 1. Product Data for Credit SS 7.2: For roof materials, indicating that roof materials comply with Solar Reflectance Index requirement. 2. Product Data for Credit MR 4: For products having recycled content, documentation indicating percentages by weight of postconsumer and preconsumer recycled content. Include statement indicating costs for each product having recycled content. Samples for Verification: For each type of exposed color, pattern, or texture indicated. Design Mixtures: For each decorative concrete paving mixture. Include alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments. Qualification Data: For qualified Installer and testing agency. Material Certificates: For the following, from manufacturer: 1. Cementitious materials. 2. Steel reinforcement and reinforcement accessories. 3. Fiber reinforcement. 4. Admixtures. 5. Curing compounds. 6. Applied finish materials. 7. Bonding agent or epoxy adhesive. 8. Joint fillers. Field quality-control reports. 035300-1

1.3 QUALITY ASSURANCE Installer Qualifications: An employer of workers trained and approved by manufacturer of decorative concrete paving systems. Ready-Mix-Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment. Testing Agency Qualifications: Qualified according to ASTM C 1077 and ASTM E 329 for testing indicated. 1. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing Technician, Grade 1, according to ACI CP-1 or an equivalent certification program. Source Limitations: Obtain decorative concrete paving products and each type or class of cementitious material of the same brand from same manufacturer's plant, and obtain each aggregate from single source. Concrete Testing Service: Engage a qualified testing agency to perform material evaluation tests and to design concrete mixtures. ACI Publications: Comply with ACI 301 unless otherwise indicated. PART 2 - PRODUCTS 2.1 LEED REQUIREMENTS Solar Reflectance Index: Not less than 78 when calculated according to ASTM E 1980, based on testing identical products by a qualified testing agency. Use materials with recycled content such that the sum of postconsumer recycled content plus on-half of the preconsumer content constitutes at least 10% or 20%, based on cost, of the total value of the materials in the project. 2.2 FORMS Form Materials: Plywood, metal, metal-framed plywood, or other approved panel-type materials to provide full-depth, continuous, straight, and smooth exposed surfaces. Forms for Textured Finish Concrete: Units of face design, size, arrangement, and configuration indicated. Provide solid backing and form supports to ensure stability of textured form liners. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and that will not impair subsequent treatments of concrete surfaces. 035300-2

2.3 STEEL REINFORCEMENT Recycled Content: Provide steel reinforcement with an average recycled content of steel so postconsumer recycled content plus one-half of preconsumer recycled content is not less than 25 percent. Plain-Steel Welded Wire Reinforcement: ASTM A 185/A 185M, fabricated from as-drawn steel wire into flat sheets. Reinforcing Bars: ASTM A 615/A 615M, Grade 60; deformed. Steel Bar Mats: ASTM A 184/A 184M; with ASTM A 615/A 615M, Grade 60, deformed bars; assembled with clips. Plain-Steel Wire: ASTM A 82/A 82M, as drawn. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars, welded wire reinforcement, and dowels in place. Manufacture bar supports according to CRSI's "Manual of Standard Practice" from steel wire, plastic, or precast concrete of greater compressive strength than concrete specified, and as follows: 2.4 CONCRETE MATERIALS Cementitious Material: Use the following cementitious materials, of the same type, brand, and source, throughout Project: 1. Portland Cement: ASTM C 150, gray portland cement Type I/II. Water: Potable and complying with ASTM C 94/C 94M. Air-Entraining Admixture: ASTM C 260. Chemical Admixtures: Admixtures certified by manufacturer to be compatible with other admixtures and to contain not more than 0.1 percent water-soluble chloride ions by mass of cementitious material. 1. Water-Reducing Admixture: ASTM C 494/C 494M, Type A, colored. 2. Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type D, colored. 3. Water-Reducing and Accelerating Admixture: ASTM C 494/C 494M, Type 2.5 FIBER REINFORCEMENT Synthetic Fiber: Monofilament or fibrillated polypropylene fibers engineered and designed for use in decorative concrete paving, complying with ASTM C 1116/C 1116M, Type III, 1/2 to 1-1/2 inches long. 2.6 CURING AND SEALING MATERIALS Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type I, Class B, manufactured for colored concrete. 1. For integrally colored concrete, curing compound shall be pigmented type approved by coloring admixture manufacturer. 2. For concrete indicated to be sealed, curing compound shall be compatible with sealer. 035300-3

Clear Acrylic Sealer: Manufacturer's standard, waterborne, non-yellowing and UV-resistant, membrane-forming, medium-gloss, acrylic copolymer emulsion solution, manufactured for colored concrete, containing not less than 15 percent solids by volume. Slip-Resistance-Enhancing Additive: Manufacturer's standard finely graded aggregate or polymer additive, designed to be added to clear acrylic sealer to enhance slip resistance of sealed paving surface. 2.7 RELATED MATERIALS Joint Fillers: ASTM D 1751, asphalt-saturated cellulosic fiber or ASTM D 1752, cork or self-expanding cork in preformed strips. Bonding Agent: ASTM C 1059, Type II, non-redispersible, acrylic emulsion or styrene butadiene. Epoxy Bonding Adhesive: ASTM C 881/C 881M, two-component epoxy resin capable of humid curing and bonding to damp surfaces; of class suitable for application temperature, of grade complying with requirements. 2.8 CONCRETE MIXTURES Prepare design mixtures, proportioned according to ACI 301, for each type and strength of normal-weight concrete, and as determined by either laboratory trial mixtures or field experience. 1. Use a qualified independent testing agency for preparing and reporting proposed concrete design mixtures for the trial batch method. 2.9 CONCRETE MIXING Ready-Mixed Concrete: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M and ASTM C 1116/C 1116M. Furnish batch certificates for each batch discharged and used in the Work. 1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M. Mix concrete materials in appropriate drum-type batch machine mixer. 1. For concrete batches of 1 cu. yd. or smaller, continue mixing at least 1-1/2 minutes, but not more than 5 minutes after ingredients are in mixer, before any part of batch is released. 2. For concrete batches larger than 1 cu. yd., increase mixing time by 15 seconds for each additional 1 cu. yd.. 3. Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mixture type, mixing time, quantity, and amount of water added. 035300-4

PART 3 - EXECUTION 3.1 EXAMINATION Examine exposed subgrades and subbase surfaces for compliance with requirements for dimensional, grading, and elevation tolerances. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION Remove loose material from compacted subbase surface immediately before placing concrete. Protect adjacent construction from discoloration and spillage during application of color hardeners, release agents, stains, curing compounds, and sealers. 3.3 EDGE FORMS AND SCREED CONSTRUCTION Set, brace, and secure edge forms, bulkheads, and intermediate screed guides to required lines, grades, and elevations. Install forms to allow continuous progress of work and so forms can remain in place at least 24 hours after concrete placement. Clean forms after each use and coat with form-release agent to ensure separation from concrete without damage. 3.4 STEEL REINFORCEMENT General: Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement. Clean reinforcement of loose rust and mill scale, earth, ice, or other bond-reducing materials. Arrange, space, and securely tie bars and bar supports to hold reinforcement in position during concrete placement. Maintain minimum cover to reinforcement. Install welded wire reinforcement in lengths as long as practicable. Lap adjoining pieces at least one full mesh, and lace splices with wire. Offset laps of adjoining widths to prevent continuous laps in either direction. Install fabricated bar mats in lengths as long as practicable. Handle units to keep them flat and free of distortions. Straighten bends, kinks, and other irregularities, or replace units as required before placement. Set mats for a minimum 2-inch overlap to adjacent mats. 3.5 JOINTS General: Form construction, isolation, and contraction joints and tool edges true to line, with faces perpendicular to surface plane of concrete. Construct transverse joints at right angles to centerline unless otherwise indicated. 035300-5

Contraction Joints: Form weakened-plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one-fourth of the concrete thickness. 1. Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch-wide joints into concrete when cutting action will not tear, abrade, or otherwise damage surface and before developing random contraction cracks. Edging: After initial floating, tool edges of paving, gutters, curbs, and joints in concrete with an edging tool to a 3/8-inch radius. Repeat tooling of edges after applying surface finishes. Eliminate edging tool marks on concrete surfaces. 3.6 G. H. I. J. CONCRETE PLACEMENT Before placing concrete, inspect and complete formwork installation, steel reinforcement, and items to be embedded or cast-in. Remove snow, ice, or frost from subbase surface and steel reinforcement before placing concrete. Do not place concrete on frozen surfaces. Moisten subbase to provide a uniform dampened condition at time concrete is placed. Do not place concrete around manholes or other structures until they are at required finish elevation and alignment. Comply with ACI 301 requirements for measuring, mixing, transporting, and placing concrete. Deposit and spread concrete in a continuous operation between transverse joints. Do not push or drag concrete into place or use vibrators to move concrete into place. Consolidate concrete according to ACI 301 by mechanical vibrating equipment supplemented by hand spading, rodding, or tamping. 1. Consolidate concrete along face of forms and adjacent to transverse joints with an internal vibrator. Keep vibrator away from joint assemblies, reinforcement, or side forms. Use only square-faced shovels for hand spreading and consolidation. Consolidate with care to prevent dislocating reinforcement dowels and joint devices. Screed paving surface with a straightedge and strike off. Commence initial floating using bull floats or darbies to impart an open-textured and uniform surface plane before excess moisture or bleed water appears on the surface. Do not further disturb concrete surfaces before beginning finishing operations or spreading surface treatments. Cold-Weather Placement: Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing, or low temperatures. Comply with ACI 306.1 and the following: 1. When air temperature has fallen to or is expected to fall below 40 deg F, uniformly heat water and aggregates before mixing to obtain a concrete mixture temperature of not less than 50 deg F and not more than 80 deg F at point of placement. 2. Do not use frozen materials or materials containing ice or snow. 3. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in design mixtures. Hot-Weather Placement: Comply with ACI 301 and as follows when hot-weather conditions exist: 1. Cool ingredients before mixing to maintain concrete temperature below 90 deg F at time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated in total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option. 035300-6

2. 3. Cover steel reinforcement with water-soaked burlap so steel temperature will not exceed ambient air temperature immediately before embedding in concrete. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade moisture uniform without standing water, soft spots, or dry areas. 3.7 FINISHES, GENERAL Architectural Concrete Finish: Match Architect's design reference sample, identified and described as indicated, to satisfaction of Architect. 1. Provide concrete finishes as shown on Drawings and as scheduled in this Section. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a texture matching adjacent formed surfaces. 1. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces unless otherwise indicated. Maintain uniformity of special finishes over construction joints unless otherwise indicated. 3.8 EXPOSED-AGGREGATE FINISHES Abrasive-Blast Finish: Perform abrasive blasting after compressive strength of concrete exceeds 2000 psi. Coordinate with formwork removal to ensure that surfaces to be abrasive blasted are treated at same age for uniform results. 1. Surface Continuity: Perform abrasive-blast finishing in as continuous an operation as possible, maintaining continuity of finish on each surface or area of Work. Maintain required patterns or variances in depths of blast to match design reference sample or mockup. 2. Abrasive Blasting: Abrasive blast corners and edges of patterns carefully, using backup boards, to maintain uniform corner or edge line. Determine type of nozzle, nozzle pressure, and blasting techniques required to match design reference sample or mockup. 3. Depth of Cut: Use an abrasive grit of proper type and gradation to expose aggregate and surrounding matrix surfaces to match design reference sample or mockup, as follows: a. Brush (B): Remove cement matrix to dull surface sheen and expose face of fine aggregate; with no significant reveal. b. Light (L): Expose fine aggregate with occasional exposure of coarse aggregate and uniform color; with maximum reveal of 1/16 inch. c. Medium (M): Generally expose coarse aggregate; with slight reveal, a maximum of 1/4 inch. d. Heavy (H): Expose and reveal coarse aggregate to a maximum projection of one-third its diameter; with reveal range of 1/4 to 1/2 inch. Remove impressions of formwork and form facings with exception of tie holes. 3.9 CONCRETE PROTECTION AND CURING General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold-weather protection. 035300-7

Evaporation Retarder: Apply evaporation retarder to concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete but before float finishing. Begin curing after finishing concrete but not before free water has disappeared from concrete surface. Curing Compound: Apply curing compound immediately after final finishing. Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas that have been subjected to heavy rainfall within three hours after application. Maintain continuity of coating, and repair damage during curing period. 1. Cure integrally colored concrete with a pigmented curing compound. 2. Cure concrete finished with pigmented mineral dry-shake hardener with a pigmented curing compound. Curing and Sealing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Repeat process 24 hours later and apply a second coat. Maintain continuity of coating and repair damage during curing period. 3.10 SEALER Clear Acrylic Sealer: Apply uniformly in two coats in continuous operations according to manufacturer's written instructions. Allow first coat to dry before applying second coat, at 90 degrees to the direction of the first coat using same application methods and rates. 3.11 PAVING TOLERANCES Comply with tolerances in ACI 117 and as follows: 1. Elevation: 3/4 inch. 2. Thickness: Plus 3/8 inch, minus 1/4 inch. 3. Surface: Gap below 10-foot-long, unleveled straightedge not to exceed 1/2 inch. 4. Lateral Alignment and Spacing of Dowels: 1 inch. 5. Vertical Alignment of Dowels: 1/4 inch. 6. Alignment of Dowel-Bar End Relative to Line Perpendicular to Paving Edge: 1/4 inch per 12 inches of dowel. 7. Joint Spacing: 3 inches. 8. Contraction Joint Depth: Plus 1/4 inch, no minus. 9. Joint Width: Plus 1/8 inch, no minus. 3.12 FIELD QUALITY CONTROL Testing Agency: Engage a qualified testing agency to perform tests and inspections. Testing Services: Testing of composite samples of fresh concrete obtained according to ASTM C 172 shall be performed according to the following requirements: 1. Testing Frequency: Obtain at least one composite sample for each 100 cu. yd. or fraction thereof of each concrete mixture placed each day. a. When frequency of testing will provide fewer than five compressive-strength tests for each concrete mixture, testing shall be conducted from at least five randomly selected batches or from each batch if fewer than five are used. 035300-8

2. 3. 4. 5. 6. Slump: ASTM C 143/C 143M; one test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture. Perform additional tests when concrete consistency appears to change. Air Content: ASTM C 231, pressure method; one test for each composite sample, but not less than one test for each day's pour of each concrete mixture. Concrete Temperature: ASTM C 1064/C 1064M; one test hourly when air temperature is 40 deg F and below and when it is 80 deg F and above, and one test for each composite sample. Compression Test Specimens: ASTM C 31/C 31M; cast and laboratory cure one set of three standard cylinder specimens for each composite sample. Compressive-Strength Tests: ASTM C 39/C 39M; test one specimen at seven days and two specimens at 28 days. a. A compressive-strength test shall be the average compressive strength from two specimens obtained from same composite sample and tested at 28 days. G. H. I. Strength of each concrete mixture will be satisfactory if average of any three consecutive compressive-strength tests equals or exceeds specified compressive strength and no compressive-strength test value falls below specified compressive strength by more than 500 psi. Test results shall be reported in writing to Architect, concrete manufacturer, and Contractor within 48 hours of testing. Reports of compressive-strength tests shall contain Project identification name and number, date of concrete placement, name of concrete testing and inspecting agency, location of concrete batch in Work, design compressive strength at 28 days, concrete mixture proportions and materials, compressive breaking strength, and type of break for both 7- and 28-day tests. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may be permitted by Architect but will not be used as sole basis for approval or rejection of concrete. Additional Tests: Testing and inspecting agency shall make additional tests of concrete when test results indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as directed by Architect. Concrete topping slab will be considered defective if it does not pass tests and inspections. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements. Prepare test and inspection reports. 3.13 REPAIRS AND PROTECTION Remove and replace decorative concrete paving that is broken or damaged or does not comply with requirements in this Section. Remove work in complete sections from joint to joint unless otherwise approved by Architect. Protect decorative concrete paving from damage. Exclude traffic from paving for at least 14 days after placement. When construction traffic is permitted, maintain paving as clean as possible by removing surface stains and spillage of materials as they occur. Maintain decorative concrete paving free of stains, discoloration, dirt, and other foreign material. Sweep paving not more than two days before date scheduled for Substantial Completion inspections. END OF SECTION 035300 035300-9