U.S. DEPARTMENT OF ENERGY-CARLSBAD AREA OFFICE MOBILE SYSTEMS VENDOR PROGRAM

Similar documents
OPTIMIZING TRANSURANIC WASTE MANAGEMENT CHALLENGES AND OPPORTUNITIES

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA. Multi-Year Work Plan to De-Inventory TRU Waste Stored at LANL

PROCESS SIMULATION AS APPLIED TO TRANSURANIC WASTE MANAGEMENT

Improvements in Hanford TRU Program Utilizing Systems Modeling and Analyses

BUSINESS CASE ANALYSIS FOR ADVANCED MIXED WASTE TREATMENT PROJECT EXPA'NDED M'ISSION

STREAMLINING THE WIPP WASTE CHARACTERIZATION PROCESS

WIPP HAZARDOUS WASTE FACILITY PERMIT UPDATE

Los Alamos National Laboratory Develops Quick to WIPP Strategy

* Los Alamos National Laboratory P.O. Box 1663, Los Alamos, New Mexico 87545

Prepared for Waste Management 1999 Proposed Topic: Nuclear Waste Policies and Programs. Prepared by: Mike Brown, CAO Sue Domes, SNL Janis Trone, SNL

THE NEVADA TEST SITE LEGACY TRU WASTE THE WIPP CENTRAL CHARACTERIZATION PROJECT

WM2011 Conference, February 27 March 3, 2011, Phoenix, AZ

Waste Management Idaho Lessons Learned

INEEL REMOTE-HANDLED TRANSURANIC WASTE INVENTORY, WASTE DISPOSITION PLANS, AND TECHNOLOGY NEEDS

STATEMENT OF WORK SMALL SPACECRAFT PROTOTYPING ENGINEERING DEVELOPMENT & INTEGRATION (SSPEDI) Space Solutions (SpS)

WM2009 Conference, March 1-5, 2009, Phoenix AZ

ARTICLE 4 SPECIFICATIONS AND SCOPES OF WORK

OFFICE OF INSPECTOR GENERAL U.S. Department of Energy. AUDIT REPORT OAI-L September 2017

AMENDMENT - REQUEST FOR PROPOSAL (RFP)

MFC CH-TRU Waste Certification Plan

Low-Level Radioactive Waste Management: Transitioning to Off-site Disposal at Los Alamos National Laboratory 11334

OCRWM Title: Quality Assurance Requirements and Description DOE/RW-0333P, Revision 19 Page: 2 of 149

WIPP and Surplus Plutonium

WIPP Overview. Betsy Forinash. Director, National Transuranic Waste (TRU) Program-HQ Office of Environmental Management, DOE

Los Alamos NATIONAL LABORATORY. Los Alamos National Laboratory Transuranic Database Analysis

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona USA

Los Alamos National Laboratory Waste Management Program

Waste Management Fiscal Year 1998 Progress Report

DOE ORDER "RADIOACTIVE WASTE MANAGEMENT" SRS & DOE COMPLEX IMPLEMENTATION ISSUES AND COSTS. W.T. Goldston Westinghouse Savannah River Company

Quality Manual ISO 9001:2008 ISO 9001:2015

ROCKY FLATS CENTRALIZED SIZE REDUCTION FACILITY PROJECT UPDATE

CASE STUDY: RH-TRU WASTE TRANSPORTATION FROM BATTELLE COLUMBUS LABORATORIES. James H. Eide Battelle Columbus Laboratories

Pre-Construction Conference Discussion Guide

Acquisition Plan Nuclear Weapons Production Plants

HANFORD SITE WASTE TREATMENT/STORAGE/DISPOSAL INTEGRATION. Kent M. McDonald Waste Management Federal Services of Hanford, Inc. Richland, Washington

EFCOG Waste Management Working Group Packaging and Transportation Subgroup Initiatives

CORPORATE QUALITY MANUAL

NQA-1 Graded Approach, 55-Gallon Drum Summary

Waste Isolation Pilot Plant

THE VOLUME DISTRIBUTION OF CANS USED IN TRU WASTE MEASURED BY VE AND ITS POSSIBLE ECONOMIC IMPLICATIONS. L. Popa-Simil, A. Adams, D. R.

Requirements for a Successful Replatform Project

Surplus Plutonium Disposition - Dilute and Dispose Approach

SYSTEM MODERNIZATION BEST PRACTICES

A62 PRE-CONSTRUCTION MEETING AGENDA

Federal Education Programs Financial Management Practices

WIPP Restart and Long-term Outlook: States Perspective

SAVANNAH RIVER SITE TRU SOLUTIONS F. Lee Fox Savannah River Nuclear Solutions Building E, Aiken, SC 29808

Choosing a TMS Plus Managed Services Provider. Making the Most of Your RFP

REFERENCES Overview Quality Assurance Engineering Program...5

A Freshwater Partners White Paper

Building what matters. Midstream Solutions. Oil & Gas

A62 UT PRE-CONSTRUCTION MEETING AGENDA

Information Technology Independent Verification and Validation

Policy and Procedure Examples

Operational Excellence in Upstream Oil and Gas

WM2012 Conference, February 26 - March 1, 2012, Phoenix, Arizona USA

Don J. Moak*, Glen C. Triner**, Lori D. West**, Richard L. Grondin*

Supplier Quality Manual

ETASS II SKILL LEVEL AND LABOR CATEGORY DESCRIPTIONS. Skill Levels

CMMI V2.0 MODEL AT-A-GLANCE. Including the following views: Development Services Supplier Management. CMMI V2.0 outline BOOKLET FOR print.

PREPARATION TO SHIP RADIOACTIVE SEALED SOURCES FROM LANL TO WIPP

Work Plan and IV&V Methodology

Independent Verification and Validation (IV&V)

VIA to: and

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA. Treatability Variance for Containerized Liquids in Mixed Debris Waste 12101

THE AMERICAN REINVESTMENT AND RECOVERY ACT: U.S. DEPARTMENT OF ENERGY ENVIRONMENTAL CLEANUP OPERATIONS

Lessons Learned from the On-Site Disposal Facility at Fernald Closure Project

EQUIPMENT-AS-A-SERVICE. Helping you deploy new technology when and where you need IT

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Kuali Research. Simplify administration and compliance, maximize funding, and make more informed decisions.

QUALITY AUDIT TRACKING: THE KEY TO EFFICIENCY, EFFECTIVENESS AND VALUE

I. Development, Submittal, and Acceptance of a Quality Management System

Report of the Director-General on the Activities of the Internal Audit Office, and Internal Audit Recommendations and Actions Taken

Request for Proposals

White Paper April 23, 2018

Title: Guideline for Existing Building Energy Efficiency Improvement Program

BHG Operational Awareness Program May 8, 1998 Configuration Management Revision 0 Page 1 of 11 CONFIGURATION MANAGEMENT

IBM MobileFirst Device Procurement and Deployment Services

City of Palo Alto (ID # 4369) City Council Staff Report

Common Myths and Best Practices. By Gr e g o r y A. Ga r r e t t

OWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b)

Material Management and Minimization. Surplus Plutonium Disposition Program Requirements Document for the Proposed Dilute and Dispose Approach

invest in leveraging mobility, not in managing it Solution Brief Mobility Lifecycle Management

Frequently Asked Questions on Metro s MicroTransit Pilot (MTP)

State Tax Audit Software Request for Information

Checked Baggage Technology Update. Rick Phillips Division Director (Acting), Checked Baggage Technologies Division

Supplier Handbook. Partnering for tomorrow. This supplier handbook is a guide for conducting business with Chemring Ordnance

QUALITY INTEGRATED ENGINEERING SERVICES to the energy sector

DATA ITEM DESCRIPTION

Seattle Public Schools The Office of Internal Audit

Product Realization. Ameritube LLC 1000 N. Hwy 77, Hillsboro TX Revision Level: Procedure No. A

Quality Assurance Policy and Procedures

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

YOUR BEST WAREHOUSE MANAGEMENT SYSTEM: GETTING MAXIMUM VALUE FROM YOUR WAREHOUSE AND YOUR FUNCTIONAL AREAS

Indoor Air Quality Program

Development of Non-Destructive Characterization Systems for Large Boxes Containing Transuranic Waste

CONTACT HANDLED TRANSURANIC WASTE CHARACTERIZATION REQUIREMENTS AT THE WASTE ISOLATION PILOT PLANT

Best Management Practice for Management of Used Aircraft Parts and Assemblies and for Recycling of Aircraft Materials

STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 5, Lesson 1 Cost Analysis Process, Players, and Business Systems

Transcription:

ABSTRACT U.S. DEPARTMENT OF ENERGY-CARLSBAD AREA OFFICE MOBILE SYSTEMS VENDOR PROGRAM Sandra Sue Countiss U.S. Department of Energy Carlsbad Area Office, Carlsbad, NM Sheila A. Lott Commodore Advanced Sciences Inc., Carlsbad, NM The U.S. Department of Energy s Carlsbad Area Office (CAO) is contracting for and deploying mobile characterization systems to cost effectively expedite preparation of transuranic (TRU) waste for disposal at the Waste Isolation Pilot Plant (WlPP). The mobile systems vendor program has been designed to accelerate the required TRU waste characterization activities at the TRU-waste sites. Two mobile vendor teams were selected through a competitive solicitation process, were deployed, and are mobilized at the Nevada Test Site (NTS), where they are undergoing audits by the CAO in order to receive their CAO mobile systems approval certificate. Stage 1 of the procurement is this approval process, which is being conducted through cooperative agreements with each vendor team. In Stage 2, the approved mobile vendors will receive orders to provide mobile TRU waste characterization and certification services via task orders issued and funded by the TRU-waste sites through the prime contracts issued by the CAO. INTRODUCTION Approximately 104,000 cubic meters of retrievably stored contact-handled (CH) TRU waste are in storage at numerous sites around the country (1). Before shipping TRU wastes for disposal at WIPP, sites must certify that the waste meets WIPP Waste Acceptance Criteria (WAC) (2). Sites with significant quantities of TRU waste plan to use existing fixed facilities or to open new facilities to characterize waste (determine chemical, radiological, and physical attributes). Constructing new fixed waste management facilities is a long-term planning issue because long budget lead times and other constraints are part of the approval process. Wastes that do not meet the WIPP WAC can be subject to additional processing, including repackaging, before disposal at the WIPP. Small-quantity sites face similar problems, since they generally lack the fixed-facility capability to characterize, treat, certify, and load TRU waste for off-site transfer (3). An alternative to fixed facilities is the use of mobile systems mounted in one or more trailers, or mounted on skids and transported to a site. Proven mobile systems technology has been used to advantage at some DOE sites for several years and is readily available. Mobile systems technology can resolve TRU waste characterization and certification requirements at DOE sites (large and small) without enormous fixed-facility cost outlays. The CAO can help ensure that this technology is made available to DOE sites needing such services; the use of this proven technology is in concert with the national TRU waste management system and site clean-up acceleration goals established in 1996 by the DOE s Office of Environmental Management. Mobile systems can be deployed to sites as required, facilitating compliance with the Federal Facility Compliance Act consent orders, unilateral orders, and regulatory agreements. Over the past two years the CAO, in close consultation with the TRU-waste sites and commercial vendors, has developed the Mobile Systems Vendor (MSV) Program, a detailed strategy for

contracting with mobile systems vendors and deploying them to TRU-waste sites. These vendors provide a full range of waste characterization, certification, and loading services for sites preparing TRU waste for disposal at WIPP.(3) BACKGROUND Several years ago the CAO evaluated the options for disposing of TRU waste located at smallquantity sites (SQS) across the U.S. Many of these sites are owned by private sector companies or universities that had provided services under contract to the DOE, while the rest are small, DOEowned sites. Two options appeared to be reasonable: ship SQS waste to one of the large DOE TRUwaste sites, or characterize and package the waste at the SQS for shipment directly to the WIPP. In 1996, the CAO issued the Mobile Waste Characterization Systems Analysis Report (4), which found that "... mobile waste characterization systems have immediate application in regard to assisting the large quantity sites in filling the pipeline to the WIPP." This report encouraged developing mobile waste characterization capability for both the SQS and the large DOE TRU-waste sites. The Mobile Systems Capability Plan was issued in September 1996 to initiate contracting for and deployment of mobile system services to prepare TRU waste for disposal at the WIPP. The CAO entered into Cooperative Agreements with two mobile systems vendor teams, Mobile Characterization Services (MCS) and TRUtech, which were selected through the competitive solicitation process. The CAO s vision is that through these agreements and participation in the CAO Mobile Systems Approval Program, the two mobile teams will have completed all applicable quality assurance (QA)-related reporting requirements; will have their planning documents reviewed and approved; and will have their processes examined, tested, and approved by CAO QA personnel. When the CAO has determined that the teams characterization, packaging, certification, and transportation preparation program meet applicable requirements (i.e., successfully completing this program), the teams will receive CAO Mobile Systems Approval Certificates so that Task Orders can be issued to either augment DOE facilities at large TRU-waste sites or partially/totally provide waste management services at small quantity TRU-waste sites, to ensure that CH-TRU waste is characterized, certified, and loaded into the TRUPACT-II containers for transport to and disposal at the WIPP. The purpose of the vendor approval activities is to tailor mobile vendor operations to the specific and stringent requirements of the WIPP program, specifically the WAC, the TRU Waste Characterization Quality Assurance Program Plan (QAPP), and the TRUPACT-II Certificate of Compliance. Site certification has proved to be a costly and time-consuming process for the TRUwaste sites. Deploying pre-approved mobile systems vendors to TRU-waste sites that have no or limited facilities or capabilities to perform those operations results in a lower, one-time vendor approval cost to CAO. This approval cost is more than offset by the cost savings realized by the sites as a result of not needing detailed plans and procedures for the entire certification process. Instead, a minimal certification process (site interface plan/procedure) will be used at these sites to ensure compatibility of site plans and procedures with those of the mobile vendors. THE NEED FOR MOBILE SYSTEMS VENDOR PROGRAM The National TRU Waste Management Plan (NTWMP) (1) documented the need for mobile systems capability: "...the use of mobile waste characterization/certification units promises to expedite TRU waste processing operations and has been factored into the Management Plan

configuration accordingly. Evidence suggests that mobile characterization units will be less expensive than comparable fixed facilities, will require less time to field, and can be used at many sites over their operating lives..." Both large and small sites need mobile capabilities for waste characterization, treatment, repackaging, and loading for transport. Many of these capabilities are available in the commercial marketplace and will provide schedule and cost advantages for achieving WIPP acceptance. The NTWMP is a logistical plan that integrates and optimizes waste work-off and shipping schedules across all TRU-waste sites and assumes the deployment of mobile systems to achieve those schedules. Most of the TRU-waste sites plan to use mobile capability in some form or another to meet the schedules presented in the NTWMP. The NTWMP includes mobile characterization and loading units in its configuration in order to meet the schedules and waste processing rate demand. A number of mobile characterization units (for example, real-time radiography, nondestructive assay, headspace gas sampling and analysis, and drum venting) are available to process stored and newly generated TRU waste packaged in 55- gallon drums and standard waste boxes. PROCUREMENT STRATEGY In January 1997, in support of the CAO, the procurement office of DOE s Albuquerque Operations Office issued a draft Request for Proposal (RFP) for mobile transuranic waste characterization services. The procurement is being conducted in two stages. Stage 1 - CAO Approval Process In April 1997 a Federal Assistance Solicitation for Cooperative Agreement was issued; in August 1997 two mobile systems vendor teams---mcs and TRUtech were selected to participate in the Mobile Systems Vendor Approval Program. The operations of the mobile systems at DOE sites must meet the same quality assurance and technical requirements for characterization and certification of TRU waste as the fixed facilities. To receive a CAO Mobile Systems Approval Certificate, each mobile system vendor team must develop and submit all necessary documentation, plans, and procedures and successfully participate in the three Performance Demonstration Programs (PDPs) as required for the individual mobile units: Nondestructive Assay, RCRA Constituent Analysis of Solidified Wastes, and Analysis of Simulated Headspace Gases. They must also demonstrate their process capability during CAO audits and assessments. Vendor plans, reviews, reports, and other deliverables include: Waste Certification Plan (WCP) Certification QA Plan Quality Assurance Project Plan (QAPjP) Sampling Plan TRUPACT-II Authorized Methods for Payload Control (TRAMPAC) Radiological Safety and Hazards Analysis Plan Packaging QA Program Plan Quality Assurance Program Document Matrix and QA Grading Procedure Standard Operating Procedures

CAO will review and approve MSV documents in accordance with the Generator Site Certification Guide (5). When CAO has approved the vendor s WCP, QAPjP, and TRAMPAC, the DOE Project Officer, assisted by CAO s Certification Manager and QA Manager, will assemble a team of qualified auditors and technical specialists who will travel to meet them at a DOE designated site (e.g., the Nevada Test Site) for the final approval audit. The CAO audit team will examine the vendor s procedures and programmatic documents pertaining to TRU waste management and observe the vendor perform characterization, certification, and transportation preparation activities on TRU waste. Since the MSV Program is a dynamic program, each mobile vendor will be modifying, upgrading, and bringing on new equipment and new processes throughout the life of their contracts. As they bring the new or modified equipment/processes on line, CAO will perform an audit/surveillance to make sure that the new or modified equipment/processes are acceptable and meet all the CAO requirements. Successful participation in the PDP will be required if the new equipment falls into one of those PDP categories. The CAO will award Certificates of Approval to the mobile systems teams as soon as they successfully complete their audits. In March 1998, these two teams were deployed to the Nevada Test Site (NTS), which consented to be the pilot TRU-waste site for the program to test the mobile systems concept and to initiate the process of receiving their CAO approval to perform TRU waste characterization, certification, and loading activities at the TRU-waste sites. Both teams have undergone their first audits by the CAO; the follow-up audits, to review corrective action implementation, were held in November and December 1998 at the NTS. CAO approval for both teams is expected in early 1999. Stage 2 - MSVs Provide Mobile TRU Waste Characterization/Certification Services In Stage 2, the CAO-approved vendors will provide mobile TRU waste characterization/certification services via Task Orders, written on contracts that will be issued and administered by the CAO. These Task Orders will be prepared by the requesting TRU-waste site in coordination with the CAO, approved, and issued. The requesting TRU-waste site will provide funding for the mobile services. Characterization/certification services that are contracted to be provided by the MSVs include, but are not limited to: Nondestructive examination (NDE) Nondestructive assay (NDA) Repackaging Headspace gas sampling and analysis Visual examination Resource Conservation and Recovery Act (RCRA) sampling and analysis Waste certification support WIPP Waste Information System data entry Data generation, review, and validation Waste tracking and inventory control WIPP Waste Stream Profile Form preparation Waste manifest preparation Container marking and bar coding, weighing, and venting Health and safety support (monitoring, decontamination, and reporting) TRUPACT-II loading

The services provided by the MSVs will be viewed by the CAO as if the site were using permanent facilities to perform these functions at the data generation level, and the MSVs will be audited at least annually to keep their approval status current (5). CAO will conduct technical exchanges with site planning personnel to plan for using mobile vendor services for TRU waste characterization/certification activities. Technical exchange will provide a forum for developing the detailed information needed to prepare a Task Order for mobile services. Early input from sites is critical for timely development of the Task Order and for the timely deployment of the vendor to the site. For example, the NTS, because of a consent agreement with the state of Nevada, was required to submit a copy of its site certification audit report and a shipping schedule by September 1, 1998. This commitment was met with support from CAO and the mobile systems vendors. The procurement process described above provides a viable mechanism for ensuring that the sites can meet the WIPP WAC without additional and extensive waste site visits and audits by CAO before beginning shipments to WIPP. PROCESS FOR USING MOBILE SYSTEMS VENDORS The following describes the process that TRU-waste sites will follow to use a mobile systems vendor team: The CAO and/or its contractor representative will hold technical exchanges with TRU-waste sites to discuss and determine each site s needs for using the mobile vendors. Each site desiring the services of the mobile vendors will be put on a tentative schedule. Once the decision is made for a TRU-waste site to use a mobile vendor team, TRU-waste site personnel will prepare a Task Order in coordination with the CAO Manager of the MSV Program. These Task Orders must be very specific and shall delineate exactly which services the TRU-waste site requires from the mobile vendor team. After a Task Order is prepared and funding obligated for these services, a copy shall be sent to the CAO Contracting Officer to have as a record for the contract. After a Task Order has been prepared and approved, the mobile vendor team will be selected. The selection of the MSV team will be accomplished by designated TRU-waste site personnel and the CAO Manager for the MSV Program. A mobile vendor team will be selected according to schedule availability, mobile capabilities, services required, site requirements, cost, and other site-specific criteria. The TRU-waste site will be put on the schedule and the selected mobile vendor team will be deployed to that site in accordance with that schedule. After a TRU-waste site has selected a mobile vendor team, the selected team will prepare a task plan that describes how the team will accomplish the requirements in the Task Order. During the performance of work for a Task Order, the selected mobile team will be evaluated by both the TRU-waste site and the CAO to ensure that milestones are being met and the schedule is being maintained.

The CAO will provide to the TRU-waste site a written evaluation regarding the performance of the mobile vendor team. The TRU-waste site will pay the mobile vendor team for services rendered in accordance with the Task Order. An overall performance evaluation of each mobile vendor team will be prepared for the CAO after work on a Task Order is completed at each TRU-waste site. This evaluation will be kept with contractual papers. This process is shown graphically in Figure 1.

Vendor Performance The CAO, in collaboration with the sites, must remain informed about all aspects of vendor operations and progress. This includes knowledge of product quality; throughput to schedule; serious delays, which could adversely affect NTWMP schedules; and actual costs accrued compared with budget planning and funding profiles. As this work is to be performed on a fixed cost basis by MSVs, minimal management controls are anticipated. Performance evaluations will be performed on the mobile systems vendor teams monthly during the task performance and after each Task Order is complete in order to maintain quality assurance and high performance standards for the TRU-waste sites and the CAO. SUMMARY The CAO will integrate the use of private mobile vendor services at the TRU-waste sites to fully/ partially characterize TRU waste or to supplement existing and planned facilities to maximize the volume of WIPP-certified TRU waste available for disposal at WIPP. The CAO will coordinate with and guide the requesting sites, as well as provide technical expertise and information. Some of the obvious benefits (3) of using mobile systems include: Operating funds can be used to procure mobile vendor services instead of using capital equipment funding, which requires a long lead time. Because funding is more readily available and mobile systems services can be acquired faster than fixed facilities can be built, mobile systems vendors offer the fastest way for TRU-waste sites to start preparing TRU waste for shipment to WIPP. Mobile systems can be deployed quickly, allowing sites to process TRU waste while waiting for fixed facilities to be funded, constructed, and operationally ready. Mobile systems can also augment fixed facilities. Mobile systems can be configured in many ways to meet changing needs at a TRU-waste site. Privatization offers a way to avoid capital acquisition and gain greater cost-effectiveness. These benefits provide a strong incentive for TRU-waste sites to use MSVs.

ACKNOWLEDGMENT This work is supported by the U.S. Department of Energy under DOE Contract No. DE-AC04-95AL89446. REFERENCES 1. U.S. DEPARTMENT OF ENERGY, "The National TRU Waste Management Plan," DOE/NTP- 96-1204, Rev. 1, Carlsbad Area Office, December 1997. 2. U.S. DEPARTMENT OF ENERGY, "Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC)", DOE/WIPP- 069, Revision 5, Carlsbad Area Office, April 1996. 3. U.S. DEPARTMENT OF ENERGY, "Mobile Systems Capability Plan," DOE/NTP-96-1202, Rev. 0, Carlsbad Area Office, September 1996. 4. U.S. DEPARTMENT OF ENERGY, "Mobile Waste Characterization Systems Analysis Report, NTP-WID-96-2163, Carlsbad Area Office, January 1996. 5. U.S. DEPARTMENT OF ENERGY, "Generator Site Certification Guide," DOE/CAO-95-2119, Rev. 1, Carlsbad Area Office, August 1999.