PROPOSED COMPLETION OF ROAD INFRASTRUCTURE AND MAINTENANCE WORKS AT EXPORT PROCESSING ZONES AUTHORITY - ATHI RIVER. ITEM NO.

Similar documents
8.01. SUB TOTAL 1 1,168, ADD 16% VAT 187, TOTAL 1,356, Total Carried Forward to Form of Tender:

PROPOSED EXTERNAL WORKS AT NKABUNE TECHNICAL TRAINING INSTITUTE BILL 1 DRIVEWAYS AND PARKINGS

SCHEDULE OF QUANTITIES CPUT BELLVILLE JOB NO: SECTION 1 : PRELIMINARY AND GENERAL ITEM PAYMENT DESCRIPTION UNIT QTY RATE AMOUNT

Bill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No.

Bill No.1: Preliminaries

CATCHMENT STRUCTURE 13M X 15M

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

Safety Method Statement External Works

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount

Item No. Description Unit Quantity Rate (EUR) Amount (EUR) No 2

July Bill No.1: Preliminaries

Cost Estimate Summary Site Prep Supervision Works Cost Risk OB Works + Risk + OB Total Union Street / Laburnum Row Junction 12,353 5,147 73,006

Appendix 15 Estimated costs of dams

CITY OF FARGO SPECIFICATIONS ASPHALT LEVELING COURSE

COUNTY GOVERNMENT OF SIAYA: PROPOSED ECD BLOCK

REGIONAL CONSTRUCTION STANDARDS

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS

TANROADS Regional Manager s Office - Iringa

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES PRECAST BOX CULVERTS CONSTRUCTION SPECIFICATION

SECTION FLEXIBLE PAVING

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

SECTION A1 EXCAVATION AND BACKFILL GENERAL

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

Bill of Quantity (BOQ)

REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form

Contract Identification No. and Package 1. SUHEP-067/68-Lot No.1-AR: Package B 2. SUHEP-067/68-Lot No.1-AR: Package C

ITEM 706 PIPE SLOPE DRAIN

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total

Bill of Quantity (BOQ)

SECTION ASPHALT PAVING

BILL OF QUANTITIES FOR KIPUNGANI SEA WALL

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2

CITY OF FARGO SPECIFICATIONS REMOVALS

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

CITY OF FARGO SPECIFICATIONS REMOVALS

SPECIAL SPECIFICATION 4653 Polypropylene Pipe

ROAD PAVEMENTS GENERAL

KGN-BDD TENDER FOR SUPPLY OF LABORATORY EQUIPMENT AND PROVISION OF CIVIL WORKS FOR THE OLKARIA CIVIL ENGINEERING LABORATORY.

SECTION STORM DRAINAGE

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.

Description Unit Quantity Rate Kshs. Amount Kshs.

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

Item 460 Corrugated Metal Pipe

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

Table of Contents. Chapter 1 : Introduction 1. Chapter 2 : Structure and design 15

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

Chapter 5: Designs for Recreational Uses 5-1 Asphalt Pavements for Non-Vehicular Use 5-1 Table 5-1: Thickness Design Chart: Bikeways, Paths, Trails

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe

Procedure and Specification for the Construction of Vehicle Access Crossings over Footways and Verges April 2016

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]

CONTRACT NO. : MTK 11/2018 REHABILITATION OF UITKYK ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

Carried to collection

CONTRACT NO. : MTK11/2017 REHABILITATION OF MSAULI ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

CONTRACT NO. : MTK 5/2018 REHABILITATION OF STEELPOORT ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

SECTION BITUMINOUS CONCRETE PAVING


SECTION STORM DRAIN

Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55.

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS

ROUTINE MAINTENANCE WORK

EXCAVATION AND BACKF1LL

ASPHALTIC CONCRETE PAVING SECTION

SECTION PAVING AND SURFACING

Installation Information 2016

CHAPTER 11 - RESTORATION OF SURFACE IMPROVEMENTS

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION DAMPPROOFING AND MEMBRANE WATERPROOFING. 2. Cast-in-place concrete structures; Section

GENERAL(Smallworks) & ENGINEER'S OFFICE. Ablution and toilet facilities on site and elsewhere Sum 1

Sl No. Rate. Hct By manual means In area of light jungle

Student Services & Classroom Addition

Section 403. DRAINAGE STRUCTURES

PAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS.

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION...7-1

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.)

Flexible Pavement Preservation Treatment Construction Patching and Edge Repair AT-TC3PP T1-JA01. Suggested Field Considerations

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

CIVILS. Road Repair. Instarmac. UltraCrete Road Repair / Ancillaries

This type of masonry shall consist of brick laid in full beds of cement mortar.

SECTION BITUMINOUS CONCRETE PAVEMENT

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

TECHNICAL SPECIFICATION

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

INDEX DESCRIPTION MATERIALS CONSTRUCTION MEASUREMENT PAYMENT 10

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

STANDARD SPECIFICATIONS JANUARY 2015 S-4 GRANULAR BASE and AGGREGATES TABLE OF CONTENTS

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS

Transcription:

BILL 1 : GENERAL & PRELIMINARIES A B C Allow for preliminaries of mobilization and set up, storage facilities etc,minor preparatory works and compliance with conditions of contract. 1.00 Allow a Prime Cost Sum of ksh 500,000 for Project Manger's supervision expenses and offsite material testing. SUM 1.00 500,000.00 500,000.00 Include a percentage of Prime Cost sum in item B above for Contractor's overheads and profit. % 1.00 D Provide and maintain project publicity sign board. NO 2.00 CIVIL WORKS PART A Page 1 of A BOQS

TOTAL CARRIED TO SUMMARY PAGE CIVIL WORKS PART A Page 2 of A BOQS

BILL 2 SITE CLEARANCE & TOP SOIL STRIPPING A B Clear site on road reserve including removal of trees, hedges, vegetation and other deleterious materials, grub up roots and backfill to 100% MDD (AASHTO T99) with approved material in accordance with the specifications and as directed by the Engineer. SM 1,000.00 Removal of top soil to a maximum depth of 200mm in accordance with the specifications and as directed by the Engineer. CM 200.00 BILL 3 EARTH WORKS FOR BUS BAY C Cut to spoil in soft material CM 1,500.00 D E F Provide and fill in approved hard material (Hardcore) to bus bay area as directed on site by the Engineer. Rate to include cost of watering and compaction to desired levels (95% MDD, AASHTO T99). CM 800.00 Provide lay and compact 300mm thick approved murram sub-base in layers of 150mm thick. CM 300.00 Provide, lay and compact 300mm thick Hand Packed Stones including quarry dust blinding to the satisfaction of the Engineer. CM 300.00 CIVIL WORKS PART A Page 3 of A BOQS

TOTAL CARRIED TO SUMMARY PAGE BILL 3 : CULVERTS AND DRAINAGE STRUCTURES No separate payment shall be made for gravel for blinding and hauling to spoil unsuitable excavation materials and the cost of such shall be included in the rates and /or prices. A Excavate/desilt, grade to shape inlets outfalls, side drains to free flow conditions including cart to spoil any excess grass debris and soils as and where directed by the Engineer. CM 450.00 B Clean drains to free flow conditions. LM 3,000.00 C Clean culverts of all sizes to free flow conditions. LM 100.00 D Excavate in any material, provide and joint 600 x 360 mm invert block drains (IBD) precast concrete channels with single side precast side slabs of 600 x 225 x75 mm as lining for stormwater drain including bedding and backfilling with selected material as directed by the Engineer. LM 500.00 CIVIL WORKS PART A Page 4 of A BOQS

E Trim and shape to required profile for stone pitching SM 600.00 F Provide all materials, select stones and construct 150mm thick stone pitching and grout with mortar all in accordance with the specifications and in conformity to Engineer's instruction. SM 600.00 BILL 4: CEMENT TREATED BASE MATERIALS G H I J Excavate, trim and clean potholes, failed and damaged areas of the carriageway and edges including cart to spoil the excavated materials. CM 375.00 Provide, place and spread natural gravel of CBR greater than 30% on repair and reconstruction areas as specified and as directed by the Engineer. CM 225.00 Provide, place and spread GCS material with the grading as specified and as directed by the Engineer. CM 225.00 Provide, transport to site and spread cement on GCS material for base as specified and as directed by the Engineer at 30-90 kg/cm. TON 21.00 K Allow for mixing in cement into GCS CM 225.00 L Allow for curing and protection of treated layers as specified. SM 750.00 TOTAL CARRIED TO SUMMARY PAGE BILL NO 5 :BITUMINOUS SURFACE TREATMENT & SURFACE DRESSING CIVIL WORKS PART A Page 5 of A BOQS

A Prepare surface of carriage way, bus bay and repair areas, provide, heat and spray MC 30 cutback bitumen prime coat at 0.8-1.2 Litres/sm L 60,000.00 B C D Provide, heat and spray 80/100 cut-back bitumen (single seal) on the carriage way at a rate of 1.0-1.4 Litres/sm L 84,000.00 Provide,transport, lay and roll 10/14 mm precoated with MC 30 chippings at a rate of 90-110 sm/cm CM 700.00 Provide and spray K1-60 as tack coat on potholes, rumble strips and speed bumps, rate of 0.5-0.8 litres/sm L 800.00 BITUMINOUS MIXES E Provide, lay and compact Asphalt Concrete Type II to bus bay, pothole patching, speed control bumps and rumble strips as directed by the Engineer at Bitumen content of 5.5-7.0 % by weight of total mix. CM 200.00 BILL 7: FOOT PATH F Prepare foot path base by cutting and filling up damaged areas with approved gravel material. Rate to include cost of compaction and watering. SM 3,000.00 G Prepare surface of foot path, provide heat and spray MC 30 cut-back bitumen as prime coat at the rate of 0.8-1.2 Litres/sm. L 3,600.00 H Provide, lay and compact one layer of Asphalt Concrete (0/10) on foot path. Rate to include application of K1-60. CM 75.00 I Allow for replacement of damaged paving slabs on the existing footpths. SM 1,500.00 CIVIL WORKS PART A Page 6 of A BOQS

J Allow for repair of concrete surround on the existing foot paths (Concrete Class 15). CM 50.00 A TOTAL CARRIED TO SUMMARY PAGE BILL 8 : ROAD FURNITURE Provide approved refrectorised white paint and paint road kerbs (250mm) at the road edge as directed by the Engineer. SM 1,500.00 B Ditto but black paint SM 1,500.00 C Provide approved refrectorised yellow paint and paint 100mm wide yellow center lines on the road as directed by the Engineer. SM 600.00 D As item B aboe but 400mm wide give way lines at junctions SM 40.00 E F As item B above but 500mm wide pedestrian crossing markings. SM 250.00 Provide and erect permanent road signs where instructed by the Engineer and in accordance with the specifications as follows: (a) Warning Signs NO 5.00 CIVIL WORKS PART A Page 7 of A BOQS

(b) Priority, Prohibitory and Mandatory Signs NO 5.00 ( c) Standard Informatory Signs NO 5.00 G Clean existing road signs, repaint and properly align to vertical position and repaint the supporting structures. NO 15.00 H Excavate for, provide and place 250 x 125mm class 25/20 precast concrete raised or ramped kerbs haunched in 100mm thick class 15/20 concrete base bedding and mortar joined in support to carriageway, bus bay and junctions as directed by the Engineer. (a) Straight Kerbs LM 100.00 (b) Kerbs radius: 12m-6m LM 30.00 ( c) Ditto but radius: 5m -1m LM 30.00 (d) Ditto but 100 x 125 mm flush kerbs LM 50.00 TOTAL CARRIED TO SUMMARY PAGE BILL 9: PROVISIONAL SUMS A Allow a Provisional Sum of Ksh 300,000 (Three Hundred Thousand Only ) for construction of Bus Shades. 300,000.00 CIVIL WORKS PART A Page 8 of A BOQS

B Allow a Provisional Sum of Ksh 2,000,000 (Two Million Only) for Land Scaping works. 2,000,000.00 C D Allow a Provional Sum of Ksh 3,000,000 (Three Million Only) for construction of pedestrian covered walkway. 3,000,000.00 Allow a Provisional Sum of Ksh 5,000,000 (Five Million Only) for Contigencies. 5,000,000.00 CIVIL WORKS PART A Page 9 of A BOQS

TOTAL CARRIED TO SUMMARY PAGE 10,300,000.00 SUMMARY PAGE Carried Forward from Page 1 Carried Forward from Page 2 Carried Forward from Page 3 Carried Forward from Page 4 Carried Forward from Page 5 Carried Forward from Page 6 10,300,000.00 CIVIL WORKS PART A Page 10 of A BOQS

SUB-TOTAL I FOR PART A CARRIED TO GRAND SUMMARY PAGE CIVIL WORKS PART A Page 11 of A BOQS