EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES

Similar documents
SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

B-PERMIT PLAN CHECK MANUAL

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

NAME STREET ADDRESS CITY, STATE & ZIP CODE. GAS ELECTRIC TELEVISION TELECOMMUNICATION OTHER (check one) UNDERGROUND OVERHEAD BOTH (check one)

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011

PERMITTING AND CONSTRUCTION MANUAL

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania.

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits.

PUBLIC WORKS DEPARTMENT GENERAL NOTES

It is the CONTRACTORS RESPONSIBILITY to use OSHA approved shoring

CITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX

CHAPTER 11 - RESTORATION OF SURFACE IMPROVEMENTS

UTILITY REGISTRATION, PERMITS, AND CONSTRUCTION

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS

CITY OF ELIZABETHTON Building Department Excavations and Cuts Permit Application

SECTION MAINTENANCE OF EXISTING CONDITIONS

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/

District No.: Applicant: Type of Work:

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

CITY OF WINDSOR STANDARD SPECIFICATIONS JULY 2012 S-31 KEYHOLE EXCAVATION TABLE OF CONTENTS

CITY OF WILSON. Public Services Engineering. Backfilling, Compaction, & Patching Policy on Existing Pavements

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment

CITY OF LAKE FOREST ENCROACHMENT PERMIT STANDARD CONDITIONS (Revised 5/11)

City of Reno Public Works

APPLICATION FOR RIGHT OF WAY PERMIT

To: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

COUNTY OF SUTTER ENCROACHMENT PERMIT

CITY OF DANA POINT PUBLIC WORKS ENGINEERING SERVICES Golden Lantern, Suite 212 Dana Point, Ca (

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

CITY OF MADRAS RIGHT-OF-WAY CONSTRUCTION & USE PERMIT 125 SW E Street, Madras, OR Telephone (541) Fax (541)

Application for Right of Way Permit

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel

SECTION TRAFFIC REGULATIONS

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ)

STANDARDS FOR RIGHT-OF-WAY EASEMENT CONSTRUCTION

SECTION STORM DRAINAGE

SECTION 1 GENERAL NOTES

DIVISION OF PLAN REVIEW & PERMITTING UTILITY PERMIT SPECIFICATIONS AND PERMIT APPLICATION

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

ROAD CUT PERMIT APPLICATION & INSTRUCTIONS

Job Order Sewer Repair Services

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES

CHAPTER 3 EXCAVATIONS

SECTION A1 EXCAVATION AND BACKFILL GENERAL

7. A saucer of soil shall be formed so that water is directed down through the roots or root ball rather than around the root ball.

SECTION UNCLASSIFIED EXCAVATION AND GRADING

Adopted October 1, 2001 Page 1 of 16

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

DESIGNING FOR MANDATORY TREE PROTECTION DURING CONSTRUC TION

Public Works and Utilities Department RIGHT-OF-WAY USE PERMIT APPLICATION

SPECIAL SPECIFICATION 6664 Level (3) Communications System

GRAYSON COUNTY POLICY, PROCEDURES AND SPECIFICATIONS OF GRAYSON COUNTY, TEXAS FOR THE INSTALLATION OF DRIVEWAY

CITY OF FARGO SPECIFICATIONS REMOVALS

APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES

City of West Hollywood California 1984

STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION TRENCHING AND BACKFILL

CITY OF FARGO SPECIFICATIONS REMOVALS

SPECIAL SPECIFICATION 6658 Time Warner Communications System

EXCAVATION PERMIT CHECKLIST

Application for Permit for Installation of Utilities or Placing Underground Construction

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

Chapter 3: Permit Procedures and Requirements

SECTION MEASUREMENT AND PAYMENT

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

LAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050

GENERAL NOTES REQUIRED NOTES ON ALL PLANS

SECTION VI POTABLE WATER, RECYCLED WATER, AND SANITARY SEWER SYSTEM FACILITY CONSTRUCTION

Standing Permit for Repair by Utility Providers

SECTION ASPHALT PAVING AND SURFACING

Special Provisions for Pavement Open Cuts

SECTION 10.0 PIPE TRENCHES Excavation and Preparation of Trench

I. STREET CONSTRUCTION AND RECONSTRUCTION

Conditions of the Utility Permit. Effective January 1, 2019

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION...7-1

SECTION MEASUREMENT AND PAYMENT

SECTION TRENCHING & BACKFILLING

TECHNICAL PROCEDURE TABLE OF CONTENTS

Adopted October 1, 2001 Page 1 of 20

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

SECTION CONSTRUCTION SERVICES

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

York County Engineering Department Roadway Inspection Requirements

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required.

Transcription:

CITY OF SANTA MONICA Department of Public Works Civil Engineering Division 1685 Main, Room 116 Santa Monica, CA 90401 Tel: (310) 458-2240 or (310) 458-8737 EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES 1. No work shall be executed in any part of the public right-of-way for the installation, repair, or removal of any facility, or for any other purpose, without first obtaining a written permit in accordance with the City of Santa Monica right-of-way management regulations. 2. All work shall be done in accordance with the latest edition of the Standard Specifications for Public Works Construction, City of Santa Monica standards, Special Provisions, and the City of Santa Monica right-of-way management regulations. 3. The City has the authority to approve or reject the placement and alignment of utility lines in the public right-of-way, the method of excavation and installation, and the location of above grade infrastructure. 4. The contractor shall contact inspector at (310) 458-2240 for a preconstruction meeting seventy-two (72) working hours prior to start of work. The inspector will discuss additional and related requirements with the contractor (i.e. notification letter, field work changes, construction schedule and work plan, safety and liability issues, etc.). The contractor shall contact the inspector for final inspection and approval of work. 5. All approved and stamped plans, including traffic control plans when required, must be present at the preconstruction meeting. The preconstruction meeting will be cancelled and have to be rescheduled if all of the required plans are not available at the time of the preconstruction meeting. 6. Contact Underground Service Alert (USA) at (800) 227-2600 prior to start of work in accordance with their time requirements. 7. Submit to the City for review and approval a notification letter on the contractor s or utility company s letterhead. The letter shall indicate the scope of work, type of construction, location and limits of work, start date, duration of the construction, and the impact of the work. Include a contact person and phone number that shall function as a community relations liaison and 24-hour emergency contact person. 8. 72 hours prior to the start of work, the approved notification letter shall be distributed to businesses and residents within 500 feet of the work area, per Section 7.06.340 (c) of the right-of-way management regulations. 9. Any deviations made to the approved plans shall be reviewed and approved by the City Engineer s Office prior to start of work. 10. Copies of the issued utility excavation permit, after-hours permit, alley closure permit, and approved construction and traffic plans must be at the job site during all working hours. GENERAL NOTES EXCAVATION IN THE PUBLIC RIGHT OF WAY Page 1

11. The contractor shall comply with the City s ordinances in regards to air, water, sound, drainage, clean up and dust pollution control, tree and plant protection, phasing, security, and insurance (see attached). 12. The contractor shall take necessary precautions to prevent avoidable damage to improvements in public right-of-way. 13. Diagonal trenching is not allowed. The public works inspector shall make rare exceptions based on the specific circumstances observed in the field. 14. The contractor shall perform work in cooperation with other utilities, including but not limited to consideration of joint trenching. 15. In open cut and/or pit and bore construction, all existing underground utilities, including service laterals within three (3) feet of the excavation work, shall be marked, potholed, and exposed to determine type, alignment, offset distance, and depth. 16. The contractor shall protect in place all utilities that are impacted and shall submit for review and approval to inspector the method of protecting the utilities. Hand digging is required when crossing existing utilities. 17. Sod in parkway areas shall be carefully removed and replaced at the completion of trenching operations. Trenching within the drip line of street trees will be done by hand so as not to damage existing root systems or the tree itself. No roots over one inch in diameter shall be cut unless approved by a licensed arborist and City public landscape staff. In all cases, when excavation and boring work is near street trees, approval from the City Urban Forester must be obtained prior to start of work. 18. Excavation work shall be limited to one (1) block at a time except when performing final paving or approved by 19. Install steel plates with a non-slip surface to bridge any open excavation in the public right-of-way during non-working hours. Such plates shall be anchored as to minimize movement and banging and where plates are not flush to surrounding surfaces cold mix shall be placed around the steel plates. The contractor is expected to promptly respond to and correct banging plates at any hour of any day. 20. The contractor shall keep the entire work area clean and free of loose dirt and other debris to the satisfaction of The contractor shall remove all excavated material from the site no later than the end of each day. If the contractor fails to maintain the cleanliness of the site, the permit is subject to revocation as outlined in section 7.06.490 of the right-of-way management regulations. 21. The contractor or applicant shall obtain from Building and Safety, City Hall, room 111, an after-hours permit for any work to be performed beyond City s regular working hours. This permit requires 10 day advanced posting of public signage. 22. Approval by Transportation Management staff is required for street and alley closures. Approved engineered traffic control plans are required whenever work will impact a travel lane (to include bike lanes) on any major streets and in downtown alleys. GENERAL NOTES EXCAVATION IN THE PUBLIC RIGHT OF WAY Page 2

23. Boring is the preferred method when excavation will pass through a cross gutter, driveway approach, alley approach, or bus lanes and bus pads. If boring is not possible inspector will determine how the area is to be restored. 24. Where possible, underground crossing of streets will be installed by boring. 25. Unless otherwise specified, maintain a minimum coverage of 3'-0" from top of pipe to finished grade, 2'-0" minimum horizontal and 1'-0" minimum vertical clearances from any existing and/or proposed underground utilities and facilities. Water lines and sewer lines are to be kept a minimum of 5 clear and shall be sleeved when crossing each other. 26. Shoring is required when the trench is 5-0 deep and below, or as deemed necessary by site conditions or 27. Except in an emergency or in the case of new service connections to a newly constructed or substantially remodeled building, there shall be no excavation in streets completely resurfaced or reconstructed by the City within the preceding three (3) years. Where excavation is necessary or approved to occur in a newly paved street, the restoration after the t-cut work shall be as detailed in note 34. 28. Where manholes, vaults, pull boxes, and any related utility boxes are installed in areas subject to traffic, including sidewalk sweeper vehicles, they shall be H-20 traffic rated and display the utility company name on the covers and lids. 29. All above ground installations in the public right-of-way must be approved by Public Works and Transportation Planning. Inspection of all above ground installations are required at the time of installation and after the area has been restored to previously existing conditions. 30. The contractor shall be responsible, at no expense to the City, for repairing any existing underground utility damaged during excavation, whether or not the existing utility was indicated on the plans or by USA markings. The contractor shall notify the public works inspector immediately upon discovery of damage to any utility. When a sewer lateral is damaged, the contractor is obligated to remove any debris that entered the lateral and must have the lateral video inspected from the damaged location to the main line connection point as proof of debris clearing and proper repair. Said video inspection shall be at the contractor s sole expense. The public works inspector will review the video as part of the required repair inspection and approval. 31. Trench backfill shall be one of the following: a. 3/4 sack-cement slurry. b. Crushed miscellaneous base mechanically compacted to 95% relative compaction in 6 inch lifts. c. Decomposed granite mechanically compacted to 95% relative compaction in 6 inch lifts. d. Native soil that has been certified by an independent testing laboratory to be clean and suitable for reuse and then mechanically compacted to 95% relative compaction in 6 inch lifts. GENERAL NOTES EXCAVATION IN THE PUBLIC RIGHT OF WAY Page 3

32. Backfill compaction testing shall be performed by an independent testing laboratory, certified by the City of Los Angeles, and copies of any reports shall be furnished to the City. 33. Backfill material for a trench in a parkway or near trees in the public right-of-way shall be as recommended by the Urban Forester. 34. Public right-of-way restoration: Asphalt s and Alleys Major Minor Perpendicular to the path of travel Parallel to the path of travel* Cold plane 10' centered on trench 1 1/2" thick and 10' before and after trench.** Overlay Cold plane 5' centered on trench 1 1/2" thick and 5' before and after trench.** Overlay with matching Pothole T cut 12" on all sides of pothole and. T cut 6" on all sides of pothole and overlay with asphalt. Multiple Cuts Alley. T cut 6" on all sides of pothole and overlay with asphalt. Pervious Gutter Newly Paved or Alley Replace with concrete Cold plane 10' centered on trench 1 1/2" thick and 10' before and after trench.** Overlay Less than 5' replace with concrete. More than 5' replace with pervious concrete to the satisfaction of the City Engineer. Cold plane the full lane width for all impacted lanes 1 1/2" thick with end transitions.** Overlay Replace with concrete Cold plane the full lane width for all impacted lanes 1 1/2" thick with end transitions.** Overlay N/A * Per SM15 all trenches must be T cut 6" either side of the trench for the full depth of the asphalt. **Total distance of the transitions will be determined by ***Check with public works to determine if the asphalt is rubberized or other formulation. GENERAL NOTES EXCAVATION IN THE PUBLIC RIGHT OF WAY Page 4

Concrete streets and alleys: Remove and replace concrete slab to the nearest score lines outside the excavation area. Provide ½ diameter by 18 long smooth dowels at 2-0 on center. Dowels shall be embedded 9 into existing concrete and greased where in contact with new concrete. 35. When asphalt streets and alleys are cut within three feet of a curb, gutter, or pavement cold joint, the contractor shall remove the full thickness of the remaining pavement sliver in this area. When cuts are in concrete pavement, cuts and removals must be made to the nearest score lines or as directed by 36. The contractor shall be responsible for replacement of any damaged traffic signal loops, traffic striping, and street markings at no expense to the City. 37. All lawn sprinkler lines, sprinkler heads and appurtenances, shrubs, grass, plants, and ground covers that are damaged or disturbed during excavation shall be replanted or replaced to match existing and the work site restored to its original condition at no expense to the City or private property owners who are not associated with the excavation work. 38. Once restoration is complete the project shall be identified with a utility marker(s). The marker shall be a stainless steel washer one and one half inches in diameter and embedded with a two and one half inch nail into the pavement over top of the installation. For installations that run sixty (60) lineal feet or more, a marker must be placed at intervals of sixty (60) feet. The washer shall be permanently imprinted with the year installed/repaired and a G for natural gas, E for electrical, or C for communications. 39. Survey monuments, surveyor nails and tags, benchmarks, utility markers, and the like that are damaged, removed, or disturbed shall be replaced at the same location with a similar marker by a licensed land surveyor under contract to the permittee and at no expense to the City. Copies of the reset documents will be presented to the Public Works inspector as part of the final inspection. 40. At substantial completion of work, the contractor shall submit to the City asbuilt/record drawings as an electronic file in PDF format. 41. Failure to comply with any of the terms and conditions of the permit may result in: the City requesting that the contractor remove all improvements completed to date under the permit and restore the street to its pre-existing condition. The City reserves its right to stop the work at any time as deemed necessary to ensure compliance with the permit terms and conditions per Section 7.06.490 of the right-of-way management regulations. Revised: May 25, 2016 GENERAL NOTES EXCAVATION IN THE PUBLIC RIGHT OF WAY Page 5