LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No. 1-AMP Christopher Christopher Repair

Similar documents
LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No

Kelly Village Apartments 3118 Green Houston, Texas 77020

11/1/2016. Smoke detectors will be furnished by MHA and installed by contractor.

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

ADDENDUM NO 1 Issued November 21, 2017

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

Cheshire, CT. By: A.M. Napolitano, LLC. Project Manager: Carolyne Sakonchick Ext. 323

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

Inspection Report. Prepared for: Gil Turiel. Property Address: 545 Briar Run Court Loganville, GA Date: July 17, 2011

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up

$308,900. Caleb Crescent Collection The Algonquin Model 1113 Sq. Ft. Elevation A. Updated: September 28, Elevation B

Davis Frame Co., Inc. Construction Budget Considerations

Single Family, Orange, CT

Vacant Unit Turnover Services Invitation for Bid (IFB) Project No

pershing+ desperes uichomes.com 6005 and 6007 Pershing Avenue pershing+desperes call or

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

Interior Remodeling Proposal

Inspection Report. Prepared for: Yossi Berg. Property Address: 4925 Diggers Way Sugar Hill, GA. Date: July 20, 2011

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits

Appalachian Log Structures Construction Cost Estimating Guide

REHABILITATION STANDARDS CHECKLIST

Handyman & Maintenance Cost Estimator

Schedule C STANDARD Specifications

Z & C Construction, Inc. Subdivision:

OF WORK SCOPE. (a) The contractor shall bid to furnish the following: labor, licenses, material, and equipment.


Call for more information

Inspection Report. Property Address:

Monteleone Homes, Inc Canfield Norridge, Illinois Lot #1 Lot Size: 72 x 100 feet

By YR Communities.

Address: Contractor: Contractor Phone: Line Item Bid Parts/Labor Labor Only Bid Week Complete (Circle One)

Madison's Home Inspections

General Construction Specifications For

COOL AMENITIES for Modern Living

Lake County Housing Authority North U.S. Highway 45 Grayslake, IL 60030

Hawthorn Plan - Aspen Hills

Front Garage Plans (T3 Lots)

Schedule D. RTM Finished Home Specifications

Inspection Report. Prepared for: Tonia Mann. Property Address: 2557 Briar Valley Way Dacula, GA Date: March 01, 2012

Lake County Housing Authority North U.S. Highway 45 Grayslake, IL 60030

What this Family Room Specification Package can be used for:

Quail Run Condominiums

Homes at Pine Ridge - NEW CONSTRUCTION SPECS

Wallingford, CT. Project Manager: Karen Charest Ext. 233

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

Inspection Report. Prepared for: Yaron Sternberg. Property Address: 926 Hemingway Road Stone Mountain, GA. Date: April 15, 2011

Décor Design Construction llc

Property: Operator Info: Operator: Estimator: Sales/Estimator. Labor Efficiency:

HARPER WOODS BUILDING DEPARTMENT PROCEDURES FOR OBTAINING CERTIFICATE OF OCCUPANCY

100 S Ashley Dr Suite 600 Tampa, FL Phone: Fax:

ESSENTIALS COLLECTION

Features & Amenities

Rental Inspection Checklist

Southington, CT. Project Manager: Ann Micacci, REALTOR Ext WinterberryWoodsLiving.com

EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR. Scope of Work. Electrical. Division 155 Electrical Rough

Work Write-Up and Bid Document

Boyle. contemporary new homes with great curb appeal. boyle call or 3br/2.5bth, 1905sf

Proposal. Lexington, MA. Price Work Description

Burlington Model at Country Hills Estates

Included Features for The Meadows at Slate Run Single Family Homes - Bridgewater, Chelsey, Ashland

SINGLE FAMILY HOME SPECIFICATIONS

REO Client Safety Hazard Requirements

Priced from $1,525,000

WorkWrite-Up and Bid DocumentlBy Trade

Inspection Report. 1 of 8

SCOPE OF WORK DEMO: ELECTRIC: 4) The contractor shall bid to remove all switches, outlets and covers.

Walnut Creek Mutual Seventy

Lake County Housing Authority North U.S. Highway 45 Grayslake, IL 60030

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS

Welcome to Smithfield Crossing Condominiums

ESSENTIALS COLLECTION

Features & Amenities. EXTERIOR FINISHES COMMUNITY FEATURES

3D Home Improvement and Inspection Services, Inc

Hogue Home Inspections

Chapter 33 - Checklists

Sams & Associates York Field Services

Inspection Services of the Treasure Coast

J & M Solutions, LLC

Coquille Indian Housing Authority Maintenance Report March 2019

Home Features. ELECTRICAL COMPONENTS Copper wire electrical system Minimum 150-amp electrical panel with circuit breakers

Exterior Features. Interior Features

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

CENTRAL GREAT PLAINS SERIES

Coquille Indian Housing Authority Maintenance Report October 2017

The Inspector. Property Inspection Report

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Windsor Gardens Association Modifications Submittal Package

Summer Hill Road Madison, CT. 4 new homes to be built on 2+ acre parcels. Project Manager: Lea Luddy Ext. 321

The Home Doctor, Inc.

ELEMENTS COLLECTION 1

BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY

standard features Power Exhaust Fans w/light - Both Baths GFCI Receptacles Upgrade Light Fixture - Bath 1 Vanity - Per Lav GFCI Receptacles

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

Providence Road Commons

Transcription:

LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No. 1-AMP102-1338 Christopher-2017 1338 Christopher Repair AGENCY CONTACT PERSON PRE-PROPOSAL MEETING RSVP via email lisap@lanshc.org by 8-8-17. PRE-PROPOSAL WALK THROUGH RSVP via email lisap@lanshc.org by 8-8-17 DEADLINE TO SUBMIT QUESTIONS PROPOSAL SUBMITTAL RETURN PROPOSAL SUBMITTAL DEADLINE Lisa Parsons Director of Asset Management Telephone: (517)487-9847 E-mail: lisap@lanshc.org TDD/TTY (800)545-1833x418 Wednesday, August 9, 2017, 8:00 a.m.et at LaRoy Froh Community Room 2400 Reo Rd. Lansing, MI 48911 Wednesday, August 9, 2017, 1:30 p.m. ET or Thursday, August 10, 2017, 9:00 a.m. ET Both times meet at house 1338 Christopher Lansing, MI 48906 Monday August 14, 2017 by 4:00 p.m. Attn: Lisa Parsons, Director of Asset Manager Email: lisap@lanshc.org or 3338 N. Waverly Rd Lansing, MI 48906 Thursday, August 17, 2017, 4:00 p.m. ET [Minority- and/or women-owned businesses are encouraged to respond]

OUTREACH TO PROSPECTIVE PROPOSERS Please return this form within 48 hours of receiving it. Thank you. Contact Information: Attention: Company Address: Telephone: Fax: Email: Lansing Housing Commission Contact Information: From: Lisa Parsons, Director of Asset Management Telephone: 517-487-9847 Email: lisap@lanshc.org TDD/TTY: 800-545-1833 x418 We invite you to participate in the following Request for Proposals (RFP) process: LHC RFP-1-AMP102-1338 Christopher-2017 Please complete the following information and return this page to my office by e-mail to lisap@lanshc.org. Failure to complete and return this form will be grounds to remove your firm from our bidder s list. We look forward to your timely reply. Do you wish us to cease sending you these notices, which means we will remove you from our bidder's list? YES NO. Do you intend to follow the directions for considering submitting a proposal? YES NO. If NO, please explain following as to why: Signature Date Printed Name LANSING HOUSING COMMISSION Page 1

Lansing Housing Commission RFP-1-AMP 102-1338 Christopher-2017 1338 Christopher Scope of Work Revised 7-25-17 Lansing Housing Commission s Mt. Vernon Community is seeking a contractor to provide services under the Scope of Work outlined below. The following scope of work will be performed at 1338 Christopher St. Lansing, MI 48906 Section 1: Scope of work to be performed for damaged bedroom: 1. EXTERIOR: a. WALLS i. Stud wall: Contractor to provide necessary lumber ii. Sheathing: Contractor to provide in area of house damage. iii. Foam insulation sheathing: Contractor will provide iv. Window-casement, LHC will provide v. Insulation: Contractor to provide in area of house damage. R Value per code current code regulation. vi. Brick work: Contractor to match existing. Repair and replace damaged bricks in area of house damage. vii. Vinyl siding: Contractor to match existing. Repair and replace damaged vinyl siding in area of house damage. 2. INTERIOR a. Electrical: contractor to provide wiring per code in the area of house damage. LHC will provide switches, outlets, covers and lighting fixtures. b. Drywall: contractor to provide all necessary materials and labor to hang, tape and finish to made ready for paint in the area of house damage. c. Paint: contractor will supply labor and equipment for primer (1 coat) and finish paint (2 coats) on walls, ceiling, trim and entry door in area of house damage. LHC will supply primer and paint only for ceiling, walls, trim, and doors d. Flooring: Contractor to provide labor and equipment to install LHC provided wood laminate flooring materials in area of house damage. e. Trim work: Contractor to provide labor and equipment to install LHC provided base, door trim and brick mold in area of house damage. f. Entry Door: Contractor to provide labor and equipment to install LHC provided Front Entry Steel Door, Storm Door, Locks and Brick mould. g. Extend downspouts away from the house securely on the exterior of house any water is draining away from the foundation. RFP No. 1 AMP 102 1338 Christopher - 2017 Page 1 of 5

Section 2: Scope of work to be performed: Unit Make Ready Make ready includes, but may not be limited to, drywall repairs and painting walls, sanding and waxing floors, replacing sub floors, tile, refinishing hardwood floors, repairing/replacing faucets, toilets, etc., replacing furnace filters complete cleaning of floors, windows, appliances, fixtures, replacing or installing smoke detectors with 10- year ion batteries and lights, and ensuring all systems are working properly. Mt. Vernon Park will provide supplies for the make ready unit with the exception of cleaning supplies, drywall compound and tape. This is a 5-bedroom Bi-level house. SUPPLIES: LHC will provide, paint, drywall, registers, furnace filters and any other replaced item listed in this scope. LHC will not provide the materials to the contractors to use that is required to fix or repair drywall (i.e. mud, paint rollers, tape, clothes etc.) GENERAL REPAIR/WORK: Make sure there are Installed smoke detectors (LHC will provide fixtures) in all bedrooms and are operable. **Hard wired carbon monoxide/smoke detector combo installed in living room/hallway. Ensure all screens are in place in windows throughout the unit and either repair or replace (if needed). Inspect the furnace, water heater, all plumbing and all electrical and confirm they are operable. Replace all furnace filters. Ensure all cove bases and trim are properly secured throughout the unit. Supplies: EACH UNIT MUST HAVE A NEW THERMOSTAT AND CARBON MONOXIDE/ SMOKE DETECTOR UNIT SPECIFIC WORK: 1. GENERAL: a. Remove and dispose of 8x8 wood shed in back yard. (field verify) b. Install new aluminum railings on back entryway with LHC provided materials. (field verify) c. Replace all bifold doors and tracks in all bedroom closets and hallways with LHC provided materials d. All Bi-Fold Door knobs will be replaced with a Brass Metal knob and plate. e. Replace all door hardware with LHC provided materials f. NO curtain rods will be rehung RFP No. 1 AMP 102 1338 Christopher - 2017 Page 2 of 5

g. Clean all Air Ducts 2. ELECTRICAL: a. All electrical outlet and switch plate covers are to be replaced with unbreakable covers. b. Replace all switches to code with LHC provided materials c. Replace all outlets to code with LHC provided materials d. Replace all light fixtures with LHC provided materials e. Replace all light bulbs throughout the house with LHC provided bulbs (REINSTALL BULBS with what is in the fixture) f. Replace phone jacks with LHC provided materials g. Replace cable plates with LHC provided materials h. Remove door bell i. Replace all smoke detectors with LHC provided materials 3. HEATING: a. Replace all return air vent registers with LHC provided materials b. Replace all supply registers with LHC provided materials c. Replace furnace filter with LHC provided materials d. Replace thermostat with new temp control thermostat and set. 4. PAINTING: a. LHC will provide all paint and primer for house. Walls and ceilings painted with LHC white, handrails will be brown. b. Complete drywall repair. c. Remove ALL soap dish and toothbrush holders. Patch and paint areas d. Paint entire 5-bedroom bi-level house (walls, handrails, and flat ceilings). e. Remove cover plates, curtain rods, and floor registers before painting. After painting, clean and reinstall the cover plates and floor registers that are not being replaced. f. contractor will supply labor and equipment for primer (1 coat) and finish paint (1 coat) on walls, ceilings, and trim. LHC will supply primer and paint only for ceiling, walls, trim, and doors. 5. FLOORS: (FIELD VERIFY DIMENSIONS AND TYPE) (LHC provided materials) a. Hardwood Flooring: Sand and polish wood floors throughout the unit (if the unit has them) b. Tile Flooring: Strip, clean, and wax 12 x 12 tiles throughout the unit (if the unit has them) c. Vinyl Flooring: Just clean, NO Wax or Stripping (if the unit has them) d. Laminate Flooring: Just clean, no sanding or waxing (if the unit has them) e. Install LHC provided Allure laminate on 2 nd floor bedrooms and hallway f. Remove wood base 1 st floor bathroom and install rubber base g. Resecure base show by back entry door, caulk and paint 6. Plumbing: RFP No. 1 AMP 102 1338 Christopher - 2017 Page 3 of 5

a. Remove laundry tub, faucet and drain b. Cut laundry drain above and below tee to laundry tub, install coupler, reinstall remainder of pipe c. Install piece of 2x4x17 on wall for laundry hook-ups d. Install laundry hookups and boilers 7. Kitchen a. Replace kitchen counter with LHC provided materials b. Replace sink and faucet with LHC provided materials c. Replace garbage disposal with LHC provided materials 8. Bath-2 nd floor a. Replace bath vanity with LHC provided materials b. Replace faucet with LHC provided materials c. Reuse vanity top d. Replace towel bar with LHC provided materials e. Complete bath tub project i. Pending final walk through f. Ensure all plumbing is in working condition and up to code 9. APPLIANCES: (replace with LHC provided materials) a. Replace stove b. Ensure all appliances are hooked up and in working condition 10. CLEANING: Clean/Scour entire unit including walls, ceilings, floors, windows, windowsills, door knobs, closet doors, stove and behind, refrigerator, bathroom fixtures (toilets, bathtubs, vanity, medicine cabinet, mirror, sink and countertops), kitchen countertops, sink, and inside and outside of cabinets and pantry s. (We do not supply cleaning materials) 11. TRASH REMOVAL and SUPPLY RETURN: Contractors are responsible for removing all trash accumulated during renovation, and returning all unused supplies to site office. The contractor will be responsible for removal of trash and debris from the vacant units. Items that cannot be thrown away in the dumpster must be hauled away. The contractor will provide a licensed plumber or electrician to complete repairs which require a license, unless she/he is licensed to do such repairs. RFP No. 1 AMP 102 1338 Christopher - 2017 Page 4 of 5

We encourage contractors to advise LHC of any problems that should be addressed to improve or maintain the overall quality of the units and recommended solutions. Recommendations will be assessed by LHC Staff and approval of additional work with costs (if any) is required prior to work beginning. Once the vacant unit is complete a visual inspection of the unit shall be conducted to ensure work is complete prior to LHC signing a work completion statement which authorizes you to submit an invoice for payment. This Scope of Work is intended to give potential bidders a general explanation of the types of services a contractor is expected to provide. It may not address every possible situation. Utilizing the scope of services described above LHC seeks an indefinite quantity bid based on an hourly rate. The selected contractor and LHC will agree upon a firm fixed price to provide labor, drywall compound and tape for each unit based upon an itemized list of all work to be performed. This Scope of Work is intended to give potential bidders a general explanation of the types of services a contractor is expected to provide. It may not address every possible situation. Davis-Bacon Wage Required Net 30 payment upon completion RFP No. 1 AMP 102 1338 Christopher - 2017 Page 5 of 5