ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS (EEHA) MAINTENANCE STANDARD

Similar documents
ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS (EEHA) COMPETENCY STANDARD

ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS (EEHA) VERIFICATION DOSSIER STANDARD

Hazardous Area Requirements (with a case study) Presenters: Dan Alecu & Lovenah Galchoolah

DESIGN STANDARD DS 25-02

Compiled by: Figure 2: Fire triangle. Successfully suppressing or separating one or more of these three components can avoid a fire or explosion.

DESIGN STANDARD DS 79-03

Australian/New Zealand Standard

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS

Australian/New Zealand Standard

The Responsible Person AKA Technical Person with Executive Functions

ExMC/1291/DV August 2017

Guidance on the Storage and Recommissioning of Traction and Rolling Stock

Subject: Guidance on Corrosion Assessment of Ex Equipment

OWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b)

General Accreditation Criteria Equipment assurance, in-house calibration and equipment verification

IECEx OPERATIONAL DOCUMENT

IECEx OPERATIONAL DOCUMENT

Specification for UDC Electrical Testing

ELECTRICAL SAFETY Information Bulletin

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0)

GUIDELINES FOR SUB-SYSTEM COMPLETION CERTIFICATES AND TEST RECORDS FOR ELECTRICAL INSTALLATIONS IN POTENTIALLY EXPLOSIVE ATMOSPHERES

IECQ PUBLICATION IECQ IEC Quality Assessment System for Electronic Components (IECQ System)

ELECTRICAL SAFETY Information Bulletin

SECTION 31 ACCESS FLOORS

Self-Audit Checklist

SPECIFICATION FOR THE MAINTENANCE OF HIGHWAY LIGHTING

Amendment A National Electric Code

Cross Connection Control And Backflow Prevention Program. City of Rifle, Colorado Utility Department

Constraints on how the Contractor Provides the Works

Medical devices Quality management systems Requirements for regulatory purposes

SIKORSKY AIRCRAFT CORPORATION ENGINEERING REQUIREMENTS

THE REQUIREMENTS FOR SCAFFOLDING IN NSW POLICY STATEMENT 1. INTRODUCTION

TÜV SÜD BABT Production Quality Certification Scheme

Technical Guideline for. Section 8. Inspection and Approval of Construction

Ex Competent Person Training and Certification Program Hazardous Areas Classification

Umbilical Reel System Preservation, Storage and Maintenance

AEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE

Document 2007 Rev 0 December 2005 Page 1 of 8

Use of genuine components: Pre-engineered fire systems

Effective Date Revision Date Page October 1, 2014 June 2015 Page 1 of 13

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS

AAMI Quality Systems White Paper

Circular No. 10/2013/TT-BXD of July 25, 2013, on construction quality management THE MINISTRY OF CONSTRUCTION

STANDARD PROCEDURE: NWSP R0 (15) Breaking Force and Elongation of Nonwoven Materials (Strip Method)

Specifications. Level 1 Essential Energy Works for the Warialda Truck Wash

Control of Equipment on Masts, Towers and Rooftops BOP018.8

DC 102 FACTORY INSPECTION PROCEDURES AND TESTS. Requirements for Manufacturers

GAS. Gas Distribution Systems Safety and Loss Management System Guidelines. Prepared by: Brad Wyatt, Provincial Safety Manager - Gas

HAGAR COURT ARCHITECTURAL GUIDELINES DRAFT 3 September 14, 2004

SA/SNZ TS :2015

<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By

High voltage for apparatus under Safe Access Rules and statutory regulations is defined as being greater than 1000V ac or 1500V dc.

MASS MANAGEMENT ACCREDITATION STANDARDS

Intro Corporation Purchase Order General Terms and Conditions

MTSP MANUFACTURE AND SUPPLY OF INSULATED RAIL JOINTS

Lockout Tagout Program

CORPORATE STANDARD ROUTINE MINOR WORKS DEVELOPERS AND ACCREDITED SUPPLIERS

INTERNATIONAL AMMUNITION TECHNICAL GUIDELINE. Storage space requirements

Linings of Aboveground Petroleum Storage Tank Bottoms API RECOMMENDED PRACTICE 652 FOURTH EDITION, SEPTEMBER 2014

PRECISE INDUSTRIES INC. Quality Manual

CRAVEN COMMUNITY COLLEGE. Control of Hazardous Energy. (Lockout/Tagout) Completed by: Eddie Foster. Completed Date: January 2, 2018

Electrical installations Marinas and boats

Supplier Quality Requirements (Including Terms & Conditions)

Certificate of Acceptance

SECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL

Management of Shared Information Systems

AAMI Quality Systems White Paper: Comparison of 21 CFR Part 820 to ISO 13485:2016 1

SQF 2000 Code. 6th Edition AUGUST A HACCP-Based Supplier Assurance Code for the Food Manufacturing and Distributing Industries

SECTION 2 SAFETY GOALS AND RESPONSIBILITIES P AGE 1

CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT

AS/NZS :2016. High-strength steel fastener assemblies for structural engineering Bolts, nuts and washers AS/NZS :2016

Lockout/Tagout Procedures

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice)

Hazardous. Scheme. the power behind your business

Supplier Quality Requirements Master List

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION

IECEx OPERATIONAL DOCUMENT

L1-CHE-SPE-300 BATTERIES FOR RAILWAY SIGNALLING APPLICATIONS

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION

Supplier Quality Requirements

Insulated sheath power cable systems

Approval Standard. for. Electrical Equipment for Measurement, Control and Laboratory Use

Qualified Persons in the Pharmaceutical Industry. Code of Practice. March 2008

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

VAREC 3600B/3650B SERIES PRESSURE OR VACUUM RELIEF VALVES INSTRUCTION, OPERATION AND MAINTENANCE MANUAL

The essential guide to the mandatory knowledge, skills and competencies required for personnel designing for or working in hazardous areas

Reporting High Risk Defects

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF UNDERPASS LUMINAIRES

LOCKOUT/TAGOUT POLICY

Supplier Quality Requirements

EPS AUSTRALIA SERVICES HAZARDOUS AREA CAPABILITY

FSC STANDARD. Chain of Custody Evaluations. Forest Stewardship Council FSC-STD V2-0 EN ACCREDITATION

Silmate RTV1473. Black, One Component, Silicone Rubber

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT

QUALITY ASSURANCE REQUIREMENTS

DAIMLER GROUP NORTH AMERICAN COMPANIES

Application for a New Approval And/or Modification Guide for Completing the Form S-0001

Application of FIDIC CC for EU- Funded Projects in Bulgaria

Transcription:

Planning and Capability Group Mechanical and Electrical Services ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS (EEHA) Document No.: VERSION 1 REVISION 3 AUGUST 2014

FOREWORD Electrical Equipment in Hazardous Area (EEHA) Standards are prepared to ensure that the Water Corporation s staff, consultants and contractors are informed as to the Water Corporation s EEHA standards and recommended practices. EEHA standards are intended to promote uniformity so as to simplify selection, installation and maintenance practices; their ultimate objective is to provide safe and functional plant, at minimum whole of life cost. The Water Corporation EEHA standards and recommended practices described in this EEHA standard have evolved over a number of years as a result of capital project delivery, plant operation and maintenance experience gained through the selection, installation and maintenance of electrical equipment in our hazardous area facilities. Deviation, on a particular project, from the EEHA standards and recommended practices maybe permitted in special circumstances but only after consultation with and endorsement by the Principal Engineer, Electrical in the Water Corporation s Mechanical and Electrical Services Branch. Users are invited to forward submissions for continuous improvement to the Principal Engineer, Electrical who will consider these for incorporation into future revisions. A Klita Manager, Mechanical and Electrical Services Branch This document is prepared without the assumption of a duty of care by the Water Corporation. The document is not intended to be nor should it be relied on as a substitute for professional engineering design expertise or any other professional advice. It is responsibility of the user to ensure they are using the current version of this document. Copyright Water Corporation: This standard and software is copyright. With the exception of use permitted by the Copyright Act 1968, no part may be reproduced without the written permission of the Water Corporation. Print Date: 5/04/2017 Warning: Document Uncontrolled When Printed Page 2 of 10

REVISION STATUS The revision status of this document is shown section by section below: REVISION STATUS SECT. VER./REV. DATE PAGES REVISION DESCRIPTION RVWD APRV REVISED (Section, Clause, Sub-Clause) All 1/0 24/08/12 All Original (First) Version - - All 1/1 04/04/12 All Updated Formatting FL RC All 1/2 30/11/13 All Updated Formatting AW JO Multiple 1/3 08/08/14 Multiple Amended sections 1.5, 3.1, Appendix A AW JO Print Date: 5/04/2017 Warning: Document Uncontrolled When Printed Page 3 of 10

S (EEHA) CONTENTS Section Page 1.0 INTRODUCTION... 5 1.1 Scope... 5 1.2 Exclusions... 5 1.3 Abbreviations... 5 1.4 Technical Integrity Custodian... 5 1.5 Referenced Documents... 5 2.0 GENERAL... 6 3.0 MAINTENANCE... 6 3.1 Maintenance Vs Overhaul/ Modification... 6 3.2 Safety during Maintenance... 7 3.2.1 General... 7 3.2.2 Test Equipment... 8 3.2.3 Removal and Re-Instatement of Covers... 8 3.2.3.1 General... 8 3.2.3.2 Flameproof... 8 3.2.3.3 Pressurisation... 8 3.3 Replacement Parts... 9 3.4 Inspection after Maintenance... 9 3.5 Hazardous Area Verification Dossier... 9 3.6 Competency... 9 APPENDIX A: EXAMPLES OF MAINTENANCE ACTIVITIES... 10 Print Date: 5/04/2017 Warning: Document Uncontrolled When Printed Page 4 of 10

1.0 INTRODUCTION 1.1 Scope This Standard specifies the general maintenance requirements for explosion-protected electrical equipment on the Water Corporation s facilities to ensure its continued safe use in hazardous areas. The intention of this Standard is to expand upon the requirements of AS/NZS60079.17, and to specify additional Water Corporation requirements. This Standard covers both planned and breakdown maintenance of new and existing installations. It covers all explosion-protected electrical equipment, including those located in non-hazardous areas. The requirements of this Standard are in addition to the general requirements for maintenance of electrical equipment. 1.2 Exclusions This Standard does not apply to the maintenance of non-explosion-protected electrical equipment. This Standard does not apply to Overhaul (refer to Water Corporation s Electrical Equipment in Hazardous Areas (EEHA) - Overhaul Standard: HA-ST-08) 1.3 Abbreviations EEHA TIC Electrical Equipment in Hazardous Areas Technical Integrity Custodian 1.4 Technical Integrity Custodian The Technical Integrity Custodian (TIC) for this Standard is the Principal Engineer - Electrical: Mechanical and Electrical Services Branch. 1.5 Referenced Documents The following documents are referenced in this Standard. If a referenced standard has been superseded, the user shall notify the TIC and utilize the latest edition of the standard unless advised otherwise in writing by the TIC. AS/NZS60079.17-2009 Explosive atmospheres Part 17: Electrical installations inspection and maintenance AS/NZS3800-2012 Electrical equipment for explosive atmospheres Overhaul and repair Print Date: 5/04/2017 Warning: Document Uncontrolled When Printed Page 5 of 10

HA-ST-04 HA-ST-05 HA-ST-06 HA-ST-08 WC-OSH 135 Electrical Equipment in Hazardous Areas (EEHA) - Competency Standard Electrical Equipment in Hazardous Areas (EEHA) - Inspection Standard Electrical Equipment in Hazardous Areas (EEHA) - Testing Standard Electrical Equipment in Hazardous Areas (EEHA) - Overhaul Standard Working in a Flammable Gas Area 2.0 GENERAL All explosion-protected electrical equipment installed on Water Corporation s facilities regardless of whether or not it is located in a hazardous area, shall be maintained in accordance with the requirements of AS/NZS60079.17 and this Standard, unless it has been formally de-certified. Maintenance of non-decertified explosion-protected equipment located in a non-hazardous to AS/NZS60079.17 and this Standard will enable this equipment to be later safely relocated to a hazardous area, if required. NOTE 1: The detailed inspection after relocation will not identify covert changes to the equipment content that could result if the equipment was not maintained in accordance with its original certification. NOTE 2: It is the Water Corporation s preference that explosion-protected electrical equipment installed in a non-hazardous area be formally de-certified. To ensure that explosion-protected equipment maintains compliance with its certification, regular planned maintenance of the equipment is required. Planned maintenance work instructions are contained in AQUA. These work instructions ensure that all explosion-protected equipment is adequately maintained so that its explosionprotection properties are not compromised due to wear and tear. 3.0 MAINTENANCE 3.1 Maintenance Vs Overhaul/ Modification It is vitally important to distinguish between maintenance and overhaul/modification because different competencies and different Australian Standards apply to these activities. AS/NZS60079.17 covers the maintenance of explosion-protected equipment whilst overhaul and modification are covered by AS/NZS3800-2012. Prior to commencing any work, the maintenance technician shall confirm that the activity required to restore the equipment to correct operation is maintenance. Maintenance work may be actioned by the technician in accordance with this Standard. Print Date: 5/04/2017 Warning: Document Uncontrolled When Printed Page 6 of 10

Work that is deemed to be overhaul or modification must be passed to a Water Corporation approved repair facility for actioning in accordance with the Water Corporation s Electrical Equipment in Hazardous Areas (EEHA) - Overhaul Standard: HA-ST-08. The following definitions are based on those stated in AS/NZS3800-2012. Maintenance: Routine actions taken to preserve the fully serviceable condition of the installed equipment. Guidance on determining which activities are deemed by the Water Corporation to be maintenance is given in Appendix A of this Standard. Overhaul: Action to restore to a fully serviceable condition equipment which has been in use or in storage for a period of time but which is not faulty. Modification: Change to the design of the equipment which affects material, fit, form or function. Guidance on determining which activities are deemed by the Water Corporation to be overhaul or modification is given in Appendix A of this Standard. Repair: action to restore faulty equipment to its fully serviceable condition complying with the relevant standard. 3.2 Safety during Maintenance 3.2.1 General To ensure that there are no ignition capable sparks when performing maintenance, no equipment other than intrinsically safe equipment shall be opened in a hazardous area unless the equipment has been electrically isolated in accordance with the relevant Water Corporation Electrical Isolation Work Instruction. However, when specific maintenance on non-intrinsically safe equipment requires that the equipment be live during maintenance, the work shall be performed under a relevant Water Corporation Permit to Work that verifies both initially and periodically that an explosive atmosphere is not present whilst the work is in progress. In addition, minimum acceptable work practices applying to Hazardous Areas at metropolitan WWTPs are described in the Water Corporation document Working in Hazardous Gas Zones. Caution is needed to ensure that isolated equipment is not live after the isolation of the supply. This can occur if: capacitors have not discharged, there is back EMF from rotating equipment, emergency batteries are not isolated, etc. Print Date: 5/04/2017 Warning: Document Uncontrolled When Printed Page 7 of 10

3.2.2 Test Equipment Testing required during maintenance shall be performed in accordance with the Electrical Equipment in Hazardous Areas (EEHA) Testing Standard: HA-ST-06. 3.2.3 Removal and Re-Instatement of Covers 3.2.3.1 General Covers shall be carefully protected whilst removed to ensure that seals and mating surfaces are not damaged. Covers shall always be replaced or temporary covers fitted - prior to work breaks (e.g. lunch, shift change etc.) to prevent the ingress of moisture and other foreign matter. Prior to reinstalling covers, they shall be checked for seal damage. Seals shall be in good condition. 3.2.3.2 Flameproof The removal and re-instatement of covers on flameproof equipment shall comply with Section 3.2.3.1, and the additional requirements of this Section. Flameproof covers shall be wrapped in a clean cloth/plastic to protect the flamepath from damage and contamination by foreign matter. All old grease should be removed so that the flamepaths can be inspected properly. The flamepath on the covers and housing shall be checked for corrosion and scratches. If a flamepath is scratched or corroded, the item shall be repaired or replaced. If the flamepath is required to be scraped to remove foreign matter, a non-metallic tool must be used to prevent scratching the surfaces of the flamepath. A thin smear of suitable grease specifically nominated by the enclosure manufacturer can be applied to both flamepath surfaces before reassembly. 3.2.3.3 Pressurisation The removal and re-instatement of covers on pressurised equipment shall comply with Section 3.2.3.1, and the additional requirements of this Section. Prior to opening the covers of pressurised equipment that will trip on loss of pressure; the impact of tripping shall be determined and communicated to the relevant parties. If the trip is to be temporarily defeated to enable live work, a Job Safety Analysis shall be performed to determine a suitable methodology to manage the risk whilst the pressurisation is not present, and to ensure that trips are reinstated as soon as practicable. Print Date: 5/04/2017 Warning: Document Uncontrolled When Printed Page 8 of 10

3.3 Replacement Parts All replacement parts used during maintenance must be per the certification documents. Parts shall be obtained from the original equipment supplier. Written authority is required from the TIC when parts are not available from the original supplier. NOTE: Component parts in most certified equipment are not individually certified and marked, however specific parts are often required by the overall certification documentation. Therefore extreme caution is needed when selecting replacements parts, especially if they are not being sourced from the original supplier. For example, the ballast in an Ex n fluorescent luminaries may not be Ex marked, but it may be an integral part of the luminaries certification. The use of different ballast could therefore be unsafe. 3.4 Inspection after Maintenance A detailed inspection shall be performed after any maintenance work, in accordance with the Water Corporation s Electrical Equipment in Hazardous Areas (EEHA) Inspection Standard: HA-ST-05. 3.5 Hazardous Area Verification Dossier The results of all maintenance activities shall be recorded in the Water Corporation site specific hazardous area verification dossier. 3.6 Competency All persons maintaining electrical installations in hazardous areas shall comply with the relevant requirements of the Water Corporation s Electrical Equipment in Hazardous Areas (EEHA) Competency Standard: HA-ST-04. Print Date: 5/04/2017 Warning: Document Uncontrolled When Printed Page 9 of 10

APPENDIX A: EXAMPLES OF MAINTENANCE ACTIVITIES This Appendix provides some common examples of activities that on the Water Corporation s facilities will be deemed maintenance and can therefore be actioned by persons with a current Water Corporation Electrical Technician EEHA Competency in accordance with this Standard. It also gives some examples of activities that are deemed to be overhaul or modification and must be actioned by a repair facility in accordance with the Water Corporation s Electrical Equipment in Hazardous Areas (EEHA) - Overhaul Standard: HA-ST-08. The TIC should be consulted whenever the Electrical Technician is not sure if the activity is maintenance. Maintenance generally involves adjusting settings, or replacing parts that are complete sub-assemblies (rather than individual components on sub-assemblies). Definitions of the terms: maintenance, overhaul, repair, replacement, and modification, are given in Section 3.1 of this Standard. The following activities on Water Corporation facilities are deemed to be maintenance: The replacement of a circuit board, switch assembly, or similar, in a certified instrument with an identical board or switch assembly manufactured by the original equipment manufacturer. The TIC shall be consulted if an identical board, switch assembly, etc. is not available. The replacement of gaskets seals and bolts. The replacement of a fluorescent tube in a luminarie. The adjustment of a pressure switch set point. The calibration of an instrument. The replacement of a terminal block in a junction box or on a barrier. The cleaning and lubrication of moving parts. The following activities on the Water Corporation s facilities are not deemed to be maintenance and must only be carried out by a Water Corporation approved repair facility. The rewinding of a motor would be overhaul. Replacement of a bearing on a motor is overhaul The addition of an extra entry to an Ex d junction box would be a modification. The re-drilling and tapping of an existing entry to an Ex d junction box would be a modification. The replacement of a component on a circuit board in an intrinsically safe instrument with an identical component would be overhaul. Print Date: 5/04/2017 Warning: Document Uncontrolled When Printed Page 10 of 10