PROPOSALS FOR THE UNDERTAKING OF AN ASBESTOS REFURBISHMENT SURVEY TO SPECIFIED AREAS OF JOSEPH BLACK BUILDING UNIVERSITY OF GLASGOW

Similar documents
DJ.Sollis (Survey Services) Ltd. Asbestos Management Survey Preliminaries

Asbestos Survey Report

REFURBISHMENT ASBESTOS SURVEY REPORT

HSG264 - ASBESTOS: THE SURVEY GUIDE DUTYHOLDER KEY POINTS SUMMARY. HSG264 Asbestos: The Survey guide contains a number of coloured summary boxes.

ASBESTOS REINSPECTION REPORT

SURVEY FOR ASBESTOS-CONTAINING MATERIALS FOR PARAGON LLP AT VACANT OFFICES WITHIN

Asbestos Report and Management Plan. For C BBC Caversham Club

ESTATES DEPARTMENT. Management of Asbestos Policy and Procedures Document. Rev 9

ASBESTOS SURVEY REPORT Management Survey (with MA only) Report Number Issue Number Issue Date

Asbestos Management Plan

Conducting Asbestos Surveys

Asbestos Report and Management Plan. For J BBC Caversham FBIS Store

ASBESTOS CONTAINING MATERIALS POLICY

HEALTH AND SAFETY GUIDANCE NOTE ASBESTOS

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT ASBESTOS

Refurbishment and Demolition Survey of 543 Gorgie Road, Edinburgh EH11 3AR

The Management of Asbestos-Containing Materials in the retail sector

Asbestos R&D Survey. Cambridge Park Court, Twickenham, Surrey, TW1 2JN

Asbestos Survey Report

Block The Acorns, Queenswood Road TYPE 2 SURVEY REPORT S

should include the allocation of responsibilities and not appoint or instruct an independent surveyor to

Duty to Manage Asbestos in Licensed Premises

Asbestos Survey Report

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

21 Murvagh Close Cheltenham GL53 7QX

Asbestos Survey Report & Register

MANAGEMENT ASBESTOS SURVEY REPORT SITE PHOTO GOES HERE

Asbestos Management August 2014

Asbestos Management Plan

ASBESTOS SURVEY REPORT

Council Health and Safety Policy. Asbestos in Buildings - Code of Practice Contents. Introduction

Ministry of Education St Albans Primary School. Asbestos Assessment 7 th of October 2015

ASBESTOS POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE

ASBESTOS GUIDELINES. GUIDANCE: Asbestos Page 1 of 14 Jan07/ver01

Page 1 of 24 Site ID: 0001GWF2 gbnsasbestos.co.uk

Amosite Demo Customer Warehouse Demonstration Demonstration Demonstration. Survey Date: 01/09/2016 Survey Ref: POTWLM

Asbestos Survey Report

Asbestos Re-inspection At

LEGIONELLA CONTROL ASSOCIATION STATEMENT OF COMPLIANCE

Maintenance work in schools

LEGISLATIVE GUIDANCE NOTES

Asbestos Management Plan

ASBESTOS MATERIALS REVIEW

The Management of Asbestos-Containing Materials in the retail sector

Directorate of Estates & Facilities Contractor s Rules and Regulations Notification and Acknowledgement

BALLYMUN REGENERATION LTD. INSTRUCTIONS TO TENDER FRAMEWORK AGREEMENT FOR PSDP CONSULTANT SERVICE

BUILDING SURVEYOR S INSPECTION REPORT OLD CO-OP BAKERY SUBSTATION - WEST CALDER FOR COMMUNITY DEVELOPMENT TRUST WEST CALDER.

REFURBISHMENT AND DEMOLITION ASBESTOS SURVEY REPORT

Local Refurbishment and Demolition Survey

Low cost, low waste, high quality. Refurbished modular and portable building specialist

Asbestos Survey for. Hall & Woodhouse Ltd. The Green Dragon 12 Bishopric Horsham West Sussex RH12 1QR. JTEC Environmental Ltd.

ICL Asbestos Management Plan 2017

Asbestos Guide. Scope. Safety Guidelines. 1 P a g e C H S _ P I C A G V

Asbestos Re-inspection Report

Asbestos Management Plan - Organisation Arrangements

Policy, Responsibilities & Procedures

Refurbishment and Demolition Survey

Asbestos Register for

Local Rule: Engaging External Service Providers

REPORT. Asbestos-Containing Building Materials Assessment Report - Nutana Lawn Bowling Storage Garage CITY OF SASKATOON.

Asbestos Register for

Reliance House Investors Report. IR11 September 2018

Asbestos Survey for. Hall & Woodhouse Ltd. Coach and Horses The Street Rotherwick Basingstoke Hampshire RG27 9BG. JTEC Environmental Ltd.

ASBESTOS DEMOLITION SURVEY REPORT

Asbestos Register for

Asbestos Management Survey for Vale of White Horse District Council at Chapel Way Public Toilets Botley Oxfordshire OX2

Asbestos Management Policy

PROCEDURE (Essex) / Linked SOP (Kent) Asbestos Management. Number: U 1005 Date Published: 22 July 2015

Air & Sound testing in one easy package

AB 14. RIBA stage AB AB 14 ESTABLISH HEALTH AND SAFETY STRATEGY 1. DEFINITION 2. PURPOSE

ASBESTOS SURVEY REPORT

Review date Edition no ID code. Yes No Yes No Y. Yes No Yes No. External queries relating to the document to be referred in the first instance to the

REFURBISHMENT/DEMOLITION ASBESTOS SURVEY REPORT SOUTH AYRSHIRE COUNCIL ON BEHALF OF BARRHILL MEMORIAL HALL COMMUNITY ASSOCIATION

Asbestos Management Plan. Policy, Organisation and Arrangements V2.2

Example Building Condition Survey & Summary Report Address Address Address London

Management of Asbestos: HSG264

PROJECT NO REPORT TO CITY OF STRATFORD ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY:

Asbestos-Containing Materials Labelling Summary for 120 Spencer Street, Melbourne, Victoria

Asbestos: The Dutyholder. Presented by: Adam Brindley

SYLLABUS ASBESTOS AWARENESS DUTY TO MANAGE: APPOINTED PERSON

Asbestos Policy and Management Plan

Safe System of Work Policy

ASBES TOS SPECIALIS TS

Asbestos Survey for. Hall & Woodhouse Ltd. The Snowdrop Lyoth Lane Lindfield Haywards Heath West Sussex RH16 2QE. JTEC Environmental Ltd.

ASBESTOS SURVEY REPORT

Estates and Facilities Directorate Asbestos Management Policy and Plan - All Campus Sites

Edinburgh Napier University

Dance Centre, Jacobs Wells Road, Bristol, BS8 1DX

Greenwich Magistrates Court Re-inspection Survey Asbestos Report

PROPERTY SERVICES OPERATING PROCEDURE

Asbestos Permit to Work

Client: Life Space Developments Ltd Date 30/01/2015 Targeted Refurbishment Survey. Targeted Refurbishment Survey to: Sites C & D

Asbestos Policy & Guidance

Asbestos Policy & Guidance

25, 2017 CITY OF SASKATOON

Review date Edition no ID code. Yes No Yes No. Yes No Yes No. External queries relating to the document to be referred in the first instance to the

02/01 ASBESTOS initial specialist Managing Trustees ongoing risk. property handbook

Guideline Leaflet PC03: Five Year Inspection Reports Church Buildings

Transcription:

PROPOSALS FOR THE UNDERTAKING OF AN ASBESTOS REFURBISHMENT SURVEY TO SPECIFIED AREAS OF JOSEPH BLACK BUILDING UNIVERSITY OF GLASGOW FOR AND ON BEHALF OF KENNETH BLACKBURN UNIVERSITY OF GLASGOW PROJECT REF: J371260 DATE: 16/03/2017 Prepared By: Chris Cook Scottish Office (Hamilton) Unit 3 Cadzow Park Hamilton South Lanarkshire ML3 6BJ

Introduction Further to your recent enquiry, we are pleased to confirm that we have now had the opportunity to evaluate our preliminary investigations for the aforementioned property and to submit the following quotation for a survey as you requested. Aim, purpose and type of survey The type of survey undertaken may vary, depending on the aim and purpose for which it is to be used. Surveys before demolition and refurbishment will continue to be required under the Control of Asbestos Regulations 2012 and the Construction (Design and Management) Regulations 2015. However, it is anticipated that most surveys will be undertaken to comply with the duty to manage asbestos in premises. In these cases, the aim of an asbestos survey is, as far as reasonably practical, to locate and assess all the ACMs present in the building and its purpose is to present the information collected in the way which allows the employer to manage the risk. Considering the aim/purpose of the survey and the clients position we suggest that a Refurbishment and Demolition Survey requires to be undertaken where as reasonably practicable:- Refurbishment and Demolition Survey A Refurbishment and Demolition Survey is used to locate and describe, as far as reasonably practicable, all ACMs in the areas where refurbishment will take place or in the whole building if demolition is planned. The survey will be fully intrusive and involve destructive inspection, as necessary, to gain access to all areas, including those difficult to reach. The site/building The property is accessed via the main Campus of the University of Glasgow. The property is a mid 1900s built block consisting of brick walls and flat roof areas. Extent of Survey The following areas are specifically excluded from the survey proposal: - All areas out with the scope of works supplied by client. The Survey will be undertaken in the following areas only: - Asbestos refurbishment survey to areas highlighted on client supplied plans.

The Survey A full and thorough survey of the areas identified on the plans supplied by the client will be necessary and will be conducted to determine the full extent of asbestos internally and externally of the areas designated at the above mentioned property. This will include where necessary the investigation of the building fabric, including structural fire protection, floor coverings, ceilings and voids above, cladding insulation materials, etc. Also included will be the pipework, the lagging, flanges and gaskets, boilers, exhausts and other installed building services. All operatives carrying out the service will be directly employed by Environtec Ltd. Environtec Ltd shall provide the necessary tools and equipment (ladders, hand tools, and sampling tools) to gain access to the areas being surveyed. All keys to doors and duct covers have to be made available to all areas and in so doing facilitating a full and concise survey with continuity of work. Environtec shall perform the survey in complete accordance with the current HSG264 Asbestos: The Survey Guide and other guidance relating to Health and Safety. Unless specifically requested we have not included for the following: Areas above 3m in height Floor voids Inspection of lift shafts without a specialist engineer (supplied by client) in attendance. Entry into confined spaces without prior knowledge and risk assessment supplied by the client Roof voids without safe walking access Flat roofs without sufficient hand rails in situ Underground ducts and voids Areas with potential Chemical and Biological hazards If you require any of the above to be included within this proposal you must inform the writer without delay. The format of the report The survey findings shall be presented in a single electronic copy, together with marked up drawings of each floor of the building, (the original drawings to be supplied by the client, where possible prior to the survey being undertaken). Photographs will be included. A detailed asbestos register section can be found in the report appendix. The report can be customised to incorporate the clients requirements.

The Costings The total project could therefor be completed for a total cost of : 500.00 + VAT and 8.50 per sample + VAT FIVE HUNDRED POUNDS + VAT & 8.50 PER SAMPLE + VAT Estimated duration of works is 1.0 day. Our costs include for supplying experienced survey staff working within normal hours and inclusive of travelling and out of pocket expenses. All, analysis and preparation of reports is included. The completed report will be issued within 48 hours upon completion of site work. Please Note: received. No works will be undertaken until an official order is We trust the above meets with your approval and look forward to your further instructions on this project. Should you have any queries or require any further information please do not hesitate to contact us. Chris Cook Executive Consultant (Hamilton) t: 01698 421898 m: 07584569652 e: christopher.cook@environtec.com w: environtec.com Hamilton Office Unit 3 Cadzow Park, 82 Muir Street Hamilton, South Lanarkshire ML3 6BJ