1 E-Government Procurement Safet Hoxha Kosovo Novembar 2015

2 Project Information Development or customization of transactional modules for e-procurement system, including ICT infrastructure and contract management information system ITB No: PSMP/PPRC/1B2.1/ /03 Project: Public Sector Modernization Project (PSMP) Project No: IDA P Purchaser: Ministry of Finance (MF) on Behalf of Public Procurement Regulatory Commission (PPRC) Supplier: InfoDom d.o.o. Komtel Project Engineering Stakeholders: - Contracting Authorities - Central Procurement Agency (CPA) - Public Procurement Regulatory Commission (PPRC) - Procurement Review Body (PRB) - Economic Operators - Public Project start date: December 15 th 2014 Project duration: 12 months

3 Business Trust Methodologies B2B, B2G High value transactions Traditional business Online business Vs

4 Why e-procurement is Important Government procurement is 15%-20% GDP (OECD) Procurement account for 70% of budget (OECD) Links the public financial system with social and economic outcomes (World Bank) Poor procurement can result in infrastructure that reduces national growth - investment becomes a disinvestment (IMF) Procurement saving of 1% equals about 10Million / year for Kosovo Expect e-procurement to yield 5%-20% savings

5 Countries Begin with Different Goals E-GP GOVERNANCE Transparency Accountability Public Confidence ECONOMIC DEVELOPMENT Competitiveness Technological Enablement Market Access EFFECTIVENESS Efficiency Informed Management Value-for-money

6 Electronic Public Procurement Platform Main modules Central registration Dashboard (BAM) e-tendering e-complaints Central Procurement Framework Agreements Audit trails e-contract e-pmis e-reverse Auction e-auction e-quoting web services (tax registry,eid)

7 The Hardware and software inventory : Production Site: Disaster Recovery (DR) Site:

8 Key Performance Indicators - Action Planning Key Performance Indicators - Examples Percentage of notices publicized electronically compared with baseline (number & value) after 6, 12 months Base line 6 months pilot By Agency: Ratio of Total no. of Electronic tenders to Total number of Tenders in Pilot entities by the end of Pilot phase 12 months roll out Ratio of Total number of Electronic tenders to Total number of Tenders in Pilot entities by the end of Pilot phase Evaluation Criteria If ratio is less than 50% then strategy has to be changed. If ratio is less than 50% then strategy has to be changed. Number of economic operators registered (number & value) after 6, 12 months o 6 month: 500 bidders o 12 months: 3000 bidders If ratio is less than 50% then strategy has to be changed.

9 Key Performance Indicators - Action Planning Savings through e- Procurement based competition Percentage of economic operators satisfied with the procurement process compared with baseline Percentage of saving against estimated cost Both for procuring entities and bidders o Bidding Process o Efficiency improvement Target 3-5% saving Positive vs. Negative response Positive response should be at least 75% Number of complaints related to the use of the e- Procurement system Ration of number of complaints against number of tenders Should not be more than 5% Need to review Time saving from RFT to notice of award (NOA) RFT to NOA Reduced by 50%

10 Key Performance Indicators - Action Planning Contract award results published online Percentage of contract awards against total e-tenders Target 100% Supplier training Number of economic operators addressed in road-shows, materials circulated, etc. Number of economic operators registered System reliability System down time vs 100% Down time should be less than 0.1% Skills development Redundancy in systems administration capacity Target 100%

11 [ Overview of Indicators for the Performance Management system Objective Indicator Measured by: Source of data collection CAs have sufficient and duration in the workplace of procurement staff for conducting procurement activities The quantity of the procurement staff Frequent replacing the procurement staff in Cas List of procurement officers (number of employees % procurement officers) % less than 3 years % 3 to 5 years % 6 to 8 years % 9 to 11 years %10 years and above By the dates of the MPA,PPRC, KIPA and CAs By the dates of the PPRC and CAs

12 Overview of Indicators for the Performance An effective training program is in place to improve procurement staff skills and suppliers Staff Training the number of training days % of all procurement officer trained % of suppliers trained Key training program components are efficient and effectiveness Quality of training materials comply with standards and actual with the practical issues By the dates of PPRC and KIPA Survey of or interviews with participants in the procurement training, also the assessor should focus on formal training to meet the requirements of the job for those involved in the procurement process.

13 Overview of Indicators for the Performance Organizational standards support efficient, effectiveness and transparent public procurement The completeness of procurement records in a procurement transaction % of monitored cases Completeness of procurement preparation documents (Before initiation of a procurement activity and Record of bid receipt and opening, Approved Evaluation Report, Record of Contracts Committee Award decision, Evidence of receipt by bidders of the contract award notices,etc). By the dates of the CAs The completeness of procurement records in a contract management % of monitored cases Completeness of procurement contracting documents (Contract Implementation plan etc.). By the dates of the CAs

14 Overview of Indicators for the Performance Activities of CAs Managers and Procurement officers are efficient, effectiveness and transparent Reporting Requirements % of CAs that have reported on the PPRC for the annual procurement activities % of procurement officer that have been reported for the procurement activities of CAs were not in conformity with PPL From the dates of the PPRC as well as meetings and interviews with the managers and procurement officers Implementation of PPRC recommendations % of CAs monitored have implemented, have not implemented and partially implemented the recommendations of the PPRC From the dates of the PPRC and CAs

15 Overview of Indicators for the Performance Ethics and anticorruption policy are efficiency and effectiveness Anticorruption Measures % the of cases from procurement area prosecutors investigated and a decision is concluded % the cases the action taken against corrupted contracting authorities Effectiveness of the anticorruption measures on public procurement % of favorable opinions by the public on the effectiveness of the anticorruption measures By the dates of the PRB and Supreme Court of Kosovo Survey or interviews with citizen and other stakeholders

16 Overview of Indicators for the Performance Fair, transparency and accountable public procurement system and Establish a good environment to invest and do business Access to the public information of public procurement dates Relevant information on public procurement process from initial to the end. Awareness of use procurement website Legal framework The PPL and other legislation promote fair end the open competition system Complains and legal protection % of complaints processed within the time limits in the legal framework % of decision taken that are endorsement % of the decisions that are addressed to the court for rereview From PPRC dates and Survey or interviews with participants on the procurements process, NGO, etc. Survey or interviews with participants on the procurements process, NGO, etc. From the PRB dates, CAs and Survey or interviews with participants on the procurements process, NGO, etc.

17 Overview of Indicators for the Performance Procurement process Procurements planning facilitates orderly execution of annual procurement activities and according to a preliminary analysis/researc h of the market Integration of procurement planning in approved annual budget Variance between the procurement plan and what is actually procured (by value, activity and time frames) % CAs which are monitor had their procurement planning integrated in the annual approved budged % e CAs, submitted final procurement planning to the CPA on time % of the procurements activities monitored are in accordance with the plans made (here making a divided by categories: goods, services and works). % of the procurements activities monitored are implementing according to the time frame contemplated in the final planning procurement. From CAs, CPA, sample of procurement case questioner and MoF From CAs, Sample Procurement case questioner and Ministry of Finance (MoF)

18 Overview of Indicators for the Performance Procurements planning facilitates orderly execution of annual procurement activities and according to a preliminary analysis/researc h of the market Determine the estimated value of the contract % of the procurements activities monitored may make an analysis of the relevant market before bringing the preliminary/final procurement planning % of procurements activities monitored determination of the estimated value in the contracting authority s records The compression of the estimated value of the contract and the value of the signing the contract Sample Procurement case questioner

19 Overview of Indicators for the Performance The bidding process is efficient and support competition Value vs procurement method Transparency, openness and real opportunity for economic operators to submit bids % of procurements (value) by method of procurement % of procurements (no.) by method of procurement % of procurement activities have having conducted through framework contract, join or centralizations procurement) % (value) of procurement spending in category: goods, works and services % of procurement activities monitored that have used methods of procurement prescribed by the law. % of procurement activities monitored which have been part of an indicative notice % of procurement activities monitored fulfilled the form published contract notice and as required % of procurement activities monitored fulfilled the form published contract award notice as required % of procurement activities monitored that the contract notice and contract award notices is published Average of days time allowed for preparation of bids (according the competitive procedures) By the dates of PPRC,CPA, CAs and Sample Procurement case questioner By the dates of PPRC and Sample Procurement case questioner

20 Overview of Indicators for the Performance The bidding process is efficient and support competition Tender documentation and technical specifications % of tenders reject in each process % of procurements activities monitored that use model tender documentation (goods, works and services) % of procurement activities are canceled By the dates of the PPRC and Sample Procurement case questioner

21 Overview of Indicators for the Performance The bidding process is efficient and support competiti on Tender evaluation and award criteria % of tender dossier including non quantifiable or subjective evaluation % of procurement activities that CAs have used the criterion most economically advantageous tender % (both number and value) of awarded procurement contracts in which social dimensions are considered either in the selection or the award criteria % (both number and value) of awarded procurement contracts in which environment-related technical dimensions are considered either in the selection or the award criteria % (both number and value) of awarded procurement contracts in which the whole life-cycle or life-cycle costing is explicitly taken into consideration (especially) % of procurement activities with complete record of evaluation process ( exception of small value contracts) % of competitive procurement where stipulated evaluation criteria are clearly followed % of monitored cases when bids security is confiscated By the dates of the PPRC and Sample Procureme nt case questioner

22 Overview of Indicators for the Performance The bidding process is efficient and support competition Level of confidence by private sector in the process % of tenders participants in each process Average percentage (both number and value) of procurement contracts that are awarded to SMEs Average percentage (both number) and value of procurement contract when demand aggregation arrangements are in place (e.g. fraction of contract awarded to SMEs in framework contract). By the dates of the PPRC and Sample Procureme nt case questioner Time taken to complete the procurement cycle Average number of days between the start of the procurement activities (this is the date when Authorizing Officer authorizes of procurement officer) and the end of the procurement cycle signing of contract (open procedure only) Average number of days between the contract notice and award contract in open, restricted and negotiation procedures. Sample Procureme nt case questioner

23 Contract Managem ent is performe d effectivel y Overview of Indicators for the Performance Contract Management Management contract activities are effective and consistent with legislative requirements Quality and consistency of payment process % of monitored contracts assigned contract manager prior to its implementation % of monitored contracts have prepared the contract management plan in time % of monitored contracts where payments are processed within the payment period specified in the contract % of monitored contracts payments are not processed in time after contract completion for completions reports to be preparation % of monitored contracts in delays payments of suppliers Average number of days of delay in contract completion % of monitored contract where is the activation of payment penalties % of monitored cases where is not returned performance security Percentage (both number and value) of contracts that are entirely cancelled ( rescinded ) during the contract execution From the PPRC dates and the Sample of Procurement case questioners From the PPRC dates and the Sample of Procurement case questioners

24 Contrac t Manage ment is perform ed effectiv ely Overview of Indicators for the Performance Contract annex Evaluation of suppliers performan ce % of monitored contracts with annex contract Average value of cost overruns (as measured by the percentage of the awarding price of the contract % of monitoring of contract that the contracting authority has requested by the PRB, the introduction of economic operator blacklisted because of poor performance % of monitored contract where the third party is engaged in monitoring the implementation or/ and after execution of contracts Level of customers satisfaction index involving civil society or other nongovernment stakeholders in the oversight of the contract management From the PPRC dates and the Sample of Procurement case questioners By the PRB dates, the Sample of Procurement case questioners and interviews or survey of civil society or other NGO and end users.

25 Thank you!

WORLD BANK ASSISTANCE ON PUBLIC PROCUREMENT SYSTEM IN KOSOVO

WORLD BANK ASSISTANCE ON PUBLIC PROCUREMENT SYSTEM IN KOSOVO WORLD BANK ASSISTANCE ON PUBLIC PROCUREMENT SYSTEM IN KOSOVO Dr. Sc. Ilaz Duli, Board Member of PPRC - Kosovo 11 June 2015 Batumi Georgia PUBLIC PROCUREMENT LEGISLATION IN KOSOVO From the introduction

More information

E-PROCUREMENT IN KOSOVO

E-PROCUREMENT IN KOSOVO E-PROCUREMENT IN KOSOVO BUCHAREST MAY 10, 2018 SAMI UKA BOARD MEMBER PUBLIC PROCUREMENT REGULATORY COMMISSION (PPRC) The Republic of Kosovo started to apply the e-procurement system in public procurement

More information

MEDIA Training on Public Procurement

MEDIA Training on Public Procurement Improving Administrative Capacities in the Area of Public Procurement in Kosovo EuropeAid/132388/C/SER/XK MEDIA Training on Public Procurement February 2014 in Kosovo and implemented by Training objective

More information

E-Procurement Systems. Presenter: Cornelia K. Sabiiti Public Procurement and Disposal of Public Assets Authority 28 February 2017

E-Procurement Systems. Presenter: Cornelia K. Sabiiti Public Procurement and Disposal of Public Assets Authority 28 February 2017 E-Procurement Systems Presenter: Cornelia K. Sabiiti Public Procurement and Disposal of Public Assets Authority 28 February 2017 Presentation Outline Concept of e-procurement Challenges of the Manual Procurement

More information

Moving Forward with E-Procurement

Moving Forward with E-Procurement Moving Forward with E-Procurement Short presentation of Automated Information System STATE REGISTER OF PUBLIC PROCUREMENT OF MOLDOVA (AIS SRPP) Technical Concept of Sistemului Informațional Automatizat

More information

Oversight and Monitoring in Public Procurement in the Republic of Serbia

Oversight and Monitoring in Public Procurement in the Republic of Serbia Oversight and Monitoring in Public Procurement in the Republic of Serbia Role and Significance of the Public Procurement Office REPUBLIC OF SERBIA PUBLIC PROCUREMENT OFFICE Public Procurement Portal -

More information

Open Government in Public Procurement Open Data in the law and in practice

Open Government in Public Procurement Open Data in the law and in practice Open Government in Public Procurement Open Data in the law and in practice Joining Forces in Public Procurement to Power Investment, DG GROW, Brussels, 7/12/2017 Eliza Niewiadomska, Senior Counsel Legal

More information

National Public Procurement Strategy

National Public Procurement Strategy National Public Procurement Strategy 2017-2021 January 2017 0 Contents 1. EXECUTIVE SUMMARY... 4 2. introduction... 7 3. STRATEGY DEVELOPMENT METHODOLOGY... 9 4. BACKGROUND AND RATIONALE... 10 4.1 Definition

More information

Efficiency. Purpose of the Checklist. Description

Efficiency. Purpose of the Checklist. Description Efficiency Purpose of the Checklist To guide and support public procurement practitioners in reviewing, developing and updating their procurement framework, according to the 12 principles of the Recommendation

More information

Performance Measurement in e-gp System

Performance Measurement in e-gp System Performance Measurement in e-gp System Third South Asia Regional Public Procurement Conference, Dhaka 1-3 November, 2015 Innovation for Sustainable Procurement Performance Presentation Outline Development

More information

Public Procurement in Macedonia

Public Procurement in Macedonia Public Procurement in Macedonia Legislation Many different procedures adjusted to the value and complexity of the procurement Analysis of the functioning of the procurement system and appropriate adjustments

More information

Yemen Procurement Reforms and e-procuremente

Yemen Procurement Reforms and e-procuremente Yemen Procurement Reforms and e-procuremente Yehya Al-Ashwal Ashwal Chairman of the Technical Committee the High Tender Board (Yemen Public Procurement) MENA Regional Seminar on Preventive Anti- Corruption

More information

Procurement Modernization

Procurement Modernization The practice of Procurement Modernization Enzo de Laurentiis Regional Procurement Manager Latin America and the Caribbean The World Bank Procurement as a hindrance to service delivery? Systems over-legislated,

More information

PURCHASING AND PROCUREMENT OVERVIEW

PURCHASING AND PROCUREMENT OVERVIEW Purchasing and Procurement Overview AASBO Certificate Program September 2018 David Smith Executive Director david@aasbo.com 256 585 1511 PURCHASING AND PROCUREMENT OVERVIEW Contract Procurement Law Understanding

More information

The World Bank Procurement Framework: the role of public procurement in preventing corruption. Enzo de Laurentiis Kiev, May 23, 2017

The World Bank Procurement Framework: the role of public procurement in preventing corruption. Enzo de Laurentiis Kiev, May 23, 2017 The World Bank Procurement Framework: the role of public procurement in preventing corruption Enzo de Laurentiis Kiev, May 23, 2017 Sound Procurement is at the Heart of Good Governance Governments and

More information

Improvement of the Public Procurement System in the Republic of Uzbekistan

Improvement of the Public Procurement System in the Republic of Uzbekistan Improvement of the Public Procurement System in the Republic of Uzbekistan Current Legal Framework Order of Cabinet Ministers No. 242 of 27.07.2016 (special information portal) Government Decree 1475 of

More information

EUROCITIES position on the European Commission legislative proposal on public procurement

EUROCITIES position on the European Commission legislative proposal on public procurement EUROCITIES position on the European Commission legislative proposal on public procurement EUROCITIES EUROCITIES is the political platform for major European cities towards the EU institutions. We network

More information

The Republic of Uganda. STATEMENT BY THE AG.EXECUTIVE DIRECTOR, PPDA AT THE LAUNCH OF THE ANTI-CORRUPTION WEEK IN UGANDA 28 th NOVEMBER 2017

The Republic of Uganda. STATEMENT BY THE AG.EXECUTIVE DIRECTOR, PPDA AT THE LAUNCH OF THE ANTI-CORRUPTION WEEK IN UGANDA 28 th NOVEMBER 2017 The Republic of Uganda STATEMENT BY THE AG.EXECUTIVE DIRECTOR, PPDA AT THE LAUNCH OF THE ANTI-CORRUPTION WEEK IN UGANDA 28 th NOVEMBER 2017 The Right Honourable Prime Minister, Honourable Minister of State

More information

UNIVERSIDAD NACIONAL DE COLOMBIA, ECONOMIC SCIENCE DEVELOPMENT RESEARCH CENTRE, BOGOTA, COLOMBIA

UNIVERSIDAD NACIONAL DE COLOMBIA, ECONOMIC SCIENCE DEVELOPMENT RESEARCH CENTRE, BOGOTA, COLOMBIA UNIVERSIDAD NACIONAL DE COLOMBIA, ECONOMIC SCIENCE DEVELOPMENT RESEARCH CENTRE, BOGOTA, COLOMBIA SEMINAR - PUBLIC PROJECTS: CONTROL FOLLOW UP WITH CONTRACTORS John Brooks - ANJO Global Consulting Ltd,

More information

Benchmarking Public Procurement 2015

Benchmarking Public Procurement 2015 Benchmarking Public Procurement 2015 Benchmarking Public Procurement is a World Bank Group initiative launched in 2013 Initial demand for the project came from the G20 Anti- Corruption Working Group in

More information

Pillar II. Institutional Framework and Management Capacity

Pillar II. Institutional Framework and Management Capacity PILLAR II. INSTITUTIONAL FRAMEWORK AND MANAGEMENT CAPACITY Pillar II. Institutional Framework and Management Capacity Pillar II assesses how the procurement system defined by the legal and regulatory framework

More information

MODERNISATION OF BARBADOS NATIONAL PROCUREMENT SYSTEM Collaborative Procurement Workshop April 12-13,2011 Montego Bay, Jamaica

MODERNISATION OF BARBADOS NATIONAL PROCUREMENT SYSTEM Collaborative Procurement Workshop April 12-13,2011 Montego Bay, Jamaica MODERNISATION OF BARBADOS NATIONAL PROCUREMENT SYSTEM Collaborative Procurement Workshop April 12-13,2011 Montego Bay, Jamaica Background- Rationale for programme Country Procurement Assessment Report

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 3.07 13 August 2014 PROCUREMENT METHODS IN SPECIAL CIRCUMSTANCES AND OTHER PROCUREMENT ARRANGEMENTS 1. Specific circumstances under special project designs and arrangements

More information

ECA e-procurement initiatives and their relevance to the SAR e-procurement efforts.

ECA e-procurement initiatives and their relevance to the SAR e-procurement efforts. ECA e-procurement initiatives and their relevance to the SAR e-procurement efforts. South Asia Region Public Procurement Conference February 20-23, 2017 Sri Lanka Hunt La Cascia Senior Procurement Specialist,

More information

Procurement & Probity Policy (v3.0)

Procurement & Probity Policy (v3.0) Procurement & Probity Policy (v3.0) VERSION HISTORY Rev No. Date Revision Description Approval 1.0 2 March 2015 Amalgamation of Procurement Policy and probity procedures to create new Policy. 2.0 23 June

More information

PROCUREMENT REVIEW PANEL

PROCUREMENT REVIEW PANEL P.SH 188/18 PROCUREMENT REVIEW PANEL, appointed by the President Pursuant to the article 105 as well article 106 of the Law on Public Procurement of the Republic of Kosova no.04/l-042, amended and supplemented

More information

PROCUREMENT REVIEW PANEL

PROCUREMENT REVIEW PANEL P.SH 340/17 PROCUREMENT REVIEW PANEL, appointed by the President Pursuant to the article 105 as well article 106 of the Law on Public Procurement of the Republic of Kosova no.04/l-042, amended and supplemented

More information

Welcome. STAKEHOLDER ENGAGEMENT WORKSHOP. New Thinking New Beginning

Welcome. STAKEHOLDER ENGAGEMENT WORKSHOP. New Thinking New Beginning Welcome. STAKEHOLDER ENGAGEMENT WORKSHOP New Thinking New Beginning SPPRA CIRCULARS SPPRA Circular No.1 of 2015 :CONTROL OF PRICES PAID BY PROCURING ENTITIES TO PREVENT AWARDING OF CONTRACTS TO TENDERERS

More information

From Cost Saving to Value Creation in Government Procurement

From Cost Saving to Value Creation in Government Procurement From Cost Saving to Value Creation in Government Procurement Stefano Tremolanti Director, Public Procurement Division Consip Spa Rome, 17 th June 2010 The evolution of Consip s Role The Consip role as

More information

Casework Technical Support (Social Welfare - Project Management)

Casework Technical Support (Social Welfare - Project Management) Casework Technical Support (Social Welfare - Project Management) Request for Tenders for Services to MABS NATIONAL DEVELOPMENT The latest date for receipt of tenders is 09 June 2017 Commercial House Westend

More information

EUROPASS DIPLOMA SUPPLEMENT

EUROPASS DIPLOMA SUPPLEMENT EUROPASS DIPLOMA SUPPLEMENT TITLE OF THE DIPLOMA (ES) Técnico Superior en Administración y Finanzas TRANSLATED TITLE OF THE DIPLOMA (EN) (1) Higher Technician in Administration and Finance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

More information

The Singapore E-Government Procurement Experience. Puay Long CHIA Principal Engineer, DSTA Executive Consultant, IDA International Nov 10, 2009

The Singapore E-Government Procurement Experience. Puay Long CHIA Principal Engineer, DSTA Executive Consultant, IDA International Nov 10, 2009 The Singapore E-Government Procurement Experience Puay Long CHIA Principal Engineer, DSTA Executive Consultant, IDA International Nov 10, 2009 Agenda Singapore Government Procurement Regime Government

More information

Implementation Status & Results Armenia Public Sector Modernization Project (P060786)

Implementation Status & Results Armenia Public Sector Modernization Project (P060786) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Armenia Public Sector Modernization Project (P060786) Operation Name: Public Sector Modernization

More information

Corporate Policy and Procedure

Corporate Policy and Procedure Page Page 1 of 13 TAB: SECTION: SUBJECT: CORPORATE ADMINISTRATION ACQUISITION/DISPOSAL OF GOODS AND SERVICES BID AWARDS AND BID PROTESTS POLICY STATEMENT PURPOSE SCOPE Bidders may receive Awards for the

More information

Procurement Policy Review Feedback from Consultations with External Stakeholders. Summary of Comments Submitted Online

Procurement Policy Review Feedback from Consultations with External Stakeholders. Summary of Comments Submitted Online Procurement Policy Review Feedback from Consultations with External Stakeholders Summary of Comments Submitted Online Stakeholders had the option to submit comments online either per email or through Survey

More information

Date of circulation. Type of technical body proposed (TC / SC / BTTF)

Date of circulation. Type of technical body proposed (TC / SC / BTTF) PROPOSAL for a NEW FIELD OF TECHNICAL ACTIVITY Date of circulation. Secretariat SIS Type of technical body proposed (TC / SC / BTTF) CEN/TC / SC N. (where appropriate) CENELEC/TC / SC (Sec). (where appropriate)

More information

Annex A. Templates for the Procurement Post Review Report

Annex A. Templates for the Procurement Post Review Report Annex A. Templates for the Procurement Post Review Report Country Loan / Credit / Trust Fund #: Project name*: Project ID: Name (s) of Implementing Agency (ies): TL: APS/PAS: Hub Coordinator Post Review

More information

SOUTH AFRICAN MEDICAL RESEARCH COUNCIL

SOUTH AFRICAN MEDICAL RESEARCH COUNCIL SOUTH AFRICAN MEDICAL RESEARCH COUNCIL SUPPLY CHAIN MANAGEMENT POLICY SUPPLY CHAIN MANAGEMENT POLICY Page 1 of 12 Document review and approval Revision history Version Author Date 1 National Manager Operations

More information

Contracting for Goods and Services

Contracting for Goods and Services Contracting for Goods and Services Northwest Territories Office of the Auditor General of Canada Bureau du vérificateur général du Canada Ce document est également publié en français. This document is

More information

PUBLIC-PRIVATE PARTNERSHIP

PUBLIC-PRIVATE PARTNERSHIP PUBLIC-PRIVATE PARTNERSHIP Law firm Sajic GP Banja Luka Bulevar vojvode Zivojina Misica 49B, Banja Luka Bosnia and Herzegovina Tel: +387 51 227 620 Fax: +387 51 227 623 e-mail: info@afsajic.com www.advokatskafirmasajic.com

More information

Guide to Procurement. Ministry of Central Services Procurement Services. Last updated: April 2014 Page 1 of 11

Guide to Procurement. Ministry of Central Services Procurement Services. Last updated: April 2014 Page 1 of 11 Ministry of Central Services Procurement Services Last updated: April 2014 Page 1 of 11 Table of Contents Purpose of guide... 3 Authority for procurement... 3 Applicability - Who is covered by The Purchasing

More information

ACTION PLAN FOR THE IMPLEMENTATION OF THE ANTI-CORRUPTION STRATEGY OF THE REPUBLIC OF ARMENIA

ACTION PLAN FOR THE IMPLEMENTATION OF THE ANTI-CORRUPTION STRATEGY OF THE REPUBLIC OF ARMENIA ACTION PLAN FOR THE IMPLEMENTATION OF THE 2009-2012 ANTI-CORRUPTION STRATEGY OF THE REPUBLIC OF ARMENIA Strategy Provisions Measure Expected Outcomes Responsible Body Source of Funding Monitoring Indicators

More information

GOOD PRACTICES AND INITIATIVES IN THE PREVENTION OF CORRUPTION

GOOD PRACTICES AND INITIATIVES IN THE PREVENTION OF CORRUPTION GOOD PRACTICES AND INITIATIVES IN THE PREVENTION OF CORRUPTION The use of information and communication technologies (ICT) for the implementation of the Convention in order to facilitate public sector

More information

Contract Management arrangements - Procurement Policy update

Contract Management arrangements - Procurement Policy update Agenda item: 13 Report title: Report by: Action: Contract Management arrangements - Procurement Policy update Gordon Duffus, Head of Procurement, Resources and Quality Assurance, gordon.duffus@gmc-uk.org,

More information

Thematic review on provisions and practices to curb corruption in public procurement

Thematic review on provisions and practices to curb corruption in public procurement The Secretariat Anti-corruption policies in Asia and the Pacific: Thematic review on provisions and practices to curb corruption in public procurement Self-assessment report Thailand Identifying reform

More information

E-Tendering Innovations For Buyers. CPP SCM 2007 Symposium

E-Tendering Innovations For Buyers. CPP SCM 2007 Symposium E-Tendering Innovations For Buyers CPP SCM 2007 Symposium October 2007 Agenda -Tendering Developments -International Tendering Experiences -Tendering Tools and Techniques -Conclusion 2 E-Tendering Innovations

More information

Ministry of Finance of Republic of Moldova MTender: piloting and development of full cycle electronic procurement system

Ministry of Finance of Republic of Moldova MTender: piloting and development of full cycle electronic procurement system Ministry of Finance MTender: piloting and development of full cycle electronic procurement system Iuri CICIBABA May 2018 Main objectives of the eprocurement reform The Government of Moldova has the goal

More information

Thematic review on provisions and practices to curb corruption in public procurement

Thematic review on provisions and practices to curb corruption in public procurement The Secretariat Anti-corruption policies in Asia and the Pacific: Thematic review on provisions and practices to curb corruption in public procurement Self-assessment report Nepal Identifying reform needs,

More information

An evaluation of the Irish Remote Interpreting Service (IRIS) Request for Tenders

An evaluation of the Irish Remote Interpreting Service (IRIS) Request for Tenders An evaluation of the Irish Remote Interpreting Service (IRIS) 2018. Request for Tenders The latest date for receipt of tenders is Thursday 30 th August 2018 at 4 pm July 2018 Sign Language Interpreting

More information

Procurement Policy. Date: September 2016 Version: Final Author: Fiona Ward (Head of Procurement)

Procurement Policy. Date: September 2016 Version: Final Author: Fiona Ward (Head of Procurement) Procurement Policy Date: September 2016 Version: Final Author: Fiona Ward (Head of Procurement) 1. Purpose and Application This Procurement Policy applies to and binds all Directors, Managers and Employees

More information

Review of the World Bank s Procurement Policy and Procedures. Global Multi-Stakeholder Consultations August December 2014

Review of the World Bank s Procurement Policy and Procedures. Global Multi-Stakeholder Consultations August December 2014 Review of the World Bank s Procurement Policy and Procedures Global Multi-Stakeholder Consultations August December 2014 Background Major Contracts Financed by the World Bank Top Sectors in FY14 by Contract

More information

Improving public-sector purchasing

Improving public-sector purchasing 18 Improving public-sector purchasing To get the most out of the purchasing function, public institutions should gain a consolidated view of purchasing spend, set high aspirations for change, streamline

More information

Manager, Sourcing Supply and Contracts, Grid Projects Approved By:

Manager, Sourcing Supply and Contracts, Grid Projects Approved By: Procurement Policy ISSUE DETAILS Effective Date: 1 Policy Owner: Chief Executive Officer Written By: Manager, Sourcing Supply and Contracts, Grid Projects Approved By: Transpower Board of Directors Minute

More information

Germany-Frankfurt-on-Main: ECB - Surveys on the access to finance of enterprises (SAFE) 2013/S Contract notice.

Germany-Frankfurt-on-Main: ECB - Surveys on the access to finance of enterprises (SAFE) 2013/S Contract notice. 1/6 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:354314-2013:text:en:html Germany-Frankfurt-on-Main: ECB - Surveys on the access to finance of enterprises (SAFE) 2013/S 205-354314

More information

1.3 If further guidance is required staff should contact the Head of Strategic Procurement.

1.3 If further guidance is required staff should contact the Head of Strategic Procurement. Procurement Policy 1. Introduction 1.1 The University has a devolved procurement structure and this document is intended to give clear guidance to staff in teaching and central service departments who

More information

ELANBiz: Government Procurement in Chile

ELANBiz: Government Procurement in Chile DISCLAIMER The positions expressed are those of the authors and do not necessarily reflect the official opinion of the European Union. Neither the European Union nor any person acting on behalf of the

More information

PUBLIC PROCUREMENT PROCEDURES AND ITS CYCLES

PUBLIC PROCUREMENT PROCEDURES AND ITS CYCLES www.arpapress.com/volumes/vol10issue1/ijrras_10_1_19.pdf PUBLIC PROCUREMENT PROCEDURES AND ITS CYCLES Selami KRASNIQI Faculty of Economics, University of Prishtina. ABSTRACT The goal of procurement is

More information

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly Law No. 04/L-045 Assembly of Republic of Kosovo, ON PUBLIC-PRIVATE-PARTNERSHIP Based on Article 65 (1) of the Constitution

More information

the Experience of Consip, the National CPB

the Experience of Consip, the National CPB 1 Central Purc chasing in Italy: the Experience of Consip, the National CPB Conference on A New Framework for Public Procurement Angela Russo, International Cooperation Projects, Consip SpA Madrid, 9 April

More information

Tendering & Purchasing

Tendering & Purchasing Annapolis Valley Regional School Board Administrative Procedure AP 200.1 Tendering & Purchasing Department: Finance Section: Departments of Finance and Operations Table of Contents Section 1 Purpose and

More information

Contracting & Procurement Policy

Contracting & Procurement Policy Contracting & Procurement Policy 1. OBJECTIVE AND PRINCIPLES The objective of this policy is to provide a framework and direction for the acquisition of goods and services required for Grand Challenges

More information

COMMENTS ON PUBLIC PROCUREMENT BILL 2012 BY CUTS INTERNATIONAL

COMMENTS ON PUBLIC PROCUREMENT BILL 2012 BY CUTS INTERNATIONAL COMMENTS ON PUBLIC PROCUREMENT BILL 2012 BY CUTS INTERNATIONAL Section No Section 41 (8) Provisions in Public Proposed Changes Rationale for suggestions/comments Procurement Bill Amendments required for

More information

Procurement Policy. Policy Objectives

Procurement Policy. Policy Objectives Procurement Policy Policy Type: Council Policy Policy Owner: Director Corporate Services Policy No. CP- 023 Last Review Date: 20 November 2018 Policy Objectives The objectives of this Policy are to ensure

More information

Section 3 - Evaluation and Qualification Criteria

Section 3 - Evaluation and Qualification Criteria Section 3 - Evaluation and Qualification Criteria 3-1 Section 3 - Evaluation and Qualification Criteria Table of Criteria 1. Evaluation... 3-2 1.1 Technical Evaluation... 3-2 1.2 Alternative Technical

More information

Seba Ismaiel. UNICEF Procurement Process and Control Oversights + Outline of Tender Document

Seba Ismaiel. UNICEF Procurement Process and Control Oversights + Outline of Tender Document Safe Injection Equipment Industry Consultation 21 st 22 nd April 2015 UNICEF Procurement Process and Control Oversights + Outline of Tender Document Seba Ismaiel Table of Content UNICEF Safe Injection

More information

The Istanbul Anti-Corruption Action Plan. Second Round of Monitoring

The Istanbul Anti-Corruption Action Plan. Second Round of Monitoring ACN Anti-Corruption Network for Eastern Europe and Central Asia Anti-Corruption Division Directorate for Financial and Enterprise Affairs Organisation for Economic Co-operation and Development (OECD) 2,

More information

Presentation: e-procurement operations in the Russian Federation

Presentation: e-procurement operations in the Russian Federation Presentation: e-procurement operations in the Russian Federation Maxim V.KIRYUSHIN Berlin, December 14, 2016 Procurement regulation in the Russian Federation Regulator Ministry of Economic Development

More information

Procurement Strategy

Procurement Strategy Procurement Strategy Contents Introduction... 2 Objectives... 2 Our Key Procurement Principles... 3 The Procurement Process... 4 Sustainable Procurement... 5 1 P a g e Introduction Procurement is defined

More information

Code of Ethics for Suppliers in Public Procurement and Disposal

Code of Ethics for Suppliers in Public Procurement and Disposal Code of Ethics for Suppliers in Public Procurement and Disposal Issued pursuant to Section 139 of the Public Procurement & Disposal Act, 2005 Telephone:+254(020) 3244000, 2213106, 2213107 Fax:+254(020)

More information

PROCUREMENT STRATEGY

PROCUREMENT STRATEGY PROCUREMENT STRATEGY 2018 2023 Approved on: 22 March 2018 Effective from: 1 April 2018 Strategy Owner Department of Finance and ICT Author Mandy Shepherd, Procurement Manager Version Number 1.0 Approved

More information

Procurement Strategy and Action Plan. Financial Year

Procurement Strategy and Action Plan. Financial Year Procurement Strategy and Action Plan Financial Year 2018-2019 Status Final Owner Procurement Source location Procurement website Consultation APUC Endorsed Audit Committee 11 June 2018 Publication 1 August

More information

Corporate Governance Guidelines

Corporate Governance Guidelines Corporate Governance Guidelines Established in September 2015 Fuyo General Lease Co., Ltd. 1 Introduction These Guidelines set out the basic concept, framework, and operating policy for corporate governance

More information

E-PROCUREMENT SYSTEM IN ALBANIA, IMPACT AND LESSONS LEARNED. Reida Kashta *

E-PROCUREMENT SYSTEM IN ALBANIA, IMPACT AND LESSONS LEARNED. Reida Kashta * E-PROCUREMENT SYSTEM IN ALBANIA, IMPACT AND LESSONS LEARNED Reida Kashta * ABSTRACT. In the framework of measures towards transparency increasing and the fight against corruption, on the public procurement

More information

FEDERAL PUBLIC PROCUREMENT DIRECTIVE MINISTRY OF FINANCE & ECONOMIC DEVELOPMENT

FEDERAL PUBLIC PROCUREMENT DIRECTIVE MINISTRY OF FINANCE & ECONOMIC DEVELOPMENT FEDERAL PUBLIC PROCUREMENT DIRECTIVE MINISTRY OF FINANCE & ECONOMIC DEVELOPMENT JUNE/2010 1 TABLE OF CONTANTS ARTICLE TITLE PAGE Part I General 1 1. Short title... 1 2. Definitions.. 1 3. Scope of Application..

More information

Desk Review Questionnaire

Desk Review Questionnaire Project RAB/01/006: TRANSPARENCY AND ACCOUNTABILITY IN THE PUBLIC SECTOR IN THE ARAB REGION Desk Review Questionnaire (Draft: 14/02/03 14:39) Country Name: I. ORGANIZATION OF GOVERNMENT Information for

More information

UNHCR/HCP/2016/xx High Commissioner s Policy on Quality Management in the Supply of Goods and Services to Persons of Concern

UNHCR/HCP/2016/xx High Commissioner s Policy on Quality Management in the Supply of Goods and Services to Persons of Concern UNHCR/HCP/2016/xx on Quality Management in the Supply of Goods and Services to Persons of Concern Approved by: Filippo Grandi, High Commissioner Signature: Approval date: Contact: Date of entry into force:

More information

Announcement of Chiang Mai University s Integrity and Transparency Policy for Conducting Its Activities In accordance with the Constitution of the

Announcement of Chiang Mai University s Integrity and Transparency Policy for Conducting Its Activities In accordance with the Constitution of the Announcement of Chiang Mai University s Integrity and Transparency Policy for Conducting Its Activities In accordance with the Constitution of the Kingdom of Thailand (Interim edition, B.E. 2557), the

More information

Employment and Social Affairs Platform-ESAP Open Call for Consultancy Services Extension of Deadline. Reference Number: 037/018

Employment and Social Affairs Platform-ESAP Open Call for Consultancy Services Extension of Deadline. Reference Number: 037/018 Employment and Social Affairs Platform-ESAP Open Call for Consultancy Services Extension of Deadline Reference Number: 037/018 This project is funded by the EU Terms of Reference: Title: Analysis of the

More information

OECD Competition Committee. Working Party No. 3 on Co-operation and Enforcement LAWS AND GOVERNMENT PROCUREMENT PRACTICES IN PERU

OECD Competition Committee. Working Party No. 3 on Co-operation and Enforcement LAWS AND GOVERNMENT PROCUREMENT PRACTICES IN PERU OECD Competition Committee Working Party No. 3 on Co-operation and Enforcement Report to Council on the Bid-Rigging Recommendation Contribution from Peru 1 LAWS AND GOVERNMENT PROCUREMENT PRACTICES IN

More information

Procurement and Contracting Operations Audit

Procurement and Contracting Operations Audit D..1D Procurement and Contracting Operations Audit Office of the Chief Audit Executive February 016 Cette publication est également disponible en français. This publication is available in accessible PDF

More information

Public Procurement Reforms to enhance value for money

Public Procurement Reforms to enhance value for money Public Procurement Reforms to enhance value for money 1. It is my pleasure to be here in the inaugural function of the Seminar on Public Procurement Reforms to enhance value for money being organized by

More information

NHS Highland Sustainable Procurement Strategy

NHS Highland Sustainable Procurement Strategy NHS Highland Sustainable Procurement Strategy 2015-16 1 NHS Highland Sustainable Procurement Policy 2015-16 CONTENTS 1. Introduction Page 3 2. Executive Summary Page 3 3. Policy Scope Page 4 4. Policy

More information

Public Procurement Act

Public Procurement Act Public Procurement Act CHAPTER 12 OF THE ACTS OF 2011 as amended by 2014, c. 34, ss. 35-38 2016 Her Majesty the Queen in right of the Province of Nova Scotia Published by Authority of the Speaker of the

More information

EIB Project Cycle and Procurement Tegucigalpa, 1-2 June 2017

EIB Project Cycle and Procurement Tegucigalpa, 1-2 June 2017 EIB Project Cycle and Procurement Tegucigalpa, 1-2 June 2017 1er Foro Internacional sobre Políticas de Adquisiciones y Mejores Prácticas en Bancos Multilaterales José Luis Alfaro, Head of Procurement alfaro@eib.org

More information

IFMS Scope: Modules SCM. Financial. Management (GL) Inventory. Management. Asset. Payroll. Management HRM. Procurement Management Catalogue Management

IFMS Scope: Modules SCM. Financial. Management (GL) Inventory. Management. Asset. Payroll. Management HRM. Procurement Management Catalogue Management Status of IFMS IFMS Background The IFMS project is aimed at replacing aging and fragmented financial (including Payroll), supply chain and human resource (HR) management systems, and associated ageing

More information

The Role of Energy Service Companies (ESCOs) in Energy Performance Contracting (EPC) IEE project TRANSPARENSE

The Role of Energy Service Companies (ESCOs) in Energy Performance Contracting (EPC) IEE project TRANSPARENSE The Role of Energy Service Companies (ESCOs) in Energy Performance Contracting (EPC) IEE project TRANSPARENSE Dr. KONSTANTINOU Kostas, Director of Local Development, ANATOLIKI S.A Thessaloniki, November

More information

PUBLIC MANAGEMENT SYSTEMS: AN OVERVIEW

PUBLIC MANAGEMENT SYSTEMS: AN OVERVIEW PUBLIC MANAGEMENT SYSTEMS: AN OVERVIEW Public management systems are the core systems that enable a government to function and to provide services to its citizens. Just as in the private sector, they ensure

More information

REPUBLIC OF SERBIA Negotiating Group for the Chapter 5-Public procurement. Bilateral screening: Chapter 5 PRESENTATION OF THE REPUBLIC OF SERBIA

REPUBLIC OF SERBIA Negotiating Group for the Chapter 5-Public procurement. Bilateral screening: Chapter 5 PRESENTATION OF THE REPUBLIC OF SERBIA REPUBLIC OF SERBIA Negotiating Group for the Chapter 5-Public procurement Bilateral screening: Chapter 5 PRESENTATION OF THE REPUBLIC OF SERBIA Brussels, 13 May 2013 GREEN PROCUREMENT, SOCIAL ASPECT, SMALL

More information

Fixed Scope Offering for Oracle Fusion Procurement. Slide 1

Fixed Scope Offering for Oracle Fusion Procurement. Slide 1 Fixed Scope Offering for Oracle Fusion Procurement Slide 1 Today s Business Challenges Adopt leading Global SCM practices & strategies across the entire enterprise value chain to move into the future.

More information

Procurement Policy. Education is for improving lives and for leaving your community and world better than you found it.

Procurement Policy. Education is for improving lives and for leaving your community and world better than you found it. Procurement Policy Education is for improving lives and for leaving your community and world better than you found it. Review date: April 2020 Page 1 of 13 Contents 1. Introduction... 3 2. Principles...

More information

GOVERNMENT OF JAMAICA PUBLIC SECTOR PROCUREMENT POLICY

GOVERNMENT OF JAMAICA PUBLIC SECTOR PROCUREMENT POLICY GOVERNMENT OF JAMAICA PUBLIC SECTOR PROCUREMENT POLICY November 2010 Ministry of Finance and the Public Service TABLE OF CONTENTS ACRONYMS... iii EXECUTIVE SUMMARY... 1 INTRODUCTION... 2 1. Public Sector

More information

PROCUREMENT REVIEW PANEL

PROCUREMENT REVIEW PANEL P.SH 199/17 PROCUREMENT REVIEW PANEL, appointed by the President Pursuant to the article 105 as well article 106 of the Law on Public Procurement of the Republic of Kosova no.04/l-042, amended and supplemented

More information

Sharing e-gp Strategies & Approaches ( Korea Online e-procurement System)

Sharing e-gp Strategies & Approaches ( Korea Online e-procurement System) Sharing e-gp Strategies & Approaches ( Korea Online e-procurement System) December 19, 2006 SH Kang(bullseye@pps.go.kr) Public Procurement Service Government of the Republic of Korea Contents Ⅰ. Overview

More information

PROCUREMENT AUDIT REPORT FOR 30 PROCURING ENTITIES

PROCUREMENT AUDIT REPORT FOR 30 PROCURING ENTITIES PROCUREMENT AUDIT REPORT FOR 30 PROCURING ENTITIES June, 2009 1. Introduction In view of its mandate under Section 7(1)(j) of the Public Procurement Act (PPA), Cap 410, the Public procurement Regulatory

More information

Research Scholar Open University, Mauritius, REVA University Bangalore

Research Scholar Open University, Mauritius, REVA University Bangalore THE CHALLENGES AND BENEFITS OF ADOPTING E-PROCUREMENT REFERENCE TO MAURITIAN ECONOMY 1 NAZIMA BHAUKAURALLY, 2 VANI RAMESH Research Scholar Open University, Mauritius, REVA University Bangalore E-mail:

More information

Open Contracting in Philippine Government Procurement

Open Contracting in Philippine Government Procurement 2015/FMP/WKSP1/014 Session: 4 Open Contracting in Philippine Government Procurement Submitted by: Philippines Workshop on Fiscal Management Through Transparency and Reforms Bagac, Philippines 9-10 June

More information

Towards Yemen e-procurement

Towards Yemen e-procurement Towards Yemen e-procurement Yehya Al-Ashwal Chairman of the Technical Committee the High Tender Board (HTB) (Yemen Public Procurement) Page 1 Background With the support of international donors, the Government

More information

2015 CPSU/CSA POLICY CONFERENCE GOVERNMENT PROCUREMENT

2015 CPSU/CSA POLICY CONFERENCE GOVERNMENT PROCUREMENT 2015 CPSU/CSA POLICY CONFERENCE GOVERNMENT PROCUREMENT Government Procurement Policy 1. Introduction 1.1 The Western Australian Government spends billions of dollars every year on the acquisition of goods

More information

Request for Expression of Interest (EOI)

Request for Expression of Interest (EOI) Request for Expression of Interest (EOI) Title Procure and deploy a Learning Management System (LMS) for WHO EOI Ref. No. Published Date 31/03/2017 Closing Date & Time 10/04/201717:00 (UTC +1) Contact

More information

BIDDING DOCUMENTS (PROCUREMENT OF GOOD AND SERVICES)

BIDDING DOCUMENTS (PROCUREMENT OF GOOD AND SERVICES) BIDDING DOCUMENTS (PROCUREMENT OF GOOD AND SERVICES) IOM Nigeria FRAMEWORK AGREEMENT FOR SUPPLY OF DIESEL FOR ONE (1) YEAR ITB NO: NG10-014 Prepared by DORCAS SHAIBU 11 January, 2018 IOM Nigeria No.11

More information