The Philippine Environmental Impact Statement (EIS) System
|
|
- Stephanie Simmons
- 6 years ago
- Views:
Transcription
1 SECURING ECC & COMPLYING WITH OTHER ENVIRONMENTAL REGULATIONS The Philippine Environmental Impact Statement (EIS) System AO 42: Rationalizing the implementation of the Philippine EIS System and giving authority in addition to the Secretary of the DENR, to the Director and Regional Director of the EMB to grant or deny the issuance of ECCs. DAO : 30: PEIS Implementation Guidelines & Procedures Streamline the EIS System & to strengthen the processes for its implementation Aims to achieve sustainable development 1
2 EIA PROCESS EIS System Procedures SCOPING BASELINE STUDY IMPACT IDENTIFICATION IMPACT PREDICTION IMPACT EVALUATION IMPACT MITIGATION & PREPARATION OF EMP Project Description Description of the Project Location and area covered Capitalization and manpower requirements For processing industries, a listing of the raw materials to be used,description of the process and overall performance or manufacturing technology Type and volume of products and discharges Pre-Scoping Requirements: Brief project description Vicinity/location map List of stakeholders to be invited for the site/formal scoping 2
3 Scoping Process Proponent gives notice to DENR-EMB Final Scoping Checklist Selection Of EIARC Members Project Briefing Technical Scoping Pre-Scoping Site Scoping Submit Scoping Report 3 Determine ERA/EHIA Requirements Post-Scoping
4 EIS DOCUMENT Executive Summary Project Description Matrix of Scoping and Agreements critical issues and concerns as validated by EMB Baseline environmental conditions Impact assessment focused on significant environmental impacts EIS DOCUMENT Environmental Risks Assessment Plan Proposals for Environmental Monitoring and Guarantee Fund Accountability statements/preparers/proponents Other documents as may be determined during scoping Plan (EMP) Defines the scope of compliance reporting, institutional and financial mechanisms to ensure that mitigating and monitoring measures will be instituted and implemented by the project proponent. Plan (EMP) Mitigation and enhancement measures Social development program (resettlement, relocation, livelihood) Contingency/Emergency Response Plan Risk Management Program 4
5 Plan (EMP) Abandonment Plan (when applicable) Environmental Monitoring Plan Information-Education and Communications Plan Plan (EMP) Coverage of Monitoring Frequency of Monitoring Standard Procedures or Methods of Monitoring (e.g. labeling, transport & handling of samples) & laboratory analysis Plan (EMP) Selection of Sampling Stations Manpower Requirements Logistics 5
6 yes no EIS Review Process for ECPs Submit 1 set Of EIS + Checklist A total of 120 Complete and clear? Pay Fee(s) Procedural Review (3 working days) Submit 10 sets + electronic copy working days if processed at the central office, or 60 working days if processed at the regional office Convene EIARC EIS Review Process ECC Denial Recommendation by endorsing authority EIARC Meetings Field Visits or Site Inspections Public Hearing (if necessary) 6 Substantive Review Clarity Balance Accuracy & Precision Consistency Response Additional Info. Limited to 2 Requests 3 EIARC meeting (60 working days for Central Off., or 40 working days for R. O.) Submit EIARC Report Review Process Report
7 ECC Amendment Major amendments if such involves modification as: Expansion of land/project area; Increase in production capacity; Change in project location; Major change/s in process flow or technology to be used ECC Amendment Minor amendments if such involves modification as Typographical error Extension of deadlines for submission of post-ecc requirements Change in company name/ownership Decrease in land/project area or production cap. ECC Amendment Requirement Necessary data, information, reports or documents that will substantiate or support the requested revision (i.e. for transfer of ownership ECC and other environmental laws compliance, justification) Detailed process description (old and new) with material balances; documentation of environmental performance of the old process; corresponding comparison of the old and new process in terms of environmental performance and EMS-based EMP Procedure for ECC Amendment Submit to: Approving office (Secretary/EMB RD) Reviewed by: Technical Committee (major amendment/s) Case handler (minor amendment/s) Timeframe: 30 days for IEE 60 days for EIS/PEIS Approving authority ECC Approving Office (major amendment/s) ECC Endorsing Office (minor amendment/s) Environmental Compliance Certificate The ECC is the approval document signifying that the project proponent has complied with all the requirements of the EIA Process THE ENVIRONMENTAL COMPLIANCE CERTIFICATE STANDARD CONDITIONS OF AN ECC Scope of the operations Installation of waste treatment facility Emissions/discharges within DENR standards Permits from other agencies Monitoring measures EMP Transfer of ownership EMF/EGF Preparation of abandonment plan 7
8 8 Bureau
9 9 Bureau
10 Requirements for Other Environmental Regulations RA 6969 REGISTRATION AS HAZARDOUS WASTE GENERATOR & TSD FACILITY Requirements Completed registration forms ECC Permits to Operate Pollution Control Facilities Storage Management Plan for raw materials, residues, by-products & end-products Long-term plan for the recycled/processed/end-product product Contingency/emergency plan RA 6969 REGISTRATION AS LOCAL TRANSPORTER OF HAZARDOUS WASTE Requirements Official letter of request Information on registration/accreditation of, transporter, waste generator and treater/recycling facility Information on the waste generated Memorandum of Agreement/Affidavit of Joint Understanding between concerned parties Waste to be treated is included in recycler/treater s s ECC 10
11 RA 9275 SECURING DISCHARGE PERMIT Requirements ECC Appointment of PCO Engineer s s Report Plans & specification Vicinity maps RA 8749 SECURING PERMIT TO OPERATE AIR POLLUTION CONTROL and SOURCE INSTALLATION Requirements ECC Appointment of PCO Engineer s s Report Plans & specification Vicinity maps 11
Current Practice of Recycling and Treatment of Hazardous Wastes in the Philippines
Current Practice of Recycling and Treatment of Hazardous Wastes in the Philippines Health Outline of the Presentation I. Hazardous Waste Management Requirements and Procedures II. Treatment, Storage and
More informationSustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015
Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 1 Ministry of Environmental Conservation and Forestry (MOECAF) Environmental
More informationINTERIM GUIDELINES FOR THE IMPORTATION OF RECYCLABLE MATERIALS CONTAINING HAZARDOUS SUBSTANCES
DENR ADMINISTRATIVE ORDER NO. 28 SERIES OF 1994 Subject: INTERIM GUIDELINES FOR THE IMPORTATION OF RECYCLABLE MATERIALS CONTAINING HAZARDOUS SUBSTANCES 1. GENERAL POLICY As a general policy and consistent
More informationRULE 2250 PERMIT-EXEMPT EQUIPMENT REGISTRATION (Adopted October 19, 2006)
RULE 2250 PERMIT-EXEMPT EQUIPMENT REGISTRATION (Adopted October 19, 2006) 1.0 Purpose The purpose of this rule is to provide affected sources and the District with the necessary administrative mechanisms
More informationCDM Experience: QUEZON CITY (PAYATAS) Controlled Disposal Facilities
CDM Experience: QUEZON CITY (PAYATAS) Controlled Disposal Facilities Clean Development Mechanism (CDM) CER (certified emission reduction) produced by Developing Countries CER/Carbon trading Industrialized
More informationLicensing Nuclear Power Plants in Canada. Ensuring Safe and Environmentally Acceptable Operations
Licensing Nuclear Power Plants in Canada Ensuring Safe and Environmentally Acceptable Operations Nuclear Power the ultimate Energy Source It s been around a long time Nuclear power closer to home Needs
More informationECONOMIC IMPACT/ENVIRONMENTAL BENEFIT ANALYSIS
ECONOMIC IMPACT/ENVIRONMENTAL BENEFIT ANALYSIS Answer to best of the proponent s ability, as required by APC&EC Regulation 8.812 STEP 1: DETERMINATION OF ANALYSIS REQUIREMENT (to be included in petition
More informationREQUEST FOR PROJECT/PROGRAMME FUNDING FROM THE ADAPTATION FUND
REQUEST FOR PROJECT/PROGRAMME FUNDING FROM THE ADAPTATION FUND The annexed form should be completed and transmitted to the Adaptation Fund Board Secretariat by email or fax. Please type in the responses
More informationConditional Uses and Planned Developments
Conditional Uses and Planned Developments If not complete, applicant will be provided a list of missing info. Step will not start until application is complete. day public input period (no decisions can
More informationChina Southern Airlines Company Limited Terms of Reference of Audit and Risk Management Committee
China Southern Airlines Company Limited Terms of Reference of Audit and Risk Management Committee Chapter 1 General Provisions Article 1 In order to ensure the sustainable, regular and healthy development
More informationTHE COMPLETE GUIDE TO ISO14001
THE COMPLETE GUIDE TO ISO14001 1. Introduction... 3 Plan Do Check Act... 5 2. Requirements... 7 Environmental Policy... 7 Environmental Aspects... 7 Legal and Other Requirements... 8 Objectives & Targets...
More informationTotal 127 files quick download in editable form by e delivery
Sr. No. A. The Total Editable Document kit has 9 main directories as below. List of Directory Document of Details 1. Environmental Manual 14 files in Ms. word 2. Environmental Procedures 07 procedures
More information9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction
9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE 9.1.1 Introduction This chapter is the provisional Environmental Management Plan (EMP) for the Jubilee Phase 1 Development project. The elements of
More information2017 Archaeology Audit Program Procedure Manual. April 2017
2017 Archaeology Audit Program Procedure Manual April 2017 Table of Contents Contents Table of Contents... 2 1.0 Introduction and Scope... 3 2.0 Audit Objectives... 3 3.0 Audit Procedures... 4 3.1 Audit
More informationIntex Resources response to Case Study 5: Nickel Mining Mindoro Island
31 March 2009 Intex Resources response to Case Study 5: Nickel Mining Mindoro Island Intex Resources is dedicated to the responsible development of the natural resources on Mindoro. We believe that private
More informationThe North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison. NAFTA Chapter 10: Government Procurement
The North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison NAFTA Chapter 10: Government Procurement Chapter Ten: Government Procurement Chapter Fifteen: Government
More informationGUIDE. DWWP Amendments Licence Amendments Licence Renewals & New System Applications. Municipal Residential Drinking Water Systems
GUIDE FOR APPLYING FOR DWWP Amendments Licence Amendments Licence Renewals & New System Applications Municipal Residential Drinking Water Systems SAFE DRINKING WATER BRANCH November 2010 PIBS 7014e01 Guide
More informationMEMORANDUM. Authority and Restrictions under Proposed O.R.C regarding Small Cell Facilities and Wireless Support Structures in the Public Way
MEMORANDUM TO: FROM: Ohio Municipal Corporations Lindsay Miller DATE: January 17, 2018 RE: Authority and Restrictions under Proposed O.R.C. 4939 regarding Small Cell Facilities and Wireless Support Structures
More informationIndustrial waste pretreatment facilities that discharge to public sewers.
Bureau of Point and Non-Point Source Management Standard Operating Procedure (SOP) 1 for Clean Water Program Water Quality Management Permits for Industrial Waste Treatment Facilities SOP No. BPNPSM-PMT-024
More informationto The Uganda Gazette No. 25, Volume CX, dated 5th May, 2017 Printed by UPPC, Entebbe, by Order of the Government No. 22.
STATUTORY INSTRUMENTS SUPPLEMENT No. 13 5th May, 2017 STATUTORY INSTRUMENTS SUPPLEMENT to The Uganda Gazette No. 25, Volume CX, dated 5th May, 2017 Printed by UPPC, Entebbe, by Order of the Government.
More informationNATIONAL ENVIRONMENT MANAGEMENT AUTHORITY
ENVIRONMENTAL COMPLIANCE IN UGANDA-A REGULATORY PERSPECTIVE/ENVIRONMENTAL IMPACT ASSESSMENT (EIA) PROCESS IN UGANDA PRESENTED AT A TRAINING WORKSHOP FOR USAID/UGANDA STAFF FROM 9 TH TO 12 TH SEPTEMBER,
More informationCHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.
CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF
More informationOverview of Environmental Impact Assessment (EIA) Procedure SEA and Sustainable Development Goals in Myanmar
Overview of Environmental Impact Assessment (EIA) Procedure SEA and Sustainable Development Goals in Myanmar Sein Aung Min Assistant Director, ECD 6 th October 2016 Constitution(2008) Government s Policy
More informationHarris County Pollution Control Services Department
Harris County Pollution Control Services Department Industrial Storm Water Inspections July 24, 2013 Nuguent Cotton, Field Manager Pollution Control Services In compliance with Harris County s TPDES MS4
More informationPOSTAL STATION B ENVELOPE REHABILITATION & BASE BUILDING UPGRADE CONSTRUCTION MANAGER FAIRNESS MONITOR FINAL REPORT
POSTAL STATION B ENVELOPE REHABILITATION & BASE BUILDING UPGRADE CONSTRUCTION MANAGER FAIRNESS MONITOR FINAL REPORT Submission Date: September 23, 2015 Submitted To: Director, Fairness Monitoring Departmental
More informationENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009
ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN Environment Protection Authority, ACT May 2009 ISBN-13: 978-0-642-60494-1 ISBN-10: 0-642-60494-0 Australian Capital Territory,
More informationThe Board of Finance of Baltimore City Department of Finance Bureau of Treasury Management
The Board of Finance of Baltimore City Department of Finance Bureau of Treasury Management Tax Increment Financing Policy and Project Submission Requirements January 23, 2012 PART I: TAX INCREMENT FINANCING
More informationPIA Submission Pre-Gateway Review
19 October 2015 Executive Director Regions Department of Planning & Environment GPO Box 39 Sydney NSW 2001 Via email pregatewayreview@planning.nsw.gov.au Dear Sir/ Madam PIA Submission Pre-Gateway Review
More informationSummary of Preparatory Study
Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic
More informationInvesco Perpetual UK Smaller Companies Investment Trust plc
Invesco Perpetual UK Smaller Companies Investment Trust plc Audit Committee Terms of Reference (December 2017) 1. Objective The Audit Committee will support the Board in fulfilling its oversight responsibilities.
More informationDepartment of Environment and Conservation. NEIA newleef 2013 October 10, 2013
Department of Environment and Conservation NEIA newleef 2013 October 10, 2013 1 The Environmental Assessment Process in Newfoundland & Labrador 2 Overview Purpose of EA in Newfoundland & Labrador EA Goals
More informationRepublic of the Philippines Department of Health OFFICE OF THE SECRETARY M a n i l a
Republic of the Philippines Department of Health OFFICE OF THE SECRETARY M a n i l a March 15, 1989 ADMINISTRATIVE ORDER No. 67 s. 1989 SUBJECT: Revised Rules and Regulations on Registration of Pharmaceutical
More informationTHIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE.
7:26-2.1 Scope and applicability TITLE 7. ENVIRONMENTAL PROTECTION CHAPTER 26. SOLID WASTE SUBCHAPTER 2. DISPOSAL N.J.A.C. 7:26-2.1 (2017) (a) This subchapter and N.J.A.C. 7:26A, 2B, 2C and 2D shall constitute
More informationThe State Environmental Quality Review Act (SEQRA) NYS Department of Environmental Conservation
The State Environmental Quality Review Act (SEQRA) What is SEQRA? Article 8 of the NYS Environmental Conservation Law Carried out through Part 617 of the New York Codes of Rules and Regulations Became
More informationVALIDATION REPORT. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO REVISION NO.
Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO. 2007-1142 REVISION NO. 02 Date of first issue: Project No.: 2007-07-09 44410005-08 Approved by: Organisational
More informationDRAFT GUIDELINE ON PUBLIC PARTICIPATION IN MYANMAR S EIA PROCESSES CONSULTATION DRAFT
DRAFT GUIDELINE ON PUBLIC PARTICIPATION IN MYANMAR S EIA PROCESSES CONSULTATION DRAFT 5 April 2017 This Draft Guideline is made possible by the generous support of the American people through the United
More informationEnergy and Climate Action Plan. County Planning Commission Hearing September 3, 2014 County of Santa Barbara
Energy and Climate Action Plan County Planning Commission Hearing September 3, 2014 County of Santa Barbara County s GHG Reduction Strategy 2 September 3, 2014 County s collective greenhouse gas emissions
More informationRevised Non-Merit System Personnel Guidance for Call Centers. All Regional Directors Supplemental Nutrition Assistance Program
Food and Nutrition Service Park Office Center 3101 Park Center Drive Alexandria VA 22302 DATE: December 19, 2017 SUBJECT: TO: Revised Non-Merit System Personnel Guidance for Call Centers All Regional Directors
More informationAudit and Risk Committee Charter
Audit and Risk Committee Charter This Charter sets out the role, responsibilities, structure and processes of the Audit and Risk Committee (Committee), established by the Board of Directors of Wesfarmers
More informationInternal Audit for Local Government Units
1 Internal Audit for Local Government Units 2 Principles and Concepts of Internal Control (IC) Outline of Presentation 3 Definition of Internal Control (IC) IC in the Philippine Government General Objectives
More informationScheduled Operating Authority Application for a Regional Public Transit Service Provider
Scheduled Operating Authority Application for a Regional Public Transit Service Provider Regional Public Transit Service: An extension of a municipal transit service outside of its municipal boundaries,
More informationEnvironmental management: challenges and opportunities for the resource sector in PNG
Environmental management: challenges and opportunities for the resource sector in PNG With an appropriate level of attention, support and effort, now is the time for industry, regulators and other stakeholders
More informationENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR Overview of Presentation 1. Objectives of the Consultancy 2. Hydropower in Myanmar 3. Draft Table of Contents 4.
More informationDeveloping the National Strategy for Microfinance in the Philippines
Developing the National Strategy for Microfinance in the Philippines Presentation by Mr. Gil S. Beltran Assistant Secretary, Department of Finance, Republic of the Philippines 18 April 2005 The views expressed
More informationImplementing Partnership Management Guidance Note No. 1. Selection and Retention of Partners for Project Partnership Agreements July 2013
Implementing Partnership Management Guidance Note No. 1 Selection and Retention of Partners for Project Partnership Agreements July 2013 Subject: Reference Documents Reference No. Date of Issue July 2013
More informationENVIRONMENTAL IMPACT ASSESSMENT AND YOU
ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity
More informationApplications of Economic Instrument (EI) for Pollution Management in Industries by Department of Industrial Works Ministry of Industry.
Applications of Economic Instrument (EI) for Pollution Management in Industries by Department of Industrial Works Ministry of Industry January 2002 Economic Instruments (EI) Policy instruments that rely
More information5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS
To Wit: To see if the Town will vote to amend the Town of Westborough Zoning Bylaws, Article 2, District Regulations, Section 2300, Use Regulations Schedule; and to amend Article 4, Special Regulations
More information700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION
700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION Section 14.01: Definitions 14.02: Application for Prequalification of Contractors 14.03: Aggregate Bonding Capacity and Single
More informationGENERAL PERMIT WMGR098 BENEFICIAL USE OF WASTE FOUNDRY SAND AND SAND SYSTEM DUSTS
A. Description: The approval herein granted is limited to the beneficial use of waste foundry system sand and sand system dusts (hereinafter referred to as waste foundry sand) generated by ferrous metal
More information! Environmental Impact Assessment process!
Environmental Impacts"! Environmental Impact Assessment process! Prof. Doutora Maria do Rosário Partidário Environmental Impacts @ MRPartidário 1 EIA Started with NEPA (National Environmental Policy Act,
More informationOil and Gas Fast Facts and Frequently Asked Questions February 19, 2013
COMMUNITY DEVELOPMENT DEPARTMENT Oil and Gas Fast Facts and Frequently Asked Questions February 19, 2013 FACTS Property Rights and Interests Property rights: each tract of land contains a set of rights
More informationProcedures: QP 4 through QP 8, QP 16, QP 17, and QP 19
SRI Quality System Registrar Procedures: QP 4 through QP 8, QP 16, QP 17, and QP 19 Booklet Version 171122 Revision Date QP 4.0 Pre-Audit Registration Procedures 15 11/07/15 QP 5.0 On-Site Audit Procedure
More informationCity Infrastructure and Traffic Operations. Titles of Positions which report to Public Domain Team Leader are:
POSITION DESCRIPTION 1. POSITION DETAILS Position Title: Division: Unit: Management Level: Team Leader Public Domain City Operations City Infrastructure and Traffic Operations Supervisor/Team Leader 2.
More informationTHE GOLD STANDARD PROGRAMME OF ACTIVITIES GUIDANCE DOCUMENT
THE GOLD STANDARD PROGRAMME OF ACTIVITIES GUIDANCE DOCUMENT This document provides detailed instructions and guidance on the steps to be followed for the development of Gold Standard Programme of Activities
More informationYOLO-SOLANO AIR QUALITY MANAGEMENT DISTRICT 1947 Galileo Court, Suite 103; Davis, CA Phone (530) ; Fax (530)
YOLO-SOLANO AIR QUALITY MANAGEMENT DISTRICT 1947 Galileo Court, Suite 103; Davis, CA 95618 Phone (530)757-3650; Fax (530)757-3670 AUTHORITY TO CONSTRUCT (ATC) APPLICATION A separate application must be
More informationThe Canadian EIA Process: The Purpose, The Process, The Players and The Pitfalls Part I The Purpose and Process
The Canadian EIA Process: The Purpose, The Process, The Players and The Pitfalls Part I The Purpose and Process Presented by: Teresa Meadows, Senior Associate TODAY S SESSION 1. Why does a project engineer
More information4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0) Fax: +44 (0)
E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 MSC-MEPC.1/Circ.4/Rev.4 10 June 2015 GUIDELINES ON THE ORGANIZATION AND METHOD OF WORK OF THE MARITIME SAFETY
More informationUPDATES INITIATIVES UNDERTAKEN IN THE PHILIPPINES ON TIMBER LEGALITY ASSURANCE SYSTEM
UPDATES INITIATIVES UNDERTAKEN IN THE PHILIPPINES ON TIMBER LEGALITY ASSURANCE SYSTEM Raul M. Briz / Sr. For. Mgt. Spec. Forest Management Bureau DENR, Philippines 21 October 2014, Vientiane, Lao PDR BASIC
More informationRainforest Alliance GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT
Rainforest Alliance GUIDE FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT July, 2017 D.R. 2017 Red de Agricultura Sostenible, A.C. This document is provided by Red de Agricultura Sostenible, A.C. (also
More informationTERMS OF REFERENCE. For a Bi-lingual Local Project Coordinator. To support stakeholder engagement and research on financial inclusion in Benin
TERMS OF REFERENCE For a Bi-lingual Local Project Coordinator To support stakeholder engagement and research on financial inclusion in Benin MAP and FinScope Consumer Survey Benin 2017 RFP ID: MAP BENIN_2017
More informationREQUIRED DOCUMENT FROM HIRING UNIT
Terms of reference GENERAL INFORMATION Title: GEF Biodiversity Mainstreaming and Project Design Specialists (International Consultant) Project Name : PPG Strengthening Forest Area Planning and Management
More informationYOUR CERTIFICATION PROCESS EXPLAINED
ISO 22000 FOOD SAFETY MANAGEMENT SYSTEMS FSSC 22000 FOOD SAFETY SYSTEM CERTIFICATION This document outlines the audit process for the above referenced standard. It outlines the stages to audit and gives
More informationWe think the word Professional scepticism needs to be defined in detail to avoid individual interpretation leading to confusion.
The CDM Executive Board (EB) has call for public comment on the draft of the Validation and Verification Manual (VVM). This document represents the main views of the CantorCO2e with regards to the current
More informationThe Evolution of Engineering and Institutional Controls in New Jersey
The Evolution of Engineering and Institutional Controls in New Jersey Kenneth J. Kloo NJDEP - Site Remediation Program ASTSWMO Mid-year Meeting Virginia Beach, VA April 23 & 24, 2014 1 What are Engineering
More informationConstruction Stormwater Compliance: Are You Covered Under the EPA s New 2017 Construction General Permit?
Construction Stormwater Compliance: Are You Covered Under the EPA s New 2017 Construction General Permit? Presented by: Jennifer Hildebrand Environmental Compliance Group Manager WSB and Associates, Inc.
More informationProcessing unit (fish products)
EXECUTIVE SUMMARY E1. INTRODUCTION The Proponent, Ferme Marine de Mahebourg Ltd (FMM), is involved in the Fish Farming sector in Mauritius since 2000. To date, FMM manages two declared Fish Farm Zones
More informationEnvironmental Impact Assessment (EIA) for Oil & Gas and Power Projects
Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects Insert then choose Picture select your picture. Right click your picture and Send to back. August 6-8 th, 2014 Craig A. Reid Partner,
More informationSEC ESTABLISHMENT OF PANEL ON CONTRACTING INTEGRITY.
SEC. 813. ESTABLISHMENT OF PANEL ON CONTRACTING INTEGRITY. (a) Establishment- (1) IN GENERAL- The Secretary of Defense shall establish a panel to be known as the `Panel on Contracting Integrity'. (2) COMPOSITION-
More informationLIST OF TABLES. Table Applicable BSS RMF Documents...3. Table BSS Component Service Requirements... 13
General Services Administration NS2020 Enterprise Infrastructure Solutions EIS RFP #QTA0015THA3003 Volume 2: Management BSS Risk Management Framework Plan LIST OF TABLES Table 8.2-1. Applicable BSS RMF
More informationCEQA BASICS. The California Environmental Quality Act. Prepared for: Orange County Department of Education. Prepared by:
The California Environmental Quality Act CEQA BASICS Prepared for: Orange County Department of Education Prepared by: Contact: DWAYNE MEARS, AICP Principal 714.966.9220 dmears@planningcenter.com The Beginning
More informationAnhydrous Ammonia Code of Practice Frequently Asked Questions
Anhydrous Ammonia Code of Practice Frequently Asked Questions 1. I have an audit scheduled this fall (between July 1 and December 31, 2016). Will I be audited to the revised January 2017 Ammonia Code?
More informationREPORT WRITING & INDEPENDENT REVIEW
REPORT WRITING & INDEPENDENT REVIEW 1 PRESENTED BY FAITH NGWENYA TECHNICAL & STANDARDS SERVICES EXECUTIVE Professional Accountant 2 3 QUALITY CONTROL ISQC 1 Monitoring ISQC 1 Engagement performance Human
More informationPROJECT AGREEMENT FOR THE BURNCO AGGREGATE MINE IN BRITISH COLUMBIA
PROJECT AGREEMENT FOR THE BURNCO AGGREGATE MINE IN BRITISH COLUMBIA PREAMBLE WHEREAS the Government of Canada is committed to improving the efficiency of federal environmental assessment (EA) and regulatory
More informationFILE COPY P Environmental and Social Safeguards CIDSS. Philippines: KALAHI - Public Disclosure Authorized. Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Philippines: KALAHI - P077012 CIDSS Environmental and Social Safeguards FILE COPY Environmental
More informationAUDIT COMMITTEE REGULATIONS. The Supervisory Board appointed an Audit Committee, such in accordance with Article 6 of the Regulations.
AUDIT COMMITTEE REGULATIONS INTRODUCTION The Supervisory Board appointed an Audit Committee, such in accordance with Article 6 of the Regulations. Capitalised terms used in these Audit Committee regulations
More informationPipeline Status Document. API Document AUGUST 2017
Pipeline Status Document API Document AUGUST 2017 Special Notes Classified areas may vary depending on the location, conditions, equipment, and substances involved in any given situation. Users of this
More informationEnvironmental and Social Assessment Framework (ESAF) for. Manila Third Sewerage Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Environmental and Social Assessment Framework (ESAF) for Manila Third Sewerage Project
More informationFile No: PERMANENT AUDIT FILE INDEX Annual update confirmation. Business details 1. Background to client
Client: Year/Period End: PERMANENT AUDIT FILE INDEX Annual update confirmation Business details 1. Background to client 2. Financial History 3. Register of laws and regulations 4. Related parties 5. Group
More informationFIAT CHRYSLER AUTOMOBILES N.V. AUDIT COMMITTEE CHARTER
FIAT CHRYSLER AUTOMOBILES N.V. AUDIT COMMITTEE CHARTER For so long as shares of Fiat Chrysler Automobiles N.V. (the Company ) are listed on the New York Stock Exchange ( NYSE ), the rules of the NYSE and
More informationManagement, Budget & Accounting Department Accounting & Control Bureau Section 412.2
412.2 SUBJECT: ACCOUNTS PAYABLE :1 OBJECTIVE: To provide policies and procedure for the processing and payment for all goods/services rendered to the City and to provide a uniform procedure for the determination
More informationEmployment through Skills Training & Placement. Dr. Anjuli Mishra Joint Director RCUES
Employment through Skills Training & Placement Dr. Anjuli Mishra Joint Director RCUES The National Skill Development Policy issued in March 2009 states that the demand for skilled manpower by 2022 is 50
More informationCONFIGURATION MANAGEMENT PLAN TEMPLATE
CONFIGURATION MANAGEMENT PLAN TEMPLATE This template helps you to create a Configuration Management (CM) Plan that allows a formal structure to describe how configuration management will be managed to
More informationHazardous. Scheme. the power behind your business
Hazardous Areas Scheme YOUR GUIDE TO REGISTRATION the power behind your business GUIDE TO REGISTRATION REQUIREMENTS Electrical work in potentially explosive atmospheres (hazardous areas) is not included
More informationCDM projects development activities in India. Vivek Kumar TERI 26 July 2005
CDM projects development activities in India Vivek Kumar TERI 26 July 2005 What is CDM? One of the three flexibility mechanisms in the Kyoto Protocol to the UNFCCC Purpose Joint Implementation International
More informationSpecialty Forms. User Guide
Specialty Forms User Guide Specialty Forms User Guide Table of Contents Specialty Forms Reference Materials...1-1 Specialty Forms Submission Checklist...1-2 Specialty Forms Policy and Procedure Summary...1-3
More informationIECEE OPERATIONAL DOCUMENT
IECEE OD-2048 Edition 1.5 2017-05-17 IECEE OPERATIONAL DOCUMENT IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System) Utilization of Customers Testing
More informationORGANIZATION AND METHOD OF WORK OF THE FACILITATION COMMITTEE
E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 FAL.3/Circ.211 20 April 2016 ORGANIZATION AND METHOD OF WORK OF THE FACILITATION COMMITTEE 1 The Facilitation
More informationAPPENDIX A Configuration Change Management Concepts, Principles, and Guidance
DCMA-INST 217 APPENDIX A Configuration Change Management Concepts, Principles, and Guidance Table Of Contents A1. Introduction... A-1 A2. Configuration Change Management Document Guidance... A-2 A3. Class
More informationAUDIT UNDP COUNTRY OFFICE INDONESIA. Report No Issue Date: 10 October 2014
UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP COUNTRY OFFICE IN INDONESIA Report No. 1332 Issue Date: 10 October 2014 Table of Contents Executive Summary i I. About the Office 1 II. Good practices
More informationUNC Chapel Hill Informal Contracting Guidelines
UNC Chapel Hill Informal Contracting Guidelines 1. Informal Contracts Informal bids are referenced by NC General Statute (NCGS) 143-131 as construction or repair work that does not reach the limits prescribed
More informationSOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No.: 19/2015/ND-CP Hanoi, 14 February 2015 DECREE
THE GOVERNMENT ------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No.: 19/2015/ND-CP Hanoi, 14 February 2015 DECREE DETAILING THE IMPLEMENTATION OF A NUMBER OF ARTICLES
More informationOVERVIEW OF THE PREQUALIFICATION OF MALE CIRCUMCISION DEVICES ASSESSMENT PROCESS
D i a g n o s t i c s a n d L a b o r a t o r y T e c h n o l o g y OVERVIEW OF THE PREQUALIFICATION OF MALE CIRCUMCISION DEVICES ASSESSMENT PROCESS Prequalification of Male Circumcision Devices PQMC_007
More informationHumantech Environmental Management System Manual
Humantech Management System Version 1.0 March 2014 Humantech, Inc. Humantech Management System Revision No.: 1 Date : 03-10-14 Prepared by: Approved by: (EMR) President Revision History Revision Date Description
More informationBENCHMARKING PPP PROCUREMENT 2017 IN MALAYSIA
BENCHMARKING PPP PROCUREMENT 2017 IN MALAYSIA Regulatory and Institutional Framework for PPPs Does the regulatory framework in your country allow procuring PPPs?. specify the relevant regulatory framework
More informationPUBLIC PRIVATE ENVIRONMENTAL MONITORING SCHEME OF ENVIRONMENTAL CRITICAL PROJECTS IN THE PHILIPPINES
PUBLIC PRIVATE ENVIRONMENTAL MONITORING SCHEME OF ENVIRONMENTAL CRITICAL PROJECTS IN THE PHILIPPINES Creation of a Multi Partite Monitoring Team (MMT) as an Instrument in Ensuring EIA Environmental Compliance
More informationFor Use By Certification Bodies Performing SAAS Accredited SA8000:2014 Certification Audits
1 2 3 4 5 6 SAAS Procedure 201A Accreditation Requirements 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 For Use By Certification Bodies Performing SAAS Accredited SA8000:2014 Certification Audits October
More informationUnited Nations Development Programme (UNDP) FOR THE
United Nations Development Programme (UNDP) CALL FOR EXPRESSIONS OF INTEREST AND PREQUALIFICATION FOR THE CONSTRUCTION AND REHABILITATION OF IRRIGATION SYSTEMS IN LEBANON UNDP Lebanon invites interested
More informationPrevention of Water Pollution through Regulatory Tools in Sri Lanka
Prevention of Water Pollution through Regulatory Tools in Sri Lanka Mr. K. H. Muthukudaarachchi, Director General Environmental Management and Assessment Central Environmental Authority Mr. K. H. Muthukudaarachchi
More informationContent Copy Of Original
Content Copy Of Original Ministry of the Environment Ministère de l Environnement ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 4495-9FUQDY Issue Date: February 5, 2014 Holcim (Canada) Inc. 2300 Steeles Ave
More information