Business Requirements Specification

Size: px
Start display at page:

Download "Business Requirements Specification"

Transcription

1 and Data Transparency Improvements Project Business Requirements Specification - Planning Business Requirements Specification and Data Transparency Improvements Project Doc ID: GNFDMDEHU6BB Page 1 of 20

2 and Data Transparency Improvements Project Business Requirements Specification - Planning Date Version Description Author 08/04/ Created the document Tarak Thaker 09/08/ Updated BRQ020 from 7 days to 1 day Lindsey Larson Doc ID: GNFDMDEHU6BB Page 2 of 20

3 and Data Transparency Improvements Project Business Requirements Specification - Planning Disclaimer All information contained in this draft Business Requirements Specification (BRS) as provided by the California Independent System Operator Corporation (ISO) is prepared for discussion and information purposes only. The draft BRS is provided as is without representation or warranty of any kind, including, without limitation, a representation or warranty as to accuracy, completeness, or appropriateness for any particular purpose. The draft BRS shall be revised as the development and review of the business requirements progresses. The ISO assumes no responsibility for the consequences of any errors or omissions. The ISO may revise or withdraw all or part of this information at any time at its discretion without notice. Doc ID: GNFDMDEHU6BB Page 3 of 20

4 and Data Transparency Improvements Project Business Requirements Specification - Planning Table of Contents 1. INTRODUCTION PURPOSE DETAILS OF BUSINESS NEED/PROBLEM DESCRIPTION BUSINESS PROCESS IMPACTS HIGH LEVEL BUSINESS PROCESS Description Pros RISKS AND MITIGATION JUSTIFICATION BUSINESS REQUIREMENTS CURRENT SYSTEM DIAGRAM TO-BE (FUTURE) SYSTEM DIAGRAM BUSINESS PROCESS: MANAGE PIRP DECOMISSIONING Business Requirements BUSINESS PROCESS: MANAGE DATA INTEGRATION FOR PIRP DECOMISSIONING Business Requirements BUSINESS PROCESS: MANAGE INTEGRATION FOR VER FORECAST DATA Business Requirements BUSINESS PROCESS: MANAGE DATA TRANSPARENCY FOR MARKET CLEARING AND EPI Business Requirements BUSINESS PROCESS: MANAGE VER FORECAST DATA ARCHIVAL Business Requirements BUSINESS PROCESS: MANAGE WECC VER FORECAST DATA ARCHIVAL Business Requirements BUSINESS PROCESS: MANAGE ALFS SYSTEM UPGRADE Business Requirements...20 Doc ID: GNFDMDEHU6BB Page 4 of 20

5 and Data Transparency Improvements Project Business Requirements Specification - Planning 1. Introduction 1.1 Purpose The purpose of this document is to capture and record a description of what the Users and Business Stakeholders of the project wish to obtain by providing high-level business requirements. This document establishes the basis for the agreement between the initiators and implementers of the project. The information in this document serves as input to determining the scope of Information Systems projects and to all Business Process Modeling and System Requirements Specifications efforts. These requirements will serve as the initial set of business unit requirements for the appropriate software application/systems development effort. It is understood that additional requirements and systems analysis may produce To Be Business Process Models, System Requirements Specifications, and Use Cases to serve as the set of requirements documents used by the development teams to buy, modify, or build the necessary software and hardware systems. The Business Unit(s) involved in the project will have an opportunity to review and approve all requirements documentation produced. Doc ID: GNFDMDEHU6BB Page 5 of 20

6 and Data Transparency Improvements Project Business Requirements Specification - Planning 2. Details of Business Need/Problem 2.1 Description The PIRP system is being decommissioned and its forecasting data collection and reporting functions must be implemented in another system. Additionally, Variable Energy Resource (VER) telemetry and performance data collection shall be streamlined to eliminate a cumbersome and time intensive manual process. The ALFS system must consume the dispatch operating target (DOT) from EMS/PISOA. Finally, the VER forecast data needs to be archived for the Department of Market Monitoring (DMM) analysis and reporting functions. 3. Business Process Impacts 3.1 High Level Business Process Description This project is highly involved in the following CAISO level 1 process areas: Manage Markets & Grid The description below outlines the high-level scope items for Load Improvements: 1. Decommission PIRP a. Retire PIRP system i. This includes retiring system references to PIRP on website & portal and remedy/incident management systems b. Retire PIRP processes and reports that are no longer relevant i. Two reports are deemed no longer required c. Assign required PIRP functionality to appropriate systems i. PIRP Reporting will be performed by CMRI (Forecast by resource) ii. Manage Exception Group Mapping that PIRP performed (in AIM) iii. ALFS will send Hourly forecast info to ETerraSettlements 2. Systems newly performing remaining PIRP functionality will consume data needed to provide that functionality a. This includes data pulls from OMAR, WebOMS, PISOA, others 3. Streamline labor intensive and error prone VER data input process among source systems (EMS, Master File) to destination systems PISOA, ALFS, Service Provider (currently AWS Truepower). Doc ID: GNFDMDEHU6BB Page 6 of 20

7 and Data Transparency Improvements Project Business Requirements Specification - Planning 4. Consume Dispatch Operating Target data into ALFS from EMS via PISOA to perform some functions in ALFS. 5. Persist VER Forecast Data in an archival system for DMM analysis and reporting. 6. Persist WECC Forecast Data Archival 7. Perform Data Transparency Reporting for Wind and Solar Resources Pros Since PIRP as a system is no longer architecturally well aligned with new system integrations and functionality migration into other systems, PIRP system decommissioning will help to reduce the number of system that need to be managed and maintained. Some of PIRP s required reporting and data collection functionality can be implemented in other systems that are better aligned with their system purpose. Streamlining the VER data collection process will eliminate a manual, error prone, and timeintensive process. 3.2 Risks and Mitigation There is a risk/dependency that the VER Resource infrastructure described in this BRS is in place before large VER penetration occurs as part of future model builds. 3.3 Justification This project is required to align system architecture with the purpose of each application. Doc ID: GNFDMDEHU6BB Page 7 of 20

8 and Data Transparency Improvements Project Business Requirements Specification - Planning 4. Business Requirements The sections below describe the Business Processes and the associated Business Requirements involved in the project. These may represent high level functional, non-functional, reporting and/or infrastructure requirements. These business requirements directly relate to the high level scope items determined for the project. Doc ID: GNFDMDEHU6BB Page 8 of 20

9 and Data Transparency Improvements Project Business Requirements Specification - Planning As the Load improvements project requires the decommissioning of PIRP, there are major integration changes required. 4.1 Current System Diagram OMAR RED arrows = SOA Integration OMS EMS/PI MET / MW Gen PISOA Meter Data, DB to DB MW Availability PI to ALFS Script MET / MW Gen Eterra Settlements HA VERs PIRP DA & HA VER ALFS DA and Real-Time 5 min VER Forecast Service Provider HA & DA Renewable Forecast for VER Meter Data, MW Availablity 5 Minute VER Forecast OASIS DA VER IFM/RTN Doc ID: GNFDMDEHU6BB Page 9 of 20

10 and Data Transparency Improvements Project Business Requirements Specification - Planning 4.2 To-Be (Future) System Diagram Red = Existing SOA Integration, Purple = New SOA Integration Master File MV EMS/PI Resource MW Gen, MET data, Windspeed, other Static resource data MET / MW Gen, DOT RED arrows = SOA Integration PISOA Purple = Pending 5 minute tags, 15-min Tags, MW Gen, (up to 800 tags), DOT MET / MW Gen, Resource-level data Including Resource Name, DOT Meter Data (Pull) OMAR Eterra Settlements HA VER, Latest Forecast ALFS DA and Real-Time 5 min VER Forecast Service Provider MW Availability (Pull) CMRI (resource-level reporting) DA, HA VER Per resource DA, HA VER Per resource OASIS (Aggregates resource-level to APIs region) DOT Day-Ahead, 5 Minute VER Forecast IFM/RTN External MPs 5-min VER Forecast EDR Submitted VER Forecast WebOMS SIBR Doc ID: GNFDMDEHU6BB Page 10 of 20

11 4.3 Business Process: Manage PIRP Decomissioning Business Requirements ID# Business Feature Requirement Type Business Unit(s) Affected BRQ005 BRQ010 The PIRP Participation Report shall be decommissioned. Load The PIRP Data Quality Report shall be decommissioned. Load BRQ015 The PIRP Rolling Hour-Ahead Forecast shall be decommissioned. This report shall be refreshed at T-105 minutes before the hour. It shall be reimplemented in CMRI. Load BRQ017 The PIRP Hour-Ahead Locked Report shall be decommissioned. It shall be re-implemented in CMRI. This report shall be refreshed at T-105 minutes before the hour. Load Note: this is the forecast report that is settled upon. BRQ020 The PIRP Day-Ahead Forecast Report shall be decommissioned. It shall be re-implemented in CMRI as a Variable Energy Resource (VER) forecast. This report will provide a rolling forecast for and including the next 1 day. This report shall be published and refreshed at 5:30am. Short Term Note: This requirement serves a business request by the IOUs. BRQ021 OASIS shall consume the Hour Ahead (HA) and Day-Ahead (DA) Renewable Variable Energy Resource data Short Term Note: PIRP currently supplies OASIS this payload. ALFS adapter shall provide this to OASIS. Doc ID: GNFDMDEHU6BB Page 11 of 20

12 and Data Transparency Improvements Project Business Requirements Specification - Planning ID# Business Feature Requirement Type Business Unit(s) Affected BRQ022 E-Terra shall consume the Hour Ahead (HA) Renewable Variable Energy Resource data Short Term Note: PIRP currently supplies Eterra this payload. ALFS adapter shall provide this to E Terra. BRQ023 PIRP as a system shall be decommissioned. This includes removal from CAISO website, taking back database and application storage, etc. Short Term Note: Likely to be implemented at a later time from the PIRp UI being turned off. BRQ025 A user must be able to request access for a given resource in the three aforementioned reports. Short Term Note: This requirement will be managed as part of the AIM Improvements project. BRQ027 AIM shall manage Exception Group Mapping (Entities) for CMRI to handle the three aforementioned CMRI reports (PIRP Hour-Ahead Locked Report, PIRP Day-Ahead Forecast Report, and Rolling Hour Ahead Report). This applies to the ClearedMW CMRI Reports, EPI Reports as part of the Data Transparency section. This functionality will allow for resource to role mappings and view restrictions. Short Term BRQ028 AIM shall manage User Role Mapping for CMRI to handle the three aforementioned CMRI reports (PIRP Hour-Ahead Locked Report, PIRP Day-Ahead Forecast Report, and Rolling Hour Ahead Report). This applies to the ClearedMW Report, EPI CMRI Reports as part of the Data Transparency section. This functionality will allow for user to role mappings and view restrictions. Short Term 4.4 Business Process: Manage Data Integration for PIRP Decomissioning Business Requirements Doc ID: GNFDMDEHU6BB Page 12 of 20

13 and Data Transparency Improvements Project Business Requirements Specification - Planning ID# Business Feature Requirement Type Business Unit(s) Affected BRQ100 CMRI shall consume Day-Ahead, Hour-Ahead VER Forecast Data from ALFS adapter. CMRI will use this data to support new the Hourly and Day-Ahead Forecast Reports (see BRQ020, BRQ015, BRQ017). ITPD BRQ103 CMRI shall make the Hourly and Day-Ahead Forecast Reports (see BRQ020, BRQ015, BRQ017) available to market participants in a UI format. ITPD BRQ105 CMRI shall make the Hourly and Day-Ahead Forecast Reports (see BRQ020, BRQ015, BRQ017) available to market participants in an automated manner (APIs). ITPD BRQ110 The Forecast Service Provider (AWST) shall consume Meter Data from the Meter Data management system. ITPD Note: Meter Data is currently being consumed by PIRP and is indirectly being made available to The Forecast Service Provider (AWST). BRQ115 ALFS shall consume VER MW Availability from the outage management system. ITPD Note: MW Availability data is currently being consumed by PIRP and is indirectly being made available to ALFS. BRQ116 The Forecast Service Provider (AWST) shall consume MW Availability from the outage management system. ITPD BRQ135 Note: MW Availability data is currently being consumed by PIRP and is indirectly being made available to The Forecast Service Provider (AWST). CSDS / AIM shall update profiles to manage exception group mappings. Corporate Systems BRQ140 BRQ145 Potential Requirement: WebOMS may require new roles to be implemented for the forecast provider (AWST) to pull data from WebOMS Potential Requirement: OMAR may require new roles to be implemented for the forecast provider (AWST) to pull data from OMAR. ITPD, Load ITPD, Load Doc ID: GNFDMDEHU6BB Page 13 of 20

14 and Data Transparency Improvements Project Business Requirements Specification - Planning ID# Business Feature Requirement Type Business Unit(s) Affected BRQ150 References to PIRP on the CAISO market portal shall be removed. ITPD BRQ155 PIRP shall be removed as an option for case management from CIDI / Remedy Force / AARF. ITPD, Help Desk BRQ160 AWS shall consume the Dispatch Operating Target (DOT) from RTN PSTO BRQ165 ALFS shall receive and consume the Market Participant submitted VER Forecast from the AI. Short-Term, PSTO 4.5 Business Process: Manage Integration for VER Forecast Data Business Requirements Doc ID: GNFDMDEHU6BB Page 14 of 20

15 and Data Transparency Improvements Project Business Requirements Specification - Planning ID# Business Feature Requirement Type Business Unit(s) Affected BRQ120 PISOA shall consume the Resource ID and Fuel type information for mapping PI tag data. ITPD, MCI Note: This may require an XSD update in order to consume this data. BRQ121 NEW VER Resource Procedure: 1. A resource is flagged as wind/solar (VER) as part of the NRI process 2. Generate PI Tags for all new Production resource IDs (especially for project, VER resource IDs). Rules / process outlined below: PSTO, Short Term Consume EMS point name, SO Analog table Create proper spacing between the end of the tag and the period (.) Concetenate the market resource ID suffix to the beginning of the PI tag. Concetenate.AQ (quality) and.av (value),.cv (calculated value, only for ALFS) to the end of the PI tag Formulate measurement type label based on the PI Tag Name. Include Designated Turbines and specific attrubites (windspeed, wind direction) into the PI Tag creation process o Backfill DT turbine wind speed and wind direction that are currently unavailable in PISOA. Output newly created tags into consuming system (PISOA) 2. The new PI Tag shall be validated to determine if it already exists. 3. If a PI tag must be created, create the PI tag based on Fuel Type. Include MF fuel type, measurement type, and tag value. 4. If an issue exists, then remediate manually and log and notify the issue. User must be able to view PI tags associated with the VER payload. A role shall allow for PI tag mapping edits (extra spaces, etc.). 5. Add the tag to the VER payload. BRQ122 The VER data payload shall be sent to ALFS and AWS via standard SOA. Short Term Doc ID: GNFDMDEHU6BB Page 15 of 20

16 and Data Transparency Improvements Project Business Requirements Specification - Planning ID# Business Feature Requirement Type Business Unit(s) Affected BRQ123 The VER data payload shall include Resource ID, PI Tag, Measurement Type, Fuel Type, Value. Short Term BRQ124 ALFS shall detect new VER resources and create associated forecasting models. Short Term BRQ125 ALFS shall consume several data elements Dispatch Operating Target (DOT) from IFM/RTN via a data payload. ITPD, Short Term Doc ID: GNFDMDEHU6BB Page 16 of 20

17 and Data Transparency Improvements Project Business Requirements Specification - Planning 4.6 Business Process: Manage Data Transparency for Market Clearing and EPI Business Requirements ID# Business Feature Requirement Type Business Unit(s) Affected BRQ200 CMRI s shall consume the ClearedMW quantity from all markets (DA, Hour-Ahead, FMM, RTD) for binding and advisory intervals. N/A BRQ210 CMRI shall make the Cleared MW quantity available to Market participants for all markets (DA, Hour-Ahead, FMM, RTD) for binding and advisory intervals. N/A BRQ220 CMRI shall receive and consume the Electricity Price Index (EPI) from RLC/ECIC for the Day-Ahead and Real-Time Markets. N/A BRQ230 CMRI shall make available the EPI to the Scheduling Coordinators (SCs) for owned resources. This applies for the Day-Ahead and Real-Time Markets for ISO resources and EIM Participating resources only. N/A Doc ID: GNFDMDEHU6BB Page 17 of 20

18 and Data Transparency Improvements Project Business Requirements Specification - Planning 4.7 Business Process: Manage VER Forecast Data Archival Business Requirements ALFS consumes the VER Forecast from DNVGL (Pacificorp) and AWST (CAISO). 5 minute forecasting, rolling 8 hours out. Uses the 5 minute forecast for the binding interval 10 minutes out. Day-Ahead Forecast (Hourly). ID# Business Feature Requirement Type Business Unit(s) Affected BRQ400 Every 5 minutes, the VER Forecast shall be recorded and archived for the binding interval in EDR. The binding interval is 24 five-minute values (2 hours, 12 5-minute intervals each). 288 x 24 values 6912 values per day. This shall be archived for 6 years. This will be about 631k rows of data, where each row contains the 24 5-minute interval values. PSTO, Short- Term 60 days worth of data shall be immediately available in ALFS. The rest (6 years) worth may be archived in EDR. Payloads: Submit5minVER (From AWS), Broadcast5MinVER (From ALFS) BRQ402 Daily, the Day-Ahead VER Forecast shall be recorded and archived for the binding interval in EDR. 24 hourly values per day (one hour interval). This shall be archived for 6 years. 30 to 60 days worth of data shall be immediately available in ALFS. The rest (6 years) worth may be archived in EDR PSTO, Short- Term, PSTD Payloads: SubmitDailyVER (From AWS), BroadcastDayAheadVER (From ALFS) (to be created) BRQ410 Every Market Participant Submitted VER Forecast shall be captured. 60 days worth of data shall be immediately available in ALFS. The rest (6 years) worth may be archived in EDR. Payload: XYZ5MinVER (name to be determined in SRS) PSTO, Short- Term, PSTD Doc ID: GNFDMDEHU6BB Page 18 of 20

19 and Data Transparency Improvements Project Business Requirements Specification - Planning 4.8 Business Process: Manage WECC VER Forecast Data Archival Business Requirements ID# Business Feature Requirement Type Business Unit(s) Affected BRQ500 EDR shall collect the WECC CSV file via FTP. This pull shall occur daily between 12:13pm and 2:00pm. 6 years worth of WECC data shall be stored with 60 days available online and the rest archived. PSTO, Short- Term, PSTD Doc ID: GNFDMDEHU6BB Page 19 of 20

20 and Data Transparency Improvements Project Business Requirements Specification - Planning 4.9 Business Process: Manage ALFS System Upgrade Business Requirements ID# Business Feature Requirement Type Business Unit(s) Affected BRQ600 The ALFS system shall be upgraded to the latest version, namely Current version is Integration Note: Broadcast / Receive should not change in structure. No regression test required on payload New Version Benefits:Should allow for easier MF integration. Automated MF data load. UI monitor is still manual. Allows for VER and DR model integration. PSTO, Short- Term, PSTD, ITRON See additional project plan notes here. BRQ605 The ALFS 764 (VER) schema shall be merged into the base Load Forecast schema. Note: The VER forecast model was create in a separate schema as part of the FERC 764 effort. At this time the VER schema shall be merged into the base model. PSTO, Short- Term, PSTD, ITRON Doc ID: GNFDMDEHU6BB Page 20 of 20

Business Requirements Specification

Business Requirements Specification Business s Specification Convergence Bidding on the Intertie Disclaimer All information contained in this draft Business s Specification (BRS) as provided by the California Independent System Operator

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specification Energy Storage and Distributed Energy Resources Phase -2 Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 18 Disclaimer All information contained in this draft Business Requirements

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specification Pay For Performance Regulation 1.1.4 Page 1 of 54 Revision History Date Version Description Author 04/29/2013 1.3 Add in the enhancements in the EMS mileage calculation

More information

Market Simulation Presentation Spring 2014 Release

Market Simulation Presentation Spring 2014 Release Market Simulation Presentation Spring 2014 Release Christopher McIntosh Lead Market Simulation Coordinator Spring 2014 Release February 20 th, 2014 Agenda Spring 2014 Market Simulation Initiatives and

More information

Operating Procedure PURPOSE... 1

Operating Procedure PURPOSE... 1 No. 4120C Table of Contents PURPOSE... 1 1. RESPONSIBILITIES... 2 2. SCOPE/APPLICABILITY... 3 2.1. Background... 3 2.2. Scope/ Applicability... 3 3. PROCEDURE DETAIL... 4 3.1. Detail... 4 3.2. Notice of

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents California Independent System Operator Corporation 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination Of Ancillary Service Standards...

More information

Spring 2014 Release Training

Spring 2014 Release Training Spring 2014 Release Training January 22 and 23, 2014 Cynthia Hinman California ISO The information contained in these materials is provided for general information only and does not constitute legal or

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 34. Real-Time Market... 3 34.1 Inputs To The Real-Time Market... 3 34.1.1 Day-Ahead Market Results as Inputs to the Real-Time Market... 3 34.1.2 Market Model and System Information...

More information

Flexible Ramping Product Cost Allocation Straw Proposal

Flexible Ramping Product Cost Allocation Straw Proposal Flexible Ramping Product Cost Allocation Straw Proposal March 15, 2012 Flexible Ramping Product Cost Allocation Straw Proposal Table of Contents 1 Introduction... 3 2 Prior discussion on Flexible Ramping

More information

ISO Smart Grid Use Case

ISO Smart Grid Use Case Smart Grid Roadmap DRAFT Consumption in Response to ISO Dispatch Instructions IC-1 Demand Response Providers Adjust Consumers Energy Consumption in Response to ISO Dispatch Instructions ISO Smart Grid

More information

Introduction to the Energy Imbalance Market (EIM Module 1)

Introduction to the Energy Imbalance Market (EIM Module 1) Introduction to the Energy Imbalance Market (EIM Module 1) Cynthia Hinman Lead Client Trainer Webinar July 25, 2013 The information contained in these materials is provided for general information only

More information

Day Ahead Market Enhancements: Issue Paper/Straw Proposal

Day Ahead Market Enhancements: Issue Paper/Straw Proposal Day Ahead Market Enhancements: Issue Paper/Straw Proposal Don Tretheway Senior Advisor, Market Design Policy Megan Poage Senior Market Design & Regulatory Policy Developer March 7, 2018 Agenda Time Topic

More information

EIM Winter Reliability notes and processes for EIM entities. Craig Williams Training and Readiness

EIM Winter Reliability notes and processes for EIM entities. Craig Williams Training and Readiness EIM Winter 2017 Reliability notes and processes for EIM entities Craig Williams Training and Readiness The information contained in these materials is provided for general information only and does not

More information

Operating Procedure PURPOSE... 1

Operating Procedure PURPOSE... 1 No. 4120 Table of Contents PURPOSE... 1 1. RESPONSIBILITIES... 2 2. SCOPE/APPLICABILITY... 3 2.1 Background... 3 2.2 Scope/ Applicability... 4 3. PROCEDURE DETAIL... 4 3.1 General Information... 4 3.2

More information

BPM Change Management Meeting

BPM Change Management Meeting BPM Change Management Meeting Julia Payton BPM Change Management Process Administrator BPM_CM@caiso.com April 3, 2018 The information contained in these materials is provided for general information only

More information

California ISO Energy Imbalance Market Operations Overview. June 10, 2014 Webinar

California ISO Energy Imbalance Market Operations Overview. June 10, 2014 Webinar California ISO Energy Imbalance Market Operations Overview June 10, 2014 Webinar Objectives 1. EIM Overview 2. CAISO s process in mitigating Unscheduled Flow (USF) 3. WebSAS tool: how dynamic and pseudo

More information

Release User Group Agenda 10:00 a.m. 10:55 a.m. (Pacific Time)

Release User Group Agenda 10:00 a.m. 10:55 a.m. (Pacific Time) Release User Group Agenda August 7, 2012 10:00 a.m. 10:55 a.m. (Pacific Time) Web Conference Information URL: https://www.connectmeeting.att.com Meeting Number: 8665282256 Access Code: 5251941 Conference

More information

8/28/2017 Readiness Criteria PGE EIM Readiness

8/28/2017 Readiness Criteria PGE EIM Readiness 8/28/2017 Criteria EIM 1 2 3 Generation, Interchange and Load comparison Comparison of SCADA measurement State Estimator solution Load, EIM Internal Intertie and EIM External Interties, and Generating

More information

Business Practice Manual for Scheduling Coordinator Certification & Termination and Convergence Bidding Entity Registration & Termination.

Business Practice Manual for Scheduling Coordinator Certification & Termination and Convergence Bidding Entity Registration & Termination. Business Practice Manual for Scheduling Coordinator Certification & Termination Convergence Bidding Entity Registration & Termination Version 89 Revised: January 1, 2015Junely, 2017 Approval History Approval

More information

3. Overview of Market Instruments

3. Overview of Market Instruments 3. Overview of Market Instruments 3.2 Ancillary Services Bids Four types of Ancillary Services are used by CAISO in its markets Regulation Up, Regulation Down, Spinning Reserve, and Non-Spinning Reserve.

More information

2. Market Operations Overview

2. Market Operations Overview 2. Market Operations Overview 2.5 Market Information This section summarizes and describes the common information that is used by the Day-Ahead and Real-Time processes. 2.5.1 Resource Static Data Static

More information

Energy Imbalance Market Overview

Energy Imbalance Market Overview Energy Imbalance Market Overview Presentation to: Portland General Electric EIM OATT Stakeholder Meeting David Timson Account Manager CAISO Strategic Alliances October 14, 2016 Topics for Discussion ISO

More information

ISO Course Outline. Market Transactions Class

ISO Course Outline. Market Transactions Class ISO Course Outline Purpose Market Transactions Class This two-day training class is intended to be one of the cornerstones of the market training program and is designed to review the market concepts and

More information

FERC Order 764 Settlements

FERC Order 764 Settlements FERC Order 764 Settlements Spring Release 2014 The information contained in these materials is provided for general information only and does not constitute legal or regulatory advice. The ultimate responsibility

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents Appendix N... 2 Pseudo-Tie Protocol... 2 1. Pseudo-Ties of Generating Units to the CAISO Balancing Authority Area... 2 1.1 Consistency with NERC/WECC Requirements... 2 1.2 CAISO Operating,

More information

6.1.9 IFM Initial Conditions

6.1.9 IFM Initial Conditions 6.1.9 IFM Initial Conditions A Generating Unit that was committed in the previous day s Day-Ahead Market (IFM or RUC) run (TD-2 for TD-1) but was de-committed before HE24 would normally be considered initially

More information

Release User Group Agenda

Release User Group Agenda Release User Group Agenda November 29, 2011 10:00 a.m. 10:55 a.m. (Pacific Time) Web Conference Information URL: https://www.connectmeeting.att.com Meeting Number: 8665282256 Access Code: 5251941 Conference

More information

Business Practice Manual for Scheduling Coordinator Certification & Termination and Convergence Bidding Entity Registration & Termination.

Business Practice Manual for Scheduling Coordinator Certification & Termination and Convergence Bidding Entity Registration & Termination. Business Practice Manual for Scheduling Coordinator Certification & Termination and Convergence Bidding Entity Registration & Termination Version 45 Last Revised: January February 2413, 20112012 and Convergence

More information

APPENDIX F FLEXIBLE RESERVE STUDY

APPENDIX F FLEXIBLE RESERVE STUDY Introduction This 2017 Flexible Reserve Study ( FRS ) estimates the regulation reserve required to maintain PacifiCorp s system reliability and comply with North American Electric Reliability Corporation

More information

Energy Imbalance Market Year 1 Enhancements Phase 2. Draft Final Proposal

Energy Imbalance Market Year 1 Enhancements Phase 2. Draft Final Proposal Energy Imbalance Market Year 1 Enhancements Phase 2 Draft Final Proposal September 8, 2015 Energy Imbalance Market Year 1 Enhancements Phase 2 Draft Final Proposal Table of Contents 1 Introduction... 3

More information

Generation Desk Logging

Generation Desk Logging 1. Provides guidelines for the different logging scenarios used by the Generation Dispatcher. Caution: Since Settlements reconciles and/or is supported by data from these entries, accurate and detailed

More information

Standards for Imports of Regulation

Standards for Imports of Regulation Standards for Imports of Regulation Page 1 of 12 REVISION HISTORY VERSION NO. DATE REVISED BY DESCRIPTION 3.0 11/1/12 C. Sibley R. Kott S. Adigun Document review. Update of document template to current

More information

Outage Management System Replacement. Cutover Customer Partnership Group

Outage Management System Replacement. Cutover Customer Partnership Group Outage Management System Replacement Cutover Customer Partnership Group October 9, 2014 WebOMS Cutover Customer Partnership Group AGENDA Key Dates User Access Outage Data Migration & Scenarios User Support

More information

Imbalance Conformance Enhancements. Issue Paper & Straw Proposal

Imbalance Conformance Enhancements. Issue Paper & Straw Proposal Imbalance Conformance Enhancements Issue Paper & Straw Proposal November 29, 2017 Intentionally left blank CAISO/M&ID/MDP/M.Poage Page 2 November 29, 2017 Imbalance Conformance Enhancements Issue Paper

More information

Market Simulation Structured Scenarios. Energy Imbalance Market Implementation Powerex

Market Simulation Structured Scenarios. Energy Imbalance Market Implementation Powerex Market Simulation Structured s Energy Imbalance Market Implementation Powerex Version: 1.5 February 1, 2018 Location of Document Link Revision History Date Version Author 11/13/17 Draft Initial Draft Christopher

More information

Powerex Comments on CAISO October 31, 2013 Revised Draft Order No. 764 Tariff Changes. Submitted By Company Date Submitted Gifford Jung

Powerex Comments on CAISO October 31, 2013 Revised Draft Order No. 764 Tariff Changes. Submitted By Company Date Submitted Gifford Jung Powerex Comments on CAISO October 31, 2013 Revised Draft Order No. 764 Tariff Changes Submitted By Company Date Submitted Gifford Jung 604-891-6040 Powerex Corp. November 12, 2013 I. INTRODUCTION Powerex

More information

Residual imbalance energy settlement and ramp rate changes for self-scheduled variable energy resources

Residual imbalance energy settlement and ramp rate changes for self-scheduled variable energy resources Market Issues Bulletin Residual imbalance energy settlement and ramp rate changes for self-scheduled variable energy resources March 10, 2015 www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400

More information

Market Performance and Planning Forum. January 14, 2014

Market Performance and Planning Forum. January 14, 2014 Market Performance and Planning Forum January 14, 2014 Objective: Enable dialogue on implementation planning and market performance issues Review key market performance topics Share updates to 2014 release

More information

PG&E s General Comments on Demand Response Vision Update. January 11, 2008

PG&E s General Comments on Demand Response Vision Update. January 11, 2008 PG&E s General Comments on Demand Response Vision Update January 11, 2008 This document provides PG&E s comments on the draft California Demand Response: A Vision of the Future. The comments are divided

More information

Operating Procedure PURPOSE... 1

Operating Procedure PURPOSE... 1 No. 2520 Table of Contents PURPOSE... 1 1. RESPONSIBILITIES... 2 2. SCOPE/APPLICABILITY... 3 2.1. Background... 3 2.2. Scope/ Applicability... 3 3. PROCEDURE DETAIL... 3 3.1. RT Schedule Validation and

More information

Commitment Cost Default Energy Bids Enhancements (CCDEBE) Business Rules

Commitment Cost Default Energy Bids Enhancements (CCDEBE) Business Rules CAISO proposes to allow market-based offers for each component of the supply offer subject to mitigation and to allow greater flexibility to negotiate or adjust each component. The purpose of this section

More information

Community Choice Aggregation (CCA) Reference Guide

Community Choice Aggregation (CCA) Reference Guide Community Choice Aggregation (CCA) Reference Guide Community Choice Aggregation (CCA) programs are governmental entities formed by cities and counties to serve the energy requirements of their local residents

More information

Imbalance Conformance Enhancements. Revised Draft Final Proposal

Imbalance Conformance Enhancements. Revised Draft Final Proposal Imbalance Conformance Enhancements March 14, 2018 Intentionally left blank CAISO/M&ID/MDP/M.Poage Page 2 March 14, 2018 Imbalance Conformance Enhancements Table of Contents 1. Purpose... 5 2. Scope Changes

More information

Market Simulation Fall 2013 Release

Market Simulation Fall 2013 Release Market Simulation Fall 2013 Release Christopher McIntosh Lead Market Simulation Coordinator Fall 2013 Release September 23 rd, 2013 Agenda Market Simulation Initiatives and Timelines MAP Stage Availability

More information

Market Simulation Winter 2017 Release

Market Simulation Winter 2017 Release Market Simulation Winter 2017 Release Trang Deluca Sr. Change & Release Planner Winter 2017 Release Market Simulation January 16, 2018 Agenda Winter 2017 Release Market Simulation Communication Plan Winter

More information

Two Settlement PJM /06/2016

Two Settlement PJM /06/2016 Two Settlement PJM 2016 Objectives Describe Two-Settlement process Day-Ahead Market Balancing Market Explain Virtual Transactions and their settlement Inc Offers Dec Bids Up-to Congestion Transactions

More information

Benefits for Participating in EIM February 1, 2016

Benefits for Participating in EIM February 1, 2016 Benefits for Participating in EIM February 1, 2016 www.caiso.com Revision History Date Version Description Author 01/27/2016 1.0 Lin Xu 02/02/2016 1.1 Corrects the November benefit amount referenced in

More information

Operating Procedure PURPOSE... 1

Operating Procedure PURPOSE... 1 No. 5320 Table of Contents PURPOSE... 1 1. RESPONSIBILITIES... 1 2. SCOPE/APPLICABILITY... 2 2.1. Background... 2 2.2. Scope/ Applicability... 2 3. PROCEDURE DETAIL... 3 3.1. Prerequisites... 3 3.2. Submit

More information

Operating Procedure PURPOSE... 1

Operating Procedure PURPOSE... 1 Table of Contents PURPOSE... 1 1. RESPONSIBILITIES... 2 2. SCOPE/APPLICABILITY... 2 2.1. Background... 2 2.2. Scope/ Applicability... 2 3. PROCEDURE DETAIL... 3 3.1. Order of Steps... 3 3.2. Restricted

More information

Load Granularity Refinements. Pricing Study Description and Implementation Costs Information Request

Load Granularity Refinements. Pricing Study Description and Implementation Costs Information Request Pricing Study Description and Implementation Costs Information Request October 28, 2014 Table of Contents I. Introduction... 3 II. Background... 3 III. Stakeholder Process and Next Steps... 4 IV. Pricing

More information

Market Performance and Planning Forum. December 18, 2017

Market Performance and Planning Forum. December 18, 2017 Market Performance and Planning Forum December 18, 2017 Objective: Enable dialogue on implementation planning and market performance issues Review key market performance topics Share updates to 2017 release

More information

Use-Limit Resource Guide Book Standard Version #8 Effective Date 2/2/2017

Use-Limit Resource Guide Book Standard Version #8 Effective Date 2/2/2017 Use-Limit Resource Guide Book Standard Version #8 Effective Date 2/2/2017 CAISO Public Use-Limit Resource Guide Book Standard REVISION HISTORY VERSION NO. DATE DESCRIPTION 1.0 12-12-2007 Initial Draft

More information

Release Notes OASIS April 18, Version 1.1

Release Notes OASIS April 18, Version 1.1 Release Notes OASIS 6.3.0 Version 1.1 April 18, 2013 REVISION HISTORY VERSION NO. DATE DESCRIPTION 1.0 01/09/2012 Initial version 1.1 04/18/2013 Updates on the Report Summary & API Specifications document

More information

Digital for Power & Utility Bottom Line Success. Solutions for Traders, Fuel and Portfolio Managers

Digital for Power & Utility Bottom Line Success. Solutions for Traders, Fuel and Portfolio Managers Digital for Power & Utility Bottom Line Success Solutions for Traders, Fuel and Portfolio Managers THE POWER INDUSTRY A Sector in Transition The Rise of Renewables Shifting priorities in dispatch strategies

More information

Business Practice Manual for Market Operations

Business Practice Manual for Market Operations Business Practice Manual for Market Operations Version 5354 Revised: July 13October 30, 2017 Page 1 of 345 Approval History Approval Date: March 23, 2009 Effective Date: March 31, 2009 BPM Owner: David

More information

the Real-Time Market will be based on the system marginal costs produced by the Real-Time

the Real-Time Market will be based on the system marginal costs produced by the Real-Time 17.1 LBMP Calculation The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in the Real-Time Market will be based on the system marginal costs produced by the Real-Time Dispatch

More information

Operating Procedure PURPOSE... 2

Operating Procedure PURPOSE... 2 No. 5330 Table of Contents PURPOSE... 2 1. RESPONSIBILITIES... 2 2. SCOPE/APPLICABILITY... 3 2.1. Background... 3 2.2. Scope/ Applicability... 3 3. PROCEDURE DETAIL... 3 3.1. General Testing Information

More information

RFI. Request for Information For Silicon Valley Power Data Warehouse and Reporting System

RFI. Request for Information For Silicon Valley Power Data Warehouse and Reporting System RFI Request for Information For Data Warehouse and Reporting System October 8, 2015 Table of Contents 1. Opportunity Overview... 1 2. Instructions for Vendors... 2 3. REQUEST FOR INFORMATION... 3 3.1.

More information

Release User Group Agenda

Release User Group Agenda Release User Group Agenda October 10, 2017 10:00 a.m. 11:00 a.m. (Pacific Time) Web Conference Information URL: https://www.connectmeeting.att.com Meeting Number: 8665282256 Access Code: 5251941 Conference

More information

Business Practice Manual for Market Operations

Business Practice Manual for Market Operations Business Practice Manual for Market Operations Version 4748 Revised: July 19, 2016September 1, 2016 Page 1 of 326 Approval History Approval Date: March 23, 2009 Effective Date: March 31, 2009 BPM Owner:

More information

California Independent System Operator Corporation Fifth Replacement Tariff

California Independent System Operator Corporation Fifth Replacement Tariff Table of Contents Method to Assess Available Transfer Capability... 2 L.1 Description of Terms... 2 L.1.1 Available Transfer Capability (ATC)... 2 L.1.2 Total Transfer Capability (TTC)... 2 L.1.3 Existing

More information

Final Flexible Capacity Needs Assessment for 2018

Final Flexible Capacity Needs Assessment for 2018 Final Flexible Capacity Needs Assessment for 2018 April 28, 2017 1 Table of Contents 1. Introduction... 3 2. Summary... 3 3. Defining the ISO System-Wide Flexible Capacity Need... 5 4. Forecasting Minute-by-Minute

More information

Supply Plan Template Jennie Sage Lead Compliance Analyst

Supply Plan Template Jennie Sage Lead Compliance Analyst Supply Plan Template Jennie Sage Lead Compliance Analyst Instructions Supply Plan Template will be available on CAISO website in Excel format Submitted to the CAISO each month via e- mail Each Scheduling

More information

Setting the Energy Bid Floor

Setting the Energy Bid Floor Setting the Energy Bid Floor Frank A. Wolak Department of Economics Stanford University wolak@zia.stanford.edu http://www.stanford.edu/~wolak Chairman, Market Surveillance Committee California ISO 1 Outline

More information

Load Granularity Refinements Issue Paper

Load Granularity Refinements Issue Paper Load Granularity Refinements Issue Paper September 22, 2014 Table of Contents I. Introduction... 3 II. Background... 3 III. Scope of Initiative and Plan for Stakeholder Engagement... 4 IV. FERC s Reasons

More information

MOD-001-1a Available Transfer Capability Implementation Document

MOD-001-1a Available Transfer Capability Implementation Document Available Transfer Capability Implementation Document For NERC MOD-001-2a Page 1 of 18 1.0 Purpose The California Independent System Operator Corporation (ISO), as a Transmission Service Provider 1 and

More information

Release User Group Agenda

Release User Group Agenda Release User Group Agenda January 2, 2018 10:00 a.m. 11:00 a.m. (Pacific Time) Web Conference Information Web Address: https://caiso.webex.com/meet/rug Meeting Number: 960 941 245 Audio connection instructions

More information

Dynamic Transfers Revised Draft Final Proposal

Dynamic Transfers Revised Draft Final Proposal Dynamic Transfers Revised Draft Final Proposal Provided in Support of 2009-2011 Stakeholder Process to Consider Expansion of Dynamic Transfer Services in ISO Tariff Revised February 18, 2011 CAISO/M&ID/Dynamic

More information

Release User Group Agenda

Release User Group Agenda Release User Group Agenda March 27 th, 2018 10:00 a.m. 11:00 a.m. (Pacific Time) Web Conference Information Web Address: https://caiso.webex.com/meet/rug Meeting Number: 960 941 245 Audio connection instructions

More information

Reduced Network Modeling of WECC as a Market Design Prototype

Reduced Network Modeling of WECC as a Market Design Prototype PAPER 2011GM0942 1 Reduced Network Modeling of WECC as a Market Design Prototype James E. Price, Member, IEEE, and John Goodin Abstract California s administration, legislature, and energy regulators have

More information

Issue Paper. Direct Participation of Demand Response Resources in CAISO Electricity Markets. December 22, CAISO JEP / BDC/ JDG 12/22/08, page 1

Issue Paper. Direct Participation of Demand Response Resources in CAISO Electricity Markets. December 22, CAISO JEP / BDC/ JDG 12/22/08, page 1 Issue Paper Direct Participation of Demand Response Resources in CAISO Electricity Markets December 22, 2008 CAISO JEP / BDC/ JDG 12/22/08, page 1 Direct Participation of DR Resources Table of Contents

More information

Stakeholder Comments Template

Stakeholder Comments Template Stakeholder Comments Template Submitted by Company Date Submitted Melanie Gillette mgillette@cedmc.org 916-671-2456 California Efficiency + Demand Management Council 12/18/2017 Please use this template

More information

the most promising locations for new renewables in the Imperial CREZ.

the most promising locations for new renewables in the Imperial CREZ. March 3, 2016 Imperial Irrigation District (IID) appreciates the opportunity to comment on the California Independent System Operator (CAISO) presentation during its 2/18/16 Stakeholder meeting discussing

More information

California ISO Preparing California for a Greener and Smarter Grid

California ISO Preparing California for a Greener and Smarter Grid California ISO Preparing California for a Greener and Smarter Grid Presented by Jim McIntosh Director Operations Executive Advisor California ISO Agenda CAISO Overview Current & Future Challenges Renewables

More information

Third Generation California Electricity Market Design

Third Generation California Electricity Market Design Third Generation California Electricity Market Design Dr. Chris Mensah-Bonsu Senior Market Design Engineer California ISO San Francisco Chapter Meeting IEEE Power Engineering Society San Francisco, California,

More information

Bulk Power System Integration of Variable Generation - Program 173

Bulk Power System Integration of Variable Generation - Program 173 Program Description Program Overview Environmentally driven regulations such as state-mandated renewable energy standards and federal air and water standards, along with improved economic viability for

More information

Reliability Demand Response Product

Reliability Demand Response Product Reliability Demand Response Product Straw Proposal Prepared for The Reliability Demand Response Product Stakeholder Initiative July 12, 2010 Table of Contents 1 Executive Summary... 1 2 Background... 3

More information

155 FERC 61,111 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

155 FERC 61,111 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 155 FERC 61,111 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable. Puget Sound Energy,

More information

Bridging the Gap between AMI and the Enterprise with MDM

Bridging the Gap between AMI and the Enterprise with MDM Bridging the Gap between AMI and the Enterprise with MDM Wendy Lohkamp Director, Product Marketing, Itron Kevin Walsh Industry Principal, SAP for Utilities Itron s History More than,00 customers in over

More information

ISO Smart Grid Use Case

ISO Smart Grid Use Case Smart Grid Roadmap DRAFT IC-2 ISO publishes indicators of grid conditions with expectations IC-2 ISO publishes indicators of grid conditions with expectations consumers will adjust usage ISO Smart Grid

More information

Complex Event Processing: Power your middleware with StreamInsight. Mahesh Patel (Microsoft) Amit Bansal (PeoplewareIndia.com)

Complex Event Processing: Power your middleware with StreamInsight. Mahesh Patel (Microsoft) Amit Bansal (PeoplewareIndia.com) Complex Event Processing: Power your middleware with StreamInsight Mahesh Patel (Microsoft) Amit Bansal (PeoplewareIndia.com) Agenda The Value of Timely Analytics The challenges / Scenarios Introduction

More information

Outage Coordination Training MISO Training

Outage Coordination Training MISO Training MISO Last material update: 05/19/2015 Course Content and Disclaimer 2 1 2 3 4 Course Description This course will review MISO's outage study processes and the coordination opportunities with TOs and MPs.

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 40. Resource Adequacy Demonstration for all SCs in the CAISO BAA... 3 40.1 Applicability... 3 40.1.1 [Not Used]... 3 40.2 Information Requirements for Resource Adequacy Programs... 3

More information

Dynamic Price, Product and Messaging Specification

Dynamic Price, Product and Messaging Specification 1 2 3 4 5 6 7 8 9 Retail Dynamic Price, Product and Messaging Specification (DRAFT -2) Draft Memo to OASIS Energy Interoperation TC by Ed Cazalet (original Sept 10, 2009, updated October 11, 2009) During

More information

Internal NYISO HVDC Controllable Line Scheduling. Concept of Operation. LECG Staff

Internal NYISO HVDC Controllable Line Scheduling. Concept of Operation. LECG Staff ConOp Internal NYISO HVDC Controllable Line Scheduling Concept of Operation Author: Scott Harvey, LECG Reviewers: ISO Staff LECG Staff Project Sponsor: Point of Contact: C. King B. Kranz Document Locator:

More information

April 28, Filing of CAISO Rate Schedule No. 90 Docket No. ER

April 28, Filing of CAISO Rate Schedule No. 90 Docket No. ER California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 April 28, 2017 Re: California

More information

PIRP Initiative. Conference Call July 12, Keith Johnson Dave Hawkins Jim Blatchford. Presented by 7/10/06 1

PIRP Initiative. Conference Call July 12, Keith Johnson Dave Hawkins Jim Blatchford. Presented by 7/10/06 1 PIRP Initiative Conference Call July 12, 2006 Presented by Keith Johnson Dave Hawkins Jim Blatchford 7/10/06 1 Objective of Call Report on status of efforts to possibly improve the PIRP forecast, and associated

More information

August 30, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C.

August 30, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. California Independent System Operator Corporation August 30, 2017 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 INFORMATIONAL

More information

Manual No. 010 Business Practices Manual Network and Commercial Models

Manual No. 010 Business Practices Manual Network and Commercial Models Manual No. 010 Network and Commercial Models Disclaimer This document is prepared for informational purposes only to support the application of the provisions of the Open Access Transmission, Energy and

More information

Release User Group Agenda

Release User Group Agenda Release User Group Agenda May 12, 2015 Web Conference Information URL: https://www.connectmeeting.att.com Meeting Number: 8665282256 Access Code: 5251941 10:00 a.m. 11:00 a.m. (Pacific Time) Conference

More information

June 1, Monthly Status Report re MRTU, California Independent System Operator Corporation, Docket No. ER06-615

June 1, Monthly Status Report re MRTU, California Independent System Operator Corporation, Docket No. ER06-615 California Independent June 1, 2007 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: Monthly Status Report re MRTU, California

More information

SAN DIEGO GAS & ELECTRIC COMPANY

SAN DIEGO GAS & ELECTRIC COMPANY SAN DIEGO GAS & ELECTRIC COMPANY REPORT ON DEMAND RESPONSE INTEGRATION INTO CAISO WHOLESALE MARKETS January 31, 2011 Contents 1. Executive Summary... 3 2. Status of Program Transition to Wholesale Market

More information

ISO REVISED STAGING PLAN NO. 7

ISO REVISED STAGING PLAN NO. 7 ID Work Item Description 2 COMPLETE HIM Server An archival database is to be created for permanent historical storage of bidding, price and schedule data. HIM is defined in section 3.2.5 of the SI DSOW:

More information

California ISO SIBR - BSAP Scheduling Coordinator Users Guide

California ISO SIBR - BSAP Scheduling Coordinator Users Guide California ISO SIBR - BSAP Scheduling Coordinator Users Guide Nov 4, 2014 Revision History Release California ISO SIBR - System Coordinator User Guide Date Version By Description 2/28/07 3.0 MM Added information

More information

Reliability Coordinator Data Request and Specifications for Data Provision

Reliability Coordinator Data Request and Specifications for Data Provision Reliability Coordinator and Specifications for Provision Version 11.0 APPLICABILITY: Balancing Authorities, Generation s, s, and Owners I. Purpose Provide a documented specification to applicable functional

More information

CAISO s Flexible Resource Adequacy and Must Offer Obligation Phase 2 Revised Straw Proposal Public Generating Pool and Public Power Council Comments

CAISO s Flexible Resource Adequacy and Must Offer Obligation Phase 2 Revised Straw Proposal Public Generating Pool and Public Power Council Comments CAISO s Flexible Resource Adequacy and Must Offer Obligation Phase 2 Revised Straw Proposal Public Generating Pool and Public Power Council Comments May 22, 2017 Public Generating Pool (PGP) and Public

More information

Evolution of the Grid in MISO Region. Jordan Bakke, David Duebner, Durgesh Manjure, Laura Rauch MIPSYCON November 7, 2017

Evolution of the Grid in MISO Region. Jordan Bakke, David Duebner, Durgesh Manjure, Laura Rauch MIPSYCON November 7, 2017 Evolution of the Grid in MISO Region Jordan Bakke, David Duebner, Durgesh Manjure, Laura Rauch MIPSYCON November 7, 2017 1 MISO s mission is to ensure reliable delivery of low-cost energy through efficient,

More information

Western Energy Imbalance Market

Western Energy Imbalance Market Western Energy Imbalance Market Monday, May 23, 2016 Peter Colussy, External Affairs Manager - Regional Copyright 2016 California ISO Energy Imbalance Market is an easily-scalable extension of real-time

More information

Energy Storage and Distributed Energy Resources Phase 3 ( ESDER 3 ) Issue Paper

Energy Storage and Distributed Energy Resources Phase 3 ( ESDER 3 ) Issue Paper Energy Storage and Distributed Energy Resources Phase 3 ( ESDER 3 ) Issue Paper Stakeholder Conference Call October 12, 2017 3:00 p.m. 5:00 p.m. (Pacific Time) Agenda Time Item Speaker 3:00-3:10 Stakeholder

More information

ConOp. Internal NYISO Controllable Lines. Concept of Operation. Scott Harvey, LECG. Document Locator:

ConOp. Internal NYISO Controllable Lines. Concept of Operation. Scott Harvey, LECG. Document Locator: ConOp Internal NYISO Controllable Lines Concept of Operation Author: Reviewers: Scott Harvey, LECG Project Sponsor: Point of Contact: Document Locator: Revision History Date Additions, deletions, modifications

More information