1 Permitting and Environmental Review Senate Environment and Natural Resources Committee Jeff J. Smith MPCA Industrial Division Director Larry R. Kramka MnDNR Assistant Commissioner lppt-2bsy11 January 27, 2011

2 Presentation Overview Permitting and Environmental Review Basics Process Improvement and Streamlining Results and Data Priority Projects Department of Natural Resources comments

3 MPCA Mission Working with Minnesotans to protect, conserve and improve our environment and enhance our quality of life. 3

4 Permitting Authority Federal Regulations Authority Delegated to States Specific State Legislation and Rules 4

5 Required Permits Air emissions Wastewater discharges Land solid waste, hazardous waste, tanks MPCA, DNR: >15,000 permits for building, changing and operating facilities 5

6 Permit Contents Facility Description Owner/Operator Location Description Site Activity Pollution Control Equipment Effluent/Emission Limits Reporting Requirements Federal and State Standardized Requirements 6

7 Types of Permits Individual One Permit One Facility 30-day public notice each permit General One Permit Many Facilities 30-day public notice for main permit Some additional notice for component 7

8 Permitting Process Submit Application MPCA Completeness Review General Permit: coverage issued if meet qualifications Individual Permit: evaluation, modeling, project adjustments Environmental Review, if necessary Public Notice as required Public Meeting as appropriate MPCA Citizens Board meeting as required Issuance 8

9 Environmental Review Informs decision-makers, public, and project proposers Environmental Quality Board Responsible Governmental Units State Agencies MPCA, MnDOT, MnDNR Local Governmental Units Cities, Counties, Townships MEPA: Minnesota Environmental Policy Act Minn. Stat. 116D; Mn Rule

10 Types of Environmental Review Environmental Assessment Worksheet [EAW] Standard forms Used by all RGUs 31 questions Decision: Potential for significant environmental impact? Yes EIS No Permitting Environmental Impact Statement [EIS] Follows EAW Detailed analysis of environmental impacts Alternatives analysis Socio-economic effects Decision: Adequacy of the EIS 10

11 Who manages environmental review? 7% 5% 4% 4% 2% 29% 208 total projects City County MPCA MnDOT DNR Watershed District 23% 26% Township Others 11

12 What types of projects undergo environmental review? 12

13 Process Improvements Focus on systematic review, adjust, and design more efficient and effective processes Continuous improvement tools Assess processes Gather customer input Collect and utilize data Analyze current problems Improve ways to accomplish work Eliminate waste maintain quality 13

14 Process Improvement Efforts Underway Low risk permitting General permits Electronic submission of DMRs Exploring e-business opportunities E-signature Report and application submittals New State Financial System for payments Use information for Legislative Audit 14

15 Permit Timeliness Air Permits 80% in less than 150 days Average 110 days Water Permits 75% in less than 180 days Average 130 days Land Permits Tanks average 90 days Hazardous Waste average 180 days Industrial Landfills average 365 days 15

16 Permit Timeliness 16

17 Environmental Review Timeliness Feedlot EAWs All EAWs Days Fiscal Year 17

18 Permitting Priorities Construction Permits - top Types of Construction Permits >3500 air registration and general permits Issued in 14 days of completed application construction stormwater permits Issued within 2 days of completed application Others issued within 30 days Modifications of existing facilities Reissuance with no modification 18

19 Metallic Mineral Mining and Environmental Review 19

20 Recent EISs Arcelor Mittal Expansion EIS (completed 2007) Develop East Reserve mining area Joint Federal-State EIS (Corps of Engineers) Minnesota Steel EIS (completed 2007) Mine, DRI plant, steel mill Joint Federal-State EIS (Corps of Engineers) PolyMet NorthMet EIS (DEIS 2009) New nonferrous mineral mine and processing facility Joint Federal-State EIS (Corps of Engineers & USFS) 20

21 Recent EISs (continued) US Steel Keetac Expansion EIS (completed 2010*) Expand mine and restart Phase 1 production line Joint Federal-State EIS (Corps of Engineers) Mesabi Nugget Phase II EIS (in prep) Reactivate 2 mine pits Joint Federal-State EIS (Corps of Engineers) Essar Steel EIS Supplement (in prep) Expanded indurating furnace, additional line State-only EIS Supplement 21

22 Required Review Both state and federal EISs are required for most Joint state/federal EISs are prepared Full Federal (NEPA) review is required, with state procedures and staffing providing a process framework 22

23 Joint Environmental Review Increases efficiency, reduces total time and costs, but: Increases complexity: Multiple lead agencies Different regulations, procedures Federal staffing limitations EPA role Federal cooperating agencies Tribal Trust responsibilities 23

24 What does MEPA do for NEPA? Provides resources federal agencies lack Dedicated project manager Technical staff Contractor Funding In MEPA proposer pays state EIS costs Timing MEPA time lines can influence NEPA 24

25 Major Elements of an Environmental Impact Statement Proposed Project Description Required permits and approvals Potential alternatives Existing Conditions Analysis of environmental, social, economic impacts Proposed action Alternatives Mitigation Cumulative effects 25

26 Scoping State scoping EAW Draft Scoping Decision Document Public Meeting Final Scoping Decision Document Federal Notice of Intent to prepare EIS State EIS Preparation Notice State 280-day clock begins EIS Preparation Proposer conducts studies Lead/cooperating agencies review Can require study modification Can lead to project changes Final reports delivered to consultant for EIS preparation 26

27 EIS Preparation (continued) Draft EIS Preparation Prepared by consultant Preliminary draft reviewed by lead/cooperating agencies Draft EIS Public Review EQB Monitor (state); Federal Register (federal) Public meeting Final EIS 14-day review (state); 30-day (federal) Response to Draft EIS comments State Adequacy Determination Federal Record of Decision Final Permit Decision 27

28 Potential Delays in EIS Process Joint federal-state EIS Project Complexity Project Description Technical studies Baseline data, methodologies, assumptions Results, errors, interpretations New types of impacts and necessary mitigation Conflict, communication, coordination Project modifications Changing regulations, policies and procedures Public controversy Staffing 28

29 Process Improvement Efforts Organizational structures Complete project description before scoping Stronger focus on NEPA scoping procedures Lead agency collaboration with proposer on study designs Formal procedures for communication, coordination, and decisionmaking Formal, consistent project management approach 29

30 Larry Kramka Assistant Commissioner Jeff Smith Industrial Division Director

2.1 INTRODUCTION 2.0 EIS DEVELOPMENT

2.1 INTRODUCTION 2.0 EIS DEVELOPMENT 2.0 EIS DEVELOPMENT 2.1 INTRODUCTION This section describes the development of the EIS for the NorthMet Project first proposed in 2005, through development of this SDEIS, as well as the FEIS planned for

More information

Mining and Our Natural Resources

Mining and Our Natural Resources Mining and Our Natural Resources February 28, 2008 Jennifer Engstrom Division of Lands and Minerals MN Department of Natural Resources Overview Brief overview of environmental review Permit to Mine for

More information

Public Notice (33 USCS 1344, 33 CFR 325.3) for the PolyMet Mining Corp. NorthMet Project

Public Notice (33 USCS 1344, 33 CFR 325.3) for the PolyMet Mining Corp. NorthMet Project Ms. Tamara Cameron Chief, St. Paul District Regulatory Branch US Army Corps of Engineers Sibley Square at Mears Park 190 5th Street East, Suite 401 St. Paul, MN 55101-1638 RE: Public Notice (33 USCS 1344,

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-59b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED HEARTLAND HUTTERIAN BRETHREN, INC. FEEDLOT

More information

Minnesota Pollution Control Agency Compliance and Enforcement Measures. Annual Report

Minnesota Pollution Control Agency Compliance and Enforcement Measures. Annual Report Compliance and Enforcement Measures Annual Report October 2010 Legislative Charge 2009 Session Laws, Chapter 37, Article 1, Section 3 By October 1, 2009 and 2010, the commissioner shall report to the chairs

More information

MINNESOTA ENVIRONMENTAL QUALITY BOARD

MINNESOTA ENVIRONMENTAL QUALITY BOARD Next Publication: August 20, 2012 Vol. 36, No. 16 Submittal Deadline: August 13, 2012 Submit to EQB.Monitor@state.mn.us Subscribe to receive the EQB Monitor. If you would like to receive the Monitor regularly,

More information

FY2010 Legislative Report on Environmental Assessment Worksheets

FY2010 Legislative Report on Environmental Assessment Worksheets FY2010 Legislative Report on Environmental Assessment Worksheets A summary of Environmental Assessment Worksheets completed by the Minnesota Pollution Control Agency in FY2010 October 2010 Legislative

More information

Poly Met Mining, Inc. Antidegradation Review - Preliminary Determination for 401 Certification

Poly Met Mining, Inc. Antidegradation Review - Preliminary Determination for 401 Certification Poly Met Mining, Inc. Antidegradation Review - Preliminary Determination for 401 Certification Summary Poly Met Mining, Inc. (PolyMet) submitted an application for a Clean Water Act Section 401 Water Quality

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-44b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED RANDY S SANITATION TRANSFER FACILITY PROPOSED

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-80b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED REG ALBERT LEA, LLC PROJECT FREEBORN COUNTY

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LESTER PRAIRIE WASTEWATER TREATMENT FACILITY EXPANSION

More information

Final Supplemental Environmental Impact Statement

Final Supplemental Environmental Impact Statement Essar Steel Minnesota Modifications Project Final Supplemental Environmental Impact Statement December 2011 Minnesota Department of Natural Resources Table of Contents Signature Page... i Table of Contents...

More information

PART VI MINNESOTA COASTAL NONPOINT SOURCE PROGRAM

PART VI MINNESOTA COASTAL NONPOINT SOURCE PROGRAM PART VI MINNESOTA COASTAL NONPOINT SOURCE PROGRAM A. SUMMARY OF DEVELOPMENT AND STATUS OF STATE NPS PROGRAMS 1. Background A major effort to combat water pollution began with the passage of the federal

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED MINNESOTA SOYBEAN PROCESSORS COOPERATIVE OILSEED PROCESSING

More information

Departmental Manual Part 516

Departmental Manual Part 516 Departmental Manual Part 516 Page 1 of 1 U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT Search BLM National Go What We Do Visit Us Information Center Get Involved Our Offices/Centers Contact

More information

Response to Public Scoping Comments PolyMet Mining, Inc., NorthMet Project October 25, 2005

Response to Public Scoping Comments PolyMet Mining, Inc., NorthMet Project October 25, 2005 Response to Public Scoping Comments PolyMet Mining, Inc., NorthMet Project October 25, 2005 The DNR prepared and issued for public review and comment a Scoping Environmental Assessment Worksheet (EAW)

More information

Completing an NPDES or SDS Feedlot Permit Application

Completing an NPDES or SDS Feedlot Permit Application www.pca.state.mn.us Completing an NPDES or SDS Feedlot Permit Application These instructions will assist you in preparing a permit application for an animal feedlot or manure storage area which requires

More information

National Environmental Policy Act (NEPA)

National Environmental Policy Act (NEPA) National Environmental Policy Act (NEPA) Jeff Wade Center for Governmental Responsibility University of Florida Levin College of Law The National Environmental Policy Act of 1969 (NEPA) first significant,

More information

EAW Guidelines Preparing Environmental Assessment Worksheets ENVIRONMENTAL QUALITY BOARD

EAW Guidelines Preparing Environmental Assessment Worksheets ENVIRONMENTAL QUALITY BOARD EAW Guidelines Preparing Environmental Assessment Worksheets ENVIRONMENTAL QUALITY BOARD EAW Guidelines was prepared by the staff of the Environmental Quality Board at Minnesota Planning to assist units

More information

MINNESOTA POLLUTION CONTROL AGENCY RMAD and Industrial Divisions Environment & Energy Section; Air Quality Permits Section

MINNESOTA POLLUTION CONTROL AGENCY RMAD and Industrial Divisions Environment & Energy Section; Air Quality Permits Section 001 p-bp15-01-02a 002 003 004 005 MINNESOTA POLLUTION CONTROL AGENCY RMAD and Industrial Divisions Environment & Energy Section; Air Quality Permits Section The University of Minnesota Twin Cities Combined

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED STEMMER RIDGE ROAD TRUNK SANITARY SEWER EXTENSION

More information

MPCA Update. Minnesota Association of County Planning and Zoning Administrators. John Linc Stine. Commissioner

MPCA Update. Minnesota Association of County Planning and Zoning Administrators. John Linc Stine. Commissioner Minnesota Association of County Planning and Zoning Administrators MPCA Update John Linc Stine Commissioner Our Mission: Protect and improve the environment and enhance human health October 4, 2013 Assess,

More information

May 2010 Guide to Minnesota Environmental Review Rules

May 2010 Guide to Minnesota Environmental Review Rules May 2010 Guide to Minnesota Environmental Review Rules Produced by the staff of the Environmental Quality Board at the Department of Administration, Office of Geographic and Demographic Analysis, May 2010

More information

Essar Steel Minnesota LLC. Supplemental Environmental Impact Statement Notice of Preparation - Public Information Meeting

Essar Steel Minnesota LLC. Supplemental Environmental Impact Statement Notice of Preparation - Public Information Meeting Essar Steel Minnesota LLC Supplemental Environmental Impact Statement Notice of Preparation - Public Information Meeting 25 March 2010 Project Scoping and Environmental Studies Project Scoping / Design

More information

An Approach to Siting Solid Waste Disposal Facilities in Minnesota

An Approach to Siting Solid Waste Disposal Facilities in Minnesota An Approach to Siting Solid Waste Disposal Facilities in Minnesota A collaborative effort of: McCain and Associates, Inc. R.W. Beck, Inc. SKB Environmental, Inc. Waste Management, Inc. Xcel Energy, Inc.

More information

Minnesota Pollution Control Agency

Minnesota Pollution Control Agency Minnesota Pollution Control Agency STATE OF MINNESOTA Minnesota Pollution Control Agency MUNICIPAL DIVISION PUBLIC NOTICE OF INTENT TO REISSUE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/ STATE

More information

GRAND PORTAGE BAND OF CHIPPEWA ENVIRONMENTAL DEPARTMENT P.O. Box 428, Grand Portage, MN (218)

GRAND PORTAGE BAND OF CHIPPEWA ENVIRONMENTAL DEPARTMENT P.O. Box 428, Grand Portage, MN (218) ~ -::> Q"A :-.. " orta~re c; C"l ;....,. ~ GRAND PORTAGE BAND OF CHIPPEWA ENVIRONMENTAL DEPARTMENT P.O. Box 428, Grand Portage, MN 55605 (218) 475-2026 FOND DULAC BAND OF LAKE SUPERIOR cmwpewae~onmentalprogram

More information

Wastewater Management Sources of Authority. John C. Kolb

Wastewater Management Sources of Authority. John C. Kolb Wastewater Management Sources of Authority John C. Kolb 888-899-7600 Rinke-Noonan, Ltd jkolb@rnoon.com St. Cloud, Minnesota www.rnoon.com 1 General State Regulation MPCA statutes chapter 115 regulates

More information

FINDINGS OF FACT and CONCLUSIONS

FINDINGS OF FACT and CONCLUSIONS FINDINGS OF FACT and CONCLUSIONS TH 23 North Gap: 2-Lane to 4-Lane Conversion Project from Paynesville to Richmond State Project No. 7305-124 Prepared by: Minnesota Department of Transportation CONTENTS

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT FACILITY HISTORY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT FACILITY HISTORY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED NEW SWEDEN DAIRY NEW SWEDEN TOWNSHIP NICOLLET COUNTY,

More information

NATIONAL ENVIRONMENTAL POLICY ACT PROCEDURES

NATIONAL ENVIRONMENTAL POLICY ACT PROCEDURES DocrD: 3619151 @'pproved for Release bv NSA on 04-14-2010, FOIA Case # 6098E] NATIONAL ENVIRONMENTAL POLICY ACT PROCEDURES Chapter 1 Purpose and Scope 1-1. Purpose This regulation implements the Council

More information

DRAFT SPECIAL CONDITIONS

DRAFT SPECIAL CONDITIONS RECLAMATION OF ENTIRE MINING AREA DRAFT SPECIAL CONDITIONS 1. Full, complete, and appropriate closure in compliance with all applicable standards of the entire area contained within the mining area is

More information

Mercury Reduction Plan Submittal Air Quality Permit Program Minn. R , subp. 3

Mercury Reduction Plan Submittal Air Quality Permit Program Minn. R , subp. 3 Mercury Reduction Plan Submittal Air Quality Permit Program Minn. R. 7007.0502, subp. 3 Doc Type: Regulated Party Response Instructions: Complete this form to meet the Mercury Reduction Plan requirements

More information

Association of State Wetland Managers. State Assumption of Sec. 404 of the Clean Water Act (CWA):

Association of State Wetland Managers. State Assumption of Sec. 404 of the Clean Water Act (CWA): State Assumption of Sec. 404 of the Clean Water Act (CWA): A large number of states have evaluated taking over the Section 404 program over the years. The Association of State Wetland Managers (ASWM) has

More information

ENVIRONMENTAL ASSESSMENT WORKSHEETS EAW Comment Deadline: November 8, 2006

ENVIRONMENTAL ASSESSMENT WORKSHEETS EAW Comment Deadline: November 8, 2006 Publication Date: October 9, 2006 Next Publication: October 23, 2006 Vol. 30, No. 21 Submittal Deadline: October 16, 2006 ENVIRONMENTAL ASSESSMENT WORKSHEETS EAW Comment Deadline: November 8, 2006 Project

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ROYALTON WASTEWATER TREATMENT FACILITY EXPANSION ROYALTON

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY In the Matter of the Decision on the Need for an Environmental Impact Statement for the Proposed Remer Wastewater Treatment Facility Expansion FINDINGS

More information

MINNESOTA POLLUTION CONTROL AGENCY Municipal Division Municipal Wastewater Section

MINNESOTA POLLUTION CONTROL AGENCY Municipal Division Municipal Wastewater Section MINNESOTA POLLUTION CONTROL AGENCY Municipal Division Municipal Wastewater Section Pre-Total Maximum Daily Load Phosphorus Trading Permitting Strategy June 24, 2008 ISSUE STATEMENT Minnesota Pollution

More information

US Army Corps of Engineers. Permitting Process. Chad Konickson. Chief, Southwest Section St. Paul District Regulatory Branch.

US Army Corps of Engineers. Permitting Process. Chad Konickson. Chief, Southwest Section St. Paul District Regulatory Branch. US Army Corps of Engineers Permitting Process Chad Konickson Chief, Southwest Section St. Paul District Regulatory Branch May 7, 2013 US Army Corps of Engineers BUILDING STRONG Outline St. Paul District

More information

MINNESOTA POLLUTION CONTROL AGENCY. Resource Management and Assistance Division. Board Item Cover Sheet

MINNESOTA POLLUTION CONTROL AGENCY. Resource Management and Assistance Division. Board Item Cover Sheet p-ear2-43c MINNESOTA POLLUTION CONTROL AGENCY Resource Management and Assistance Division Board Item Cover Sheet MEETING DATE: August 27, 2012 DATE MAILED: August 17, 2012 Presenter(s): Karen Kromar Phone

More information

DAKOTA COUNTY SOIL AND WATER CONSERVATION DISTRICT COMPREHENSIVE PLAN

DAKOTA COUNTY SOIL AND WATER CONSERVATION DISTRICT COMPREHENSIVE PLAN DAKOTA COUNTY SOIL AND WATER CONSERVATION DISTRICT COMPREHENSIVE PLAN 2011-2015 4100 220 th Street West, Suite 102 Farmington, MN 55024 651-480-7777 www.dakotacountyswcd.org I. INTRODUCTION A. Purpose

More information

Minnesota River Basin Interagency Study

Minnesota River Basin Interagency Study 650 Minnesota River Basin Interagency Study Agencies collaborate for basin water quality and ecosystem restoration in Minnesota, Iowa, North Dakota, and South Dakota A multi-state effort is underway to

More information

Chris Horton, Ph.D., CIA, CGAP County Auditor. Arlington County Auditor DRAFT Annual Audit Work Plan FY 2019

Chris Horton, Ph.D., CIA, CGAP County Auditor. Arlington County Auditor DRAFT Annual Audit Work Plan FY 2019 Chris Horton, Ph.D., CIA, CGAP County Auditor Arlington County Auditor DRAFT Annual Audit Work Plan FY 2019 June 19, 2018 Introduction The Annual Audit Work Plan for Fiscal Year 2019 (FY 2019 Plan) comprises

More information

Narrative for Conditional Use Permit Application Proposed AT&T Wireless Communications Facility Koochiching County CUP#1103 Introduction

Narrative for Conditional Use Permit Application Proposed AT&T Wireless Communications Facility Koochiching County CUP#1103 Introduction Narrative for Conditional Use Permit Application Proposed AT&T Wireless Communications Facility Koochiching County CUP#1103 (Revised, updated and submitted on April 22, 2011 to be added to official record

More information

520 Lafayette Road North, Saint Paul, MN Phone: Fax: December 20, 2017

520 Lafayette Road North, Saint Paul, MN Phone: Fax: December 20, 2017 520 Lafayette Road North, Saint Paul, MN 55155 www.eqb.state.mn.us Phone: 651-757-2873 Fax: 651-757-2343 December 20, 2017 Meeting Location: MPCA Board Room St. Paul, Minnesota 1:00 p.m. 4:00 p.m. AGENDA

More information

INTERNAL AUDIT OF PROCUREMENT AND CONTRACTING

INTERNAL AUDIT OF PROCUREMENT AND CONTRACTING OFFICE OF THE COMMISSIONNER OF LOBBYING OF CANADA INTERNAL AUDIT OF PROCUREMENT AND CONTRACTING AUDIT REPORT Presented by: Samson & Associates February 20, 2015 TABLE OF CONTENT EXECUTIVE SUMMARY... I

More information

actions and approvals by the Federal Aviation Administration ( FAA) and the Federal

actions and approvals by the Federal Aviation Administration ( FAA) and the Federal METROPOLITAN AIRPORTS COMMISSION In re MSP 2020 Improvements Final Environmental Assessment/Environmental Assessment Worksheet, Adequacy Determination, and Negative Declaration on the Need for an Environmental

More information

October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects

October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects Lake Elmo Airport Environmental Assessment (EA)/ Environmental Assessment (EAW) Worksheet October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects Agenda Public Event #2

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED MINNESOTA MUNICIPAL POWER AGENCY SHAKOPEE DISTRIBUTED

More information

Minnesota Pollution Control Agency

Minnesota Pollution Control Agency Minnesota Pollution Control Agency STATE OF MINNESOTA Minnesota Pollution Control Agency MUNICIPAL DIVISION PUBLIC NOTICE OF INTENT TO REISSUE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/ STATE

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

1.0 Introduction. The USACE Fort Worth District s goals for the REIS are to:

1.0 Introduction. The USACE Fort Worth District s goals for the REIS are to: Lignite Mining in Texas Chapter 1.0 Introduction 1-1 1.0 Introduction Surface coal and lignite mining operations typically conduct work that results in impacts to waters of the U.S. Such work requires

More information

Trends in Mining. Lake Superior Binational Forum (Public Input Session, Hibbing ) Mark Severson

Trends in Mining. Lake Superior Binational Forum (Public Input Session, Hibbing ) Mark Severson Trends in Mining Lake Superior Binational Forum (Public Input Session, Hibbing - 2006) Mark Severson What is driving change in the mining industry? Are there international factors that drive this change?

More information

Hello my name is Joy Loughry and I am with the groundwater technical unit of the Minnesota department of natural resources. Today I am going to talk

Hello my name is Joy Loughry and I am with the groundwater technical unit of the Minnesota department of natural resources. Today I am going to talk Hello my name is Joy Loughry and I am with the groundwater technical unit of the Minnesota department of natural resources. Today I am going to talk about how the state of Minnesota manages its Water resources

More information

Calico Baseline Data Methodologies. Notice of Prospective Applicants Readiness to Collect Baseline Data

Calico Baseline Data Methodologies. Notice of Prospective Applicants Readiness to Collect Baseline Data Background Calico Baseline Data Methodologies Notice of Prospective Applicants Readiness to Collect Baseline Data July 2017 On May 17, 2017, Calico Resources USA Corporation filed Environmental Baseline

More information

The Regulatory Framework

The Regulatory Framework The Regulatory Framework Water reuse project objectives How Do MN Agencies Currently Manage Water Reuse? Agency Roles Regulation by Source What Have We Heard? Agency roles and responsibilities Department

More information

Construct and Operate a Rail Line Between North Pole, Alaska and Delta Junction, Alaska

Construct and Operate a Rail Line Between North Pole, Alaska and Delta Junction, Alaska February 2, 2009 Reply To Attn Of: ETPA-088 Ref: 05-063-STB Mr. David Navecky STB Finance Docket No. 34658 Surface Transportation Board 395 E Street S.W. Washington, DC 20423-0001 Dear Mr. Navecky: The

More information

The Effluent Permitting Process under the Environmental Management Act. An Overview for Mine Project Applicants

The Effluent Permitting Process under the Environmental Management Act. An Overview for Mine Project Applicants The Effluent Permitting Process under the Environmental Management Act An Overview for Mine Project Applicants APRIL 2013 Disclaimer This document does not replace the Environmental Management Act or its

More information

Minnesota Water Supply Plan Instructions & Checklist

Minnesota Water Supply Plan Instructions & Checklist Minnesota Water Supply Plan Instructions & Checklist 2016-2018 Public Water Suppliers All public water suppliers in Minnesota that operate a public water distribution system, serve more than 1,000 people

More information

ATTACHMENT (12509-SPD EIS SOP) Statement of Responsibilities (Template)

ATTACHMENT (12509-SPD EIS SOP) Statement of Responsibilities (Template) ATTACHMENT 9.3.2 (12509-SPD EIS SOP) Statement of Responsibilities (Template) STATEMENT OF RESPONSIBILITIES REGARDING PREPARATION OF ENVIRONMENTAL IMPACT STATEMENT FOR DEPARTMENT OF ARMY PERMIT APPLICATION

More information

RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF WATER RESOURCES CHAPTER ENVIRONMENTAL PROTECTION FUND FEES

RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF WATER RESOURCES CHAPTER ENVIRONMENTAL PROTECTION FUND FEES RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF WATER RESOURCES CHAPTER 0400-40-11 ENVIRONMENTAL PROTECTION FUND FEES TABLE OF CONTENTS 0400-40-11-.01 General 0400-40-11-.03

More information

Internal Audit Policy and Procedures Internal Audit Charter

Internal Audit Policy and Procedures Internal Audit Charter Mission Statement Internal Audit Policy and Procedures Internal Audit Charter The mission of the Internal Audit Department is to provide independent and objective reviews and assessments of the business

More information

Feedlot Construction Setbacks from Open Water and Wells

Feedlot Construction Setbacks from Open Water and Wells Feedlot Construction Setbacks from Open Water and Wells Water Quality/Feedlots #8.30 May 2009 Contents New and expanded feedlots near waters... 2 Setbacks from wells... 3 Public water supply wells... 4

More information

March 15, The Honorable Pat Garofalo Minnesota State Representative. The Honorable Melissa Hortman

March 15, The Honorable Pat Garofalo Minnesota State Representative. The Honorable Melissa Hortman 85 7 th Place East, Suite 500 St. Paul, Minnesota 55101 2198 651 539 1500 Equal Opportunity Employer March 15, 2016 The Honorable Pat Garofalo Minnesota State Representative 485 State Office Building 100

More information

Internal Oversight Division. Internal Audit Strategy

Internal Oversight Division. Internal Audit Strategy Internal Oversight Division Internal Audit Strategy 2018-2020 Date: January 24, 2018 page 2 TABLE OF CONTENTS LIST OF ACRONYMS 3 1. BACKGROUND 4 2. PURPOSE 4 3. WIPO STRATEGIC REALIGNMENT PROGRAM 5 (A)

More information

M.A. - Marine Affairs, Environmental Management Emphasis, University of Rhode Island, 1998

M.A. - Marine Affairs, Environmental Management Emphasis, University of Rhode Island, 1998 JULIE BETHKE Education M.A. - Marine Affairs, Environmental Management Emphasis, University of Rhode Island, 1998 B.S. - Wildlife and Fisheries Science, Pennsylvania State University, 1995 Professional

More information

TABLE OF CONTENTS Notice to the Permittee Permit Shield Facility Description Amendment Description Table A: Limits and Other Requirements

TABLE OF CONTENTS Notice to the Permittee Permit Shield Facility Description Amendment Description Table A: Limits and Other Requirements TABLE OF CONTENTS Notice to the Permittee Permit Shield Facility Description Amendment Description Table A: Limits and Other Requirements GP 001 Mobile Sources GP 002 Emission Units Subject to Taconite

More information

Poly Met Mining, Inc. NPDES Antidegradation Review - Preliminary MPCA Determination

Poly Met Mining, Inc. NPDES Antidegradation Review - Preliminary MPCA Determination January 10, 2018 Poly Met Mining, Inc. NPDES Antidegradation Review - Preliminary MPCA Determination Antidegradation Procedures Overview Poly Met Mining, Inc. (PolyMet) submitted an NPDES/SDS application

More information

Terms of Reference Audit Consultant UN Women Audit Unit Office of Audit and Investigations

Terms of Reference Audit Consultant UN Women Audit Unit Office of Audit and Investigations Background: UNDP (OAI) is responsible for provision of internal audit and investigations services to UNDP and its affiliated entities. The core mandate of OAI is to provide independent, objective assurance

More information

Audit Committee Charter

Audit Committee Charter FLUOR CORPORATION Effective: 11/02/16 Supersedes: 10/31/13 I. PURPOSE AND ACTIVITIES A. Statement of Purpose The Audit Committee (the "Committee") shall Audit Committee Charter 1. Represent and assist

More information

SECTION 6: MITIGATION STRATEGY

SECTION 6: MITIGATION STRATEGY SECTION 6: MITIGATION STRATEGY This section describes the process by which the Lehigh Valley Steering Committee and municipal planning partnership performed the update to the county and local mitigation

More information

Guidance on RCRA Post Closure Care Period: Long-Term Management for Hazardous Waste Disposal Facilities

Guidance on RCRA Post Closure Care Period: Long-Term Management for Hazardous Waste Disposal Facilities Guidance on RCRA Post Closure Care Period: Long-Term Management for Hazardous Waste Disposal Facilities 1 ASTSWMO Mid-Year Meeting Virginia Beach, VA Plenary Session April 23, 2014 ~~~~~ Sonya Sasseville,

More information

SAINT CLOUD TECH HIGH SCHOOL. Board Workshop

SAINT CLOUD TECH HIGH SCHOOL. Board Workshop SAINT CLOUD TECH HIGH SCHOOL Board Workshop 08.09.2017 AGENDA Estimate Review Entry Design Update Schedule & Permit Update ESTIMATE REVIEW Where we were: SCHEMATIC DESIGN ## # # # # 4 -!%,!)5&)1"+-."!&)!"##$#%&'(#)"

More information

Design and Construction: CIP Project Management Review. Hampton Roads Sanitation District

Design and Construction: CIP Project Management Review. Hampton Roads Sanitation District Design and Construction: CIP Project Management Review Hampton Roads Sanitation District May 11, 2016 Table of Contents I. Executive Summary... 2 Background... 2 Objectives... 3 Scope... 4 Methodology

More information

East Central Solid Waste Commission Sanitary Landfill (SW-17) Expansion

East Central Solid Waste Commission Sanitary Landfill (SW-17) Expansion .Minnesota Pollution Control Agency 520 Lafayette Road North I St. Paul, MN55155-4194 I 651-296-6300 I 800-657-3864 I 651-282-5332 TTY I www.pca.state.mn.us June 8,2010 TO: RE: INTERESTED PARTIES East

More information

Analysis of the City and Borough of Juneau Mining Ordinance. CBJ ; CBJ ; and October 12, 2017

Analysis of the City and Borough of Juneau Mining Ordinance. CBJ ; CBJ ; and October 12, 2017 Analysis of the City and Borough of Juneau Mining Ordinance CBJ 49.65.110-195; CBJ 49.15.320; and 49.15.330 October 12, 2017 Prepared for the City and Borough of Juneau Municipal Attorney Prepared by Bob

More information

Application Deadline: August 14, 5 PM

Application Deadline: August 14, 5 PM Vacancy Announcement Title: Reports To: Location: Salary: Classification: Summary: Chief of Staff Tribal Council Happy Camp with travel to other offices $90,000 - $120,000 DOE Full Time, Regular, Exempt,

More information

FINAL SUPPLEMENTAL FINAL ENVIRONMENTAL IMPACT STATEMENT

FINAL SUPPLEMENTAL FINAL ENVIRONMENTAL IMPACT STATEMENT Date FINAL SUPPLEMENTAL FINAL ENVIRONMENTAL IMPACT STATEMENT For Trunk Highway 60 St. James to Windom Prepared by: Minnesota Department of Transportation and Federal Highway Administration Minnesota Division

More information

State Disposal System Permit Number MN

State Disposal System Permit Number MN State Disposal System Permit Number Permittee: Facility name: Elk River Municipal Utilities Elk River Municipal Utilities Water Treatment Facility City: Elk River County: Sherburne Issuance date: July

More information

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR All the documents shown today are in the MN Stormwater Manual on the page titled 2018 Construction Stormwater Permit Public Notice and Public Informational

More information

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC DRAFT AIR EMISSION PERMIT NO. 07900006 004 Major Amendment IS ISSUED TO Miller Milling Co LLC Miller Milling Co LLC 100 2nd Avenue Southwest New Prague, Le Sueur County, MN 56071 The emission units, control

More information

Audit of Entity Level Controls

Audit of Entity Level Controls Unclassified Internal Audit Services Branch Audit of Entity Level Controls February 2014 SP-606-03-14E You can download this publication by going online: http://www12.hrsdc.gc.ca This document is available

More information

AIR EMISSION PERMIT NO IS ISSUED TO ISPAT INLAND STEEL MINING CO

AIR EMISSION PERMIT NO IS ISSUED TO ISPAT INLAND STEEL MINING CO AIR EMISSION PERMIT NO. 13700062-001 IS ISSUED TO ISPAT INLAND STEEL MINING CO Ispat Inland Steel Mining Co U.S. Highway 53 North Virginia, St. Louis County, Minnesota 55792 The emission units, control

More information

ENVIRONMENTAL ASSESSMENT WORKSHEETS

ENVIRONMENTAL ASSESSMENT WORKSHEETS June 5, 2006 EQB Monitor ENVIRONMENTAL ASSESSMENT WORKSHEETS Comments due on July 5, 2006 Meadowbrook Description: Meadowbrook is a 232 acre project located in Sections 12 and 13, Township 33, Range 27,

More information

Published by Minnesota Rural Water Association BOARD MEMBER GUIDANCE MANUAL

Published by Minnesota Rural Water Association BOARD MEMBER GUIDANCE MANUAL Published by Minnesota Rural Water Association BOARD MEMBER GUIDANCE MANUAL Copyright 2012 by the Minnesota Rural Water Association Our Mission: "To provide the latest information, education, and technical

More information

Major environmental impact assessment (EIA) processes in Queensland

Major environmental impact assessment (EIA) processes in Queensland Major environmental impact assessment (EIA) processes in Queensland By Dr Chris McGrath (8 November 2011) Environmental impact assessment (EIA) is the term used to describe a variety of processes used

More information

Recommendations for BLM Streamlining Planning & NEPA. July 24, 2017

Recommendations for BLM Streamlining Planning & NEPA. July 24, 2017 Recommendations for BLM Streamlining Planning & NEPA July 24, 2017 A. Focused Analysis: How can the BLM reduce duplicative and disproportionate analyses? 1. Solution #1 Develop Guidance that Broadly Interprets

More information

100 Rev. Dr. Martin Luther King Jr. Blvd 75 Rev. Dr. Martin Luther King Jr. Blvd Saint Paul, Minnesota Saint Paul, Minnesota 55155

100 Rev. Dr. Martin Luther King Jr. Blvd 75 Rev. Dr. Martin Luther King Jr. Blvd Saint Paul, Minnesota Saint Paul, Minnesota 55155 Minnesota House of Representatives Minnesota Senate 100 Rev. Dr. Martin Luther King Jr. Blvd 75 Rev. Dr. Martin Luther King Jr. Blvd Saint Paul, Minnesota 55155 Saint Paul, Minnesota 55155 January 23,

More information

Section 2 Environmental Considerations for Port Development and Operations

Section 2 Environmental Considerations for Port Development and Operations Environmental Considerations for Port Development and Operations The purpose of this section is to identify port development and operation activities that may affect environmental quality. For each activity,

More information

Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals:

Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals: Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals: The King County Flood District (District) is seeking proposals from firms to prepare a programmatic

More information

Minnesota Department of Transportation County Road 82 West Roseville, MN Metropolitan District - Waters Edge. Phone: (651)

Minnesota Department of Transportation County Road 82 West Roseville, MN Metropolitan District - Waters Edge. Phone: (651) An Equal Opportunity Employer 8 0 0 0 Minnesota Department of Transportation Metropolitan District - Waters Edge 1500 County Road 82 West Roseville, MN 55113-3174 Phone: (651) 234-7720 DATE: TO: FROM:

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description p-ear2-01a STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED MAR-KIT SANITARY LANDFILL, KITTSON COUNTY,

More information

Annex A. Templates for the Procurement Post Review Report

Annex A. Templates for the Procurement Post Review Report Annex A. Templates for the Procurement Post Review Report Country Loan / Credit / Trust Fund #: Project name*: Project ID: Name (s) of Implementing Agency (ies): TL: APS/PAS: Hub Coordinator Post Review

More information

Managing Risks For Results Internal Audit Perspective. Planning & Performance Exchange (PPX) Learning Event November 3, 2009

Managing Risks For Results Internal Audit Perspective. Planning & Performance Exchange (PPX) Learning Event November 3, 2009 Managing Risks For Results Internal Audit Perspective Planning & Performance Exchange (PPX) Learning Event November 3, 2009 Overview Why Focus on Risk Management? IA Risk Management Tools/Processes Risk-based

More information

for The Minnesota Pollution Control Agency

for The Minnesota Pollution Control Agency DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT STATE OF MINNESOTA Minnesota Pollution Control Agency Municipal Division National Pollutant Discharge Elimination System (NPDES)/ State Disposal System (SDS) Permit

More information

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number: Public Notice Applicant: City of Dallas Project No.: SWF- 2014-00151 Date: April 18, 2014 The purpose of this public notice is to inform you of a proposal for work in which you might be interested. It

More information

Minnesota Pollution Control Agency

Minnesota Pollution Control Agency DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT STATE OF MINNESOTA Minnesota Pollution Control Agency Industrial Division National Pollutant Discharge Elimination System (NPDES)/ State Disposal System (SDS)

More information

Solid Waste Facility Draft Permit SW

Solid Waste Facility Draft Permit SW Solid Waste Facility Draft Permit Permittee: Facility name: Ramsey/Washington Recycling and Energy Board Recycling and Energy Center 100 Red Rock Road Newport, Minnesota 55055-1827 Washington County Issuance

More information

NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, SEPTEMBER 30, 2018

NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, SEPTEMBER 30, 2018 NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, 2017 - SEPTEMBER 30, 2018 Introduction This document serves as the Pennsylvania Department of Environmental Protection

More information

FY Biennial Budget Request Mille Lacs SWCD

FY Biennial Budget Request Mille Lacs SWCD FY 18-19 Biennial Budget Request Mille Lacs SWCD Total Requested Biennial State Contribution: $1,075,818.00 BBR ID BBR16-0773 Total Leveraged Funds $200,000.00 Submitted Date 4/14/2016 Total Resource Project

More information