STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

Size: px
Start display at page:

Download "STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY"

Transcription

1 STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY In the Matter of the Decision on the Need for an Environmental Impact Statement for the Proposed Remer Wastewater Treatment Facility Expansion FINDINGS OF FACT AND CONCLUSIONS The city of Remer (City) is proposing to reconstruct and expand its wastewater treatment facility (WWTF). Pursuant to Minn. R , subp. 18.B., the Minnesota Pollution Control Agency (MPCA) staff has prepared an Environmental Assessment Worksheet (EAW) for the project. Based on the EAW and comments or information received during the EAW comment period, the MPCA hereby makes the following. PROJECT DESCRIPTION FINDINGS OF FACT 1. Project Proposal. The City (population 345) is proposing to upgrade its wastewater collection and treatment system to alleviate deficiencies in the current system. The upgrades include repairing and expanding the collection system (including the installation of one new lift station and replacing two that are malfunctioning), constructing an additional 9.67-acre treatment pond on a 12-acre site, and replacing the force-main between the treatment ponds and the new lift station. Upon completion, the proposed pond will become the primary pond to which all of the City s wastewater will be diverted for primary treatment. The existing treatment ponds will then become secondary treatment ponds. Upon completion, the total wastewater treatment system (stabilization ponds) will comprise 17.6 acres, with a total operating volume of million gallons. This will provide a total detention time of 215 days based upon a 106,300 gallons per day (gpd) flow. TDD (for hearing and speech impaired only): (651) Printed on recycled paper containing at least 100% fibers from paper recycled by consumers

2 2. Existing System. The current system consists of a collection system and stabilization ponds that discharge treated effluent into the Willow River during spring and fall, as permitted in an MPCA National Pollutant Discharge Elimination Systems (NPDES) permit. The two existing stabilization ponds include: a primary treatment pond, 5.2 acres in size with a capacity of 6.78 million gallons, and a secondary treatment pond, 2.7 acres in size with a capacity of 3.52 million gallons. They are located southeast of the City. The ponds were sized based on a design flow of 55,000 gpd and a total detention time of 180 days. A 1997 evaluation concluded that the existing system is inadequate: a) the stabilization ponds are undersized; b) many pipes in the collection system are too shallow and subject to periodic freezing (creating a need to leave faucets running to mitigate the problem which, in turn, adds unnecessary inflow to the treatment ponds); c) other pipes need to be replaced as they are allowing ground water to infiltrate into the system; d) serious problems exist with the two lift stations (one of which is not functioning at all); and e) force-mains are in need of repair. In addition, residences located in the south and west part of the City are not currently connected to the municipal treatment system, and many of the existing individual sewage treatment systems (ISTSs) in these areas are known to be failing and out of compliance with applicable requirements

3 3. Project Site. The repairs and extension of the collection system will be made within the City. The City is a small residential community located in north central Minnesota, situated in the southeastern corner of the Chippewa National Forest. The additional treatment pond will be built within a 12-acre parcel of farmland, located directly north and adjacent to the existing ponds, on property that the City is in the process of purchasing. While the geography around the City predominately consists of forests in varied terrain intermixed with water features, lakes, streams, and wetlands, the parcel of land where the proposed pond will be built is currently used for agricultural purposes (grazing). This land parcel is outside of the City s incorporated area. 4. Major Elements. The proposed project consists of the following planned improvements: a) construct a properly-designed collection system for the unsewered areas of the City and repair and/or replace deficient components of the existing collection system (including installing three new lift stations); b) replace the force-main between one of the faulty lift stations and the treatment ponds; and c) expand the existing treatment pond system. With the exception of the treatment pond expansion, the improvements will be done in existing right-of-ways and easement areas. An estimated 50 new connections will be added to the wastewater collection system as a result of the extension of the collection system. 5. The additional 9.67-acre pond will have a million-gallon capacity and will be constructed with a synthetic liner. Select granular borrow will be used above and below the lining for protection. To prevent erosion, the inside of the pond dikes will have at least a nine inch layer of riprap extending from the toe of the dike to one foot above the six foot water level. The proposal is designed to meet the City s wastewater treatment needs for a 20-year time frame. 6. Treated wastewater will be released from the ponds to the Willow River in accordance with the NPDES permit requirements. The existing, sufficiently sized, gravity flow outfall line will be used to allow the discharge of up to six inches of water from the ponds each day during the discharge period. PROJECT HISTORY 7. The project involves the expansion of a municipal WWTF, which will result in an increase of more than 50 percent of its Average Wet Weather (AWW) design flow. The preparation of an EAW is mandatory pursuant to Minn. R , subp. 18.B. 8. An EAW was prepared on May 25, A press release containing the notice of availability of the EAW for public review was provided to media serving the project area on May 29, The public comment period for the EAW began on May 29, 2000, and ended on June 28, One comment letter from the Minnesota Historical Society was received during the 30-day comment period. Responses to comments received have been prepared by MPCA staff and are hereby incorporated by reference

4 CRITERIA FOR DETERMINING THE POTENTIAL FOR SIGNIFICANT ENVIRONMENTAL EFFECTS 11. In deciding whether a project has the potential for significant environmental effects, the MPCA must consider the four factors set out in Minn. R , subp. 7.A. These criteria are: A) the type, extent, and reversibility of environmental effects; B) cumulative potential effects of related or anticipated future projects; C) the extent to which the environmental effects are subject to mitigation by ongoing public regulatory authority; and D) the extent to which environmental effects can be anticipated and controlled as a result of other available environmental studies undertaken by public agencies or the project proposer, including other Environmental Impact Statements (EISs). The MPCA findings with respect to each of these issues are set forth below. TYPE, EXTENT, AND REVERSIBILITY OF ENVIRONMENTAL EFFECTS The first factor that the MPCA must consider is the "type, extent, and reversibility of environmental effects," Minn. R , subp. 7.A. The MPCA findings with respect to each of these issues are set forth below. 12. Fish, Wildlife, and Ecologically Sensitive Resources. No critical habitats, threatened or endangered species are known to exist in the vicinity of the project. Treated effluent from the stabilization ponds will be discharged to the Willow River in accordance with the provisions of the NPDES Wastewater Permit. The effluent limits in the discharge permit are established to protect water quality standards for the receiving waters and their designated uses. The MPCA finds that the project will not have extensive and/or irreversible environmental effects related to wildlife resources. 13. Potential Impacts on Water Quality. All wastewater entering the WWTF is generated at residential and commercial sources. The proposed effluent limitations are intended to protect the uses of, and prevent degradation to, the receiving waters. In this case the receiving water is the Willow River, a multiclassified designated use water (2B, 3B, 4A, 4B, 5 and 6). The proposed limits, which would be included in the facility s discharge permit, are as follows: Five-day carbonaceous biochemical oxygen demand: 25 milligrams per Liter (mg/l) Total Suspended Solids: 45 mg/l Fecal Coliform Group Organisms: 200 organisms per 100 milliliters ph: Phosphorus: a limit may be imposed The MPCA finds that the project will not have extensive and/or irreversible environmental effects related to water quality

5 14. Physical Impacts on Water Resources. The outfall at the new pond will discharge to the Willow River using the existing outfall structure. Also, the new force main, which needs to cross the Willow River, will be installed by boring under the river to avoid streambank erosion and restoration problems. Consequently, MPCA finds that the project will not have extensive and/or irreversible physical impacts upon the Willow River or any other water resource. 15. Potential for Groundwater Contamination. No adverse impacts on ground water are expected. The proposed additional pond will contain a synthetic liner, which will mitigate the potential for ground-water contamination. Also, the integrity of the existing ponds has been evaluated and found not to be causing any adverse ground-water effects. MPCA finds that the project will not have extensive and/or irreversible environmental effects related to ground-water contamination. 16. Water-related Land Use Management Districts. The land where the proposed treatment ponds will be constructed is within the Cass County-regulated shoreland zoning district, which comprises a ¼ mile zone adjacent to this part of the Willow River. The county ordinance requires sewage treatment systems to be located at least 100 feet away from the ordinary high water level (OHWL), and structures must be located no closer than 150 feet to the OHWL. As the new wastewater treatment ponds are proposed to be located 200 feet away from the OHWL, and no structures are proposed to be built within the 150 feet setback area, the proposal is compatible with the shoreland provisions of the county ordinance. 17. Erosion and Sedimentation. The potential for erosion during repair and extension of the collection system will exist until the roadway and vegetative cover is re-established. Similarly, the potential for erosion during construction of the new treatment pond will also exist until the work is complete and the dikes have been vegetated. The project will be subjected to the conditions of a NPDES permit for discharge of stormwater run-off from the construction sites, including developing an erosion control plan and incorporating best management practices to prevent potential stormwater pollution. Site-specific erosion control plans have been completed, which include silt fencing, straw bale sediment traps, temporary and permanent seeding, and mulching. Disturbed areas for the collection system portion of the project will be restored to pre-construction conditions. Areas disturbed for the treatment ponds will be seeded with a Minnesota Department of Transportation (MnDOT) specified grass seed mix. MPCA finds that the project does not have extensive and/or irreversible environmental effects related to Erosion and Sedimentation. 18. Dust, Odors and Noise. A certain amount of dust is unavoidable during construction; however, this will be minimized by using dust control measures, primarily the use of water sprayed from a water truck, and by minimizing the time it takes to establish temporary or permanent vegetative cover on exposed soils. The collection system extension and repair work will create some shortterm noise impacts, which will be mitigated by limiting construction activity to daylight hours (7:00 a.m. to 7:00 p.m.). The heavy equipment that will be used for the pond construction will also generate noise; however, as no residences are within one-quarter mile of the pond site, this is not anticipated to be a problem. The stabilization ponds typically generate odors for a brief period (three to seven days) each spring when the ponds lose their ice cover and the contents are mixed. The MPCA finds that the project does not have extensive and/or irreversible environmental effects related to dust, odor or noise

6 CUMULATIVE POTENTIAL EFFECTS OF RELATED OR ANTICIPATED FUTURE PROJECTS The second factor that the MPCA must consider is the "cumulative potential effects of related or anticipated future projects," Minn. R , subp. 7.B. The MPCA findings with respect to this factor are set forth below The current collection and treatment system was designed in the 1960s and parts of the system were updated in the 1980s. The new ponds and collection system are being designed to handle the existing demands placed on the system, and also to provide enough capacity to handle the anticipated growth of the City for the next 20 years and possibly some orderly annexation. The City s 20 year growth is estimated at 20 percent. The potential annexation is estimated to add an additional 50 new residential connections to the system. The proposed effluent limits would be protective of water quality and of species in the receiving water. The project enables approximately 50 households that are currently using ISTSs to be connected to the wastewater collection system. Many of these ISTs are known to be failing and out of compliance with applicable requirements. The connection of these households would thereby eliminate the potential ground water and human health threat these systems pose. 26. The MPCA finds that there are no related or anticipated future actions which could result in cumulative, adverse, environmental effects. THE EXTENT TO WHICH THE ENVIRONMENTAL EFFECTS ARE SUBJECT TO MITIGATION BY ONGOING PUBLIC REGULATORY AUTHORITY The third factor that the MPCA must consider is "the extent to which the environmental effects are subject to mitigation by ongoing public regulatory authority," Minn. R , subp. 7.C. The MPCA findings with respect to this factor are set forth below. 25. The following permits or approvals will be required for the project: Unit of Government Permit or Approval Required FEDERAL: a. U.S. Department of Agriculture (USDA), Rural Utilities Service b. USDA Rural Development c. USDA Rural Development Loan and Grant Program NEPA Environmental Assessment Facility Plan d. USDA Rural Development Plan Review - 6 -

7 STATE: e. Mn Dept. of Trade and Economic Development Small Cities Development Program Grant f. MPCA Facility Plan g. MPCA NPDES Permit Stormwater h. i. j. k. l. m. MPCA MPCA MnDOT MN Department of Natural Resources (MDNR) LOCAL: Cass County Cass County NPDES Permit Wastewater Discharge State Disposal System Permit (Sewer Extension) Utility Permit (Right-of-way access) Utility Crossing License/Protected Waters Permit Reclassification of Land Use/Zoning District Conditional Use Permit 26. Description of the Scope of Key Permits/Approvals: a. USDA. Federal funding has been earmarked for this project. In order to receive such funding, the proposal is required to complete a federal environmental assessment and to gain the approvals specified above. The federal environmental assessment process has been completed, and a Findings of No Significant Impacts was issued on November 18, b. MPCA. The MPCA will prepare and issue a NPDES permit (wastewater discharge), which will contain conditions to ensure that wastewater loadings to the facility will be given adequate treatment, following a 30-day public comment period. A General NPDES Stormwater permit is required for projects that will disturb five or more acres, and it requires the permittee to mitigate the potential adverse effects from erosion and sedimentation during construction. c. MDNR. A MDNR Utility Crossing License/Protected Waters Permit is required for the force main which will be constructed beneath the Willow River. The permittee is required to abide by all conditions to ensure that this activity will not negatively impact this protected water. d. Cass County. The proposed treatment pond will be located in an area outside of the City limits. Since that land is currently zoned as residential, a rezoning request must be approved, and a conditional use permit granted, for the pond to be constructed at this location

8 27. The MPCA finds that the permits and monitoring reports that are required by public regulatory authority will provide additional opportunity to mitigate the environmental effects of the project, if necessary. THE EXTENT TO WHICH ENVIRONMENTAL EFFECTS CAN BE ANTICIPATED AND CONTROLLED AS A RESULT OF OTHER AVAILABLE ENVIRONMENTAL STUDIES UNDERTAKEN BY PUBLIC AGENCIES OR THE PROJECT PROPOSER, INCLUDING OTHER EISs. The fourth factor that the MPCA must consider is "the extent to which environmental effects can be anticipated and controlled as a result of other available environmental studies undertaken by public agencies or the project proposer, including other EISs," Minn. R , subp. 7.D. The MPCA findings with respect to this factor are set forth below. 28. The proposed project: repairing and expanding the City s WWTF collection system and constructing the additional treatment pond, has been reviewed by the MPCA staff There are no elements of the project that pose the potential for significant environmental effects which cannot be addressed in the project design and permit development processes. The MPCA finds that the environmental effects of the project can be anticipated and controlled as a result of environmental review, previous environmental studies, and permitting processes undertaken by the MPCA on similar projects. CONCLUSIONS 1. The EAW, the permit development process, the facility planning process, and responses prepared by MPCA staff in response to comments on the Remer Wastewater Treatment Facility Expansion EAW (the project), have generated information adequate to determine whether the project has the potential for significant environmental effects. 2. Areas where the potential for significant environmental effects may have existed have been identified and appropriate mitigative measures have been incorporated into the project design and permits. The project is expected to comply with all MPCA standards. 3. Based on the criteria established in Minn. R , the project does not have the potential for significant environmental effects. 4. An Environmental Impact Statement is not required. 5. Any findings that might properly be termed conclusions and any conclusions that might properly be termed findings are hereby adopted as such. Karen A. Studders, Commissioner Minnesota Pollution Control Agency Date - 8 -

9 COMMENTS AND RESPONSES TO COMMENTS Remer Wastewater Treatment Facility Expansion 1. Britta L. Bloomberg, Deputy State Historic Preservation Officer, Minnesota Historical Society, dated, January 27, Comment 1-1: The commenter stated that: a) there are no properties listed on the National or State Registers of Historic Places, and there are no known or suspected archaeological properties in the area that will be affected by this project; and b) the no response to EAW question 25a is appropriate. Response: The comment is noted (no response necessary).

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LONSDALE WASTEWATER TREATMENT FACILITY EXPANSION,

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LESTER PRAIRIE WASTEWATER TREATMENT FACILITY EXPANSION

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED METROPOLITAN COUNCIL ENVIRONMENTAL SERVICES ST. LOUIS

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED EAGLE BEND WASTEWATER TREATMENT FACILITY IMPROVEMENTS

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-20b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LONG PRAIRIE MUNICIPAL WASTEWATER TREATMENT

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED WAHKON WASTEWATER TREATMENT FACILITY EXPANSION MILLE

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT FACILITY HISTORY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT FACILITY HISTORY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED HOWARD LAKE WASTEWATER TREATMENT IMPROVEMENTS PROJECT

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ROYALTON WASTEWATER TREATMENT FACILITY EXPANSION ROYALTON

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. St. Francis Wastewater Treatment Facility Project Description

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. St. Francis Wastewater Treatment Facility Project Description p-ear2-78b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ST. FRANCIS WASTEWATER TREATMENT FACILITY

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED PLAINVIEW ELGIN WASTEWATER TREATMENT FACILITY IMPROVEMENTS

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED NEW FASHION PORK, ENGELKES SITE NOBLES COUNTY WORTHINGTON,

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ELK RIVER LANDFILL INTERNAL COMBUSTION ENGINE GENERATOR

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-44b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED RANDY S SANITATION TRANSFER FACILITY PROPOSED

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ASMUS EGG FARMS INC FEEDLOT EXPANSION ALFSBORG TOWNSHIP

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED STEMMER RIDGE ROAD TRUNK SANITARY SEWER EXTENSION

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED PJM PORK, INC. SWINE FEEDLOT EXPANSION PROJECT COURTLAND

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-59b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED HEARTLAND HUTTERIAN BRETHREN, INC. FEEDLOT

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-75b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED STROBEL FARMS JUNGBLOET SITE & BUECKSLER SITE BLUE

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

TO INTERESTED PARTIES: RE: Heartland Corn Products Ethanol Plant Expansion

TO INTERESTED PARTIES: RE: Heartland Corn Products Ethanol Plant Expansion TO INTERESTED PARTIES: RE: Heartland Corn Products Ethanol Plant Expansion The Minnesota Pollution Control Agency (MPCA) has approved the Findings of Fact for the Environmental Assessment Worksheet (EAW)

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description p-ear2-46b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED SHAMROCK RECYCLING AND TRANSFER STATION

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED MINNESOTA SOYBEAN PROCESSORS COOPERATIVE OILSEED PROCESSING

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED AHRENDT BROTHERS CATTLE EXPANSION PROJECT MOUND TOWNSHIP,

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT PROPOSED PROJECT DESCRIPTION

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT PROPOSED PROJECT DESCRIPTION STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ANNANDALE/MAPLE LAKE WASTEWATER TREATMENT FACILITY

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ANDERSEN CORPORATION - PROJECT XL WASHINGTON COUNTY

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-60b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ELK RIVER WASTEWATER TREATMENT FACILITY

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-68b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED PIRKL GAS, INC. PROPANE STORAGE EXPANSION

More information

Minnesota Pollution Control Agency

Minnesota Pollution Control Agency Minnesota Pollution Control Agency STATE OF MINNESOTA Minnesota Pollution Control Agency MUNICIPAL DIVISION PUBLIC NOTICE OF INTENT TO REISSUE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/ STATE

More information

SOUTH ST. LOUIS SOIL AND WATER CONSERVATION DISTRICT FINDINGS OF FACT

SOUTH ST. LOUIS SOIL AND WATER CONSERVATION DISTRICT FINDINGS OF FACT SOUTH ST. LOUIS SOIL AND WATER CONSERVATION DISTRICT RECORD OF DECISION In the Matter of the Determination of the Need for an Environmental Impact Statement for the Sargent Creek Channel and Floodplain

More information

STATE OF MINNESOTA. Minnesota Pollution Control Agency

STATE OF MINNESOTA. Minnesota Pollution Control Agency STATE OF MINNESOTA Minnesota Pollution Control Agency MUNICIPAL DIVISION PUBLIC NOTICE OF INTENT TO REISSUE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/ STATE DISPOSAL SYSTEM (SDS) PERMIT MN0054305

More information

TO INTERESTED PARTIES: RE: Chippewa Valley Ethanol Company Expansion

TO INTERESTED PARTIES: RE: Chippewa Valley Ethanol Company Expansion TO INTERESTED PARTIES: RE: The Minnesota Pollution Control Agency (MPCA) has approved the,, and Order for the Environmental Assessment Worksheet (EAW) on the proposed Project, Swift County. The Findings

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-94b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED CITY OF MORGAN CONSTRUCTION OF WASTEWATER

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY In the Matter of the Decision on the Need for an Environmental Impact Statement for the Proposed Environmental Assessment Worksheet REVISED FINDINGS

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED BINFORD FARMS SECTION 4 FEEDLOT EXPANSION MAGNOLIA

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-80b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED REG ALBERT LEA, LLC PROJECT FREEBORN COUNTY

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-127b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED CITY OF TRACY CONSTRUCTION OF NEW WASTEWATER

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED MONTROSE REGIONAL WASTEWATER TREATMENT FACILITY EXPANSION,

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED FLINT HILLS RESOURCES, LP - ULTRA LOW SULFUR DIESEL

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-97b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED BUENDORF HOG FACILITY HARTLAND TOWNSHIP

More information

FINDINGS OF FACT And CONCLUSIONS

FINDINGS OF FACT And CONCLUSIONS FINDINGS OF FACT And CONCLUSIONS SOUTHWEST RECONNECTION PROJECT Highway 61/101 Flood Mitigation State Project No. 1009-24 and State Aid Project No. 010-661-002 Prepared for: Carver County September 2013

More information

TO INTERESTED PARTIES: RE: Al-Corn Clean Fuels Plant Expansion

TO INTERESTED PARTIES: RE: Al-Corn Clean Fuels Plant Expansion TO INTERESTED PARTIES: RE: Al-Corn Clean Fuels Plant Expansion The Minnesota Pollution Control Agency (MPCA) has approved the for the Environmental Assessment Worksheet (EAW) on the proposed Al-Corn Clean

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ARMSTRONG FEEDLOT FREEDOM TOWNSHIP/WASECA COUNTY WASECA,

More information

Minnesota Pollution Control Agency

Minnesota Pollution Control Agency Minnesota Pollution Control Agency STATE OF MINNESOTA Minnesota Pollution Control Agency MUNICIPAL DIVISION PUBLIC NOTICE OF INTENT TO REISSUE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/ STATE

More information

FINDINGS OF FACT and CONCLUSIONS

FINDINGS OF FACT and CONCLUSIONS FINDINGS OF FACT and CONCLUSIONS I-694/ I-494/ I-94 Interchange Improvements State Project No. 8286-81 Prepared by: Minnesota Department of Transportation July, 2018 CONTENTS STATEMENT OF ISSUE... 2 ADMINISTRATIVE

More information

If you have any questions on the EAW, please contact Lynne Kolze of my staff at (651)

If you have any questions on the EAW, please contact Lynne Kolze of my staff at (651) August 3, 2001 TO: RE: INTERESTED PARTIES City of Delavan Sewage Collection and Wastewater Enclosed is the (EAW) for the proposed City of Delavan Sewage Collection and Wastewater, Faribault County. The

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED BRAUN HOG FEEDLOT EXPANSION PRAIRIEVILLE TOWNSHIP/BROWN

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED FLINT HILLS RESOURCES, LP MARSHALL TANK FARM EXPANSION

More information

Project Priority List scoring worksheet - stormwater Guidance document

Project Priority List scoring worksheet - stormwater Guidance document www.pca.state.mn.us Project Priority List scoring worksheet - stormwater Guidance document PLEASE NOTE: THE MINNESOTA STATE FISCAL YEAR IS FROM JULY 1 JUNE 30 The first step towards receiving either a

More information

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history, culture, economy

More information

Please note that comment letters submitted to the MPCA do become public documents and will be part of the official public record for this project.

Please note that comment letters submitted to the MPCA do become public documents and will be part of the official public record for this project. June 3, 2005 TO: INTERESTED PARTIES RE: Rushmore Wastewater Treatment Facility Enclosed is the Worksheet (EAW) for the proposed Rushmore Wastewater Treatment Facility, Nobles County. The EAW was prepared

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED SKB TRANSFER STATION, BLAINE ENVIRONMENTAL CAMPUS

More information

Statement of Basis Beardsley Wastewater Treatment Facility NPDES/SDS Permit No. MN May 2017

Statement of Basis Beardsley Wastewater Treatment Facility NPDES/SDS Permit No. MN May 2017 Statement of Basis Beardsley Wastewater Treatment Facility NPDES/SDS Permit No. MN0040703 May 2017 Description of permitted facility The City of Beardsley (City) Wastewater Treatment Facility (Facility)

More information

Statement of Basis. LG Everist, Inc., County Highway 17 Ortonville, Minnesota 56278, Big Stone County NPDES/SDS Permit No: MN May 2018

Statement of Basis. LG Everist, Inc., County Highway 17 Ortonville, Minnesota 56278, Big Stone County NPDES/SDS Permit No: MN May 2018 www.pca.state.mn.us Statement of Basis LG Everist, Inc. LG Everist, Inc., 43966 County Highway 17 Ortonville, Minnesota 56278, Big Stone County NPDES/SDS Permit No: MN0068764 May 2018 Description of permitted

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED BUFFALO LAKE ETHANOL, LLC FAIRMONT, MINNESOTA FINDINGS

More information

ENVIRONMENTAL ASSESSMENT For Choctaw Utilities, Inc. Water Plant Replacement Loan Number FS

ENVIRONMENTAL ASSESSMENT For Choctaw Utilities, Inc. Water Plant Replacement Loan Number FS ENVIRONMENTAL ASSESSMENT For Choctaw Utilities, Inc. Water Plant Replacement Loan Number FS391083-0002 Applicant: David Lohrer, President, Board of Directors Choctaw Utilities, Inc. 2005 Itawamba Trail

More information

INFRASTRUCTURE ELEMENT SANITARY SEWER SUB-ELEMENT

INFRASTRUCTURE ELEMENT SANITARY SEWER SUB-ELEMENT INFRASTRUCTURE ELEMENT SANITARY SEWER SUB-ELEMENT GOALS, OBJECTIVES & POLICIES GOAL, OBJECTIVES & POLICIES GOAL SS. SANITARY SEWER PUBLIC SERVICE. It is the goal of the City of Casselberry to provide,

More information

What's new in the 2018 Construction Stormwater General Permit

What's new in the 2018 Construction Stormwater General Permit What's new in the 2018 Construction Stormwater General Permit Introduction: This document is intended to highlight the changes in the new construction stormwater general permit. Many of the permit requirements

More information

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR All the documents shown today are in the MN Stormwater Manual on the page titled 2018 Construction Stormwater Permit Public Notice and Public Informational

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-131b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED HI-WAY 30 HOGS, LLC PROJECT BYRON TOWNSHIP,

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

MINNESOTA POLLUTION CONTROL AGENCY. Watershed Division. Board Item Cover Sheet. MEETING DATE: August 26, 2014 DATE MAILED: August 15, 2014

MINNESOTA POLLUTION CONTROL AGENCY. Watershed Division. Board Item Cover Sheet. MEETING DATE: August 26, 2014 DATE MAILED: August 15, 2014 b-bp14-08-03a MINNESOTA POLLUTION CONTROL AGENCY Watershed Division Board Item Cover Sheet MEETING DATE: August 26, 2014 DATE MAILED: August 15, 2014 Presenter(s): Supervisor: Manager: Division Director:

More information

Public Notice ISSUED: 5/6/2014 EXPIRES: 6/5/2014

Public Notice ISSUED: 5/6/2014 EXPIRES: 6/5/2014 APPLICANT: Kinghorn Company / Scannell Properties Public Notice ISSUED: 5/6/2014 EXPIRES: 6/5/2014 REFER TO: 2014-00724-MMJ SECTION:404 - Clean Water Act 1. APPLICATION FOR PERMIT TO discharge fill material

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY In the Matter of the Decision on the Need for an Environmental Impact Statement for the Proposed South Washington County Wastewater Treatment Plant

More information

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS Section 1 Intent. 49 Section 2 Floodplain Requirements 49 Section 3 Water-Oriented Accessory Structures 50 Section 4 Stairways,

More information

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY 1. PURPOSE: SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY The purpose of this policy is to establish procedures to facilitate compliance with federal, state and local stormwater regulations

More information

Public Notice of Application for Permit

Public Notice of Application for Permit US Army Corps of Engineers Alaska District ANCHORAGE Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898 Public Notice of Application for Permit PUBLIC NOTICE DATE: January

More information

ENVIRONMENTAL ASSESSMENT

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT A. Project Identification Name: Murray City Sewer Facilities Project (CS390037-0008) Carbon Hill Sewer Facilities Project (CS390037-0011) Address: Hocking County Commissioners

More information

Guide for the draft 2018 NPDES/SDS Construction Stormwater General Permit

Guide for the draft 2018 NPDES/SDS Construction Stormwater General Permit Guide for the draft 2018 NPDES/SDS Construction Stormwater General Permit Introduction: This document is intended to serve as a guide for readers to understand all of the proposed changes associated with

More information

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018 City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting June 11, 2018 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history,

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY ATTACHMENT 1 STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION TO REISSUE THE MINNESOTA NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM CONSTRUCTION

More information

Capital Facilities Element

Capital Facilities Element Capital Facilities Element Purpose The Growth Management Act requires cities to prepare a capital facilities element consisting of: 1. An inventory of current capital facilities owned by public entities,

More information

East Central Solid Waste Commission Sanitary Landfill (SW-17) Expansion

East Central Solid Waste Commission Sanitary Landfill (SW-17) Expansion .Minnesota Pollution Control Agency 520 Lafayette Road North I St. Paul, MN55155-4194 I 651-296-6300 I 800-657-3864 I 651-282-5332 TTY I www.pca.state.mn.us June 8,2010 TO: RE: INTERESTED PARTIES East

More information

CCSD#1 Stormwater Standards

CCSD#1 Stormwater Standards SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless

More information

Mn/DOT Outstate District SWPPP

Mn/DOT Outstate District SWPPP SWPPP Table of Contents Introduction......4 PUBLIC EDUCATION AND OUTREACH...5 Distribute Educational Materials...5 Implement an Education Program...6 Education Program: Public Education and Outreach...7

More information

WQMP AMENDMENT REVIEW CHECKLIST

WQMP AMENDMENT REVIEW CHECKLIST State of New Jersey Highlands Water Protection and Planning Council 100 North Road (Route 513) Chester, New Jersey 07930-2322 (908) 879-6737 (908) 879-4205 (fax) www.highlands.state.nj.us WQMP AMENDMENT

More information

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information.

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information. MARTIN COUNTY EXCAVATION AND FILL PERMIT APPLICATION This application to be used only for excavating or filling activities not associated with a building permit or development review and for projects requiring

More information

Shakopee, Minnesota St. Paul, Minnesota Citizen Petition

Shakopee, Minnesota St. Paul, Minnesota Citizen Petition ENVIRONMENTAL ASSESSMENT WORKSHEET Note to reviewers: The Environmental Assessment Worksheet (EAW) provides information about a project that may have the potential for significant environmental effects.

More information

Section Wastewater Treatment Element

Section Wastewater Treatment Element 3.3.4. Wastewater 4-3-12 Section 3.3.4. Wastewater Treatment Element Pursuant to Section 163.3177(3), Florida Statutes and Chapter 9J-5.011(2) of the Florida Administrative Code. Background Discussion

More information

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies INFRASTRUCTURE ELEMENT Goal, Objectives and Policies City of Bartow Comprehensive Plan Adopted August 5, 1991 Amended August 2, 1993, Amended 1996 & 1999 Adopted Changes January 16, 2001, Amended April

More information

Public Notice ISSUED: July 13, 2018 EXPIRES: August 13, 2018

Public Notice ISSUED: July 13, 2018 EXPIRES: August 13, 2018 APPLICANT: Sargento Foods Inc. Public Notice ISSUED: July 13, 2018 EXPIRES: August 13, 2018 REFER TO: 2010-2909-RJH SECTION: 404 - Clean Water Act 1. APPLICATION FOR PERMIT TO discharge dredged and fill

More information

PUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT

PUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT COMPREHENSIVE PLAN EXHIBIT DD D. Infrastructure Element (Sanitary Sewer, Potable Water, Solid Waste, Drainage and Natural Groundwater Aquifer Recharge) Goals, Objectives and Policies GOAL D.1: Putnam County

More information

Crow Wing Soil and Water Conservation District Annual Plan

Crow Wing Soil and Water Conservation District Annual Plan Crow Wing Soil and Water Conservation District 2007 Annual Plan 1 I. INTRODUCTION The Crow Wing SWCD Supervisors and Staff with the aid of the U.S. Department of Agriculture, are developing this plan to

More information

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) / Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE

More information

Wakulla County Comprehensive Plan July 2013 GOALS, OBJECTIVES AND POLICIES

Wakulla County Comprehensive Plan July 2013 GOALS, OBJECTIVES AND POLICIES GOALS, OBJECTIVES AND POLICIES INFRASTRUCTURE ELEMENT Goal 1: To provide needed public facilities in a manner that protects investments in existing facilities and supports orderly, efficient growth while

More information

City of Duluth, the New UDC and Stormwater

City of Duluth, the New UDC and Stormwater City of Duluth, the New UDC and Stormwater Tom Johnson, PE City of Duluth - Public Works Project Engineer, Utilities - Stormwater Stormwater Challenges Topography (proximity to lake) High Quality Streams

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-82b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED R & R THIER FEEDLOTS, INC. OLNEY TOWNSHIP

More information

ENVIRONMENTAL ASSESSMENT WORKSHEET

ENVIRONMENTAL ASSESSMENT WORKSHEET ENVIRONMENTAL ASSESSMENT WORKSHEET Note to reviewers: The Worksheet (EAW) provides information about a project that may have the potential for significant environmental effects. This EAW was prepared by

More information

ATTACHMENTS: 1. Findings of Fact, Conclusion of Law, and Order 5/24/07

ATTACHMENTS: 1. Findings of Fact, Conclusion of Law, and Order 5/24/07 The MPCA is the governmental unit responsible for preparing an Environmental Assessment Worksheet (EAW) when an animal feedlot project meets the thresholds specified in Minn. R. 4410.4300, subp. 29A. As

More information

Carpinteria Valley Water District Carpinteria Advanced Purification Project

Carpinteria Valley Water District Carpinteria Advanced Purification Project NOTICE OF PREPARATION AND SCOPING MEETING Carpinteria Valley Water District Carpinteria Advanced Purification Project TO: Agencies, Organizations, and Interested Parties DATE: January 7, 2019 SUBJECT:

More information

RE: St. Michael Wastewater Treatment Facility (WWTF) Expansion

RE: St. Michael Wastewater Treatment Facility (WWTF) Expansion February 4, 2000 TO INTERESTED PARTIES: RE: St. Michael Wastewater Treatment Facility (WWTF) Expansion Enclosed is the Environmental Assessment Worksheet (EAW) for the proposed St. Michael WWTF Expansion,

More information

Wastewater Treatment & Water Supply Alternatives Analysis

Wastewater Treatment & Water Supply Alternatives Analysis Wastewater Treatment & Water Supply Alternatives Analysis Lake Sallie & Lake Melissa Chain of Lakes Prepared for Pelican River Watershed District February 2008 Table of Contents 1.0 EXECUTIVE SUMMARY...

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT PROPOSED PROJECT DESCRIPTION

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT PROPOSED PROJECT DESCRIPTION STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LOWELL FRANZEN FEEDLOT PROJECT LYLE TOWNSHIP MOWER

More information

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E Ambassador Bridge Enhancement Project CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX E DRAFT EROSION AND SEDIMENT

More information

Single Family Residential Construction Erosion/Sediment Control Standards

Single Family Residential Construction Erosion/Sediment Control Standards Single Family Residential Construction Erosion/Sediment Control Standards Introduction: This booklet contains standard plans and procedures sufficient for typical building construction. It is not intended

More information

Contiguous Lots, Relationships & Special Topics Fall Darrin Hoverson Area Hydrologist

Contiguous Lots, Relationships & Special Topics Fall Darrin Hoverson Area Hydrologist Contiguous Lots, Relationships & Special Topics Fall 2018 Darrin Hoverson Area Hydrologist 1. Nonconforming Lots 2. SL Model Ordinance Update 3. New Review Process 4. Website Resources Regs & Administration

More information

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013 PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013 NAME LOCATION MAWSS Shelton Beach Road East side of Shelton Beach Road Extension, 2/10± mile North of Moffett Road CITY

More information

ENVIRONMENTAL ASSESSMENT WORKSHEET

ENVIRONMENTAL ASSESSMENT WORKSHEET ENVIRONMENTAL ASSESSMENT WORKSHEET Note to reviewers: The Environmental Assessment Worksheet (EAW) provides information about a project that may have the potential for significant environmental effects.

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information