1 .Minnesota Pollution Control Agency 520 Lafayette Road North I St. Paul, MN I I I TTY I June 8,2010 TO: RE: INTERESTED PARTIES East Central Solid Waste Commission Sanitary Landfill (SW-17) Expansion The Minnesota Pollution Control Agency (MPCA) has approved the Findings of Fact, Conclusions of Law, and Order for a Negative Declaration on the need for an Environmental Impact Statement on the proposed East Central Solid Waste Commission Sanitary Landfill (SW-17) Expansion, Kanabec County. The Findings of Fact, Conclusions of Law, and Order document concludes that this project does not have the potential for significant environmental effects. The decision for a Negative Declaration completes the state environmental review process under the revised Environmental Quality Board rules, Minn. R , subp. 7. Final governmental decisions to grant a permit or other approval for the project may now be made. These documents can be reviewed at the following locations: the MPCA offices in St. Paul, Brainerd, and Duluth; the Minneapolis Public Library at 300 Nicollet Mall, Minneapolis; and the East Central Regional Library at 244 South Birch Street, Cambridge. The document can be viewed on our MPCA Web site at Requests for copies of these documents may be made by contacting the St. Paul office at We want to express our appreciation for comments submitted on the Environmental Assessment Worksheet. Comments and responses to them have been incorporated into the Findings of Fact, Conclusions of Law, and Order and have been considered by MPCA staff in drafting permits for the proposed project. Sincerely,. ~~. Craig Affeldt Supervisor, Environmental Review Unit St. Paul Office Regional Division CA:mbo St. Paul I Brainerd I Detroit Lakes I Duluth I Mankato I Marshall I Rochest!!r I Willmar I Printed on 100% post-consumer recycled paper ---

2 STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED EXPANSION OF THE EAST CENTRAL SOLID WASTE COMMISSION SANITARY LANDFILL, AND THE PROPOSED LANDFILL GAS-FIRED ENGINE-GENERATOR SET, ARTHUR TOWNSHIP, KANABEC COUNTY, MINNESOTA FINDINGS OF FACT CONCLUSIONS OF LAW AND ORDER FINDINGS OF FACT Pursuant to Minn. R , the Minnesota Pollution Control Agency (MPCA) staff has prepared an Environmental Assessment Worksheet (EAW) for the proposed East Central Solid Waste Commission (ECSWC) sanitary landfill expansion (Project). Based on the MPCA staff environmental review, the EAW, comments and information received during the comment period, and other information in the record of the MPCA, the MPCA hereby makes the following Findings of Fact, Conclusions of Law, and Order. EXISTING FACILITY 1. ECSWC sanitary landfill (permit SW-17) is located on acres in Sections 20, 21, and 29 of Arthur Township (Township 39 North, Range 24 West) in Kanabec County. The facility currently occupies approximately 160 acres within this parcel. The site is located approximately four miles southwest of Mora, Minnesota on the north side of State Highway The facility includes a closed, unlined mixed municipal solid waste (MSW) landfill, a currently operated lined MSW landfill, a former demolition debris landfill, and a new demolition debris landfill. Prior to 1991, waste was deposited in the unlined landfill. The unlined landfill, located at the southern end of the facility, was closed in The approximate area of the closed portion of the landfill is 10 acres, and it holds approximately 629,200 cubic yards of waste. 3. Groundwater contamination (vinyl chloride) has been identified in the southeast corner of the landfill site and is assumed to originate from this unlined cell. Monitoring has been performed since the contamination was discovered, and the most recent testing has shown a downward trend in concentrations. There is no evidence that contamination has moved off the site. No remediation is currently being done, but is an option if concentrations increase. 4. Leachate is currently managed by trucking it to St. Paul for disposal in the Metropolitan Council Environmental Services (MCES) wastewater treatment plant, or recirculation in the landfill. ECSWC intends to propose land application of leachate onsite within the next few months. 5. Landfill gas (LFG) is managed by an active collection system and flare. Other facilities currently located at the site include: TDD (for hearing and speech impaired only): Printed on recycled paper containing at least 30% fibers from paper recycled by consumers

3 On the Need for an Environmental Impact Statement East Central Solid Waste Commission Sanitary Landfill Expansion Project, Arthur Township, Kanabec County Minnesota Findings of Fact Conclusions of Law And Order Scalehouse and residential customer waste drop-off area Operation maintenance building ECSWC administrative office Materials Recovery and Compost building and infrastructure, currently used for equipment and material storage 6. The property is bounded on the south by Kanabec County Road 60 (180 th Avenue) and on the east by Imperial Road (formerly Rittenour Road), maintained by Arthur Township. ECSWC owns additional parcels east and south of these boundaries. The surrounding owned areas (totaling approximately 66.5 acres) are used currently as buffer properties. Property surrounding the landfill is generally zoned for agricultural and rural residential use. Sand and gravel operations are located immediately north and south of the landfill property. 7. Access to the landfill is restricted by fencing along County Road 60 and Imperial Road, as well as along the northern and western property boundary. The main gate to the landfill is located on County Road 60 and is marked by signs identifying the facilities located on the site. The main gate remains open during business hours and is otherwise locked. A secondary entrance to the landfill is located along Imperial Road on the eastern boundary. This entrance is used primarily for access to the soil borrow operations north of the MSW landfill and for facility contractors, and generally remains locked. A third gate is located along County Road 60, west of the main gate, near the stormwater detention basin for the former compost facility. This gate is rarely used and remains locked. 8. MSW collection within the ECSWC service area is supported by transfer stations located near Cambridge (SW-400) and Hinckley (SW-401). Both transfer stations are owned and operated by the ECSWC. A portion of waste generated in Aitkin County is transported through a transfer station owned by Garrison Disposal before being hauled to the landfill. A portion of waste generated in Chisago County is transported through a privately-owned transfer station before being transported to the ECSWC transfer station in Cambridge. PERMIT HISTORY 9. Former owners of the landfill originally began disposal activities there in October In 1979, the MPCA issued a modified permit for the filling of an additional ten acres at the site. Though the additional ten acres was approved, the entire expansion area was not utilized. The ECSWC, established in 1988 as a consortium of Kanabec, Chisago, Isanti, Pine, and Mille Lacs Counties, took over operations at the landfill in In June 1991, the MPCA issued a modified permit to the ECSWC to construct and operate a lined expansion of the existing sanitary landfill. The subsequent permit amendment authorized an expansion of capacity for the disposal of 477,000 cubic yards (CY) of MSW and cover soils in the lined expansion area. 11. A permit renewal issued in May 1999 increased the total capacity for lined Phases 1 through 5 to an estimated 1,429,700 CY of airspace. The permit authorized the landfill to utilize up to 950,890 CY of airspace as long as the Certificate of Need capacity was available. This includes compacted, in-place MSW and all daily, intermediate, and final cover soil to be deposited in Phases 3A through Another permit renewal in September 2004, which included a vertical expansion within the previously identified MSW footprint, granted approval for 355,000 CY of additional disposal 2

4 On the Need for an Environmental Impact Statement East Central Solid Waste Commission Sanitary Landfill Expansion Project, Arthur Township, Kanabec County Minnesota Findings of Fact Conclusions of Law And Order capacity. The current permitted landfill volume totals 1,784,700 CY (inclusive of all cover materials), providing MSW and demolition debris disposal capacity to ECSWC customers through The September 2004 permit reissuance also allowed ECSWC to begin a pilot leachate recirculation study. The purpose of leachate recirculation is to stabilize the waste, reduce its volume, and maximize LFG production to be burned in the flare and engine-generator for greenhouse gas reduction. Leachate recirculation operations are limited to Phases 4 and 5. The leachate recirculation system was constructed in 2004 and recirculation began in October The permit modification approval included additional facility monitoring parameters, and operation and monitoring reports to be submitted to the MPCA on a quarterly basis. 14. The ECSWC Materials Recovery and Compost Facility (SW-360) was permitted by the MPCA in This facility was undertaken by the ECSWC in an effort to comply with the goals and objectives of the Waste Management Act. The Materials Recovery and Compost Facility was designed with a capacity of 250 tons per day. The facility operated until the summer of 1994, when it was damaged during a fire. In 1995, ECSWC entered into an operations agreement with a composting and recycling company to operate this component of facility operations. However, the contracted facility operators were not able to produce a useful compost product, and could not operate the system in an economical manner. The operations agreement was, therefore, terminated in The facility has not operated since, and ECSWC currently has no plans to resume the MSW processing operations. The ECSWC and its serviced counties developed a Solid Waste Management Plan in 2006 that identifies the landfill as a means of disposal for waste that is not reused or recycled. 15. A three-acre construction and demolition (C&D) debris landfill (SW-415) on the 160-acre ECSWC site was permitted in The demolition debris landfill was operated until 2004, when ECSWC transferred the existing C&D waste in-place to the MSW footprint as part of the 2003 SW-17 permit reissuance. C&D waste was disposed of in the MSW landfill until In 2007, the MPCA approved a new C&D material landfill to the north of the existing MSW landfill, beneath the subgrade of the proposed MSW expansion area. The new C&D landfill is incorporated into the facility s current MSW permit, SW-17 and has been utilized exclusively for C&D material disposal since September The current MPCA permit divides the landfill into five MSW phases, identified as Phase 1 through 5, and four C&D phases identified as Phase 1 through 4. The current permitted capacity of the MSW Landfill is 1,784,700 CY. The current permitted capacity of the C&D landfill is 126,500 CY. 17. An EAW was prepared on the landfill facility in The process ended with a negative declaration, meaning no Environmental Impact Statement (EIS) was required. PROJECT DESCRIPTION 18. The current solid waste permit renewal application seeks MPCA approval for the construction of additional MSW landfill cells Phase 6A and 6B, north of MSW Landfill Phase 5, and construction of additional C&D landfill Phases 5 and 6, west of C&D Landfill Phase 4. The proposed expansion would provide an additional MSW disposal capacity of 968,022 CY and additional C&D disposal capacity of 116,121 CY. 19. In addition to the proposal by ECSWC to expand its landfill disposal capacity, the Southern Minnesota Municipal Power Agency (SMMPA) is seeking an air emission permit to install and 3

5 On the Need for an Environmental Impact Statement East Central Solid Waste Commission Sanitary Landfill Expansion Project, Arthur Township, Kanabec County Minnesota Findings of Fact Conclusions of Law And Order operate an engine and generator set on the landfill site to burn the landfill gas and generate power for the local grid. The flare will remain and continue to be used as needed if the active gas collection system produces more gas than the engine can use, and when the engine-generator set is down for maintenance. The flare will require an air emission permit as well, meaning that the proposed projects will require a total of one solid waste permit and two air emission permits. PROCEDURAL HISTORY 20. Pursuant to Minn. R , subp. 17B, an EAW was prepared by MPCA staff on the proposed projects. Pursuant to Minn. R , the EAW was distributed to the Environmental Quality Board (EQB) mailing list and other interested parties on March 5, The MPCA notified the public of the availability of the EAW for public comment. A news release was provided to media in Kanabec, Pine, Isanti, Mille Lacs and Aitkin Counties, as well as other interested parties, on March 8, The notice of the availability of the EAW was published in the EQB Monitor on March 8, 2010, and the EAW was made available for review on the MPCA Web site at The public comment period for the EAW began on March 8, 2010, and ended on April 19, During the comment period, the MPCA received one comment letter from The Minnesota Department of Natural Resources (MDNR) and five letters from citizens. A list of the comment letters received is included as Appendix A to these findings. 23. The MPCA prepared written responses to the comment letters received during the public comment period. The comment letters received and the responses to the comments are included as Appendix B to these findings. CRITERIA FOR DETERMINING THE POTENTIAL FOR SIGNIFICANT ENVIRONMENTAL EFFECTS 24. Under Minn. R , the MPCA must order an EIS for projects that have the potential for significant environmental effects. In deciding whether a project has the potential for significant environmental effects, the MPCA must compare the impacts that may be reasonably expected to occur from the project with the criteria set forth in Minn. R , subp. 7. These criteria are: A. the type, extent, and reversibility of environmental effects; B. cumulative potential effects; C. the extent to which the environmental effects are subject to mitigation by ongoing public regulatory authority; and D. the extent to which environmental effects can be anticipated and controlled as a result of other available environmental studies undertaken by public agencies or the project proposer, including other EISs. THE MPCA FINDINGS WITH RESPECT TO EACH OF THESE CRITERIA ARE SET FORTH BELOW Type, Extent, and Reversibility of Environmental Effects 4

6 On the Need for an Environmental Impact Statement East Central Solid Waste Commission Sanitary Landfill Expansion Project, Arthur Township, Kanabec County Minnesota Findings of Fact Conclusions of Law And Order 25. The first criterion that the MPCA must consider when determining if a project has the potential for significant environmental effects is the type, extent, and reversibility of environmental effects Minn. R , subp. 7. A. The MPCA findings with respect to this criterion are set forth below. 26. The types of impacts that may reasonably be expected to occur from the Project include the following: Air Quality Impacts Water Quality Impacts Groundwater Impacts Habitat Impacts (wetlands) Issues raised in comment letters, including general groundwater concerns, general air quality concerns including effects on workers, soils, and crops, traffic, possible well contaminations, and noise. 27. With respect to the extent and reversibility of impacts that are reasonably expected to occur from the Project, the MPCA makes the following findings. Air Quality Impacts 28. The project would result in two air emission point sources (the flare and engine-generator set) as well as landfill area emissions such as fugitive dust. These emission sources were evaluated by air emission dispersion modeling and preparation of an Air Emission Risk Assessment (AERA). A qualitative analysis of greenhouse gas impacts was also included. 29. The dispersion modeling showed that estimated air concentrations of the criteria pollutants (except lead, which is not emitted from any of the facility sources) were below the National Ambient Air Quality Standards and the Minnesota Ambient Air Quality Standards. 30. The AERA analysis was performed based on a worst case scenario, including the assumption that the flare and engine-generator set would be operating continuously at full capacity. In reality, the landfill will not produce enough gas to power both sources at full capacity. The analysis found that screening level potential risk estimates for the post-modification landfill are at or below established health risk benchmarks, with the exception of the farmer cancer risk estimate. 31. Pursuant to AERA guidelines, the source of the human health impact (the engine-generator set) and the area of highest impact (the fence line along the southeast facility boundary) were re-examined by means of a refined analysis. The worst case farmer-cancer scenario alluded to above assumed, in addition to inhalation and consumption of vegetables raised in the highest impact area, that the farmer raises and consumes beef, pork, chicken, milk, and eggs produced from forage grown within the location of highest impact. Further, the majority of the calculated farmer cancer risks come from dioxins/furans emitted by the engine and consumed via ingestion of milk produced in the highest risk area. Since farming does not occur at the highest risk area, and the risks dissipate rapidly with distance, the refined analysis shows that health risk estimates do not exceed benchmarks. 32. Carbon dioxide and methane are emitted from landfills and are two of the primary greenhouse gases, which trap heat near the earth s surface, causing the earth s climate to warm. Volume for volume, methane is much more potent in this regard than is carbon dioxide. ECSWC employs the flare to 5

7 On the Need for an Environmental Impact Statement East Central Solid Waste Commission Sanitary Landfill Expansion Project, Arthur Township, Kanabec County Minnesota Findings of Fact Conclusions of Law And Order convert methane to carbon dioxide, thus reducing the facility s level of greenhouse gas impact. The installation of the engine-generator set would have a similar effect. 33. The main source of worldwide greenhouse gas emissions is the combustion of fossil fuels to run vehicles, heat buildings, and produce electricity. While landfills are a source of greenhouse gases, they do not represent a significant percentage of statewide greenhouse gas emissions. In Minnesota, landfills contribute approximately one to four percent towards total inventoried Minnesota greenhouse gas emission sources. 34. The MPCA finds that information presented in the EAW and other information in the environmental review record is adequate to address the concerns related to air emissions. The impacts on air quality that are reasonably expected to occur from the proposed Project have been considered during the review process and methods to prevent significant adverse impacts have been developed. 35. The MPCA finds that the Project, as it is proposed, does not have the potential for significant environmental effects based on the type, extent, and reversibility of impacts related to air quality that are reasonably expected to occur from the project. Water Quality Impacts 36. The facility discharges stormwater from outfalls from stormwater treatment and storage basins. Site stormwater will be collected off the landfill via benches and downdrains and transported in a series of ditches to constructed ponds in the southwestern, southeastern, and northern portions of the site. These ponds will be sized to control the 24-hour, 25-year storm event and achieve 80 percent sediment removal efficiency, and constructed so as to encourage infiltration. The sandy nature of the soil in the area will encourage infiltration as well. All precipitation that contacts solid waste is collected and treated as leachate. Runoff from the landfill facility ultimately flows to the Ann River, Fish Lake, the Snake River, and the St Croix River. Stormwater permitting requirements will mitigate potential adverse water quality effects, and no measurable impact on those waters is likely. 37. The MPCA finds that information presented in the EAW and other information in the environmental review record is adequate to assess impacts related to water quality. The impacts on water quality that are reasonably expected to occur from the proposed Project have been considered during the review process and methods to prevent significant adverse impacts have been developed. 38. The MPCA finds that the Project, as it is proposed, does not have the potential for significant environmental effects based on the type, extent, and reversibility of impacts related to water quality that are reasonably expected to occur from the project. 6

8 On the Need for an Environmental Impact Statement East Central Solid Waste Commission Sanitary Landfill Expansion Project, Arthur Township, Kanabec County Minnesota Findings of Fact Conclusions of Law And Order Groundwater Impacts 39. The new MSW disposal cells proposed as part of this Project will be lined with state of the art impermeable materials. Leachate generated within the landfill is collected on this liner by means of a series of pipes and risers that will transport the collected leachate to the leachate storage ponds or to storage tanks. Leachate is currently managed either by trucking it to the MCES facility in St Paul for treatment or by recirculation within the landfill, and this will continue with the project. The proposed new cells will also be capped upon closure with impermeable materials. 40. East Central also intends to implement land application of leachate on site during the frost free months with MPCA approval. If approved, this will take place on land within the landfill boundary and located west of the proposed disposal area. Monitoring wells will be utilized to assure that leachate is not being over applied. Leachate to be land applied would be taken from the leachate storage and treatment ponds. These ponds are designed to reduce Biochemical Oxygen Demand, Chemical Oxygen Demand, Volatile Organic Compounds, odors, and metals in the leachate by mechanical aeration. 41. The combination of lined and capped disposal cells and a variety of means for managing collected leachate means that little if any leachate would be expected to reach groundwater in the vicinity of the existing and proposed landfill. 42. The MPCA finds that information presented in the EAW and other information in the environmental review record is adequate to address the concerns related to groundwater quality. The impacts on groundwater quality that are reasonably expected to occur from the proposed Project have been considered during the review process and methods to prevent significant adverse impacts have been developed. 43. The MPCA finds that the Project, as it is proposed, does not have the potential for significant environmental effects based on the type, extent, and reversibility of impacts related to groundwater quality that are reasonably expected to occur from the project. Wildlife and Habitat Impacts 44. The East Central site has been a solid waste disposal facility for 40 years, and much of it is already disturbed to a greater or lesser degree. No significant wildlife populations have been observed permanently residing within these areas. 45. There are 4.98 acres of wetlands located on the site west of the current active disposal area and lie within an area that is intended to be used for land disposal of leachate, subject to mitigation and MPCA approval. The area is divided into two subareas for land application purposes, and the wetlands in the first subarea to be used have been filled and leveled in anticipation of siting of a demolition landfill cell that was subsequently developed elsewhere. Pursuant to a Wetland Conservation Act sequencing analysis performed by the Kanabec County Technical Evaluation Panel in 2006, and the subsequent adoption of a Wetland Replacement Plan and Wetland Mitigation Plan by the ECSWC, the anticipated loss of the wetlands in the two subareas was mitigated by purchase of 4.98 acres of wetland credits in These wetlands are in the path of the landfill s ultimate life of facility development plan, although approval for actual development for disposal cells is several permit cycles away. 46. The MDNR Natural Heritage Program has identified six rare species near the Ann River in the vicinity of the existing and proposed landfill. Of the rare species, the mucket and round pigtoe 7

9 On the Need for an Environmental Impact Statement East Central Solid Waste Commission Sanitary Landfill Expansion Project, Arthur Township, Kanabec County Minnesota Findings of Fact Conclusions of Law And Order mussels are both state listed as threatened. The DNR states that, provided the Project will not negatively impact the water quality of Ann River, the Project will not affect any known occurrences of rare features. As discussed further in Finding No. 36, surface water run-off will be collected in ditches/basins and diverted to sedimentation basins for settling of suspended solids; the Project is thus not expected to impact the water quality of the Ann River. 47. The MPCA finds that information presented in the EAW and other information in the environmental review record is adequate to address the concerns related to wildlife and habitat. The impacts on wildlife and habitat that are reasonably expected to occur from the proposed Project have been considered during the review process and methods to prevent significant adverse impacts have been developed. 48. The MPCA finds that the Project, as it is proposed, does not have the potential for significant environmental effects based on the type, extent, and reversibility of impacts related to wildlife and habitat that are reasonably expected to occur from the project. Issues raised in comment letters, including general groundwater concerns, general air quality concerns including effects on workers, soils, and crops, traffic, possible well contaminations and noise. 49. Several commenters expressed concern about a perceived higher incidence of diseases such as cancer in the vicinity of the landfill. According to the Minnesota Department of Health (MDH), which is the state agency charged with collecting cancer incidence data, there is no evidence that what appears to be a higher than normal incidence of cancer in the vicinity of the landfill is in fact out of the normal range statewide. According to MDH, small sample sizes in lightly populated areas are not reliable as a basis for such conclusions, and can actually be misleading. In this case, data from MDH shows an apparent slight elevation in the incidence of some kinds of cancers, but the numbers are well within the normal ranges for these cancers statewide. 50. One commenter expressed a general concern about groundwater pollution on his property and in the area. As noted above in findings 39 41, the proposed new MSW disposal cells will be lined and capped with impermeable materials, and leachate will be collected and managed so as not to enter groundwater. Monitoring well sampling near the old, unlined landfill has shown decreasing contamination levels in the more recent tests. The monitoring system has found no contaminants beyond the property boundary. Finally, this commenter s land is south of the landfill, while groundwater movement in the area is generally east-southeasterly, meaning that it is not likely that contaminants would move toward his property. 51. The same commenter expressed concern about soil contamination from the methane burner and generator, as well as adverse effects on his crops and employees. 52. According to the AERA, the primary risk drivers in the highest impact areas come from the enginegenerator set. 53. Regarding effects on soils and crops, a predevelopment background study at the Elk River landfill site showed only minute concentrations of dioxins and furans, which are the primary risk drivers for farmer cancer risks in the highest impacted area at East Central. Since the East Central landfill was not a dioxin source until the recent addition of the flare, the situations are similar, and there is no reason to suspect that material differences would be found were a similar study to be done at East Central. Moreover, the air emission modeling performed for the engine-generator set predicts much 8

10 On the Need for an Environmental Impact Statement East Central Solid Waste Commission Sanitary Landfill Expansion Project, Arthur Township, Kanabec County Minnesota Findings of Fact Conclusions of Law And Order lower concentrations than a study similar to the one done at Elk River would find at East Central, and also predicts even lower concentrations than what would be expected as background levels. 54. Regarding effects on employees, the AERA found that all project pollutant concentrations in the highest impact area will be below established guidelines, meaning that it is reasonable to expect that there will be no significant effects on people working in the area. 55. One commenter expressed concern about odors and recommended that soil should be used for cover rather than alternative cover materials. The MPCA has found alternative cover materials to be effective in minimizing odors, and has the authority to order use of soil for this purpose if this is found to be necessary. Recent odor events are traceable to equipment failures that have been corrected. 56. The same commenter expressed concerns about noise and recommends that the crusher not be allowed to operate 24 hours per day. The landfill s air quality permit will require the facility to meet state noise standards at all times. The conditional use permit issued by Arthur Township limits crusher operations to 7a.m. 7 p.m. Complaints should be directed to the Township. 57. This commenter also recommended more signs warning drivers of trucks entering and leaving the landfill. Since the proposed landfill expansion is for the purpose of continuing the current level of operations, the current level of truck traffic will not change significantly. No other evidence was found to indicate that the current level of signing is deficient. 58. The MPCA finds that information presented in the EAW and other information in the environmental review record is adequate to address the concerns related to increased cancer incidence in the area of the landfill; general groundwater concerns; general air quality concerns including odors, effects on workers, soils, and crops, traffic, and noise. Impacts that are reasonably expected to occur from the proposed Project have been considered during the review process and mitigation for potential impacts has been developed where needed. 59. The MPCA finds that the Project, as it is proposed, does not have the potential for significant environmental effects based on the type, extent and reversibility of impacts related to increased cancer incidence in the area of the landfill; general groundwater concerns; general air quality concerns including odors, effects on workers, soils, crops, traffic, and noise that are reasonably expected to occur from the project. Cumulative Potential Effects 60. The second criterion that the MPCA must consider when determining if a project has the potential for significant environmental effects is the "cumulative potential effects. In making this determination, the MPCA must consider whether the cumulative potential effect is significant; whether the contribution from the project is significant when viewed in connection with other contributions to the cumulative potential effect; the degree to which the project complies with approved mitigation measures specifically designed to address the cumulative potential effects; and the efforts of the proposer to minimize the contributions from the project. Minn. R , subp. 7.B. The MPCA s findings, with respect to this criterion, are set forth below. 9

11 On the Need for an Environmental Impact Statement East Central Solid Waste Commission Sanitary Landfill Expansion Project, Arthur Township, Kanabec County Minnesota Findings of Fact Conclusions of Law And Order 61. The EAW addressed the following cumulative potential effects for the proposed project: Surface Water Quality Groundwater Quality Criteria Air Emissions Non-criteria Air Emissions (air toxics) Greenhouse Gas Emissions Odor, Dust and Noise Surface Water Quality 62. The Project is located within the watershed of the Ann River and Fish Lake. Water quality and biological assessments have been conducted for these waters resulting in the identification of cumulative potential effects in the Ann River (impaired fish and aquatic invertebrate communities and contamination by E. coli bacteria) and in Fish Lake (eutrophication). Projects for the assessment of sources of relevant pollutants are underway and will establish total maximum daily loads (TMDLs) and load allocation targets for all regulated and unregulated sources of pollutants related to the impairments. 63. Runoff from the landfill will be managed according to best management practices (BMP) described in the landfill s stormwater management plan. Runoff will be collected by means of contouring, benches, and down-drains that will direct it to the stormwater storage and treatment basins, which are constructed and sized to control 80 percent of incoming sediment and the 25-year, 24-hour rain event. The predominant soils are sandy, and much of the stored stormwater is expected to infiltrate. Any overflows will go to wetlands surrounding the landfill. Significant cumulative stormwater impacts are thus not expected. 64. Following the establishment of approved TMDLs for the Ann River and Fish Lake, TMDL implementation plans will be prepared that define targeted load reductions for pollutant sources within the watershed. To the extent that future strategies or control measures are identified in the implementation plans, additional or modified stormwater control measures may be required to be incorporated in future permit re-issuance. Groundwater Quality 65. The expansion project consists of two new lined disposal cells. The facility s groundwater monitoring system has not detected any releases from lined cells at the landfill. No cumulative effects on groundwater have been identified. Criteria Air Emissions 66. Cumulative impacts were analyzed via computer modeling of the dispersion of criteria pollutant air emissions, including background, to demonstrate compliance with the National Ambient Air Quality Standards (NAAQS) and the Minnesota Ambient Air Quality Standards (MAAQS) for PM 10, PM 2.5, NO x, and SO 2 and CO. Lead was not modeled as it is not emitted from any of the facility sources. The analysis showed that facility concentrations are below NAAQS and MAAQS for all pollutants. This remains true when background concentrations are added. 67. A modeling analysis was also conducted to predict compliance with the new one-hour NO 2 federal ambient air quality standard. The facility s modeled impact is 18 ug/m 3. The MPCA estimated a conservative background concentration of 71 ug/m 3, based on data from the U.S. Environmental Protection Agency (EPA) Monitor Values Report - Criteria Air Pollutants, and added this background 10

12 On the Need for an Environmental Impact Statement East Central Solid Waste Commission Sanitary Landfill Expansion Project, Arthur Township, Kanabec County Minnesota Findings of Fact Conclusions of Law And Order value to the facility concentration. The estimated total 1-hr NO x impact is 89 ug/m 3, which is 72 percent of the standard. 68. These results indicate that no cumulative potential effects on air quality have been identified attributable to emissions of regulated criteria air pollutants. Non-criteria Air Emissions (air toxics) 69. To evaluate the cumulative potential cumulative health risks from inhaling outside air in the vicinity of the landfill, monitoring data from a rural monitoring station with similar population density was considered along with potential risks from the landfill (see table below). These rural monitoringbased risk estimates reflect emissions from industrial facilities, traffic, gas stations, wood-burning stoves, etc. or distant emissions sources that contribute to a regional level of pollutants that have been detected at similar levels across Minnesota. Calculated cumulative inhalation risks estimates were below facility risk guidelines except for cancer risks, which are above facility risk guidelines throughout the state. The percent contribution of the cumulative potential inhalation cancer risk estimates from the project modification is six percent. Potential Cumulative Inhalation Health Risk Estimates Max Acute Inhalation Hazard Index Max Chronic Non- Cancer Inhalation Hazard Index Max Cancer Inhalation Risk Risk estimates from rural population monitoring data E-5 Total current landfill risk estimates 0.1 < E-5 Total landfill risk estimates after modifications at the site of maximum impact 0.2 < E-5 Total Cumulative Sum at the site of maximum impact E-5 % contribution from modifications 21% < 2% 6% Greenhouse Gases 70. The expansion project will include an active gas collection system, which included fans, pipes and risers that deliver the collected gas to the existing flare. The flare will convert the methane in the gas to carbon dioxide, which is 25 times less potent as a greenhouse gas than methane. The addition of the SMMPA generator set to burn LFG for electricity production will accomplish the same goal, with the added benefit of energy production. The only other known regulated projects in the vicinity of the landfill are feedlots. While animal agriculture as a whole is a significant contributor to the worldwide greenhouse effect, there is no evidence that individual feedlots in the area produce measurable contributions. Based on the above, no significant cumulative potential greenhouse gas effects are expected for the project. Odor, Dust, and Noise 71. Odors at a landfill are a function of the disposal area that is open at any one time and the effectiveness of the landfill gas control system. The project is a continuation of landfilling activities that have been ongoing for some time, so there is no reason to expect a significant increase in odorous emissions from the project. Also, odors will be minimized by the expanded gas collection system and combustion of gas in the flare and generator set, so that odor impacts are likely to be lower than historically. Feedlots create odorous emissions as well. However, there are few in the vicinity, and the 11

13 On the Need for an Environmental Impact Statement East Central Solid Waste Commission Sanitary Landfill Expansion Project, Arthur Township, Kanabec County Minnesota Findings of Fact Conclusions of Law And Order nearest one found in MPCA files is over one mile southwest of the proposed disposal area. Since the winds that carry odors also eventually dissipate them, it is not likely that there would be significant cumulative odorous effects associated with the project. 72. To date, dust emissions have not been a significant issue at the landfill, and this is not expected to change. No significant cumulative effects are expected. 73. To date, noise has not been a significant issue at the landfill, and this is not expected to change. No significant cumulative impacts are expected. 74. Based on information on the Project obtained from operational experience, air modeling, the permit development processes, and an Air Emission Risk Assessment, and other information presented in the EAW, the MPCA does not expect significant cumulative potential effects from this Project. 75. The MPCA finds that there are no significant cumulative potential environmental effects associated with the proposed project. The Extent to Which the Environmental Effects Are Subject to Mitigation by Ongoing Public Regulatory Authority 76. The third criterion that the MPCA must consider when determining if a project has the potential for significant environmental effects is "the extent to which the environmental effects are subject to mitigation by ongoing public regulatory authority," Minn. R , subp. 7.C. The MPCA findings, with respect to this criterion, are set forth below. 77. The following permits or approvals will be required for the Project: Unit of Government MPCA MPCA MPCA MPCA MPCA MPCA MCES Kanabec County Arthur Township Permit or Approval Required Solid Waste Disposal Facility Permit Facility Industrial Stormwater Permit Construction Stormwater Permit Title V Air Permit Methane Engine Facility Operating Air Permit--Landfill Landfill Expansion Certificate of Need (CON) Industrial Discharge Permit Wetland Mitigation Approval Conditional Use Permit 78. Mixed Municipal Solid Waste Land Disposal Facility Permit Typical mixed municipal waste includes garbage collected in aggregate from residential routes. The project proposer is responsible for submitting engineering plans and for managing the facility in accordance to the final permit requirements which would regulate design parameters, construction, operation, leachate management, monitoring, closure, post-closure, and emergency/contingency action plans, among other things. 79. Facility Industrial Stormwater Permit and Spill Response Plan The National Pollutant Discharge Elimination System (NPDES)/State Disposal System Industrial Stormwater Permit requires that specific conditions be adhered to for construction and operation of the facility, and for overall compliance with water quality requirements. The facility will need to 12

14 On the Need for an Environmental Impact Statement East Central Solid Waste Commission Sanitary Landfill Expansion Project, Arthur Township, Kanabec County Minnesota Findings of Fact Conclusions of Law And Order prepare a Spill Response Plan and/or revise its Stormwater Pollution Prevention Plan. 80. NPDES Construction Stormwater Permit A General NPDES Construction Stormwater Permit is required when a project disturbs one or more acres. It provides for the use of BMP such as silt fences, bale checks, and prompt revegetation to prevent eroded sediment from leaving the construction site. The proposer must have a sediment and erosion control plan that will provide more detail as to the specific measures to be implemented and will also address: phased construction; vehicle tracking of sediment; inspection of erosion control measures implemented; and timeframes in which erosion control measures will be implemented. The general permit also require adequate stormwater treatment capacity be provided to assure that water quality will not be impacted by runoff once the project is constructed. 81. Air Emission Permit The Air Emission Permit for the facility would contain operational and emission limits, including requirements for use of control equipment, that would help prevent or minimize the potential for significant environmental effects. 82. Landfill Expansion Certificate of Need No new MSW disposal capacity is permitted without a certificate of need indicating the capacity is needed. Need is certified only if there are no feasible and prudent alternatives including reduction, recycling, and resource recovery. 83. The Wetland Conservation Act requires that, whenever proposed development would impact a wetland, a sequencing analysis must be performed by the county in which the development would occur. This analysis follows the statute s requirement that impacts to the wetland must be avoided where possible, minimized if avoidance is not feasible, and mitigated as a last resort. The County completed the sequencing analysis in 2006 when the landfill was proposing to site a demolition debris disposal cell in the wetland area in the northwest quarter of the landfill property, and concluded that avoidance and minimization were not feasible. The landfill accordingly purchased wetland credits to mitigate loss of the wetlands, and the wetlands were filled in preparation for cell construction. The demolition debris cell was ultimately sited elsewhere on the property, but the landfill will soon propose to use the area in question for land application of leachate. In response to a public comment that the sequencing analysis should be reconsidered since the basis for the 2006 analysis has changed, the landfill has re-referred the issue to the County for reconsideration. However, since the wetlands have already been filled and mitigated, and the area lies in the path of future MSW cell development, it is expected that the County s conclusion (that avoidance and minimization are not feasible and therefore mitigation is indicated) will remain the same. 84. Conditional Use Permit The proposer is required to obtain all required building and conditional use permits required by local units of government to ensure compliance with local ordinances. The conditional use permit will address local zoning, environmental, regulatory, and other requirements that are needed to avoid adverse effects on adjacent land uses. 85. The above-listed permits include general and specific requirements for mitigation of environmental effects of the Project. The MPCA finds that the environmental effects of the project are subject to mitigation by ongoing public regulatory authority. 13

15 On the Need for an Environmental Impact Statement East Central Solid Waste Commission Sanitary Landfill Expansion Project, Arthur Township, Kanabec County Minnesota Findings of Fact Conclusions of Law And Order The Extent to Which Environmental Effects can be Anticipated and Controlled as a Result of Other Available Environmental Studies Undertaken by Public Agencies or the Project Proposer, Including Other EISs 86. The fourth criterion that the MPCA must consider is the extent to which environmental effects can be anticipated and controlled as a result of other available environmental studies undertaken by public agencies or the project proposer, including other EISs, Minn. R , subp. 7. D. The MPCA findings with respect to this criterion are set forth below. 87. The following documents were reviewed by MPCA staff as part of the environmental impact analysis for the proposed Project. 88. Data presented in the EAW were obtained from permit applications, application review and permit development by staff, the air dispersion modeling report, other reports and analysis or other EAWs for similar projects. This list is not intended to be exhaustive. The MPCA also relies on information provided by the Project proposer, persons commenting on the EAW, staff experience, and other available information obtained by staff. 89. There are no elements of the Project that pose the potential for significant environmental effects that cannot be addressed in the Project design and permit development processes, or by regional and local plans. 90. Based on the environmental review, previous environmental studies, and MPCA staff expertise and experience on similar projects, the MPCA finds that the environmental effects of the Project that are reasonably expected to occur can be anticipated and controlled. 91. The MPCA adopts the rationale stated in the attached Response to Comments (Appendix B) as the basis for response to any issues not specifically addressed in these Findings. CONCLUSIONS OF LAW 92. The MPCA has jurisdiction in determining the need for an EIS for this Project. The EAW, the permit development process, and the evidence in the record are adequate to support a reasoned decision regarding the potential significant environmental effects that are reasonably expected to occur from this Project. 93. Areas where the potential for significant environmental effects may have existed have been identified and appropriate mitigation measures have been incorporated into the Project design and permits. The Project is expected to comply with all MPCA standards. 94. Based on a comparison of the impacts that are reasonably expected to occur from the Project with the criteria established in Minn. R subp. 7, the Project does not have the potential for significant environmental effects. 95. An EIS is not required. 96. Any findings that might properly be termed conclusions and any conclusions that might properly be termed findings are hereby adopted as such. 14

16 On the Need for an Environmental Impact Statement East Central Solid Waste Coinmission Sanitary Landfill Expansion Project, Arthur Township, Kanabec County Minnesota Findings of Fact Conclusions of Law And Order ORDER 97. The Minnesota Pollution Control Agency determines that the project consisting of the expansion of the East Central Solid Waste Commission Sanitary Landfill and the installation and operation on the landfill site of an engine-generator set to burn landfill gas does not have the potential for significant environmental effects and that there is no need for an Environmental Impact Statement. IT IS SO ORDERED?~ z:~ Paul Eger, Commissio Minnesota Pollution Control Agency Date 15

17 APPENDIX A Minnesota Pollution Control Agency East Central Solid Waste Commission Sanitary Landfill Expansion Environmental Assessment Worksheet LIST OF COMMENT LETTERS RECEIVED 1. Ron Wieland, Minnesota DNR. Letter received April 7, Janyce and Steve Nestrud, Mora. Letter received April 7, Russ Mann, Bjorklund Companies. Letter received April 19, David Halvorson, Ogilvie. Letter not dated. 5. Sharon Rittenour, Mora. Letter received April 14, 2010.

18 1

19 2

20 3

21 4

22 5

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ELK RIVER LANDFILL INTERNAL COMBUSTION ENGINE GENERATOR

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-44b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED RANDY S SANITATION TRANSFER FACILITY PROPOSED

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED EAGLE BEND WASTEWATER TREATMENT FACILITY IMPROVEMENTS

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. St. Francis Wastewater Treatment Facility Project Description

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. St. Francis Wastewater Treatment Facility Project Description p-ear2-78b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ST. FRANCIS WASTEWATER TREATMENT FACILITY

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-75b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LONSDALE WASTEWATER TREATMENT FACILITY EXPANSION,

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED WAHKON WASTEWATER TREATMENT FACILITY EXPANSION MILLE

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ANDERSEN CORPORATION - PROJECT XL WASHINGTON COUNTY

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED METROPOLITAN COUNCIL ENVIRONMENTAL SERVICES ST. LOUIS

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED NEW FASHION PORK, ENGELKES SITE NOBLES COUNTY WORTHINGTON,

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY In the Matter of the Decision on the Need for an Environmental Impact Statement for the Proposed Remer Wastewater Treatment Facility Expansion FINDINGS

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT FACILITY HISTORY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT FACILITY HISTORY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED HOWARD LAKE WASTEWATER TREATMENT IMPROVEMENTS PROJECT

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description p-ear2-46b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED SHAMROCK RECYCLING AND TRANSFER STATION

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED PJM PORK, INC. SWINE FEEDLOT EXPANSION PROJECT COURTLAND

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LESTER PRAIRIE WASTEWATER TREATMENT FACILITY EXPANSION

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-20b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LONG PRAIRIE MUNICIPAL WASTEWATER TREATMENT

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ASMUS EGG FARMS INC FEEDLOT EXPANSION ALFSBORG TOWNSHIP

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED BINFORD FARMS SECTION 4 FEEDLOT EXPANSION MAGNOLIA

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED STROBEL FARMS JUNGBLOET SITE & BUECKSLER SITE BLUE

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-59b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED HEARTLAND HUTTERIAN BRETHREN, INC. FEEDLOT

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED FLINT HILLS RESOURCES, LP MARSHALL TANK FARM EXPANSION

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED AHRENDT BROTHERS CATTLE EXPANSION PROJECT MOUND TOWNSHIP,

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED BRAUN HOG FEEDLOT EXPANSION PRAIRIEVILLE TOWNSHIP/BROWN

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED FLINT HILLS RESOURCES, LP - ULTRA LOW SULFUR DIESEL

More information

TO INTERESTED PARTIES: RE: Chippewa Valley Ethanol Company Expansion

TO INTERESTED PARTIES: RE: Chippewa Valley Ethanol Company Expansion TO INTERESTED PARTIES: RE: The Minnesota Pollution Control Agency (MPCA) has approved the,, and Order for the Environmental Assessment Worksheet (EAW) on the proposed Project, Swift County. The Findings

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ROYALTON WASTEWATER TREATMENT FACILITY EXPANSION ROYALTON

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-80b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED REG ALBERT LEA, LLC PROJECT FREEBORN COUNTY

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED STEMMER RIDGE ROAD TRUNK SANITARY SEWER EXTENSION

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. Project Description p-ear2-01a STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED MAR-KIT SANITARY LANDFILL, KITTSON COUNTY,

More information

TO INTERESTED PARTIES: RE: Heartland Corn Products Ethanol Plant Expansion

TO INTERESTED PARTIES: RE: Heartland Corn Products Ethanol Plant Expansion TO INTERESTED PARTIES: RE: Heartland Corn Products Ethanol Plant Expansion The Minnesota Pollution Control Agency (MPCA) has approved the Findings of Fact for the Environmental Assessment Worksheet (EAW)

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-60b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ELK RIVER WASTEWATER TREATMENT FACILITY

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED SKB TRANSFER STATION, BLAINE ENVIRONMENTAL CAMPUS

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-68b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED PIRKL GAS, INC. PROPANE STORAGE EXPANSION

More information

FINDINGS OF FACT and CONCLUSIONS

FINDINGS OF FACT and CONCLUSIONS FINDINGS OF FACT and CONCLUSIONS I-694/ I-494/ I-94 Interchange Improvements State Project No. 8286-81 Prepared by: Minnesota Department of Transportation July, 2018 CONTENTS STATEMENT OF ISSUE... 2 ADMINISTRATIVE

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-131b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED HI-WAY 30 HOGS, LLC PROJECT BYRON TOWNSHIP,

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-97b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED BUENDORF HOG FACILITY HARTLAND TOWNSHIP

More information

MINNESOTA POLLUTION CONTROL AGENCY Industrial Division

MINNESOTA POLLUTION CONTROL AGENCY Industrial Division MINNESOTA POLLUTION CONTROL AGENCY Industrial Division APEC Ethanol Production Facility Request for Approval of Findings of Fact, Conclusions of Law, and Order and Authorization to Issue a Negative Declaration

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT FACILITY HISTORY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT FACILITY HISTORY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED NEW SWEDEN DAIRY NEW SWEDEN TOWNSHIP NICOLLET COUNTY,

More information

SOUTH ST. LOUIS SOIL AND WATER CONSERVATION DISTRICT FINDINGS OF FACT

SOUTH ST. LOUIS SOIL AND WATER CONSERVATION DISTRICT FINDINGS OF FACT SOUTH ST. LOUIS SOIL AND WATER CONSERVATION DISTRICT RECORD OF DECISION In the Matter of the Determination of the Need for an Environmental Impact Statement for the Sargent Creek Channel and Floodplain

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ARMSTRONG FEEDLOT FREEDOM TOWNSHIP/WASECA COUNTY WASECA,

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY ATTACHMENT 1 STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION TO REISSUE THE MINNESOTA NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM CONSTRUCTION

More information

TO INTERESTED PARTIES: RE: Al-Corn Clean Fuels Plant Expansion

TO INTERESTED PARTIES: RE: Al-Corn Clean Fuels Plant Expansion TO INTERESTED PARTIES: RE: Al-Corn Clean Fuels Plant Expansion The Minnesota Pollution Control Agency (MPCA) has approved the for the Environmental Assessment Worksheet (EAW) on the proposed Al-Corn Clean

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED BUFFALO LAKE ETHANOL, LLC FAIRMONT, MINNESOTA FINDINGS

More information

MINNESOTA POLLUTION CONTROL AGENCY RMAD and Industrial Divisions Environment & Energy Section; Air Quality Permits Section

MINNESOTA POLLUTION CONTROL AGENCY RMAD and Industrial Divisions Environment & Energy Section; Air Quality Permits Section 001 p-bp15-01-02a 002 003 004 005 MINNESOTA POLLUTION CONTROL AGENCY RMAD and Industrial Divisions Environment & Energy Section; Air Quality Permits Section The University of Minnesota Twin Cities Combined

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-94b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED CITY OF MORGAN CONSTRUCTION OF WASTEWATER

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

Mn/DOT Outstate District SWPPP

Mn/DOT Outstate District SWPPP SWPPP Table of Contents Introduction......4 PUBLIC EDUCATION AND OUTREACH...5 Distribute Educational Materials...5 Implement an Education Program...6 Education Program: Public Education and Outreach...7

More information

Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report

Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report Clean Harbors Canada Inc. Lambton Landfill Expansion Environmental Assessment Draft Air Quality & Odour Net Effects Analysis & Prepared By: JANUARY, 2014 Executive Summary Two expansion alternatives were

More information

CCSD#1 Stormwater Standards

CCSD#1 Stormwater Standards SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-bp15-01-02b ATTACHMENT 1 STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED UNIVERSITY OF MINNESOTA

More information

MINNESOTA POLLUTION CONTROL AGENCY. Watershed Division. Board Item Cover Sheet. MEETING DATE: August 26, 2014 DATE MAILED: August 15, 2014

MINNESOTA POLLUTION CONTROL AGENCY. Watershed Division. Board Item Cover Sheet. MEETING DATE: August 26, 2014 DATE MAILED: August 15, 2014 b-bp14-08-03a MINNESOTA POLLUTION CONTROL AGENCY Watershed Division Board Item Cover Sheet MEETING DATE: August 26, 2014 DATE MAILED: August 15, 2014 Presenter(s): Supervisor: Manager: Division Director:

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED PLAINVIEW ELGIN WASTEWATER TREATMENT FACILITY IMPROVEMENTS

More information

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN SITUATED IN THE SW ¼ OF SECTION 18, T.2S., R.67W., OF THE 6 TH P.M. COUNTY OF ADAMS, STATE OF COLORADO PREPARED FOR: Thornton Cornerstone

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED MINNESOTA SOYBEAN PROCESSORS COOPERATIVE OILSEED PROCESSING

More information

Solid Waste Facility Permit SW

Solid Waste Facility Permit SW Solid Waste Facility Permit Permittee: Facility name: East Central Solid Waste Commission East Central Sanitary Landfill 1756 180th Ave Mora, MN 55051 7010 Issuance date: June 3, 2015 Modification date:

More information

3/1/2013. Minnesota Erosion Control Association. St. Cloud, Minnesota. (March 8, 2013) While the permit must meet the requirements

3/1/2013. Minnesota Erosion Control Association. St. Cloud, Minnesota. (March 8, 2013) While the permit must meet the requirements Construction Stormwater General NPDES/SDS Permit Reissuance Minnesota Erosion Control Association 25th Annual lconference St. Cloud, Minnesota March 6, 2013 Lawrence S. Zdon The Minnesota General Construction

More information

ATTACHMENTS: 1. Findings of Fact, Conclusion of Law, and Order 5/24/07

ATTACHMENTS: 1. Findings of Fact, Conclusion of Law, and Order 5/24/07 The MPCA is the governmental unit responsible for preparing an Environmental Assessment Worksheet (EAW) when an animal feedlot project meets the thresholds specified in Minn. R. 4410.4300, subp. 29A. As

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT ATTACHMENT 1 STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DETERMINATION OF ADEQUACY OF THE ENVIRONMENTAL IMPACT STATEMENT FOR THE OLMSTED WASTE-TO-ENERGY FACILITY: MUNICIPAL

More information

ENVIRONMENTAL ASSESSMENT WORKSHEET

ENVIRONMENTAL ASSESSMENT WORKSHEET ENVIRONMENTAL ASSESSMENT WORKSHEET Note to reviewers: The (EAW) provides information about a project that may have the potential for significant environmental effects. This EAW was prepared by the Minnesota

More information

Model Riparian Buffer Ordinance.

Model Riparian Buffer Ordinance. Model Riparian Buffer Ordinance. This is a sample riparian buffer ordinance written as an amendment to an existing zoning ordinance. This ordinance complies with the state minimum standards for river corridor

More information

FINDINGS OF FACT And CONCLUSIONS

FINDINGS OF FACT And CONCLUSIONS FINDINGS OF FACT And CONCLUSIONS SOUTHWEST RECONNECTION PROJECT Highway 61/101 Flood Mitigation State Project No. 1009-24 and State Aid Project No. 010-661-002 Prepared for: Carver County September 2013

More information

Feedlot Construction Setbacks from Open Water and Wells

Feedlot Construction Setbacks from Open Water and Wells Feedlot Construction Setbacks from Open Water and Wells Water Quality/Feedlots #8.30 May 2009 Contents New and expanded feedlots near waters... 2 Setbacks from wells... 3 Public water supply wells... 4

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT PROPOSED PROJECT DESCRIPTION

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT PROPOSED PROJECT DESCRIPTION STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LOWELL FRANZEN FEEDLOT PROJECT LYLE TOWNSHIP MOWER

More information

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history, culture, economy

More information

Storm Water Pollution Prevention Plan (SWP3) Checklist

Storm Water Pollution Prevention Plan (SWP3) Checklist . Summit Soil and Water Conservation District Storm Water Pollution Prevention Plan (SWP3) Checklist Modified from the Ohio EPA SWP3 Checklist (Revised January 2017) SITE NAME: REVIEWER: DATE RECEIVED:

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. KTJ 314, LLC Blaine, MN 55449

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. KTJ 314, LLC Blaine, MN 55449 18-118 ABRA Auto Body, Page 1 of 8 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 13, 2018 AGENDA NUMBER: 14 FILE NUMBER: 18-118 ITEM: ABRA Auto Body RECOMMENDATION: Approve with 6 Stipulations

More information

Surface Water Management

Surface Water Management Surface Water Management Figure 7: Examples of Nonpoint Source Pollution The water quality leaving the metropolitan area is as good as the water quality entering the metropolitan area, and in compliance

More information

Florida Department of Environmental Protection Inspection Checklist

Florida Department of Environmental Protection Inspection Checklist Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: BASELINE LANDFILL CLASS I On-Site Inspection Start Date: On-Site Inspection End Date: WACS : 20906

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT PROPOSED PROJECT DESCRIPTION

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT PROPOSED PROJECT DESCRIPTION STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ANNANDALE/MAPLE LAKE WASTEWATER TREATMENT FACILITY

More information

City of Valdosta Land Development Regulations

City of Valdosta Land Development Regulations Chapter 324 Section 324-1 Environmental Planning Criteria Protection of Groundwater Recharge Areas (A) Purpose and Intent. Pursuant to O.C.G.A. 12-2-8 and the Georgia Department of Natural Resources (DNR),

More information

Building Better Storm Water Quality

Building Better Storm Water Quality Building Better Storm Water Quality s Storm Water Pollution Prevention Guidelines for Development Construction Projects City of El Segundo 350 Main Street (310) 524-2380 El Segundo, California 90245 Introduction

More information

Appendix 9. Wright Landfill Stabilization Report 2013

Appendix 9. Wright Landfill Stabilization Report 2013 Appendix 9 Wright Landfill Stabilization Report 2013 Board of County Commissioners State of Florida October 30, 2013 Ms. Dawn Templin Northwest District Florida Department of Environmental Protection 160

More information

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater

More information

2.1 INTRODUCTION 2.0 EIS DEVELOPMENT

2.1 INTRODUCTION 2.0 EIS DEVELOPMENT 2.0 EIS DEVELOPMENT 2.1 INTRODUCTION This section describes the development of the EIS for the NorthMet Project first proposed in 2005, through development of this SDEIS, as well as the FEIS planned for

More information

Florida Department of Environmental Protection Inspection Checklist

Florida Department of Environmental Protection Inspection Checklist Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: DELAND LANDFILL, CLASS III On-Site Inspection Start Date: On-Site Inspection End Date: WACS : 29244

More information

Northern States Power Company 414 Nicollet Mall 211 N. Broadway, Suite 211 Minneapolis, MN Green Bay, WI 54303

Northern States Power Company 414 Nicollet Mall 211 N. Broadway, Suite 211 Minneapolis, MN Green Bay, WI 54303 PC 02-18 Lab USA CUP Ash Processing Facility 02/07/18 Property Owner Applicant Northern States Power Company Lab USA 414 Nicollet Mall 211 N. Broadway, Suite 211 Minneapolis, MN 55401 Green Bay, WI 54303

More information

MPCA Overview. Tim Scherkenbach Deputy Commissioner. Senate Environment and Natural Resources Committee. January 27, 2011.

MPCA Overview. Tim Scherkenbach Deputy Commissioner. Senate Environment and Natural Resources Committee. January 27, 2011. MPCA Overview Senate Environment and Natural Resources Committee Tim Scherkenbach Deputy Commissioner January 27, 2011 lppt-4bsy11 Presentation Overview MPCA Organization MPCA Programs 2 MPCA Mission Working

More information

F3. Final Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report

F3. Final Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report F3. Final Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report Clean Harbors Canada Inc. Lambton Landfill Expansion Environmental Assessment Air Quality & Odour Net Effects Analysis

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-127b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED CITY OF TRACY CONSTRUCTION OF NEW WASTEWATER

More information

Application For Waste Regulation (Check all that apply)

Application For Waste Regulation (Check all that apply) Environmental Protection and Growth Management Department ENVIRONMENTAL ENGINEERING AND PERMITTING DIVISION 1 North University Drive, Mailbox #201 Plantation, Florida 33324 954-519-1483 FAX 954-519-1412

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-41b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED HIGH ISLAND DAIRY, LLC LAKE PRAIRIE TOWNSHIP

More information

Solid Waste Facility Permit SW

Solid Waste Facility Permit SW Solid Waste Facility Permit Permittee: Facility name: Issuance date: 101 Transfer Facility 101 Transfer Facility 6528 County Highway 101 East Shakopee, Minnesota 55379 Scott County TBD Expiration date:

More information

MINNESOTA POLLUTION CONTROL AGENCY. Resource Management and Assistance Division. Board Item Cover Sheet

MINNESOTA POLLUTION CONTROL AGENCY. Resource Management and Assistance Division. Board Item Cover Sheet p-ear2-43c MINNESOTA POLLUTION CONTROL AGENCY Resource Management and Assistance Division Board Item Cover Sheet MEETING DATE: August 27, 2012 DATE MAILED: August 17, 2012 Presenter(s): Karen Kromar Phone

More information

Volume II Recommendations January 2006 City of Madison Comprehensive Plan

Volume II Recommendations January 2006 City of Madison Comprehensive Plan 10 UTILITIES THE PLAN: GOALS, OBJECTIVES, POLICIES AND IMPLEMENTATION RECOMMENDATIONS Volume II Recommendations January 2006 TABLE OF CONTENTS Utilities Overview... 10 1 Summary of Utilities Issues...

More information

SIOUX ENERGY CENTER SCPB CCR IMPOUNDMENT CLOSURE PLAN

SIOUX ENERGY CENTER SCPB CCR IMPOUNDMENT CLOSURE PLAN SIOUX ENERGY CENTER SCPB CCR IMPOUNDMENT CLOSURE PLAN i Table of Contents 1.0 INTRODUCTION... 1 2.0 SITE DESCRIPTION... 1 3.0 CLOSURE PLAN... 1 3.1 Overview of Closure Approach... 1 3.2 Estimated Maximum

More information

Project Priority List scoring worksheet - stormwater Guidance document

Project Priority List scoring worksheet - stormwater Guidance document www.pca.state.mn.us Project Priority List scoring worksheet - stormwater Guidance document PLEASE NOTE: THE MINNESOTA STATE FISCAL YEAR IS FROM JULY 1 JUNE 30 The first step towards receiving either a

More information

F3. Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report

F3. Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report F3. Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report Clean Harbors Canada Inc. Lambton Landfill Expansion Environmental Assessment Draft Air Quality & Odour Net Effects Analysis

More information

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018 City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting June 11, 2018 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history,

More information

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW SUBCHAPTER 8 STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW 7:45-8.1 Purpose and scope of review Except for those projects expressly exempted by this chapter or waived by the Commission, the Commission

More information

Statement of Basis. LG Everist, Inc., County Highway 17 Ortonville, Minnesota 56278, Big Stone County NPDES/SDS Permit No: MN May 2018

Statement of Basis. LG Everist, Inc., County Highway 17 Ortonville, Minnesota 56278, Big Stone County NPDES/SDS Permit No: MN May 2018 www.pca.state.mn.us Statement of Basis LG Everist, Inc. LG Everist, Inc., 43966 County Highway 17 Ortonville, Minnesota 56278, Big Stone County NPDES/SDS Permit No: MN0068764 May 2018 Description of permitted

More information

Public Notice ISSUED: April 5, 2019 EXPIRES: May 6, 2019

Public Notice ISSUED: April 5, 2019 EXPIRES: May 6, 2019 APPLICANT: Aitkin County Highway Department Public Notice ISSUED: April 5, 2019 EXPIRES: May 6, 2019 REFER TO: MVP-2019-00387-EJI SECTION: 404 - Clean Water Act 1. APPLICATION FOR PERMIT TO discharge fill

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW

COON CREEK WATERSHED DISTRICT PERMIT REVIEW 16-054 Woodland Creek Wetland Banking Restoration Project, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 11 FILE NUMBER: 16-054 ITEM: Woodland Creek

More information

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT Nonmetallic Mining Reclamation & Operation Plan Amendment No. 1 (Includes modifications for Wash Plant construction) Mondovi Mine Town of Mondovi, Wisconsin Prepared for: Buffalo White Sand, LLC PO Box

More information

Department of Environmental Conservation. Fiscal Year 2015 Performance Outcomes and Measures

Department of Environmental Conservation. Fiscal Year 2015 Performance Outcomes and Measures Department of Environmental Conservation Fiscal Year 2015 Performance Outcomes and Measures Department of Environmental Conservation Fiscal Year 2015 Performance Outcomes and Measures Department of Environmental

More information

Frequently Asked Questions

Frequently Asked Questions North Wake Landfill Q1. Where is the North Wake Landfill located? The North Wake Landfill is located at 9300 Deponie Drive, off of Durant Road in north Raleigh, between Falls of Neuse Road and Capital

More information

CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION

CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION Community Development Department 949 E 2 nd Ave Durango, CO 81301 (970) 375-4810 fax (970) 375-4848 Contact Information City of Durango

More information

Infrastructure Element

Infrastructure Element Infrastructure Element 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 INFRASTRUCTURE ELEMENT GOAL 1: To provide for environmentally

More information

STATE OF MINNESOTA. Minnesota Pollution Control Agency. FACT SHEET for the

STATE OF MINNESOTA. Minnesota Pollution Control Agency. FACT SHEET for the I. INTRODUCTION STATE OF MINNESOTA Minnesota Pollution Control Agency FACT SHEET for the 2016 GENERAL NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) ANIMAL FEEDLOT PERMIT Permit Number MNG440000

More information