1 UCD IT Services Application Jukebox Project Initiation Document Version February 2015 Version History Version Date Summary of Changes Changed by Initial Draft Revisions Revisions Application Jukebox Project Initiation Document Page 1 of 10
2 Contents Objectives & Scope Background to the Project Project Objectives Expected Benefits Project Scope Change Control Project Plan Project Approach Milestones & Deliverables Project Structure Roles & Responsibilities Project Team Meetings Risks & Issues Initial Risk & Issue Log Ongoing Management of Risks and Issues Communication Plan Project Costs Initial Project Budget Ongoing Costs Application Jukebox Project Initiation Document Page 2 of 10
3 1 Objectives & Scope This Project Initiation Document (PID) defines the Application Jukebox Project in detail including objectives, scope, approach, deliverables, timescale and structure of the project so that it can be understood and agreed by all stakeholders. 1.1 Background to the Project Currently IT Services deliver academic software applications to open access computer labs and users own devices using Citrix technology. This requires a substantial server farm back end, and is capable of virtualising approximately 80% of teaching applications in use in UCD. A portion of the Citrix technology will end of life in Q2 of 2015, this fact coupled with a hardware refresh being due on the back end has prompted IT Services to look for a more suitable solution to deliver applications to end users. 1.2 Project Objectives The objective of this project is to implement a new technology to deliver software applications to both labs and users own devices, with a higher rate of successful application packaging and an enhanced end user experience. It is also imperative that meaningful data on application usage can be generated. University Strategic Objective 2: Provide an educational experience that defines international best practice. University Strategic Objective 8: Further develop world class facilities to support our vision 1.3 Expected Benefits Reduced back end infrastructure requirement, expected 75% reduction compared with current App Farm. Increased number of applications (estimated 99%) can be packaged, including AutoCAD, SAS 9.4, MS Office etc Improved end user experience Potential for enhanced service offerings in this space, e.g. downloads, software purchase, license management etc. Improved reporting features Application Jukebox Project Initiation Document Page 3 of 10
4 1.4 Project Scope This project, once completed, will change the underlying technology supporting the virtualisation and delivery of software applications, used for teaching, to both open access computer labs and users own Windows OS devices. 1.5 Change Control The Project Initiation Document will be approved on commencement of the project by the relevant project members. Following this, an ongoing Project Plan will be maintained and updated to accommodate any minor changes occur. Once the scope is agreed herein, any further changes to scope or major deviation from the proposed time frames will be the subject of the change control. Application Jukebox Project Initiation Document Page 4 of 10
5 2 Project Plan 2.1 Project Approach The project will take place over a number of stages, the first stage will focus on use in open access computer labs incorporating testing, piloting in a single computer lab, extended pilot, roll out to all labs. The second stage will focus on users own device testing, own device pilot and own device roll out and associated communications and awareness campaign. 2.2 Milestones & Deliverables The following milestones, deliverables and target delivery dates have been defined for the project: Milestone Deliverable Responsibility Reviewers/ Approvers Due Date 0 Project Initiation completed Project initiation doc completed Genevieve Dalton Contract Negotiation Signed contract R: T Mountjoy A: UCD Legal Technical Install & Configure Working AJ environment Project Team / Software Application Packaging All apps packaged 3 Tiers Project Team Deliver an image 4 Implement in OPAC Labs that supports use of AJ technology to Project Team R: T Mountjoy A: C Acton OPAC labs 5 Rollout to user own devices (Windows only) Deploy solution to BYOD customers Project Team / Customer Services Project Plan Milestone Deliverable Responsibility Due Date 0 Project Initiation completed Project initiation doc completed 1 Contract for 250 device trial Negotiate a contract for a 250 unit device trial Application Jukebox Project Initiation Document Page 5 of 10
6 2 Package all Tier 1 Approx 35 applications to be packaged for (Teaching Apps launch of pilot folder) applications 3 Configure lab PCs Work with Customer Services to add AJ player to lab image 4 Establish a pilot lab Roll out test AJ image to a nominated test lab (G5) 5 Extended lab pilot Roll out test AJ image to additional labs 6 Negotiate contract Establish cost and contractual obligations for full site for full site license 7 Rollout to all labs Roll out to all labs 8 Scaling up of back Implement full DR on all components of the end environment AJ environment 9 Packaging of Tier 2 Package all applications classed as Tier 2 apps (SfU only) 10 Packaging Tier 3 Package all applications classed as Tier 3 apps (locally installed) 11 Own User Device Carry out testing on a number of Windows Testing OS devices, laptop, PC, surface with different OS and hardware specs 12 Own User Device Roll out to a specific customer group for Pilot testing and feedback 13 Own User Device Roll out to all own device users on campus Roll out 14 Project Handover to Moving project to live service status, and Customer Services handing over level 1 support to Customer Services team, and associated knowledge transfer Nicola Carrigan Andrew Kearney Caroline Hackman Caroline Hackman Caroline Hackman Tech Man Nicola Carrigan Nicola Carrigan Nicola Carrigan Project Team End March 3 Project Structure The project comprises a Project Team. The team will agree project schedules, approve major deliverables and resolve any critical issues that arise during the lifetime of the project. The Project Manager will manage the project on a daily basis and will report regularly to the Chief Services Officer, and also to the Work Programme group on a regular basis. Application Jukebox Project Initiation Document Page 6 of 10
7 3.1 Roles & Responsibilities Role Responsibilities Names Project Ensure that resources are provided as required Genevieve Dalton Sponsor / for the project Chief Take action on any issues escalated by the Services Project Team Officer Project Prepare the Project Plans Manager / Determine resource requirements and ensure Head of that appropriate resources are allocated Service Manage the project to ensure that the desired results are achieved within agreed time scales Monitor progress and report on a regular basis to the Project Sponsor Ensure that the project direction is appropriate to the achievement of the ultimate objectives Review and approve deliverables Monitor and proactively manage risks as they arise. Manage budget and costs Project Team Conduct the tasks and activities of the project in accordance with the Project Plan Prepare the project deliverables by the agreed due dates Report progress to the Project Manager Nicola Carrigan Customer Services Team Assist in testing of solution through pilot phases Taking over first line support once project is complete Caroline Hackman Andrew Kearney 3.2 Project Team Meetings The following are the scheduled project governance meetings: Team Attendees Frequency Project Team,, Nicola Carrigan Weekly Application Jukebox Project Initiation Document Page 7 of 10
8 4 Risks & Issues 4.1 Initial Risk & Issue Log The following project risks or issues have been identified on commencement of the project. These initial tasks to address these risks or issues are outlined. Risk / Issue Probability / Impact P H P M P L I H I M I L Actions to Mitigate Responsibility Contracts not signed by deadline for site license Ensure as much time available for review and sign up as possible Project Manager Lack of skilled resources available to implement technical solution Ensure suitable transfer of key skills within team Project Team Failure of lab imaging solution SLA Head of Customer Services Inability to package certain applications Involve Software2 as early as possible to address possible issues here Project Team Technical problem with environment 4.2 Ongoing Management of Risks and Issues Any additional risks and issues identified will be maintained on an ongoing basis by the Project Manager in separate Risks and Issues logs. Application Jukebox Project Initiation Document Page 8 of 10
9 5 Communication Plan Identify the key stakeholders in the project and the plans for interaction and communication with each. Stakeholders are individuals and groups who will be capable of influencing the success of a project, directly impacted by the project as users or customers or involved in approving or implementing project deliverables. The following table highlights the communication and interaction activities planned for each stakeholder group: Stakeholder Actions Responsibility IT Services Executive Update management on progress of project Project Team Management on a regular basis. Involve other teams in testing phases where suitable. Software2 Close involvement with vendor during Project Team purchase, packaging, testing, and pilot phases. Academic Staff Communicate changes to academic staff in a timely manner as updates are made that Project Team / Customer Services may impact on those teaching in computer labs. Students Communicate and promote changes and benefits to students, particularly around own Project Team / Customer Services device developments Work Programme Group Update at regular meetings Project Manager UCD Community Update via published Work Programme Quarterly Progress Reports, available on IT Services website Project Manager Application Jukebox Project Initiation Document Page 9 of 10
10 6 Project Costs 6.1 Initial Project Budget Outline the proposed costs of the project by phase, typically to cover items such as consultancy resource costs, product/vendor & licence costs, training, any specific hardware costs, etc. You might also want to consider adding in an element of contingency into these costs. Item Unit Cost Total 250 Device License 6,950 6,950 Site License Year 1 61,857 61,857 Consultancy Days x 5 1,365 6,825 S2 Hub 1,300 1,300 Image Deployment x per device 1,820 Image Deployment x per device 6, Ongoing Costs Item Unit Cost Total Annual Site License 61,857 61,857 Contingency Days 1,365 2,730 Application Jukebox Project Initiation Document Page 10 of 10
UCD IT Services. <Project ID> ITRM. Project Initiation Document. Version 1.0 8th Dec Version History
UCD IT Services ITRM Project Initiation Document Version 1.0 8th Dec 2014 Version History Version Date Summary of Changes Changed by 1.0 08/12/14 Initial doc Paul Barry Project
More informationInformation Technology Services Project Management Office Operations Guide
Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...
More informationCarahsoft End-User Computing Solutions Services
Carahsoft End-User Computing Solutions Services Service Description Horizon View Managed Services Gold Package Managed Services Packages Options # of Desktops to be Managed Desktop Type Duration of Services
More informationAnnex 2: Statement of work. Table of contents
UNFCCC/CCNUCC Page 1 Annex 2: Statement of work Table of contents Annex 2... 2 Objective... 2 Engagement... 2 Overall approach... 2 Partnering... 3 Quality and reviews... 3 Developer contract... 4 Operator
More informationFastTrack for Dynamics 365
FastTrack for Dynamics 365 Accelerate Customer Success Includes new services for FY18 Q3 Customer Presentation Speaker Name Title Microsoft FastTrack Our customer success service for the Microsoft Cloud
More informationProject Highlight Report
Powys County Council - Standard/Small Level Template Revision July This document is used to give a progress report for a project. It is also a communication tool for the project manager to inform the project
More informationFastTrack for Dynamics 365 Accelerate Customer Success
FastTrack for Dynamics 365 Accelerate Customer Success Includes new services for FY18 Q2 The evolution of Microsoft FastTrack New customers per month New customers per month Data migrated engineers 200
More informationA GeoTalent White Paper Key Steps for Implementing a Talent Management System
A GeoTalent White Paper Key Steps for Implementing a Talent Management System Implementing a talent management system requires resources and procedures from both the customer organization and the vendor.
More informationCorporate ITAM Directive
GENERAL Effective October 1st, 2015 Author / Maintainer Responsibility / Owner Approver(s) Related to Policy METS I.T. Service Management Executive Vice-President, Media Technology and Infrastructure Services
More informationFastTrack for Dynamics 365 Accelerate Customer Success
FastTrack for Dynamics 365 Accelerate Customer Success Includes new services for FY18Q1 The evolution of Microsoft FastTrack New customers per month New customers per month Data migrated engineers 200
More informationWDVA EMR Project Readiness Assessment Report
WDVA EMR Project Readiness Assessment Report 1 Prepared by: Marcus Bailey Project QA Assurance Consultant New Compass Consulting, LLC marcus@newcompassconsulting.com Tele: 360-239-4607 Transformation Leadership
More informationIBM WATSON CAMPAIGN AUTOMATION SUPPORT AGREEMENT
IBM WATSON CAMPAIGN AUTOMATION SUPPORT AGREEMENT This is agreement is governed by the PSC Master Services Agreement (MSA) (named 201711 Master Services Agreement ) found at: http://www.purplesquareconsulting.com/master-services-agreements.
More informationThis is agreement is governed by the PSC Master Services Agreement (MSA) (named Master Services Agreement ) found at:
IBM WATSON MARKETING SOFTWARE SUPPORT AGREEMENT This is agreement is governed by the PSC Master Services Agreement (MSA) (named 201804 Master Services Agreement ) found at: http://www.purplesquareconsulting.com/master-services-agreements.
More informationBlackBerry Enterprise Mobility Suite Management Edition Jumpstart
BlackBerry Enterprise Mobility Suite Management Edition Jumpstart Program Description, August 2017 BlackBerry Enterprise Mobility Suite Management Edition Jumpstart Program Description ( Management Edition
More informationImperial College Union Implementation Project
Imperial College Union Implementation Project The Project Plan is the controlling document for the project scope, deliverables, timescale, resources, responsibilities and project controls applied to the
More informationMarketing & Customer Engagement Manager
Role Title Directorate Job Family Competency Level Pay Range / Scale Responsible to Location Marketing & Customer Engagement Manager Families and Homes Marketing and Communications Principal Officer/Manager
More informationANNEX A.1 TECHNICAL SPECIFICATIONS. (amended) OPEN CALL FOR TENDERS F-SE-15-T01. Provision of Web Development Services
ANNEX A.1 TECHNICAL SPECIFICATIONS (amended) OPEN CALL FOR TENDERS F-SE-15-T01 Provision of 1 Contents 1 Background information... 3 2 Scope of required services... 3 3 Definition of Lots... 3 4 Description
More informationITIL Intermediate Capability Stream:
ITIL Intermediate Capability Stream: OPERATIONAL SUPPORT AND ANALYSIS (OSA) CERTIFICATE Sample Paper 1, version 6.1 Gradient Style, Complex Multiple Choice QUESTION BOOKLET Gradient Style Multiple Choice
More informationiso20000templates.com
iso20000templates.com Public IT Limited 2011 Design and Transition of New or Changed s Document Ref. ITSM05003 Version: 1.0 Draft 1 Document Author: Document Owner: V 1.0 Draft 1 Page 1 of 16 Revision
More informationOperating Level Agreement (OLA) Template
Operating Level Agreement (OLA) Template About this template This template provides a consistent format for all Operating Level Agreements (OLAs) between internal departments of ITS and a recognized IT
More informationProject Manager CAFM Project (Fixed Term) EHA
It is important to note that this job description is a guide to the work you will initially be required to undertake. It may be changed from time to time to meet changing circumstances. It does not form
More informationNTT DATA Service Description
NTT DATA Service Description NTT DATA Managed Services for Microsoft Azure Site Introduction NTT DATA is pleased to provide NTT DATA Managed Services for Microsoft Azure Site (the Service(s) ) in accordance
More informationWindows XP Deployment (1-62) Saint Louis University Information Technology Services Office of Special Projects
Saint Louis University Information Technology Services Office of Special Projects Windows XP Deployment (1-62) Project Definition Date of Publication: March 14, 2002 1-62_Project Definition2.doc 1 4/16/2002
More informationSoftware Category Strategy FY18. Stephen Horsley
Software Category Strategy FY18 Stephen Horsley June 2018 Contents Category Scope/Purpose Overall Approach Current Arrangement by Sub Category SRM Risk, Implementation Plan and Benefits Category Scope
More informationCLIENT NAME. Project Charter
Ministry of Citizens Services Information Access Operations CLIENT NAME EDRMS TRIM Implementation Phase 1 TRIM for Physical Records Version: Date: Status: Prepared by: Information Access Operations Change
More informationProgram Summary. Criterion 1: Importance to University Mission / Operations. Importance to Mission
Program Summary DoIT provides secure, managed and monitored desktop and device support services for departments, classrooms, conference rooms, technology centers and labs. This support includes: hardware
More informationCourse: ICT50415 Diploma in IT (Networking) Final Date Due: 2016 S2, Week 16 Teachers: Scott Martin, Az de Silva
Kingscliff IT Inc. Virtualisation Project Course: ICT50415 Diploma in IT (Networking) Final Date Due: 2016 S2, Week 16 Teachers: Scott Martin, Az de Silva Unit: ICTICT511 Match ICT needs with the strategic
More informationALBANY PORT AUTHORITY ENVIRONMENTAL MANAGEMENT SYSTEM
ALBANY PORT AUTHORITY ENVIRONMENTAL MANAGEMENT SYSTEM May 2006 Document Status Rev Author Reviewer/s Date Approved for Issue No. Name Distributed To Date 1 J. Prout V. Ee 26/05/06 V. Ee Albany Port Authority
More informationCompany Name Here ios Approval and Deployment Project Charter
Company Name Here ios Approval and Deployment Project Charter Version 1.0 Revision Date: 1/25/12 Approval of the project charter indicates an understanding of the purpose and content described in this
More informationProject Management Initiation Document
Project Management Initiation Document This document provides an ideal project management plan template which can be used by anyone at any level who is undertaking a project and is looking for a plan structure
More information1. Introduction. 2. Scope of Work and Timeframes
1. Introduction This Statement of Work ("SOW") is incorporated into the Master Subscription Agreement/Quote (the "Agreement") between ("Wrike") and Licensee dated Effective Date of the Agreement. If any
More informationPOSITION DETAILS. ORGANOGRAM (Adjust as necessary. Include line manager, line manager s manager, all subordinates and colleagues. Include job grades)
HR191 JOB DESCRIPTION NOTES Forms must be downloaded from the UCT website: http://www.uct.ac.za/depts/sapweb/forms/forms.htm This form serves as a template for the writing of job descriptions. A copy of
More informationCUSTOMER BANK ACCOUNT MANAGEMENT SYSTEM PROJECT PLAN 10 TH FEB Approved On. 20 Feb 2015 Page 1 of 11 Project Plan Approved By.
CUSTOMER BANK ACCOUNT MANAGEMENT SYSTEM PROJECT PLAN 10 TH FEB 2015 Approved On. 20 Feb 2015 Page 1 of 11 Project Plan Contents 1. INTRODUCTION 3 1.1. Project Overview 3 1.2. Scope of Work 3 1.3. Project
More informationProject Plan. For Building a Data Management System for FORCE. Prepared for: Andrew Lowery Fundy FORCE
Project Plan For Building a Data Management System for FORCE Prepared for: Andrew Lowery Fundy FORCE Submitted by: SEG Consulting Inc. www.segconsulting.ca Version 1.0 June 29, 2017 Version Log The following
More informationDesktop Support Program Service Level Expectations
Desktop Support Program Service Level Expectations DRAFT Version 1.0 February 1, 2014 Page 1 of 7 Service Description Desktop support services provides installation and updates of desktop, laptop or tablet
More informationUniversity of Wisconsin-Superior
University of Wisconsin-Superior Policy Subject: Computer Replacement, Software and IT Support Policy Cabinet Division: Administration and Finance Policy History: Draft June 2018 Effective Date: September
More informationCOPYRIGHTED MATERIAL 1 MANAGING THE STRATEGIC PLANNING PROCESS PURPOSE. Chapter Content
1 MANAGING THE STRATEGIC PLANNING PROCESS PURPOSE To establish and manage the process for setting vision, strategy, and direction in order to be an upper-quartile company. To ensure that this is reflected
More informationAPPENDIX O CONTRACTOR ROLES, RESPONSIBILITIES AND MINIMUM QUALIFICATIONS
APPENDIX O CONTRACTOR ROLES, RESPONSIBILITIES AND MINIMUM QUALIFICATIONS Shared denotes whether a Contractor Resource may be responsible for that in addition to another identified. Contractor Required
More informationPlan, Deploy and Configure Microsoft InTune
Plan, Deploy and Configure Microsoft InTune 5 Day Course AUDIENCE IT Pros that have experience with Windows 10 use, deployment and management Experience with any optional ios or Android devices. FORMAT
More informationWhite Paper Operating Windows as a Service processes
Operating Windows as a Service processes Keeping up with the Windows 10 curve Operating Windows as a Service processes for an enterprise The introduction of Windows 10 has been a game changer in many ways,
More informationTeleopti WFM Implementation Scope of Work
Teleopti WFM Implementation Scope of Work 200-1000 Agents 1 Overview This Statement of Work (SOW) specifies the standard scope of work Teleopti (its representative hereafter referred as Vendor ) will follow
More informationPOSITION DETAILS. ORGANOGRAM (Adjust as necessary. Include line manager, line manager s manager, all subordinates and colleagues. Include job grades)
HR191 JOB DESCRIPTION NOTES Forms must be downloaded from the UCT website: http://forms.uct.ac.za/forms.htm This form serves as a template for the writing of job descriptions. A copy of this form is kept
More informationCOMMUNICATION MANAGEMENT PLAN
COMMUNICATION MANAGEMENT PLAN This Communications Management Plan sets the communications framework for this project between the Sponsors Agents Contractor level. This will serve as a guide for communications
More informationBlackBerry Enterprise Mobility Suite - Cloud Collaboration Edition Jumpstart
BlackBerry Enterprise Mobility Suite - Cloud Collaboration Edition Jumpstart Program Description ( Cloud Collaboration Edition ) This document provides a general description of the services to be provided.
More informationGood Dynamics to BlackBerry Enterprise Mobility Suite Upgrade Quickstart
Good Dynamics to BlackBerry Enterprise Mobility Suite Upgrade Quickstart Program Description ( Good Dynamics to BlackBerry Enterprise Mobility Suite Upgrade ) This document provides a general description
More informationITIL Foundation v V1. Module 4: Service Transition. Reader s Note QAI India Ltd. I
Reader s Note 2 Reader s Note 3 Reader s Note 4 Reader s Note 6 7 A configuration record is a set of attributes and relationships about a CI. Configuration records are stored in a configuration management
More informationTitle: Configuration Management: The Core of IT Operations Session #: 495 Speaker: Donna Scott Company: Gartner
Title: Configuration Management: The Core of IT Operations Session #: 495 Speaker: Donna Scott Company: Gartner Predicts 2006 Increasing regulatory requirements will drive IT investment by as much as a
More information1.0 PART THREE: Work Plan and IV&V Methodology
1.0 PART THREE: Work Plan and IV&V Methodology 1.1 Multi-Faceted IV&V Methodology Large, complex projects demand attentive and experienced IV&V and project management support to meet expectations. Monitoring
More informationApple Shared File Service
Service Definition Apple Shared File Service V1.2 Signoff Name Role Signature & Date Jeanette Patamia IT Director, Customer Services Document Control Information Document Change History Version Date Last
More informationTxDOT s Compass Project. September 29, 2009
TxDOT s Compass Project September 29, 2009 Agenda I. Project Background II. Part 1 Maintenance Management Study III. Part 2 Maintenance Management System Selection IV. Part 3 The Compass Project V. Questions
More informationITS Desktop Computer Support Policy
ITS Desktop Computer Support Policy The document that follows explains in detail the scope of the coverage provided. It includes the following topics: Purpose Definition of Full Support Support Methodology
More informationOperational Insight for MDM
Operational Insight for MDM Introducing the MDM Hub Analyzer Presented By: Hosted By: Jeff Klagenberg VP, Products & Solutions; GlobalSoft. Webinar Agenda Introduction to GlobalSoft Challenges for Operational
More informationSoftware License Management
LicenseWatch White Paper Software License Management - Virtualisation Table of Contents Introduction...3 SAM Tool for Optimalisation of Virtualisation Software...3 Higher Efficiency...3 Higher Availability...3
More informationDell Service Description
Dell Service Description Dell Managed Services for Microsoft Azure Site Recovery Introduction Dell is pleased to provide Dell Managed Services for Microsoft Azure Site Recovery (the Service(s) ) in accordance
More informationSecurity Monitoring Service Description
Security Monitoring Service Description Contents Section 1: UnderdefenseSOC Security Monitoring Service Overview 3 Section 2: Key Components of the Service 4 Section 3: Onboarding Process 5 Section 4:
More informationUoD IT Job Description
UoD IT Job Description Role: Service Delivery Manager (People HERA Grade: 8 Management Systems) Responsible to: Assistant Director (Business Services) Accountable for: Day to day leadership of team members
More informationLet s Connect Successfully working together
Let s Connect Successfully working together In this handbook you will find the primary information that you ll need as a Brennan IT customer. Included are the processes we follow, Service Desk procedures,
More informationTEAMCENTER SERVICE CAPACITY PLAN. Version 2.0 Effective Date: 07/12/2013 Expiry Date: 07/12/2014
TEAMCENTER SERVICE CAPACITY PLAN Version 2.0 Effective Date: 07/12/2013 Expiry Date: 07/12/2014 VERSION HISTORY Version Implemented By Revision Date Approved By Approval Date 0.1 Ray Pasetes 03/22/2011
More informationTough Math for Desktop TCO
Top 6 reasons to use a Remote Desktop and RemoteApps Tough Math for Desktop TCO In their fight to reduce IT budgets, small- and medium-sized businesses have to answer one tough question: how do we reduce
More informationLIC OF INDIA P&GS DEPARTMENT CENTRAL OFFICE MUMBAI
8. Service Level Agreement (SLA) P&GS Application Support Services This Schedule describes the service levels that have been established for the Services offered by the Bidder to LIC. The Bidder shall
More informationAustralian Hardware. Risk Management Plan
Australian Hardware Risk Management Plan This is a simulated business, not a real one. It is provided for education purposes only, for Learn.com.au courses (content provided by IBSA [ibsa.org.au]. Risk
More informationENTERPRISE ACTIVE MAINTENANCE AND SUPPORT SERVICE
ENTERPRISE ACTIVE MAINTENANCE AND SUPPORT SERVICE Customer is a licensee of certain Software AG products under a Licence and Maintenance Agreement that the Customer has executed with a Software AG subsidiary
More informationHU801B Project Management Lecture 7 - Project Planning
HU801B Project Management Lecture 7 - Project Planning Material extracted from Software Engineering 9 th Edition, Sommerville http://softwareengineering-9.com Agenda Project planning and the planning process
More informationeconstruction Why, How, & When
econstruction Why, How, & When Associated General Contractors Annual Meeting February 19, 2016 Joe Squire, P.E., State Construction and Materials Engineer Squire, AGC Annual Meeting 2/19/2016 1 econstruction
More informationIdentifying Application Performance Risk
Identifying Application Performance Risk Performance Engineering COLLABORATIVE WHITEPAPER SERIES COLLABORATIVE WHITE PAPER SERIES: Identifying Application Performance Risk Under what conditions will an
More informationThis report can be found on CNSC s website at:
2002 Report of the Canadian Nuclear Safety Commission in response to The Report of the Auditor General entitled Canadian Nuclear Safety Commission Power Reactor Regulation This document has been prepared
More informationROLES AND RESPONSIBILITIES... 2 SUPPORT POLICIES... 4 HOW TO CONTACT M*MODAL SUPPORT... 5 SERVICE LEVEL AGREEMENTS AND ESCALATION PROCEDURES...
ROLES AND RESPONSIBILITIES... 2 CUSTOMER... 2 M*MODAL SUPPORT... 3 SUPPORT POLICIES... 4 CUSTOMER... 4 HOW TO CONTACT M*MODAL SUPPORT... 5 SERVICE LEVEL AGREEMENTS AND ESCALATION PROCEDURES... 6 M*MODAL
More informationJOB DESCRIPTION. Nadi Head Of ICT As follows
JOB DESCRIPTION Position: Location of position: Reporting to: Specific accountabilities: ICT Support Officer Nadi Head Of ICT As follows Objective The ICT Support Officer position will ensure that the
More informationSCHEDULE 20 SERVICE DOCUMENTATION
Schedule 20: Service Documentation 1 Introduction 1.1 This Schedule sets out the types of documentation relating to the provision of the Services (whether originally developed by the Contractor or on its
More informationJOB DESCRIPTION. Software Engineering Manager Technology, Systems & Proposed band. Job family. Job purpose
Job title Job family Job purpose Software Engineering Manager Technology, Systems & Proposed Delivery band E Responsible for recruiting and leading a small number of skilled multi-disciplined teams and
More informationRequest for Proposal. For. Consulting Services for. Accela Software Upgrade
Request for Proposal For Consulting Services for Accela Software Upgrade September 30, 2013 1 1.0 General Invitation 1.1 Purpose of the Request for Proposal Guilford County is soliciting the submission
More informationStep 1: Perform Blueprint Project Management
Step 1: Perform Blueprint Project Management Version 1.5, December 2006 1. Step Description and Purpose The Perform Blueprint Project Management step is intended to establish the key supporting project
More information{Buffalo County} IT Managed Services REQUEST FOR PROPOSAL BUFFALO COUNTY
BUFFALO COUNTY IT Managed Services REQUEST FOR PROPOSAL ISSUED DATE: 8/1/2018 SUBMISSION DATE: SEPTEMBER 14, 2018 AT 4:00 P.M. CENTRAL STANDARD TIME RFP COORDINATOR: SONYA J. HANSEN ADMINISTRATIVE COORDINATOR
More informationPass4sure.ITIL-F.347.QA
Pass4sure.ITIL-F.347.QA Number: ITIL-F Passing Score: 800 Time Limit: 120 min File Version: 19.1 http://www.gratisexam.com/ ITIL-F.EN.dat ITIL Foundation Enjoy the real success with nicely written Questions
More informationCOM M. Silver
M. Silver Research Note 19 June 2003 Commentary Linux Desktop Migration Cost Model Migration from on the desktop will be an expensive proposition. Users that employ a limited number of applications may
More informationGOVERNANCE AES 2012 INFORMATION TECHNOLOGY GENERAL COMPUTING CONTROLS (ITGC) CATALOG. Aut. / Man. Control ID # Key SOX Control. Prev. / Det.
GOVERNANCE 8.A.1 - Objective: Information Technology strategies, plans, personnel and budgets are consistent with AES' business and strategic requirements and goals. Objective Risk Statement(s): - IT Projects,
More informationProactive Care Service
Proactive Care Service HP Services Technical data Service overview HP Proactive Care Service (Proactive Care) offers an integrated set of proactive and reactive services designed to help you improve the
More informationIBM Infrastructure Security Services - Managed Security Information and Event Management (Managed SIEM)
IBM Infrastructure Security Services - Managed Security Information and Event Management (Managed SIEM) DK_INTC-8838-00 11-2011 Page 1 of 17 Table of Contents 1.Scope of Services...3 2.Definitions...3
More informationCore Skills: Contributing Skills: Role Title: Senior Project Manager EXAMPLE. Reference: SFIA level 5
Role Title: Senior Project Manager EXAMPLE Reference: SFIA level 5 Core Skills: Requirements definition and management Stakeholder relationship management (REQM) Level 5 (RLMT) Level 5 Financial management
More informationPreparing the proposal
Preparing the proposal Designing and Supporting Computer Networks Chapter 9 Copyleft 2012 Vincenzo Bruno (www.vincenzobruno.it) Released under Creative Commons License 3.0 By-Sa Cisco name, logo and materials
More informationNothing in this job description restricts management s right to assign or reassign duties and responsibilities to this job at any time.
S22230, page 1 Nothing in this job description restricts management s right to assign or reassign duties and responsibilities to this job at any time. FUNCTIONAL DUTIES Serves as IT Service Delivery Manager
More informationRequest for Proposal
Request for Proposal Outsourced IT & Managed Services Issued Date 10/13/17 Submission Deadline 11/3/17 RFP Coordinator: Scott deoliveira (779)777-7274 sdeoliveira@dekalbparkdistrict.com 1403 Sycamore Road,
More informationLet s Connect Successfully working together
Let s Connect Successfully working together In this handbook you will find the primary information that you ll need as a Brennan IT customer. Included are the processes we follow, Service Desk procedures,
More informationNote: appendix may include further responsibilities or experience necessary for the particular role.
Job title Job family Lead Project Manager Project Management Proposed band E Job purpose To lead a major project, significant workstream of a programme, or portfolio of projects, to stakeholder expectations,
More informationInformation Services Group Public Sector
IV&V Assessment Report - Deliverable IVV2.2 Presented by: Information Services Group Public Sector December 12, 2018 2018 Information Services Group, Inc. All Rights Reserved Copyright 2018, Information
More informationInitiation Report Inland Revenue Transformation Plan project
Inland Revenue Plan project Project Sponsors: Peter Mersi and Tim Occleshaw Withheld under section 9(2)(a) of the Official Information Act 1982 Prepared by: Date: June 2011 Draft In Confidence About this
More informationISC: UNRESTRICTED AC Attachment. Virtual Desktop Information Technology
Virtual Desktop Information Technology February 4, 2015 THIS PAGE INTENTIONALLY LEFT BLANK ISC: UNRESTRICTED Table of Contents Executive Summary... 5 1.0 Background... 6 1.1 Explanation of the Technology
More informationEX q. IT 认证题库专家 QQ:
EX0-117.259q IT 认证题库专家 http://rhcsa.taobao.com QQ:155136256 Exam A QUESTION 1 Q1. When an IT service provider adopts and adapts ITIL best practices, which of the following is the greatest benefit? A. Work
More informationDigital Strategy Update. Alex Hocevar February 2018
Digital Strategy Update Alex Hocevar February 2018 1 TPL s Digital Strategy What we ve previously talked about 2 Toronto Public Library s Digital Strategy The TPL Digital Strategy modernizes the customer
More informationSAP Live Access General User Guide
1. Before You Start SAP Live Access General User Guide July 2017 2. Get to Know SAP Live Access 3. Manage Your Training System 4. Support 1. Before You Start 2. Get to Know SAP Live Access 3. Manage Your
More informationLITERA MICROSYSTEMS CUSTOMER EXPERIENCE OVERVIEW ONBOARDING & IMPLEMENTATION ADOPTION & TRAINING CUSTOMER SUPPORT SOFTWARE UPDATES & LONG-TERM SUCCESS
LITERA MICROSYSTEMS CUSTOMER EXPERIENCE OVERVIEW ONBOARDING & IMPLEMENTATION ADOPTION & TRAINING CUSTOMER SUPPORT SOFTWARE UPDATES & LONG-TERM SUCCESS 1 This guide walks through your journey as a customer,
More information1010 La Trobe Street Docklands Victoria
Position description Position Group Reports to Location Service Desk Administrator Telecommunications IT Service Delivery Manager 1010 La Trobe Street Docklands Victoria Date 2018 Our organisation VicTrack
More informationBlackBerry Enterprise Mobility Suite Application Edition Jumpstart
BlackBerry Enterprise Mobility Suite Application Edition Jumpstart Program Description, August 2017 BlackBerry Enterprise Mobility Suite Application Edition Jumpstart Program Description ( Application
More informationDataBasics Managed Services Service Level Agreement (SLA)
DataBasics Managed Services Service Level Agreement (SLA) V2.0 December 2015 Table of Contents 1 Introduction... 3 2. Purpose... 3 3. Scope... 3 4. Dates and Reviews... 4 5. Software and Services Covered...
More informationANNEX THREE. Regime for Monitoring of Separation of Batelco and NBN Compliance
ANNEX THREE Regime for Monitoring of Separation of Batelco and NBN Compliance Compliance Monitoring Regime Draft for Discussion Purpose: To establish a regime for monitoring Batelco s compliance with the
More informationEAST SUSSEX FIRE AUTHORITY Job Description
EAST SUSSEX FIRE AUTHORITY Job Description Job Title: Supplier Service Manager Job Family: JF6 Specialist/Technical Manager Reporting to: ITG Manager Responsible for: 1 direct report (Support Officer,
More informationLearning and Technology Services
Learning and Technology Services Project Management Processes DRAFT for discussion only Heather Williams January 14, 2010 Document Revision History Version Date Author(s) Description of Change 1 August
More informationProject Manager s Roadmap We re all smarter together
Version 7.0a Project Manager s Roadmap We re all smarter together Think Top Down! Methodology Checklists Define Plan Execute Close Conflict Resolution Modes Contract Outsource Management Mentoring References
More informationEnterprise Monitoring Management
White Paper Application Delivery Management Enterprise Monitoring Management Key steps and components of a successful solution Table of Contents page Executive Summary... 1 Setting the Goal: Establishing
More information