1 APPLICATION FOR A RELAXATION OF BYELAW 10 (for any development including buildings, walls, driveways, hardstanding, land tile outfalls, services, trees, fences and landscaping across, into or within 9 metres of the edge of a Boardmaintained watercourse) MEMBER INTERNAL DRAINAGE BOARDS Broads (2006) IDB, East Suffolk IDB, King s Lynn IDB, Norfolk Rivers IDB, South Holland IDB Kettlewell House Austin Fields Industrial Estate King s Lynn Norfolk PE30 1PH Tel - (01553) info@wlma.org.uk APPLICATION GUIDANCE NOTES Before making an application to any of the Water Management Alliance IDBs, it is important that you have read and understood these notes, the relevant Board s Byelaws and the Land Drainage Act 1991 (as amended), and that you are familiar with the Board s Planning & Byelaw Policy. These guidance notes summarise situations where consent is/is not likely to be granted by the Board for relaxations of Byelaw 10, but the Planning & Byelaw Policy gives more detail about various types of development, and the conditions likely to be stipulated as part of any approval. The application form requires completion of the following sections: Name and address of applicant(s) The person, people or company wishing to carry out the development. Name and address of agent An architect, consultant or other person acting on behalf of the applicant(s). Location of proposal The site where the proposed works would be undertaken. Do the proposals include Multiple-choice options about what the proposed works are. Description of proposed development More detailed description of the development, including size(s) and location(s). General questions including ones about land ownership and to whom the consent/refusal should be sent. N.B. Measurements relating to Byelaw 10 are to be taken from the landward toe of the bank where the watercourse is embanked; from the bank top for an open watercourse (which is not embanked); and from the closest point of the enclosing structure where the watercourse is enclosed. In the case of underground works, the measurement is to be taken from an imaginary infinite vertical line running through the drain brink or landward toe of the embankment, as appropriate. e.g. Open watercourse (not embanked) Open watercourse (embanked) Byelaw measurements taken from this line Byelaw measurements taken from this line Culverted watercourse Enclosed watercourse (e.g. bridge) Byelaw measurements taken from this line Byelaw measurements taken from this line
2 Installation of land tile outfalls Outfalls are to be installed through pre-cast concrete headwall units dug in flush with the drain batter. Consent will be granted subject to the applicant s compliance with this, and other conditions. Erection of fencing All fencing within 9 metres of the watercourse is to be temporary, with no posts concreted in. If the watercourse is culverted, then the fence should be at least 0.50 metres from the nearest outside edge of the pipe; if it is an open drain but no machine access is available, then the fence is to be at least 1 metre from the edge of the drain, and no taller than 1.80 metres; and if machine access is available to the open drain, then the fence is to be at least 6 metres back from the edge of the watercourse. These guidelines do not apply with multiple-property residential developments, where all fencing is to be 9 metres from the drain brink or nearest outside edge of the pipeline. Electricity cables, telephone wires, gas, water or sewerage pipes or any other services If possible all services running alongside a watercourse must be installed at least 9 metres from the drain brink, landward toe of the embankment, or outside edge of the pipeline (as appropriate) at all points. Where an application is submitted for services within 9 metres of a drain, overhead cables must give a minimum vertical clearance of at least 10 metres from the level of the top of the bank at all times, and underground services are to be installed in pipes/ducting, directionally-drilled beneath the watercourse. Depths below an open drain and clearances to piped drains will be specified on a case-by-case basis. Other conditions will also apply. Erection of a garage Consent will usually be granted for a temporary, sectional garage (on a non-permanent base), provided it will be at least 6 metres from the brink of an open drain where machine access is available, or 3 metres from the nearest outside edge of a pipeline or the brink of an open drain where no machine access is available. Consent will usually only be granted for any garage with foundations or a concrete base provided it will be at least 6 metres from the drain at all points. Erection of a wall Approval will not normally be granted for any walls closer than 6 metres from the edge of the drain or pipeline, or higher than 1.80 metres above surrounding ground level. Landscaping (including trees, hedges, shrubs, patios) New trees within 9 metres of a drain will only ever be considered if exceptional circumstances apply. Hedges and shallow-rooted bushes, and hard landscaping (e.g. patios), will be allowed provided a 1 metre strip is retained from the drain brink in the case of an open watercourse with no machine access; a 6 metre clear strip is maintained where machine access is available; and a 3 or 6 metre easement is kept next to a piped watercourse (width depends on the drain in question). All hedging and bushes are to be maintained at no more than 1.80 metres tall, and hard landscaping is to be constructed sloping away from the drain to prevent possible saturation of the batter by surface water run-off. These guidelines do not apply with multiple-property residential developments, where all landscaping is to be 9 metres from the drain brink or nearest outside edge of the pipeline. Access roads, driveways and parking areas Approval will usually be given for gravel / tarmac chipping roads, driveways or parking areas, provided they are no closer than one metre from the drain. Approval for concrete / tarmac is unlikely to ever be forthcoming for proposals within 9 metres of an open drain or 6 metres of the outside edge of a pipeline, except where the application covers the main access road to the site, and that road runs perpendicular to the watercourse. Any consented works within 9 metres of a drain will also be subject to the area being constructed so that it slopes away from the watercourse, or to it being built with kerbs and a gully drainage system. Single dwelling or two-storey or ground-floor extension (residential) or commercial/industrial development If possible, all new buildings and extensions should be at least 9 metres from the edge of the watercourse at all points. Applications may be submitted for developments within this distance, and will be considered on a site-specific basis, but even if a relaxation is granted, it is extremely unlikely that this will ever be for works less than 6 metres from the drain. Residential developments (multiple dwellings) With the exception of a new access culvert and/or roadway perpendicular to the drain, the Board will seek to ensure that there are 9 metre wide easement strips left adjacent to all its maintained watercourses, with these strips kept clear of any development. Approvals issued by the Board will be subject to the grantee entering into a legal agreement with the Board (the form of agreement is dependent on whether the grantee is an individual/company or a statutory authority, as well as the type of development being consented), and may be subject to other conditions, all of which will have to be complied with prior to the start of development.
3 APPLICATION FOR CONSENT TO DISCHARGE SURFACE WATER RUN-OFF TO A WATERCOURSE MEMBER INTERNAL DRAINAGE BOARDS Broads (2006) IDB, East Suffolk IDB, King s Lynn IDB, Norfolk Rivers IDB, South Holland IDB Kettlewell House Austin Fields Industrial Estate King s Lynn Norfolk PE30 1PH Tel - (01553) info@wlma.org.uk APPLICATION GUIDANCE NOTES Before making an application to any of the Water Management Alliance IDBs, it is important that you have read and understood these notes, the relevant Board s Byelaws and the Land Drainage Act 1991 (as amended), and that you are familiar with the Board s Planning & Byelaw Policy. These guidance notes summarise situations where consent is/is not likely to be granted by the Board for relaxations of its Byelaws to allow discharges of surface water run-off to a watercourse, but the Planning & Byelaw Policy gives more detail about various types of development, and the conditions likely to be stipulated as part of any approval. The application form requires completion of the following sections: Name and address of applicant(s) The person, people or company wishing to carry out the development. Name and address of agent An architect, consultant or other person acting on behalf of the applicant(s). Location of proposal The site where the proposed works would be undertaken. Is/are the outfall(s) into a Board-maintained watercourse? Includes follow-up questions about legal agreements and approval from other landowners. Description of proposed development Outline of the intended works, including their location(s). What are the areas of impermeable surface draining to the watercourse? The respective areas of impermeable surface (e.g. roofs and roads) which drain to a watercourse, pre and post-development. Will the rate of discharge be restricted? Is a flow control device going to be installed, or would the proposed discharge be at an unattenuated rate. General question The Board has a responsibility to ensure that proposals for surface water disposal from any development are unlikely to adversely affect other people or land. If the proposed discharge goes through any system not maintained by the Board, or which is not solely the responsibility of the applicant, then as part of an application for consent, written evidence must be provided from all other people, companies and authorities responsible for the drainage systems leading from the development site up to the point of connection to the Board s system, showing that they are agreeable to the intended increase in flows, and accept any increased maintenance liability arising from this. The Board will not begin to consider any application until such time as this requirement has been complied with. If the Board considers that any watercourse maintained by a third-party will not be capable of accepting the planned additional flows, applications may be refused, or it may be necessary for improvement works to be undertaken (to the satisfaction of the Board, but at the applicant's cost) before consent will be granted. The cost of such improvements will be in addition to any development contribution due to the Board (see below). For Boardmaintained watercourses, the Board may also require the applicant to pay for hydrological modelling work to be carried out, or amendments to be made to an existing model, to assess the impact of the proposed discharge, the cost of which would again be in addition to any development contribution due to the Board. Depending on the results shown by the model, there is still no guarantee that the application will then be consented by the Board. Where proposals will result in an increase in the rate or volume of flows in a watercourse, one of the conditions of any consent granted by the Board will be the payment of a development contribution to the Board. Such contributions are payable to the Board unless the rate and volume of surface water discharge is limited to the same as that prior to development. The consent will also be subject to a formal agreement being entered into by the person or authority that will be responsible for the new drainage system after its construction; and the Board expects any system serving multiple properties to be adopted by a competent authority. Where a development proposes to have a restricted outflow rate, but there will still be an increase in the overall volume of discharge, a development contribution is levied, but is charged at a percentage of the full rate, based on the equivalent run-off (in litres per second per hectare) for the additional impermeable area. Please see the Board s Charging Policy for the current full rate and percentage charges for restricted discharges.
4 Outfalls into a Board s drain will only be consented if they do not protrude beyond the existing bank profile or inside face of an inspection chamber wall, and if they are positioned, designed and constructed to the specification and satisfaction of the Board s Officers and built entirely at the applicant s cost. If the system is not being adopted by another competent authority, the Board may require that the maintenance of the outfall is commuted to it, in which case a Commuted Maintenance fee will also be due to the Board. A Commuted Maintenance fee is a one-off charge payable where the Board will become responsible for the future maintenance costs associated with a new structure (in this case likely to be an outfall headwall structure). The Commuted Maintenance fee is paid in addition to the cost of construction of the structure, although if the future maintenance of the outfall will rest with another authority e.g. the local Highways Department, then no such fee is payable to the Board. If the affected drain is owned by the Board, then a one-off Wayleave payment will also be due to the Board to reflect the fact that the works are within an area of land it owns. The Commuted Maintenance fee due where a watercourse is not owned by the Board is 130% of the cost of materials, as priced by the Board s Officers, and where the drain is owned by the Board it is 230% of the cost of materials, again as calculated by the Board s Officers. If the outfall is being adopted by another authority, but is being constructed on land owned by the Board, then the Wayleave fee will be 100% of the cost of materials (as priced by the Board s Officers). The relevant Commuted Maintenance/Wayleave fee will be stipulated as part of any approval issued and a period of between 1 month and 3 months will be given for the applicant to accept that figure, depending on the likelihood of increases in materials costs. At the time of acceptance, the first 50% of the fee becomes due. Beyond this period, the Board s Officers will determine whether the quoted fee is still applicable, or whether it should be revised in light of any changes to the cost of materials. The second 50% of the fee is then payable when construction of the outfall is completed to the satisfaction of the Board s Officers.
5 APPLICATION FOR CONSENT TO DISCHARGE TREATED FOUL WATER TO A WATERCOURSE MEMBER INTERNAL DRAINAGE BOARDS Broads (2006) IDB, East Suffolk IDB, King s Lynn IDB, Norfolk Rivers IDB, South Holland IDB Kettlewell House Austin Fields Industrial Estate King s Lynn Norfolk PE30 1PH Tel - (01553) info@wlma.org.uk APPLICATION GUIDANCE NOTES Before making an application to any of the Water Management Alliance IDBs, it is important that you have read and understood these notes, the relevant Board s Byelaws and the Land Drainage Act 1991 (as amended), and that you are familiar with the Board s Planning & Byelaw Policy. These guidance notes summarise situations where consent is/is not likely to be granted by the Board for relaxations of its Byelaws to allow discharges of treated foul water, but the Planning & Byelaw Policy gives more detail about various types of development, and the conditions likely to be stipulated as part of any approval. The application form requires completion of the following sections: Name and address of applicant(s) The person, people or company wishing to carry out the development. Name and address of agent An architect, consultant or other person acting on behalf of the applicant(s). Location of proposal The site where the proposed works would be undertaken. Is the outfall into a Board-maintained watercourse? Includes a follow-up question about legal agreements. Description of proposed development Outline of the intended works, including their location(s). What is the proposed daily rate of discharge? The volume of water likely to be discharged per day. General question Discharge to a privately-maintained watercourse If the proposed treatment plant and outfall will only cater for one dwelling, formal consent from the Board will not normally be required, as the rate/volume of discharge is unlikely to have a significant effect on the local drainage network. However, an application may be needed for multiple-property, industrial or commercial developments, or certain other sites, due to the higher discharge rates and volumes, and the ensuing potential for a greater impact on local drainage infrastructure. Discharge to a Board-maintained watercourse Formal consent will be required for all proposed discharges to a Board-maintained drain. Consent will be granted provided: All elements of the works except the outfall pipe are at least 9 metres from the edge of the drain In the case of an open drain, the discharge pipe is installed through a pre-cast concrete headwall unit dug in flush with the drain bank, with suitable erosion protection (again dug in flush with the drain batter) installed below the headwall down to the toe of the watercourse, In the case of a piped watercourse, the discharge pipe is connected into an existing inspection chamber, or a new inspection chamber is constructed to the Board's specification to accommodate the outfall (a Commuted Maintenance fee may be payable if a new manhole is built see below). In either case, the inspection chamber wall around the incoming pipe is to be repaired to the Board's satisfaction prior to completion of the works. The applicant enters into the Board s standard Deed of Indemnity prior to undertaking the works. In certain circumstances, the Board may agree to the treatment plant itself being no closer than 6 metres from the edge of the watercourse, if the treatment plant is capable of withstanding and supporting the vehicular loads that may be imposed on it during the Board's operations. If the Board's Officers consider that the receiving watercourse will not be capable of accepting the planned additional flows, applications may be refused, or drain improvement works may have to be undertaken (to the satisfaction of the Board, but at the applicant's cost) before consent will be granted.
6 Although a development contribution will not normally be payable for treated foul water discharges, the Board reserves the right to require a payment to be made if it feels it is warranted (such as where the amount of the proposed treated water discharge may be comparable to another development's surface water run-off). Commuted Maintenance fees for new inspection chambers A Commuted Maintenance fee is a one-off charge payable where the Board will become responsible for the future maintenance costs associated with a new structure (in this case likely to be an inspection chamber). The Commuted Maintenance fee is paid in addition to the cost of construction of the structure. If the affected drain is owned by the Board, then a one-off Wayleave payment will also be due to the Board to reflect the fact that the works are within an area of land it owns. The Commuted Maintenance fee due where a watercourse is not owned by the Board is 130% of the cost of materials, as priced by the Board s Officers, and where the drain is owned by the Board it is 230% of the cost of materials, again as calculated by the Board s Officers. The relevant fee will be stipulated as part of any approval issued and a period of between 1 month and 3 months will be given for the applicant to accept that figure, depending on the likelihood of increases in materials costs. At the time of acceptance, the first 50% of the fee becomes due. Beyond this period, the Board s Officers will determine whether the quoted fee is still applicable, or whether it should be revised in light of any changes to the cost of materials. The second 50% of the fee is payable when construction is completed to the satisfaction of the Board s Officers.
7 APPLICATION FOR CONSENT TO ALTER A WATERCOURSE (for the construction or alteration of a bridge or culvert, the infilling of any drainage channel, or works reducing or altering the flow or capacity of any watercourse) MEMBER INTERNAL DRAINAGE BOARDS Broads (2006) IDB, East Suffolk IDB, King s Lynn IDB, Norfolk Rivers IDB, South Holland IDB Kettlewell House Austin Fields Industrial Estate King s Lynn Norfolk PE30 1PH Tel - (01553) info@wlma.org.uk APPLICATION GUIDANCE NOTES Before making an application to any of the Water Management Alliance IDBs, it is important that you have read and understood these notes, the relevant Board s Byelaws and the Land Drainage Act 1991 (as amended), and that you are familiar with the Board s Planning & Byelaw Policy. These guidance notes summarise situations where consent is/is not likely to be granted by the Board for relaxations of its Byelaws and/or the Land Drainage Act 1991 for proposals to alter a watercourse, but the Planning & Byelaw Policy gives more detail about various types of development, and the conditions likely to be stipulated as part of any approval. The application form requires completion of the following sections: Name and address of applicant(s) The person, people or company wishing to carry out the development. Name and address of agent An architect, consultant or other person acting on behalf of the applicant(s). Location of proposal The site where the proposed works would be undertaken. Does the proposal affect a Board-maintained watercourse? Includes a follow-up question about legal agreements. Description of proposals Outline of the intended works, including their location(s). General questions including about ownership of the watercourse. Section 23 of the Land Drainage Act 1991 (as amended) prohibits any obstruction or culvert being placed in a watercourse, or an existing culvert being altered in a manner that would affect the flow of a watercourse, without the prior consent of the relevant drainage board. However, the Environment Agency s Policy Regarding Culverts advocates retaining open drains wherever possible, due to their higher flood storage capacity and the potential loss of wildlife habitat if they are piped, and this stance is also taken by the Water Management Alliance Boards. Therefore consent will only be granted for proposals which will not unduly increase local flood risk or adversely affect the standard of drainage; which will not have an unfavourable impact on the local environment or wildlife; and provided the intended length of culverting/bridging is minimised. Applications to bridge or culvert a privately-maintained watercourse Applications will only be granted if the plans are satisfactory or would be if certain amendments are made, and any approvals issued will be subject to various conditions. If the Board considers that altering the watercourse is not appropriate for any reason, the application will be refused. Applications to bridge or culvert a Board-maintained watercourse Although this is not a guarantee that approval will be granted, these applications will normally be consented (subject to conditions) provided at least one of the following criteria is met: i. The proposal is for a replacement culvert or bridge, or ii. iii. The piping/bridge is for the sole access to a field, property, building plot or an estate development, and the total length of piping or width of the bridge is the minimum required for the access, or The total length of drain to be piped/bridged is 12 metres or less. In all other cases, the granting of consent will only ever be considered where an overriding need for the piping can be demonstrated e.g. for Health & Safety reasons, or where the piping would be of benefit to the Board.
8 Any bridge or culvert in a Board-maintained drain will always have to be constructed to a specification previously approved, or stipulated, by the Board. The Board expects culverts to be used in preference to bridges, and therefore new bridges will only be permitted where specific technical or operational reasons dictate that they would be the better option. The cost of installation must be met in full by the applicant unless there is a benefit to the Board, in which case the Board s Chief Executive may agree to make a contribution towards the works. A Commuted Maintenance fee is also likely to be payable to the Board (see later section). Applications to construct a weir or install any other flow control structure Applications will be considered on a case-by-case basis, but are only likely to be consented if the proposals will not have an adverse effect on any other landowners or properties. A Commuted Maintenance fee is also likely to be payable to the Board where the weir of flow control structure is in a Board-maintained watercourse (see later section). Commuted Maintenance fees for new culverts, bridges or weirs A Commuted Maintenance fee is a one-off charge payable where the Board will become responsible for the future maintenance costs associated with a new structure (in this case likely to be a culvert, bridge or weir). In the case of a culvert or bridge, the Board will not be responsible for the wearing surface, but will maintain the rest of the structure. The Commuted Maintenance fee is paid in addition to the cost of construction of the structure, although if the future maintenance of the culvert, bridge or weir will rest with another authority e.g. the local Highways Department, then no such fee is payable to the Board. If the affected drain is owned by the Board, then a one-off Wayleave payment will also be due to the Board to reflect the fact that the works are within an area of land it owns. The Commuted Maintenance fee due where a watercourse is not owned by the Board is 130% of the cost of materials, as priced by the Board s Officers, and where the drain is owned by the Board it is 230% of the cost of materials, again as calculated by the Board s Officers. If the culvert, bridge or weir is being adopted by another authority, but is being constructed on land owned by the Board, then the Wayleave fee will be 100% of the cost of materials (as priced by the Board s Officers). The relevant Commuted Maintenance/Wayleave fee will be stipulated as part of any approval issued and a period of between 1 month and 3 months will be given for the applicant to accept that figure, depending on the likelihood of increases in materials costs. At the time of acceptance, the first 50% of the fee becomes due. Beyond this period, the Board s Officers will determine whether the quoted fee is still applicable, or whether it should be revised in light of any changes to the cost of materials. The second 50% of the fee is then payable when construction of the culvert, bridge or weir is completed to the satisfaction of the Board s Officers.
As part of this process you are responsible for:
Section 104 application for the adoption of a new sewer The process In order to progress a sewer for adoption you are required to complete the application form following the principles set out in the current
More informationComplying Development
Complying Development Development Control Plan PART 1 - INTRODUCTION PREAMBLE This Development Control Plan (DCP) applies to complying development on lands zoned: For Residential Development: Residential
More informationGood Practice Guide. Technical Guidance: Flood risk activity exemptions Date Published: April GPG 221 Document Owner: Flood Risk Strategy
Good Practice Guide Technical Guidance: Flood risk activity exemptions Date Published: April 2016 GPG 221 Document Owner: Flood Risk Strategy Page 1 of 41 Version History: Document Date Summary of Changes
More informationDeveloper Services. Building over or near a sewer. DEV 005G Guidance notes and procedure. What is a public sewer?
Developer Services DEV 005G Guidance notes and procedure Building over or near a sewer If you are thinking of building a structure (for example, a new building, extension, conservatory, garage etc.) you
More informationDitches and drainage in Herefordshire Guidance on Landowner Responsibilities
Ditches and drainage in Herefordshire Guidance on Landowner Responsibilities Herefordshire is a beautiful and rural county in which agriculture is a significant industry. Balfour Beatty working on behalf
More informationBuilding over or close to a public sewer
Building over or close to a public sewer Place holder image thameswater.co.uk/developerservices Building over or close to a public sewer Did you know Thames Water is legally responsible for more than 100,000
More informationApplication Pack 5. How to apply for a Connection to a Public Sewer/Lateral Drain
Application Pack 5 How to apply for a Connection to a Public Sewer/Lateral Drain Guidance Notes The provisions of the Water Industry Act 1991 (WIA91) take precedence over these notes. We recommend that
More informationGuidance notes for developers
Guidance notes for developers - adoption of sewers. Section 104 of the Water Industry Act 1991 Foreword These guidelines are designed to be used in conjunction with the current version of Sewers for Adoption
More informationAppendix 3. POLICY & PROCEDURE No
DEPARTMENT OF PUBLIC WORKS DIVISION: ENGINEERING SERVICES SECTION: ADMINISTRATIVE PAGE NO: 1 OF 10 REVISION NO: 3 DATE: 1995 05 01 ESTABLISHED: 1986 03 03 Appendix 3 POLICY & PROCEDURE No. 2.3.1-020 TITLE:
More informationULDA Decision Notice
ULDA Decision Notice Site Address Bowen St, Roma Real property description Lot 142 SP250497 Type of approval UDA development approval subject to conditions Aspects of development Reconfiguring a Lot with
More informationRural Residential Development Control Plan
1 Rural Residential Development Control Plan Council of the City of Greater Lithgow 180 Mort Street, Lithgow NSW 2790 Telephone: (02) 6354 1077 2 EXPLANATORY NOTE: Council has been aware for some time
More informationCITY OF EDMONTON BYLAW SURFACE DRAINAGE BYLAW (CONSOLIDATED ON DECEMBER 10, 2008))
0 CITY OF EDMONTON BYLAW 11501 SURFACE DRAINAGE BYLAW (CONSOLIDATED ON DECEMBER 10, 2008)) Bylaw 11501 Page 2 of 14 BYLAW 11501 SURFACE DRAINAGE BYLAW AMENDMENT NO. 2 Whereas, pursuant to sections 7 and
More informationProcedure and Specification for the Construction of Vehicle Access Crossings over Footways and Verges April 2016
Procedure and Specification for the Construction of Vehicle Access Crossings over Footways and Verges April 2016 (1) Authorisation to work in the Highway Persons wishing to construct a vehicular crossing
More informationRequisition a public sewer and/or lateral drain
Please ensure you have read our guidance notes before completing this application form and include as much information as possible. If mandatory fields (marked with a ) are not completed this could result
More informationCompliance Document for New Zealand Building Code Clause G15 Solid Waste
Compliance Document for New Zealand Building Code Clause G15 Solid Waste Prepared by the Department of Building and Housing This Compliance Document is prepared by the Department of Building and Housing.
More informationApplication for adoption of new sewers
Application for adoption of new sewers Section 104 WIA 1991 This form should be used to offer proposed drainage systems for adoption by United Utilities under Section 104 of the Water Industry Act 1991.
More informationTOWN OF HOLLIS, NEW HAMPSHIRE
TOWN OF HOLLIS, NEW HAMPSHIRE ROAD and DRIVEWAY SPECIFICATIONS APPENDIX (Adopted 10/7/08) APPENDIX A A. Road Design Standards 1. Pavement and drainage facilities, curbs and sidewalks, when required, shall
More informationSECTION 6 STORMWATER AND LAND DRAINAGE
SECTION 6 STORMWATER AND LAND DRAINAGE Final Version, Approved September 2003 Section 6 and Land Drainage Contents 6.1 PERFORMANCE STANDARDS... 2 6.1.1 General... 2 6.2 MEANS OF COMPLIANCE... 3 6.2.1 General...
More informationBuilding in the Otatara Zone PROPOSED. Invercargill City DISTRICT PLAN Building in the Otatara Zone 1
Building in the Otatara Zone Invercargill City DISTRICT Building in the Otatara Zone 1 Otatara Zone When building or renovating there are many standards and rules to be aware of. Included in these are
More informationThis guide only applies for sewer assets up to and including 225mm diameter.
INTRODUCTION This guide only applies for sewer assets up to and including 225mm diameter. These guidelines (subject to change) provide an outline of the requirements which need to be considered when planning
More informationDomestic Enquiry Form
Domestic Enquiry Form Legal and Planning Services, Neighbourhoods and Prosperity Broxtowe Borough Council Council Offices, Foster Avenue, Beeston, Nottingham NG9 1AB Tel: (0115) 917 7777 Fax: (0115) 917
More informationApplication to requisition a sewer Section 98 WIA 1991
Application to requisition a sewer Section 98 WIA 1991 This form should be used if you want to requisition a public sewer under Section 98 of the Water Industry Act 1991. PLEASE COMPLETE ALL SECTIONS USING
More informationPre-Development Enquiry Form
Pre-Development This application form is to be used to assess if we are able to provide your development with water and/or drainage services for a planned development. It is expected that this is submitted
More informationCITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT
CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards
More informationSELF LAY. Application to self lay a water supply (mains and connections) V1 04/17. SECTION 1 Applicant (correspondence address) Page 1 of 14
V1 04/17 Application to self lay a water supply (mains and connections) This form can be used to apply to self lay a new water main and connections, under Section 51 of the Water Industry Act 1991 and
More informationWATER MANAGEMENT ALLIANCE (EASTERN) MAINTENANCE OPERATIVE
WATER MANAGEMENT ALLIANCE (EASTERN) MAINTENANCE OPERATIVE The Water Management Alliance (Eastern) Internal Drainage Boards, comprising Broads, East Suffolk and Norfolk Rivers Internal Drainage Boards require
More informationSoil Removal and Deposit Regulation Bylaw No. 3786, 1992
District of West Vancouver Soil Removal and Deposit Regulation Bylaw No. 3786, 1992 Effective Date March 22, 1993 Consolidated for Convenience Only This is a consolidation of the bylaws below. The amendment
More informationManningham Works Code of Practice
Manningham Works Code of Practice June 2017 Manningham City Council 699 Doncaster Road (PO Box 1) Doncaster Vic 3108 t 9840 9333 f 9848 3110 e manningham@manningham.vic.gov.au www.manningham.vic.gov.au
More informationBeaumont Lot Grading Guidelines
Beaumont Lot Grading Guidelines Updated: 2019-01-14 CONTENTS LOT GRADING OVERVIEW... 3 INTRODUCTION... 3 PURPOSE... 3 DEFINITIONS... 3 LOT GRADING REQUIREMENTS... 3 DESIGN GRADES AND EXISTING GRADES...
More informationBUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE
BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE Please Note: No construction, including site preparation (grading, excavating, vegetation removal, etc.), will be allowed until a building permit or
More informationGRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION
CHAPTER 23.105 GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION Sections 23.105.101 General... 1 23.105.102 Definitions... 1 23.105.103 Permits required... 3 23.105.104 Hazards.... 4 23.105.105 Permit
More informationDeclaration of works
Declaration of works United Utilities Declaration of Works Guidance 1 Our declaration of works criteria Contents Declaration of Works sample form 3 Consent criteria 4-7 Construction details 8 Other useful
More informationSITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS
SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS Revised: June 4, 2014 Requirements for obtaining a site alteration permit vary depending on the type of project being proposed. This information
More informationInitial Construction Costs For Various Pavement and Drainage Options
Interpave Initial Construction Costs For Various Pavement and Drainage Options Final Prepared For Interpave Scott Wilson Ltd Interpave Pavement Design CONTENTS 1. Overview 2. Summary of Pavement Types
More informationGuidelines for Design of Potable Water Distribution Facilities In New Developments
Guidelines for Design of Potable Water Distribution Facilities In New Developments Prepared by: OUC Water Business Unit Water Resources and Engineering Division Latest Update: September 29, 2009 1. Development
More informationPALMERSTON NORTH CITY PALMERSTON NORTH STORMWATER DRAINAGE BYLAW. Administration Manual
PALMERSTON NORTH CITY PALMERSTON NORTH STORMWATER DRAINAGE BYLAW 2015 Administration Manual 1 Contents Part One Introduction... 4 Part Two Standard Conditions For Stormwater Connections... 5 Appendix 1
More informationOrdinance No Lot Surface Drainage
Ordinance No. 35-2008 - Lot Surface Drainage The Township has adopted a new Lot Surface Drainage Ordinance which amends Chapter 170, Article IX, Subdivision and Site Plan Review by adding a new Section
More information7. Unreticulated Sewage Systems
7. Unreticulated Sewage Systems 7.1 Issues A large portion of the region does not have a reticulated sewage system. Individuals disposing of their own domestic wastes can cause adverse effects. These effects
More informationCambridgeshire s Culvert Policy. An explanation of our policy regarding applications to culvert ordinary watercourses.
Cambridgeshire s Culvert Policy An explanation of our policy regarding applications to culvert ordinary watercourses. Document History Document history Details By Current Version Date Initial draft RH
More informationUPDATE 3A MINIMUM REQUIREMENTS
3. STORMWATER CONTENTS SECTION PAGE LATEST UPDATE 3A MINIMUM REQUIREMENTS 3.1 July 2004 3B MEANS OF COMPLIANCE 3.1 July 2004 3.B.1 DESIGN STANDARD 3.1 October 2005 3.B.2 DISCHARGE PERMITS 3.3 July 2004
More informationARCHIVED. Compliance Document for New Zealand Building Code Clause G15 Solid Waste. Prepared by the Department of Building and Housing
Compliance Document for New Zealand Building Code Clause G15 Solid Waste Prepared by the Department of Building and Housing This Compliance Document is prepared by the Department of Building and Housing.
More informationPermitted Development for Householders: Guidance from Communities and Local Government. March 2010 Department for Communities and Local Government
Permitted Development for Householders: Guidance from Communities and Local Government March 2010 Department for Communities and Local Government Permitted Development for Householders: Guidance from Communities
More informationDaytime phone: Mobile:
Application No: 60 20 Application for Services Consent Water, Sewer, Stormwater, Channel Crossing, Vehicle Access, Occupation of Road Reserve (including all private underground and/or aboveground services
More informationSECTION 11: REGULATORY FLOODWAYS
SECTION 11: REGULATORY FLOODWAYS Contents 11.1. The Floodway... 11-2 11.1.1. The floodway concept... 11-2 11.1.2. Floodway map... 11-2 11.1.3. Floodway permitting... 11-3 11.1.4. Changing the floodway...
More informationPART 6 GENERAL REGULATIONS
PART 6 GENERAL REGULATIONS The General Regulations set forth in Part 6 shall apply to Development in all Districts, and may be amended in the same manner as any other Part or Section of this Bylaw. SECTION
More informationApplying for a Kinder Morgan Cochin Canada / UTOPIA Canada Proximity & Crossing Permit. Design and Construction Guidelines
Applying for a Kinder Morgan Cochin Canada / UTOPIA Canada Proximity & Crossing Permit Design and Construction Guidelines A Guide to Applying for a Kinder Morgan Cochin Canada / UTOPIA Canada Proximity
More informationmeters (16 Inches) Transportation (T)
OFFICE USE ONLY Application # Town of Steady Brook BUILDING AND DEVELOPMENT APPLICATION {All Applications must include copy of Legal Survey, showing all measurements And distances required} {Processing
More informationEngineering Design Standards
Engineering Design Standards Revision: A Date: 01.11.17 Updated by: EH Contents Introduction 1.0 - Section 104 and Section 38 Drawings... 1 1.1 - S104 General Principles of Design:... 1 1.2 - S38 General
More informationLOT GRADING GUIDELINES FOR COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY RESIDENTIAL PROPERTIES
LOT GRADING GUIDELINES FOR COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY RESIDENTIAL PROPERTIES Contents COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY... 1 RESIDENTIAL
More informationSTANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS
TABLE OF CONTENTS 11.01 SCOPE OF WORK... 1 11.02 REFERENCES... 1 11.03 MATERIALS... 2 11.04 GRANULAR & NATIVE BACKFILL... 2 11.05 CONSTRUCTION... 2 11.06 MEASUREMENT FOR PAYMENT... 5 11.07 BASIS OF PAYMENT...
More informationAsset Protection Bond Information Sheet
Asset Protection Bond Information Sheet What Is A Asset Protection Bond? An Asset Protection Bond is a surety relating to: a) Potential damage to Council assets such as: underground pipework. footpaths.
More informationDESIGN & CONSTRUCTION STANDARD SPECIFICATIONS. Wireline Occupancies
DESIGN & CONSTRUCTION STANDARD SPECIFICATIONS Wireline Occupancies OFFICE OF: VICE PRESIDENT ENGINEERING JACKSONVILLE, FLORIDA ISSUED: September 15, 2003 REVISED: December 16, 2016 THIS PAGE BLANK DESIGN
More informationTOWNSHIP OF TINY LOT GRADING/DRAINAGE PLAN PROCEDURE
TOWNSHIP OF TINY LOT GRADING/DRAINAGE PLAN PROCEDURE Approved: December 2015 Revised: April 2017 TABLE OF CONTENTS Section 1.0 Introduction... 2 Section 2.0 Policy... 2 Section 3.0 Preparation of the Lot
More informationGUIDE TO THE COMPLYING DEVELOPMENT CHECKLIST
GUIDE TO THE COMPLYING DEVELOPMENT CHECKLIST THE CODES SEPP: COMPLYING DEVELOPMENT CHECKLIST This Checklist will assist council or accredited certifiers when assessing applications for Complying Development
More informationBuilding over or near a public sewer.
Building over or near a public sewer. www.developers.thameswater.co.uk 0800 009 39 Monday to Friday, 8am to 5pm If you re planning a new building, a conservatory, a garage or any other extension to your
More informationCOUNTY OF SUTTER ENCROACHMENT PERMIT
COUNTY OF SUTTER ENCROACHMENT PERMIT PERMIT No. Development Services Dept. Engineering Division 1130 Civic Center Blvd Yuba City, CA 95993 (530) 822-7400 Hours: 8 AM - 5 PM Upon completion, submit application
More informationFENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.
Village of Vernon Hills Community Development Department 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http:// www.vernonhills.org FENCES This hand out is for REFERENCE
More information( THE M4 CORRIDOR AROUND NEWPORT SCHEME )
PUBLIC INQUIRY IN THE MATTER OF THE HIGHWAYS ACT 1980 AND THE ACQUISITION OF LAND ACT 1981 AND IN THE MATTER OF: THE M4 MOTORWAY (JUNCTION 23 (EAST OF MAGOR) TO WEST OF JUNCTION 29 (CASTLETON) AND CONNECTING
More informationTHE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION
THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION Standard Specifications for Restoration INDEX PAGE R.1 GENERAL...1 R.2 SCOPE...1 R.3 MATERIALS...1 R.4 CONSTRUCTION...2 R.4.1 General...2
More informationZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS
OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS 1500.01 GENERAL REQUIREMENTS 1500.02 NATURE OF STORM WATER FACILITIES 1500.03 DRAINAGE EASEMENTS 1500.04 STORM WATER MANAGEMENT
More informationWorks, services and infrastructure code
9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the
More informationEquipment Guide shorten restoration times underground
Dominion Energy Virginia s Strategic Underground Program is a system-wide initiative to shorten restoration times following major storms by placing certain outage-prone overhead electric distribution lines
More informationBuilding Permit Applications for new home construction will not be accepted unless the following documentation is included at the time of submission:
Building Permit Applications for new home construction will not be accepted unless the following documentation is included at the time of submission: Copy of Alberta Government s New Home Registration
More informationSITE GRADING (LOT GRADING) - CITY OF TORONTO In Compliance with Sentence B of the Ontario Building Code, every site is to be graded so that w
SITE GRADING (LOT GRADING) - CITY OF TORONTO In Compliance with Sentence B-9.14.6.1 of the Ontario Building Code, every site is to be graded so that water will not accumulate at or near the building under
More informationASPEN LAKES DEVELOPMENT CORP.
DEVELOPMENT CORP. (hereinafter called the "Developer") DEVELOPMENT GUIDELINES A OBJECTIVES 1) Creation of a rural community atmosphere. 2) Thoughtful home designs with enhanced landscaping. 3) Professional
More informationSCRRA RIGHT-OF-WAY ENCROACHMENT PROCESS
SCRRA RIGHT-OF-WAY ENCROACHMENT PROCESS MARCH 2017 SCRRA RIGHT-OF-WAY ENCROACHMENT PROCESS 1.0 General A. All work activities within the SCRRA operating corridor and right-of-way, or work activities that
More informationFence and Wall Requirements
Fence and Wall Requirements Definitions Decorative wall - A wall constructed of stone or other material erected for the sole purpose of providing a decorative and/or landscaped feature, and not to include
More informationIf a new residence s electrical service is not located within 200 feet of existing
Primary Line Extensions CHAPTER 4 If a new residence s electrical service is not located within 200 feet of existing primary electrical facilities, a primary line extension is required to place a close
More informationOrdinary watercourse maintenance
Guide to Ordinary watercourse maintenance As a Lead Local Flood Authority, Essex County Council is responsible for overseeing the management of flooding from surface water and local drainage systems such
More informationSCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS
SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS Version 2 June 2006 1. Purpose These Guidelines are supplementary
More informationTucson Electric Power Company Rules and Regulations
Original Sheet No.: 906 A. Priority and Timing of Service Establishments 1. After an Applicant has complied with the Company s application requirements and has been accepted for service by the Company
More informationNew connection to a public sewer
New connection to a public sewer Application form You can go to our website thameswater.co.uk/buildover and apply online or complete this form and return to Thames Water, Developer Services, Clearwater
More information7.00 INTRODUCTION... 1
SITE PLANS, REZONING, LAND DIVISION AND CONDOMINIUM SECTION 7 GENERAL REQUIREMENTS INDEX Page 7.00 INTRODUCTION... 1 7.01 SITE GRADING AND MECHANICAL PLANS... 2 7.01.01 Submission Procedures... 2 7.01.02
More information1 The development hereby permitted shall be carried out in accordance with the following approved plans:
Location 44A Church Lane (Formally Know As Land At Rear Of 1 King Street) London N2 8DS Reference: 17/1022/S73 Received: 20th February 2017 Accepted: 20th February 2017 Ward: East Finchley Expiry 17th
More informationMONROE COUNTY ZONING OFFICE
MONROE COUNTY ZONING OFFICE 100 South Main Street Waterloo, IL 62298 618-939-8681 Ext. 260 mczoning@htc.net PROCEDURES FOR NEW CONSTRUCTION 1. Applicant must provide a recorded copy of deed to the property
More informationDesign Guidelines. 1. INTRODUCTION 2. SECTION SPECIFICATIONS 3. HOUSE DESIGN RULES
Design Guidelines. 1. INTRODUCTION Waimakariri District Council (WDC) and Ravenswood Developments Ltd (Ravenswood) have in place a number of rules and covenants that effect the development of sections
More informationARTICLE III. TECHNICAL CODES AND OTHER CONSTRUCTION STANDARDS* Sec Adoption of the Florida Building Code and Countywide Amendments.
Page 1 of 6 ARTICLE III. TECHNICAL CODES AND OTHER CONSTRUCTION STANDARDS* *Cross references: Coastal construction code, 67-16 et seq.; building standards, 67-171 et seq. State law references: Construction
More informationIS LOOKING TO RECRUIT 2 LAND DRAINAGE OPERATIVES
KING S LYNN DRAINAGE BOARD IS LOOKING TO RECRUIT 2 LAND DRAINAGE OPERATIVES King s Lynn Drainage Board is looking to recruit two Land Drainage Operatives to join their workforce to undertake ditch maintenance
More informationManufacturing standard
CI/SfB I I (52.5) I f I I Landscaping Charcon Highway OHS61759 FM96927 EMS96928 Highway is a high capacity combined kerb and drainage system, offering a cost-effective all-in-one alternative to conventional
More informationZONING CLEARANCE PLAN REVIEW CHECKLIST. Based on the Revised Town of Carefree Zoning Ordinance
ZONING CLEARANCE PLAN REVIEW CHECKLIST Based on the Revised Town of Carefree Zoning Ordinance Date: Applicant: Permit Number: Reviewer: Address: Lot & Subdivision: Zoning District: New SRF: Addn/Remodel:
More informationReview of Plans and Specs from a Constructability Perspective
Review of Plans and Specs from a Constructability Perspective The Executive Regional Manager and the Project Manager, with approval of the Director of Project Management, may request the Constructability
More informationTemporary Watercourse Crossing: Culverts
Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol
More informationPART 5D - NATURAL HAZARDS
CONTENTS...PAGE 5D.1 CONTENT AND STRUCTURE...3 5D.2 RESOURCE MANAGEMENT ISSUES...3 5D.3 RESOURCE MANAGEMENT OBJECTIVE AND POLICIES...4 5D.4 RESOURCE MANAGEMENT STRATEGY...4 5D.5 IMPLEMENTATION...4 5D.6.RULES
More information4.4.6 Underground Detention
4.4.6 Underground Detention Limited Application Water Quality BMP Description: Detention storage located in underground pipe systems or vaults designed to provide water quantity control through detention
More informationREQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY
REQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY The requirements contained herein are established to provide for orderly and systematic use of the county road rights-of-way within Union
More informationDetermination 2011/027 Subject to clarification of 30 May Surface water runoff onto other property at 90 Paremata Road, Porirua
Determination 2011/027 Subject to clarification of 30 May 2011 1 Surface water runoff onto other property at 90 Paremata Road, Porirua 1. The matter to be determined 1.1 This is a Determination under Part
More informationAPPLICATION FOR CONSTRUCTION LETTER OF APPROVAL
APPLICATION FOR CONSTRUCTION LETTER OF APPROVAL DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL DIVISION OF SOIL AND WATER CONSERVATION SHORELINE AND WATERWAY MANAGEMENT SECTION Office of the
More informationDrainage By-law. WM-4 Consolidated as of April 18, 2011
Drainage By-law WM-4 Consolidated as of April 18, 2011 As Amended by By-law No. Date Passed at Council WM-4 September 20, 1993 WM-4-95001 September 18, 1995 WM-4-96002 August 6, 1996 WM-4-97003 May 5,
More informationAGRICULTURAL AWARENESS COMMITTEE MINNESOTA REGIONAL COMMON GROUND ALLIANCE (MNCGA)
www.gopherstateonecall.org AGRICULTURAL AWARENESS COMMITTEE MINNESOTA REGIONAL COMMON GROUND ALLIANCE (MNCGA) MNCGA Damage Prevention Bulletin No. 2015-1 Farming Road Right-Of-Way, by Claude Anderson,
More informationBUILDING PERMIT GUIDE SHEET
Lake Lorelei Property Owners Association 615 Lorelei Drive Fayetteville, OH 45118 (513) 875-3435 Fax (513) 875-4244 Email: gm@lakeloreleiohio.com www.lakeloreleiohio.com BUILDING PERMIT GUIDE SHEET The
More informationDrainage Strategy Report
CONSULTING ENGINEERS Report No: Date: C1014 Aug 2017 Project: Drainage Strategy Report Danygraig Works, Risca Client: P.D. Edenhall This report is provided for the benefit only of the party to whom it
More informationTI/131 TECHNICAL ADVICE ON THE SITING OF CLASS 1 TYPE OIL STORAGE INSTALLATIONS FOR SINGLE FAMILY DWELLINGS
TI/131 TECHNICAL ADVICE ON THE SITING OF CLASS 1 TYPE OIL STORAGE INSTALLATIONS FOR SINGLE FAMILY DWELLINGS Cover Price 10 (ex. VAT and p&p) (Please note this information sheet is available from the OFTEC
More informationIMPLEMENTATION GUIDELINE NO. 19 Vegetation Retention
IMPLEMENTATION GUIDELINE NO. 19 Vegetation Retention Date of Council Resolution This guideline was adopted by Council on 12 December 2007 and takes effect on 19 December 2007, in accordance with section
More informationRegarding the issuing of a building consent for the separation of surface water drainage to 39 and 39A Towai Street, Kohimarama, Auckland
Determination 2013/001 1 Regarding the issuing of a building consent for the separation of surface water drainage to 39 and 39A Towai Street, Kohimarama, Auckland 1. The matters to be determined 1.1 This
More informationDIEMERSFONTEIN WINE & COUNTRY ESTATE BUILDING CONTRACTORS CODE OF CONDUCT
DIEMERSFONTEIN WINE & COUNTRY ESTATE BUILDING CONTRACTORS CODE OF CONDUCT 1. CODE OF CONDUCT AGREEMENT The building contractor is a builder/contractor ( the contractor ) appointed by the owner ( the employer
More informationDIVISION 6. ACCESSORY USES OR STRUCTURES
DIVISION 6. ACCESSORY USES OR STRUCTURES Sec. 58-591. Generally. (a) Principal use or structure required to be present. An accessory use or structure in any zoning district shall not be established prior
More informationCITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:
CITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST "THE FOLLOWING CHECKLIST IS ONLY A SUMMARY THAT IS PROVIDED FOR THE APPLICANT'S BENEFIT; HOWEVER, FULFILLING THE REQUIREMENTS OF THIS SUMMARY
More informationNorthumbrian Water Limited 9 March 2011
Northumbrian Water Limited 9 March 2011 Flooding - The role of water companies in addressing flooding and SuDs. Les Hall New Development Manager Introduction Northumbrian Water and our sewerage role. Our
More informationRegulation 18 August 2009 NO Operations and Maintenance LEVEE ENCROACHMENT STANDARDS AND PROCEDURES
CENWP-EC DEPARTMENT OF THE ARMY PDR 30-2-5 Portland District, Corps of Engineers (Draft) P.O. Box 2946 Portland, Oregon 97208 Regulation 8 August 2009 NO. 30-2-5 Operations and Maintenance LEVEE ENCROACHMENT
More informationULDA Decision Notice
ULDA Decision Notice Site Address Bowen St, Roma Real property description Lot 143 AP15786 Type of approval UDA development approval subject to conditions Aspects of development Reconfiguring a Lot with
More information