STANDARDS UPDATE NOTICE (SUN) ISSUED: August 16, 2018

Size: px
Start display at page:

Download "STANDARDS UPDATE NOTICE (SUN) ISSUED: August 16, 2018"

Transcription

1 STANDARDS UPDATE NOTICE (SUN) ISSUED: August 16, 2018 STANDARD INFORMATION Standard Number: CSA C22.2 No. 223 Standard Name: Power Supplies with Extra-Low-Voltage Class 2 Outputs Standard Edition and Issue Date: 3 rd Edition Dated December 1, 2015 Date of Revision: December 1, 2015 Date of Previous Revision of Standard: 2 nd Edition Revised 2013 EFFECTIVE DATE OF NEW/REVISED REQUIREMENTS Effective Date: June 1, 2021 IMPACT, OVERVIEW, AND ACTION REQUIRED Impact Statement: A review of all Listing Reports is necessary to determine which products comply with new/revised requirements and which products will require re-evaluation. NOTE: Effective immediately, this revised standard will be exclusively used for evaluation of new products unless the Applicant requests in writing that current requirements be used along with their understanding that their listings will be withdrawn on Effective Date noted above, unless the product is found to comply with new/revised requirements. Overview of Changes: Add requirement for outdoor use equipment Changed the dimension requirements for direct plug-in equipment Specific details of new/revised requirements are found in table below. If the applicable requirements noted in the table are not described in your report(s), these requirements will need to be confirmed as met and added to your report(s) such as markings, instructions, test results, etc. (as required). Client Action Required: Information To assist our Engineer with review of your Listing Reports, please submit technical information in response to the new/revised paragraphs noted in the attached or explain why these new/revised requirements do not apply to your product (s). Current Listings Not Active? Please immediately identify any current Listing Reports or products that are no longer active and should be removed from our records. We will do this at no charge as long as Intertek is notified in writing prior to the review of your reports. Standards Update Notice KR/KM 1

2 STANDARD INFORMATION CLAUSE VERDICT COMMENT 4 Info Construction 4.2 Info General Additions to existing requirements are underlined and deletions are shown lined out below. 4.4 Info Enclosures For a power supply that is intended to be used with children s toys a) the output voltage shall not exceed 30 V rms or 42.4 Vpk; b) the power supply shall be marked according to Clause 5.7; c) the power supply shall comply with the test specified in Clause 6.16; and d) for direct plug-in power supplies the perimeter of the face section from which the blades project shall not be less than 7.9 mm from any point on either blade; and shall comply with the additional enclosure test specified in Clause Nonmetallic enclosures shall be either of material having a flammability classification not less than 0.6 V-1 in accordance with CSA Standard C22.2 No consist of a polymeric material that complies with the V-1 flammability requirements specified in CAN/CSA-C22.2 No for the minimum thickness used in the enclosure or shall comply with the requirements of the flame test specified in Clause 6.8. Outdoor use enclosures The enclosures of direct plug-in and cord-connected power supplies suitable for outdoor use shall be constructed to prevent the entrance or accumulation of water around live parts, electrical components, or wiring. The enclosures shall comply with the requirements specified in Clauses and as applicable. Cord-connected power supplies suitable for outdoor use and intended to be mounted within 0.3 m from the ground, as a separate unit or as part of a finished product, shall be subjected to the drop and impact tests of Clause 6.9, followed by the water immersion test of Clause

3 Info Supply connections Cord-connected power supplies suitable for outdoor use and intended for installation at a height more than 0.3 m from the ground and all direct plug-in power supplies suitable for outdoor use shall be C22.2 No Power supplies with extra-low-voltage Class 2 outputs subjected to the drop and impact tests specified in Clause 6.9, followed by the rain test specified in Clause The power supplies shall be marked with the marking specified in Clause and shall be provided with a supporting means. Metallic parts of an enclosure, the deterioration of which could impair safety of a power supply suitable for outdoor use, shall be protected against rust and corrosion and shall comply with the applicable requirements of CAN/CSA C22.2 No A decorative part that is not part of an enclosure is not required to be corrosion resistant. Non-metallic parts of an enclosure, the deterioration of which could impair safety of a power supply suitable for outdoor use, shall comply with the UV test specified in Clause Special purpose fasteners requiring special tools are acceptable for assembly of enclosures to comply with Clause Screws or other fasteners removable by ordinary tools may be used to assemble enclosures that give access to components requiring replacement by a service person, provided that tampering is discouraged (e.g., by sealing one or more of the assembly fasteners) Info Direct plug-in power supplies The enclosure of a direct plug-in power supply shall be capable of being readily gripped for removal from the receptacle, and the perimeter of the face section from which the blades project shall be not less than mm from any point on either blade. A direct plug-in power supply that is provided with folding, retractable, or removable blades shall not loosen to an extent that will result in a risk of electric shock or fire hazard. The blades shall be subjected to the test specified in Clause A direct plug-in power supply that is provided with removable blades shall comply with Clause without the removable blades or blade assembly attached Info Cord-connected power supplies 3

4 Info Output connections Info Marking Cord-connected power supplies for outdoor use shall have a power supply cord consisting of, as a minimum, an extra-hard usage type suitable for wet locations type SJOW, SJWT, SOW, or STW, or equivalent. The supply cord shall be of the 3- conductor grounding type unless the power supply is not required to be grounded. The supply cord shall not be more than 2 m in length. For power supplies intended for outdoor use that require the marking specified in Clause 5.2.2, the following shall apply: a) Output wiring suitable for outdoor use shall be W rated, and UV resistant if it is exposed to sunlight. b) An output connection suitable for outdoor use shall be corrosion resistant and UV resistant if it is exposed to sunlight. c) A flexible cord or cable on the secondary output circuit of a power supply suitable for outdoor use shall be of the types of insulation shown in Table 11 of the Canadian Electrical Code, Part I, suitable for wet locations, and shall be at least of the Type SPT-2, PXWT, or CXWT. Power supplies intended to be used with children s toys shall be marked with the following, or equivalent: 5.7 TOY POWER SUPPLY And ALIMENTATION POUR JOUET. Power supplies suitable for outdoor use Marking shall be capable of withstanding the stresses of ordinary usage, including exposure to weather and other ambient conditions, handling, storage, and similar conditions. An adhesive-backed label shall comply with the requirements of CSA C22.2 No. 0.15, for the exposure conditions and surface temperatures of minimum range from 35 C to 80 C. If a tag is used, it shall be permanent and tear resistant. 4

5 Power supplies intended for outdoor use, shall be marked with the following warning, or equivalent: WARNING: Risk of electric shock. Connect only to a receptacle protected by Class A GFCI And AVERTISSEMENT: Risque de choc électrique. Brancher uniquement dans une prise de courant protégée par un disjoncteur différentiel de classe A. Power supplies intended for outdoor use and for mounting greater than 0.3 m from the ground as required by Clause , shall be marked with the following warning or equivalent: WARNING: RISK OF ELECTRIC SHOCK. MOUNT THE UNIT AT A HEIGHT GREATER THAN 0.3 M FROM THE GROUND SURFACE. and Avertissement: RISQUE DE CHOC ÉLECTRIQUE. INSTALLER L APPAREIL À PLUS DE 0,3 M DU SOL Instructions for power supply suitable for outdoor use The instructions shall include applicable items in the following list. The statement READ AND FOLLOW ALL SAFETY INSTRUCTIONS shall be prominently displayed and precede the list, and the statement SAVE THESE INSTRUCTIONS shall be prominently displayed and follow the list. The word WARNING shall be entirely in upper case letters The text of the safety instructions specified in Clause shall be verbatim, or in equally definitive terminology, unless a variation from the specified wording may be used if a specific conflict of the application to a power supply exists The items in the list in Clause shall be numbered and may include additional important safety instructions as deemed appropriate by the manufacturer The power supply shall not be provided with literature, carton markings, or illustrations depicting or implying running wiring through a building structure. 5

6 Info Tests 6.2 Info Test conditions Info Drop and impact The power supply shall be provided with installation instructions stating that the supply circuit for the system shall be protected by a ground fault circuit interrupter (GFCI) of the Class A type, unless GFCI is an integral part of the power supply. Ambient temperature Table 6 is based on a room ambient temperature of 25 C. Tests may be conducted with an ambient temperature between 10 and 40 C. Additionally, a power supply intended for outdoor use shall be tested with an ambient temperature between 35 C to 40 C if the ambient temperature specified by the manufacturer is higher than the temperature limits. If the manufacturer s specified ambient temperature is lower than the temperature limits, the specified ambient temperature shall be used. Prior to the drop and impact tests, a polymeric enclosure of a power supply suitable for outdoor use shall be conditioned to 37.5 C ± 2.5 C for 3 h. If the manufacturer s specified ambient temperature is lower than 40 C, the specified ambient temperature shall be used. Securement of removable, folding, or retractable blades Folding or retractable blades In addition to the blade retention tests specified in Clauses and , the blades shall be subjected to an endurance test of 6,000 cycles. Each cycle shall consist of folding or retracting the blades to its closed or recessed position and then extending it to its position of normal use. Removable blades The blades shall be subjected to 6000 cycles of attachment and re-attachment. Blade test conclusion At the conclusion of each of the tests specified in Clause or above, the power supply shall a) not have any exposed live parts; b) comply with the blade retention test of Clause 6.10; c) not have any damage to the blade securement means of the power supply enclosure; d) not have any deformation to the power supply enclosure that will result in a risk of electric shock; e) not have any dislodgement or displacement of any internal wiring and/or components that will result in a risk of electric shock or fire hazard; and f) remain fully operational. 6

7 Compression (rod) The enclosure shall be subjected to a force of 90 N for a period of 1 min. No live parts shall be made accessible as the result of this test and no condition shall be produced which would increase the risk of electric shock of the power supply. The force specified in Clause shall be applied through the axis of a 12.7 mm diameter metal rod having a flat contact end with the edge rounded to a radius of 0.8 mm to eliminate sharp edges. The axis of the rod shall be perpendicular to the surface under test and the force shall be increased to 90 N over a period of 5 s. Note: During the test specified in Clause , the power supply is to rest on a flat surface in any convenient position. At the completion of the test specified in Clause , the power supply shall be subjected to the dielectric withstand test described in Clause 6.5. Rain A power supply marked for outdoor use shall be subjected to the rain test specified in CAN/CSA-C22.2 No. 94.2, when it is mounted and positioned in the worst-case scenario as intended. The test shall be conducted using water with a resistivity of 200 ohms-meter. The water resistivity shall be obtained by the addition of sodium chloride (commontable salt) to tap water. Distilled water shall not be used. The rain test shall be repeated on other sides of the enclosure of the power supply as necessary unless the construction is such that a test on one side is representative of a test on another side. Following the rain test specified in Clause , the power supply shall be subjected to the following tests: a) leakage current test specified in Clause 6.6. The test shall be discontinued when the leakage current stabilizes; and b) dielectric strength test specified in Clause 6.5. Water immersion 7

8 A power supply suitable for outdoor use shall be conditioned by operating at room temperature for 3-1/2 h. The power supply shall then be de-energized and immediately immersed in at least 0.3 m of water. The temperature of the water, before immersion, shall be 5 C or less. The power supply shall remain submerged for 4 h. At the end of the immersion period, the power supply shall be removed from the water and subjected to 2 additional cycles of operation and immersion. Between each cycle, the power supply shall be placed in a dry location at room temperature for approximately 16-1/2 h. The power supply shall be inspected immediately after the third immersion for evidence of water entry. Following the water immersion test above, the power supply shall be subjected to the following tests: a) leakage current test specified in Clause 6.6. The test shall be discontinued when the leakage current stabilizes; and b) dielectric strength test specified in Clause 6.5. UV Exposure Conditioning Unless the enclosure material has been evaluated for deterioration of impact strength after weathering, in accordance with CAN/CSA-C22.2 No. 0.17, Clause 5.9, the power supply suitable for outdoor use shall be subjected to weathering test specified in Clause 5.9 of CSA CAN/CSA-C22.2 No. 0.17, followed by the test specified in Clause After the UV exposure conditioning test, the test samples shall fulfil the requirements specified in Clause CUSTOMERS PLEASE NOTE: This Table and column Verdict can be used in determining how your current or future production is or will be in compliance with new/revised requirements. 8

Standards Update Notice (SUN) Issued: October 30, 2015

Standards Update Notice (SUN) Issued: October 30, 2015 Standard Information Standard Number: UL 1703 Standard Name: Flat-Plate Photovoltaic Modules and Panels Standard Edition and Issue Date: 3 rd Edition Dated March 15, 2002 Date of Revision: October 25,

More information

STANDARDS UPDATE NOTICE (SUN) ISSUED: February 23, 2018

STANDARDS UPDATE NOTICE (SUN) ISSUED: February 23, 2018 STANDARDS UPDATE NOTICE (SUN) ISSUED: February 23, 2018 STANDARD INFORMATION Standard Number: UL 83 / CSA C22.2 No 75 / NMX-J-010-ANCE Standard Name: Thermoplastic-Insulated Wires and Cables Standard Edition

More information

DEVICES AND LUMINAIRES

DEVICES AND LUMINAIRES CHAPTER 40 DEVICES AND LUMINAIRES SECTION E4001 SWITCHES E4001.1 Rating and application of snap switches. General-use snap switches shall be used within their ratings and shall control only the following

More information

DEVICES AND LUMINAIRES

DEVICES AND LUMINAIRES CHAPTER 39 DEVICES AND LUMINAIRES SECTION E3901 SWITCHES E3901.1 Rating and application of snap switches [404.14(A)]. General-use snap switches shall be used within their ratings and shall control only

More information

STANDARDS UPDATE NOTICE (SUN) ISSUED: March 5, 2018

STANDARDS UPDATE NOTICE (SUN) ISSUED: March 5, 2018 STANDARDS UPDATE NOTICE (SUN) ISSUED: March 5, 2018 STANDARD INFORMATION Standard Number: UL 749 / CSA C22.2 No 167 Standard Name: Household Dishwashers Standard Edition and Issue Date: 10 th / 7 th Edition

More information

Data Bus Connector and Terminator Requirements Document DB-1001-A. Revision C

Data Bus Connector and Terminator Requirements Document DB-1001-A. Revision C Data Bus Connector and Terminator Requirements Document DB-1001-A Revision C 2507 W. Geneva Dr. Tempe, Arizona 85282 Phone [602] 231-8616 FAX [602] 273-9135 www.phxlogistics.com TABLE OF CONTENTS 1. Introduction

More information

RB 107 Specification DuraSeal Splices

RB 107 Specification DuraSeal Splices 00 Constitutional Drive 1 of 1 RB 107 Specification DuraSeal Splices 1.0 Introduction 1.1 Scope This specification covers a series of one-piece pre-insulated crimp splices having a heatshrinkable sleeve

More information

INFORMATION BULLETIN

INFORMATION BULLETIN TEMPORARY AND PERMANENT SERVICES FOR CONSTRUCTION POWER Date of Issue: February 29, 2016 NO: IB-EL-2016-03 The following bulletin provides guidance on the application of rules pertaining to the 2015 BC

More information

SOLARLOK BREEZE Junction Box

SOLARLOK BREEZE Junction Box SOLARLOK BREEZE Junction Box Table of contents 1. SCOPE... 2 1.1. Content... 2 1.2. Qualification... 3 2. APPLICABLE DOCUMENTS... 3 2.1. TE Connectivity Documents... 3 2.2. Commercial Standard... 3 3.

More information

SRI LANKA STANDARD SPECIFICATION FOR THREE-PIN PLUGS, SOCKET-OUTLETS AND SOCKET-OUTLET ADAPTORS

SRI LANKA STANDARD SPECIFICATION FOR THREE-PIN PLUGS, SOCKET-OUTLETS AND SOCKET-OUTLET ADAPTORS AMENDMENT NO. 3 APPROVED ON 2006-11-29 TO SLS 948 : PART 1 : 1991 SRI LANKA STANDARD SPECIFICATION FOR THREE-PIN PLUGS, SOCKET-OUTLETS AND SOCKET-OUTLET ADAPTORS PART 1 : THREE-PIN PLUGS SOCKET-OUTLETS

More information

Ground Fault Circuit Interrupters (GFCI) & Assured Grounding Program

Ground Fault Circuit Interrupters (GFCI) & Assured Grounding Program Ground Fault Circuit Interrupters (GFCI) & Assured Grounding Program Applicable OSHA Standards: 29 CFR 1926.404 1. PURPOSE & SCOPE a.) To establish methods, guidelines and responsibilities to protect Vision

More information

Temporary Wiring. Low-Voltage Electrical Safety Orders

Temporary Wiring. Low-Voltage Electrical Safety Orders Temporary Wiring Low-Voltage Electrical Safety Orders 2405.1. Scope. Except as specifically modified in this Article, all other requirements of this Order for permanent wiring shall also apply to temporary

More information

2. Article (A) Delete the measurement of 6 feet 7 inches and insert: 66 inches (5 feet 6 inches).

2. Article (A) Delete the measurement of 6 feet 7 inches and insert: 66 inches (5 feet 6 inches). H. The National Electric Code 2011 is hereby revised: 1. Article 230.70 (A) (1) Delete in its entirety and insert: 230.70 (A) (1) Readily Accessible Location. The service disconnect means shall be installed

More information

Feb12 Rev D

Feb12 Rev D Product Specification AMPSEAL* Connectors 108-1329 01Feb12 Rev D 1. SCOPE 1.1. Content This specification covers performance, tests and quality requirements for AMPSEAL* connectors. 1.2. Qualification

More information

Sections through of Chapter 5 of the Victoria City Code are amended to read as follows: ARTICLE IX. NATIONAL ELECTRICAL CODE

Sections through of Chapter 5 of the Victoria City Code are amended to read as follows: ARTICLE IX. NATIONAL ELECTRICAL CODE Sections 5-100 through 5-105 of Chapter 5 of the Victoria City Code are amended to read as follows: ARTICLE IX. NATIONAL ELECTRICAL CODE Sec. 5-100. Adoption of published code. There is hereby adopted

More information

IMPORTANT LETTER. Subscribers to UL Listing Service for Low Voltage Landscape Lighting Systems (IFDH)

IMPORTANT LETTER. Subscribers to UL Listing Service for Low Voltage Landscape Lighting Systems (IFDH) February 7, 2003 Subject UL 1838 IMPORTANT LETTER To: Subject: Subscribers to UL Listing Service for Low Voltage Landscape Lighting Systems (IFDH) Review Program to Determine Compliance with the Revisions

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 16060 Grounding and Bonding This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or

More information

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS DAIMLERCHRYSLER MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS ISSUE DATE: 5/1/90 EFFECTIVE DATE: 2/4/92 REVIEW DATE:

More information

ELECTRICAL INSPECTION BULLETIN (Effective )

ELECTRICAL INSPECTION BULLETIN (Effective ) ELECTRICAL INSPECTION BULLETIN (Effective 2009-02-01) Rule 36-000 Customer Owned High Voltage Installations With the increase in customer own high voltage equipment there appears to be confusion over which

More information

CRITERIA FOR TESTING IMPACT & NON IMPACT RESISTANT BUILDING ENVELOPE COMPONENTS USING UNIFORM STATIC AIR PRESSURE

CRITERIA FOR TESTING IMPACT & NON IMPACT RESISTANT BUILDING ENVELOPE COMPONENTS USING UNIFORM STATIC AIR PRESSURE TESTING APPLICATION STANDARD (TAS) 202-94 CRITERIA FOR TESTING IMPACT & NON IMPACT RESISTANT BUILDING ENVELOPE COMPONENTS USING UNIFORM STATIC AIR PRESSURE 1. Scope 1.1 This protocol covers procedures

More information

MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT

MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 2476 JANUARY 1990 MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT 2476.01 SCOPE 2476.02 REFERENCES 2476.05 MATERIALS TABLE OF CONTENTS

More information

BULLETIN SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS, AND ELECTRIC SERVICE REQUIREMENT CHANGES OR ADDITIONS

BULLETIN SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS, AND ELECTRIC SERVICE REQUIREMENT CHANGES OR ADDITIONS SaskPower Electrical Inspections BULLETIN 01-2017 February 15, 2017 TO: LICENSED ELECTRICAL CONTRACTORS ELECTRICAL CONSULTANTS AND ENGINEERS SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS,

More information

Manitoba Electrical Code

Manitoba Electrical Code THE MANITOBA HYDRO ACT (C.C.S.M. c. H190) Manitoba Electrical Code Regulation 76/2018 Registered June 15, 2018 Adoption of Canadian Electrical Code, Part I, 24th edition 1 Subject to section 3 and the

More information

UL TEST REPORT AND PROCEDURE

UL TEST REPORT AND PROCEDURE Issue Date: 2015-12-22 Page 1 of 13 Report Reference # E182560-V4-S35 UL TEST REPORT AND PROCEDURE Standard: ANSI/AAMI ES60601-1 (2005/(R) 2012 +A1:2012, C1: 2009/(R) 2012 + A2:2010/(R) 2012) Amendment

More information

PRODUCT SPECIFICATION

PRODUCT SPECIFICATION 1 of 23 B 1.0 GENERAL Scope This specification covers the insulation piercing Quickie Backplane Connector System designed for Backplane-to-flat cable (round conductor) interconnection in low power applications.

More information

SECTION PART 1 GENERAL

SECTION PART 1 GENERAL SECTION 16060 GROUNDING AND BONDING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Grounding of electrical systems and equipment and basic requirements for ground for equipment, circuits, and systems.

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS SECTION 26 12 16 SECONDARY UNIT SUBSTATIONS PART 1 GENERAL 1.1 SUMMARY This section describes metal-clad, indoor or outdoor, secondary unit substations with integral primary fused disconnect switches,

More information

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp, TITLE 14 CHAPTER 10 PART 4 HOUSING AND CONSTRUCTION ELECTRICAL CODES 2011 NEW MEXICO ELECTRICAL CODE 14.10.4.1 ISSUING AGENCY: The Construction Industries Division of the Regulation and Licensing Department.

More information

SSL Series 1.2 IP X8 waterproof solution. Product Data Sheet. REV. 0, 2014 August

SSL Series 1.2 IP X8 waterproof solution. Product Data Sheet. REV. 0, 2014 August SSL Series 1.2 IP X8 waterproof solution Product Data Sheet REV. 0, 2014 August General Specification Number of Positions Current Rating Wire Information Voltage Rating Dielectric Withstand Voltage Durability

More information

* All equipment grounding conductors shall be tested for continuity and shall be electrically continuous.

* All equipment grounding conductors shall be tested for continuity and shall be electrically continuous. 1 IMHOFF CUSTOM SERVICES INC> ASSURED EQUIPMENT GROUNDING CONDUCTOR PROGRAM Imhoff Custom Services Inc. assured equipment grounding conductor program is in place to assure workers are protected on construction

More information

SECTION HEAT TRACING FOR PLUMBING PIPING

SECTION HEAT TRACING FOR PLUMBING PIPING SECTION 22 05 33 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable in the section

More information

Octaform Quick Liner Wall & Ceiling Panels Guide Specification CAN Page 1

Octaform Quick Liner Wall & Ceiling Panels Guide Specification CAN Page 1 Guide Specification CAN Page 1 This master guide specification Section is intended for use when specifying plastic panelling. This section includes performance, and descriptive type specifications; edit

More information

Polymer Cutout Testing Recommendations

Polymer Cutout Testing Recommendations 1 Polymer Cutout Testing Recommendations High Voltage Fuse Subcommittee May 2012 Frank Lambert Recommended Tests 1. Water Diffusion Tests (CAN/CSA 310 09 7.3) 2. DyePenetration (ANSI C29.13 Section 7.3)

More information

WIRING METHODS CHAPTER 38

WIRING METHODS CHAPTER 38 CHAPTER 38 WIRING METHODS SECTION E3801 GENERAL REQUIREMENTS E3801.1 Scope. This chapter covers the wiring methods for services, feeders and branch circuits for electrical power and distribution. E3801.2

More information

An Urgent Bulletin from CSA International

An Urgent Bulletin from CSA International Ref No: I10-125 Wiring Harnesses No. 2 (Supersedes INFORMS Wiring Harnesses No. 1) Date: October 29, 2010 An Urgent Bulletin from CSA International Existing Certification not affected Apply any time to

More information

2007 FLORIDA BUILDING CODE TEST PROTOCOLS HVHZ (TAS)

2007 FLORIDA BUILDING CODE TEST PROTOCOLS HVHZ (TAS) TESTING APPLICATION STANDARD (TAS) 202-94 CRITERIA FOR TESTING IMPACT & NONIMPACT RESISTANT BUILDING ENVELOPE COMPONENTS USING UNIFORM STATIC AIR PRESSURE 1. 2. 3. Scope: 1.1 This protocol covers procedures

More information

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Fiber Optic Dynamic Lane Control Sign

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Fiber Optic Dynamic Lane Control Sign 1995 Metric CSJ 0353-03-077 SPECIAL SPECIFICATION ITEM 6143 Fiber Optic Dynamic Lane Control Sign 1.0 Description This Item shall govern for the furnishing and installation of Fiber Optic Dynamic Lane

More information

a) Line and load compartments must be separated by a stable barrier.

a) Line and load compartments must be separated by a stable barrier. 1.00 GENERAL 1.01 The electric utility shall furnish and connect all meters, instrument transformers, test switches, and meter control wiring necessary to complete the meter installation. 1.02 The customer

More information

UL TEST REPORT AND PROCEDURE

UL TEST REPORT AND PROCEDURE Issue Date: 2015-09-28 Page 1 of 10 Report Reference # E182560-V4-19 UL TEST REPORT AND PROCEDURE Standard: ANSI/AAMI ES60601-1 (2005/(R) 2012 +A1:2012, C1: 2009/(R) 2012 + A2:2010/(R) 2012) Amendment

More information

3M Cold Shrink Silicone Rubber Connector Insulators 8440 Series

3M Cold Shrink Silicone Rubber Connector Insulators 8440 Series 3M Cold Shrink Silicone Rubber Connector Insulators 8440 Series Data Sheet May 2014 Product Description 3M Cold Shrink Connector Insulators 8440 Series are open-ended, silicone rubber, tubular sleeves.

More information

FrostGuard 120 V 120 V PREASSEMBLED ELECTRIC HEATING CABLES FOR PIPE FREEZE PROTECTION AND ROOF & GUTTER DE-ICING INSTALLATION INSTRUCTIONS

FrostGuard 120 V 120 V PREASSEMBLED ELECTRIC HEATING CABLES FOR PIPE FREEZE PROTECTION AND ROOF & GUTTER DE-ICING INSTALLATION INSTRUCTIONS FrostGuard 120 V 120 V PREASSEMBLED ELECTRIC HEATING CABLES FOR PIPE FREEZE PROTECTION AND ROOF & GUTTER DE-ICING INSTALLATION INSTRUCTIONS DESCRIPTION FrostGuard 120 V preassembled self-regulating heating

More information

ENGINEERING COMMITTEE Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE

ENGINEERING COMMITTEE Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE ENGINEERING COMMITTEE Interface Practices Subcommittee AMERICAN NATIONAL STANDARD Passive Network Device (NID) Enclosure Specification NOTICE The Society of Cable Telecommunications Engineers (SCTE) Standards

More information

SECTION HEAT TRACING FOR PLUMBING PIPING

SECTION HEAT TRACING FOR PLUMBING PIPING SECTION 22 05 33 HEAT TRACING FOR PLUMBING PIPING PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not

More information

Cold Shrink EPDM Tubes Connector Insulators 8420 Series

Cold Shrink EPDM Tubes Connector Insulators 8420 Series Product Description PST features are: Applications 6 Figure 1 Page 2 of 6 Data: Physical & Electrical Properties PST Selection Table Min. diameter (mm) Max. diameter (mm) Length (mm) 8423-6 7.8 14.3 152

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property 2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical

More information

Mar11 Rev A

Mar11 Rev A Product Specification 108-1472 11Mar11 Rev A Connector, Short Point Receptacle Contact 1. SCOPE 1.1. Content This specification covers performance, tests and quality requirements for TE Connectivity (TE)

More information

Article 10 - ADMINISTRATIVE SECTION

Article 10 - ADMINISTRATIVE SECTION Article 10 - ADMINISTRATIVE SECTION 10.1 TITLE These Administrative Regulations along with the requirements included in the 2005 Edition of the National Electrical Code (NFiPA-70-2005) as approved by the

More information

(Condensed from National Electric Code)

(Condensed from National Electric Code) WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,

More information

SERVICES AND. Topic: requirements. installations. service pole met; and. braced. Page 1 of 9

SERVICES AND. Topic: requirements. installations. service pole met; and. braced. Page 1 of 9 INFORMATION BULLETIN SERVICES AND SERVICE EQUIPMENT Date of Issue: October 1, 2012 NO: IB-EL 2012-03 Topic: Services and Servicee Equipment This Information Bulletin supplements the Directive on: Services

More information

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING 2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending

More information

An Urgent Bulletin from CSA International

An Urgent Bulletin from CSA International Ref No: I12-074 PLUMBING PRODUCTS NO. 230 Date: August 17, 2012 An Urgent Bulletin from CSA International New Service available as of today Apply any time to have your products evaluated Announcing: Publication

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 GROUNDING AND BONDING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

BUILDER S CONSTRUCTION SUPPLIES (Temporary in permanent position) REQUIREMENTS. March 2014

BUILDER S CONSTRUCTION SUPPLIES (Temporary in permanent position) REQUIREMENTS. March 2014 BUILDER S CONSTRUCTION SUPPLIES (Temporary in permanent position) REQUIREMENTS March 2014 Energy Safe Victoria (ESV) continues to receive complaints concerning defective builder s construction supplies.

More information

MAY-16 REV B2

MAY-16 REV B2 Product Specification 108-20025 06-MAY-16 REV B2 The product described in this document has not been fully tested to ensure conformance to the requirements outlined below. Therefore, TE Connectivity (TE)

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March

More information

PRODUCT SPECIFICATION. ExaMAX RAR BACKPLANE RIGHT ANGLE RECEPTACLE (RAR) COPLANAR RIGHT ANGLE RECEPTACLE (RAR)

PRODUCT SPECIFICATION. ExaMAX RAR BACKPLANE RIGHT ANGLE RECEPTACLE (RAR) COPLANAR RIGHT ANGLE RECEPTACLE (RAR) 1 of 15 J ExaMAX VH ExaMAX RAH ExaMAX RAR ExaMAX RAR BACKPLANE RIGHT ANGLE RECEPTACLE (RAR) COPLANAR RIGHT ANGLE RECEPTACLE (RAR) AND VERTICAL HEADER (VH) AND RIGHT ANGLE HEADER (RAH) (4-Pair, 10-Column

More information

CERTIFICATE OF ACCREDITATION

CERTIFICATE OF ACCREDITATION CERTIFICATE OF ACCREDITATION In terms of section 22(2)(b) of the Accreditation for Conformity Assessment, Calibration and Good Laboratory Practice Act, 2006 (Act 19 of 2006), read with sections 23(1),

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 262726 - WIRING DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Receptacles,

More information

Grounding & Bounding. 1. Bonded Connected to establish electrical continuity and conductivity.

Grounding & Bounding. 1. Bonded Connected to establish electrical continuity and conductivity. & Bounding Article 100 Definitions 1. Bonded Connected to establish electrical continuity and conductivity. 2. Raceway fittings bonds sections of raceway Bonding jumper bonds receptacles to boxes Threaded

More information

MATERIAL SPECIFICATION FOR HIGH PRESSURE SODIUM LUMINAIRES FOR UNDERPASS LIGHTING

MATERIAL SPECIFICATION FOR HIGH PRESSURE SODIUM LUMINAIRES FOR UNDERPASS LIGHTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 2434 November 2016 MATERIAL SPECIFICATION FOR HIGH PRESSURE SODIUM LUMINAIRES FOR UNDERPASS LIGHTING TABLE OF CONTENTS 2434.01 SCOPE 2434.02 REFERENCES

More information

Mar11 Rev B

Mar11 Rev B Product Specification 108-1163-7 11Mar11 Rev B Inverted Six and Eight Position Surface Mount Shielded Modular Jack Assembly 1. SCOPE 1.1. Content This specification covers performance, tests and quality

More information

MESH FLOOR HEATING SYSTEMS INSTALLATION INSTRUCTIONS

MESH FLOOR HEATING SYSTEMS INSTALLATION INSTRUCTIONS MESH FLOOR HEATING SYSTEMS INSTALLATION INSTRUCTIONS MESH FLOOR HEATING SYSTEMS TOLL FREE: 1.800.778.WARM(9276) PHONE: 604.529.4400 FAX: 604.529.4404 EMAIL: RES.customercare@pentair.com www.nuheat.com

More information

Grounding Conductor & GFCI Employee Protection Program

Grounding Conductor & GFCI Employee Protection Program Page 1 of 7 Sect: 1.0 Purpose This section covers Ardent s program for protecting employees from hazardous electrical energy due to equipment malfunctions, defects, or improper grounding. OSHA requires

More information

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 INDEX Page SECTION 1.0: SCOPE 1 1.1 Toronto Hydro Requirements 1 1.2 Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 SECTION 3.0: DEFINITIONS AND THE INTERNATIONAL SYSTEM OF UNITS 1 3.1 Definitions

More information

SECTION BUSWAYS

SECTION BUSWAYS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 25 11 BUSWAYS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable to the section and

More information

37-SDMS-01 REV. 03 SPECIFICATIONS FOR

37-SDMS-01 REV. 03 SPECIFICATIONS FOR 37-SDMS-01 REV. 03 SPECIFICATIONS FOR LOW VOLTAGE MOLDED CASE CIRCUIT BREAKERS FOR SERVICE CONNECTIONS This specification is property of SEC and subject to change or modification without any notice CLAUSE

More information

IMPORTANT CODE UPDATE ENFORCEMENT DATE FOR NEW NATIONAL ELECTRIC CODE IS SET FOR MAY 1, 2013

IMPORTANT CODE UPDATE ENFORCEMENT DATE FOR NEW NATIONAL ELECTRIC CODE IS SET FOR MAY 1, 2013 IMPORTANT CODE UPDATE ENFORCEMENT DATE FOR NEW NATIONAL ELECTRIC CODE IS SET FOR MAY 1, 2013 2011 National Electrical Code (NEC) Update Statement The National Electrical Code, 2011 Edition, with Appendices,

More information

Comparison of the two proposals developed by the Ministry of Labour (MOL) and the SAE Working Group (SAE WG)

Comparison of the two proposals developed by the Ministry of Labour (MOL) and the SAE Working Group (SAE WG) to Ontario Regulation 213/91 (Construction Projects) under the Occupational Health and Safety Act (OHSA) related to Suspended Access Equipment (SAE) Comparison of the two proposals developed by the Ministry

More information

INFORMATION BULLETIN

INFORMATION BULLETIN INFORMATION BULLETIN SERVICES AND SERVICE EQUIPMENT This bulletin provides guidance on the application of rules pertaining to the 2015 BC Electrical Code Regulation. The requirements of local municipal

More information

SERVICES - SERVICE EQUIPMENT- PANELBOARDS

SERVICES - SERVICE EQUIPMENT- PANELBOARDS NO: D-E3 101110 1 THIS DIRECTIVE SUPERSEDES DIRECTIVES D-E3 070302 5 & D-E3 070302 6 SERVICES - SERVICE EQUIPMENT- PANELBOARDS This Directive is being issued by a provincial safety manager pursuant to

More information

Chapter ELECTRICAL CODE

Chapter ELECTRICAL CODE Chapter 19.08 ELECTRICAL CODE 19.08.010 National Electrical Code (NEC) adopted. 19.08.100(1) Definitions, general. 19.08.210.5 Identification of branch circuits. 19.08.210.11(C) Branch circuits required;

More information

1. The plan needs to show compliance with the 2013 CEC, 2013 CBC and 2013 CRC. [ CBC] RESPONSE:

1. The plan needs to show compliance with the 2013 CEC, 2013 CBC and 2013 CRC. [ CBC] RESPONSE: Solar Panels Interactive PV system checklist: 1. The plan needs to show compliance with the 2013 CEC, 2013 CBC and 2013 CRC. [ 107.2 CBC] 2. The electrical plans show a different number of panels than

More information

DETAIL SPECIFICATION SHEET CONNECTOR, RECEPTACLE, ELECTRICAL, CLASS I (COAXIAL, SERIES TWIN, TWTNC, JAM NUT MOUNTED)

DETAIL SPECIFICATION SHEET CONNECTOR, RECEPTACLE, ELECTRICAL, CLASS I (COAXIAL, SERIES TWIN, TWTNC, JAM NUT MOUNTED) INCH POUND MIL-DTL-3655/13B 18 March 2008 SUPERSEDING MIL-DTL-3655/13B 4 October 1999 DETAIL SPECIFICATION SHEET CONNECTOR, RECEPTACLE, ELECTRICAL, CLASS I (COAXIAL, SERIES TWIN, TWTNC, JAM NUT MOUNTED)

More information

MIL-DTL-3655/16B w/amendment 2 18 March 2008 SUPERSEDING AMENDMENT 1 1 November 1999 DETAIL SPECIFICATION SHEET

MIL-DTL-3655/16B w/amendment 2 18 March 2008 SUPERSEDING AMENDMENT 1 1 November 1999 DETAIL SPECIFICATION SHEET INCH POUND MIL-DTL-3655/16B 18 March 2008 SUPERSEDING AMENDMENT 1 1 November 1999 DETAIL SPECIFICATION SHEET CONNECTOR, RECEPTACLE, ELECTRICAL, CLASS I (COAXIAL, SERIES TWIN, TWBNC) This specification

More information

Cable Terminators COMMERCIAL AND INDUSTRIAL FITTINGS: RIGID AND IMC CONDUIT FITTINGS. Applications

Cable Terminators COMMERCIAL AND INDUSTRIAL FITTINGS: RIGID AND IMC CONDUIT FITTINGS. Applications Cable Terminators and Sealing Fittings are used on conduit ends and cable ends to effectively seal the cable and conduit. Terminator The Terminator body is deep enough to provide an ample compound chamber

More information

SECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL

SECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL 1.01 DESCRIPTION SECTION 16000 GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL A. This Section includes the general provisions applicable to electrical work and testing of the completed electrical systems.

More information

Certificate of Compliance

Certificate of Compliance Certificate of Compliance Certificate: 70128861 Master Contract: 229177 (LR 103294) Project: 70128861 Date Issued: 2017-04-04 Issued to: Murata Power Solutions 4118 14th Ave Markham, Ontario L3R 0J3 CANADA

More information

Tindo Karra. Installation and Specifications Manual. Introduction

Tindo Karra. Installation and Specifications Manual. Introduction Tindo Karra Installation and Specifications Manual Introduction Thank you for choosing a Tindo Solar Module. Background to our name TINDO Tindo is a word from the Kaurna warra Aboriginal language which

More information

TEST REPORT IEC Information technology equipment Safety Part 22: Equipment to be installed outdoors

TEST REPORT IEC Information technology equipment Safety Part 22: Equipment to be installed outdoors Report Reference No.... : TEST REORT IEC 60 950-22 Information technology equipment Safety art 22: Equipment to be installed outdoors Date of issue... : 30 October 2014 Total number of pages... 19 S143891.01

More information

SPECIAL SPECIFICATION 8810 Communication Hub Enclosure

SPECIAL SPECIFICATION 8810 Communication Hub Enclosure 2004 Specifications CSJ 0914-00-301 & 0914-00-314 SPECIAL SPECIFICATION 8810 Communication Hub Enclosure 1. Description. Provide Communication Hub Enclosures of various types and sizes, as shown on the

More information

Temporary Wiring Practices And Guidelines For NECA. National Electrical Contractors Association Omaha, Nebraska

Temporary Wiring Practices And Guidelines For NECA. National Electrical Contractors Association Omaha, Nebraska Temporary Wiring Practices And Guidelines For NECA National Electrical Contractors Association Omaha, Nebraska Table of Contents I. Planning II. Lighting and Power III. Maintenance IV. Inspections V. Routing

More information

Mar11 Rev C

Mar11 Rev C Product Specification 108-1579 11Mar11 Rev C Sealed Circular Plastic Connector With Removable Crimp Contacts 1. SCOPE 1.1. Content This specification covers performance, tests and quality requirements

More information

AMENDMENT OF MALAYSIAN STANDARD MALAYSIAN STANDARD MS :2009

AMENDMENT OF MALAYSIAN STANDARD MALAYSIAN STANDARD MS :2009 MS 2112-1:2009, AMD. 1:2015 AMENDMENT OF MALAYSIAN STANDARD MALAYSIAN STANDARD MS 2112-1:2009 ELECTRIC CABLE AND WIRE - POLYVINYL CHLORIDE (PVC) INSULATED CABLES OF RATED VOLTAGES UP TO AND INCLUDING 450/750

More information

MATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

MATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1821 APRIL 2004 MATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS TABLE OF CONTENTS 1821.01 SCOPE 1821.02 REFERENCES

More information

Product Specification AMPLATCH* System 50 Connector Receptacle and Paddleboard

Product Specification AMPLATCH* System 50 Connector Receptacle and Paddleboard Product Specification AMPLATCH* System 50 Connector Receptacle and Paddleboard 27 Apr 12 Rev C 1. SCOPE 1.1. Content This specification covers performance, tests and quality requirements for AMPLATCH*

More information

SELF-REGULATING ROOF HEAT CABLE. Installation Guide WS-SRIM V2.0

SELF-REGULATING ROOF HEAT CABLE. Installation Guide WS-SRIM V2.0 SELF-REGULATING ROOF HEAT CABLE Installation Guide WS-SRIM-2-2016-V2.0 GENERAL INFORMATION The following instructions are designed to assist in installing and operating an electric radiant heat roof deicing

More information

AMERICAN NATIONAL STANDARD. Door & Access Systems Manufacturers Association, International ANSI/DASMA

AMERICAN NATIONAL STANDARD. Door & Access Systems Manufacturers Association, International ANSI/DASMA ANSI/DASMA 108-2005 AMERICAN NATIONAL STANDARD STANDARD METHOD FOR TESTING SECTIONAL GARAGE DOORS AND ROLLING DOORS: DETERMINATION OF STRUCTURAL PERFORMANCE UNDER UNIFORM STATIC AIR PRESSURE DIFFERENCE

More information

Accreditation No: LAB 041. Electrical Measurement & Test Laboratory (EMTL), PCSIR Labs. Complex, Lahore Pakistan.

Accreditation No: LAB 041. Electrical Measurement & Test Laboratory (EMTL), PCSIR Labs. Complex, Lahore Pakistan. Issue : 10/08/15 Accreditation No: Awarded to al Measurement & Test Laboratory (EMTL), PCSIR Labs. Complex, Lahore Pakistan. The scope of accreditation is in accordance with the standard specifications

More information

OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE. See Chapter 3, Section 3.01 for more information about point of entrance (POE).

OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE. See Chapter 3, Section 3.01 for more information about point of entrance (POE). 6.01 GENERAL OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE See Chapter 3, Section 3.01 for more information about point of entrance (POE). In all cases, the customer installs, owns, and maintains the

More information

TESTING APPLICATION STANDARD (TAS) CRITERIA FOR TESTING PRODUCTS SUBJECT TO CYCLIC WIND PRESSURE LOADING

TESTING APPLICATION STANDARD (TAS) CRITERIA FOR TESTING PRODUCTS SUBJECT TO CYCLIC WIND PRESSURE LOADING TESTING APPLICATION STANDARD (TAS) 203-94 CRITERIA FOR TESTING PRODUCTS SUBJECT TO CYCLIC WIND PRESSURE LOADING 1. 2. 3. Scope: 1.1 This protocol covers procedures for conducting the cyclic wind pressure

More information

TESTING APPLICATION STANDARD (TAS) CRITERIA FOR TESTING PRODUCTS SUBJECT TO CYCLIC WIND PRESSURE LOADING

TESTING APPLICATION STANDARD (TAS) CRITERIA FOR TESTING PRODUCTS SUBJECT TO CYCLIC WIND PRESSURE LOADING TESTING APPLICATION STANDARD (TAS) 203-94 CRITERIA FOR TESTING PRODUCTS SUBJECT TO CYCLIC WIND PRESSURE LOADING 1. 2. 3. Scope: 1.1 This protocol covers procedures for conducting the cyclic wind pressure

More information

AS/NZS 3000: 2018 Changes to Wiring Rules Standard

AS/NZS 3000: 2018 Changes to Wiring Rules Standard BUILDING SERVICES Ref: BCA 19-01 Current at January 2019 AS/NZS 3000: 2018 Changes to Wiring Rules Standard The new edition of AS/NZS 3000 Wiring Rules Standard (Electrical Installations) was published

More information

Reference Information:

Reference Information: Solar PV Simplified Standard Permit Application Requirements For: Central/String Inverter(s) & Micro-Inverter(s) Systems for One and Two Family Dwellings SCOPE: Use this application only for utility-interactive

More information

SECTION CONVECTORS

SECTION CONVECTORS SECTION 23 82 33 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph

More information

MIL-DTL-3655/15B w/amendment 2 18 March 2008 SUPERSEDING AMENDMENT 1 1 November 1999 DETAIL SPECIFICATION SHEET

MIL-DTL-3655/15B w/amendment 2 18 March 2008 SUPERSEDING AMENDMENT 1 1 November 1999 DETAIL SPECIFICATION SHEET INCH POUND MIL-DTL-3655/15B 18 March 2008 SUPERSEDING AMENDMENT 1 1 November 1999 DETAIL SPECIFICATION SHEET CONNECTOR, PLUG, ELECTRICAL, CLASS I (COAXIAL, SERIES TWIN, TWBNC) This specification is approved

More information

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd RAM ELEVATORS Elevator Electrical Planning Guide This guide is intended for people with an understanding of electricity. If you are not, please consult a licensed electrician as errors in application of

More information