1 COOK COUNTY STRUCTURED WIRING SYSTEM SPECIFICATION AND PLANNING GUIDE 1.0 CODES AND STANDARDS Materials and installation shall comply with codes, laws and ordinances of Federal, State, and local governing bodies having jurisdiction, also with the Cook County Structured Wiring System Specification and Planning Guide, hereinafter referred to as the Wiring Guide In case of differences between building codes, State and Federal laws, local ordinances and the Wiring Guide, the most stringent shall govern. 2.0 REFERENCE STANDARDS National Electrical Code (NFPA 70) Chicago Electrical Code The most recent revision to the listed Electronic Industries Association/Telecommunications Industry Association (EIA/TIA) and addendums or Technical Systems Bulletin (TSB) for the following standards: EIA/TIA 568 Commercial Building Telecommunications Standard EIA/TIA 569 Commercial Building Standard for Telecommunications Wiring Standard TIA/EIA 606 The Administration Standard for the Telecommunications Infrastructure TIA/EIA 607A Commercial Building Grounding/Bonding Requirements 3.0 STATION CABLES (UTP) Every station shall be wired with Cook County s standard configuration which consists of two category 5e cables and one category 3 cable. See attachments #2 & #3 for specifications on outlet layout and pin assignments. The contractor must perform all installations per manufacturer s specifications in order to satisfy any requirements to keep all warranties in effect, which shall include training for certification if required Enhanced Category 5e Cable is used for Cook County s data communications Cable shall be non-plenum riser rated, 4 pair, 24 AWG, listed per NEC Article , tested to 350 MHz and verified to exceed Category 5e, 100 OHM, power sum type cable and shall conform to EIA/TIA-568B.2. Other standards supported include: IEEE 802-3, IBASE-5, 10 Base-T; IEEE 802-5, 4MBPS, 15 MBPS token ring (100M, 104WS); 100 MBPS TP-PMD, 155 MBPS ATM Manufacturer: CommScope Part No: 55N4R (Specify blue 1 st data, white 2 nd data). 1

2 Exceptions to the data cable standard must be approved by the Department of Telecommunication Operations. A copy of the written approval shall be kept on file by the Category 3 Cable is used for Cook County s voice communications Cable shall be non plenum riser rated, 4 pair, 24 AWG, listed per NEC Article , gray in color and capable of supporting TIA/EIA 568B.2 Category 3, NEMA 24 AWG premise wire, IEEE Base T Ethernet, IEEE UTP Token Ring 4/16, ISDN voice grade and IBM Type 3 Media Manufacturer: Systimax Part No: Exceptions to the voice cable standard must be approved by Telecommunication Operations. A copy of the written approval shall be kept on file by the Department of Telecommunication Operations. 3.1 WIRELESS ACCESS POINTS & VIDEO CAMERAS Each wireless access points shall be wired with a single CAT 5E cable (yellow) which will be terminated onto a CAT 5E jack (yellow) on each end. In the IDF/MDF closet the CAT 5E jack will be snapped into a separate 24 port blank patch panel which is clearly marked as Wireless Access Points. See section for patch cord requirements a Each video camera shall be wired with a single CAT 5E cable (yellow) which will be terminated onto a CAT 5E jack (yellow) on each end. In the IDF/MDF closet the CAT 5E jack will be snapped into a separate 24 port blank patch panel which is clearly marked as Video Cameras. See section for patch cord requirements Cable Manufacturer: Commscope Part No: 55N4R (yellow) Jack Part No: CJ5E88TGYL Blank Patch Panel - 24 port snap in w/labels Part No: CPPL24WBLY CABLING ROUTING Cable rings and/or J-hooks utilized for cable routing shall not have a diameter larger than 3. All routing rings and hooks shall not exceed 75% of their capacity. 2

3 3.2.2 All cabling is to be routed parallel to structural walls. Where UTP Category-5e cable is being installed, the UTP data cable lengths are to be kept at two hundred ninety (290) feet or less. The Cabling Contractor shall give the Project Manager a written notice if a UTP data cable will exceed the two hundred ninety (290) feet length prior to installing the cable. Rerouting the cable will be reviewed Exposed cabling within the termination closet shall be neatly routed utilizing a cable tray. Smaller installations could use D-rings with approval of Telecommunication Operations Cable routing shall be such that the cable is not closer than six (6) inches from light fixture ballasts, motors, transformers and/or any other device capable of emitting electromagnetic interference Cables are not to be spliced or extended by any means without approval of Telecommunication Operations. 3.3 CABLE TERMINATIONS (UTP) Minimal cable jacket shall be removed for termination per the manufacturer s specifications The twist of each pair shall remain natural to final termination. Person terminating is not to add twist to pairs after the jacket has been removed Cabling Contractor shall refer to the manufacturer s recommended procedure for terminating to the connector. 3.4 CABLE TESTING (UTP) Cables are to be tested after the installation is complete. If for any reason the jack and/or patch panel termination are removed for additional work of any nature, the drop location is to be retested if previously tested. All cables associated with the drop location are to be retested Each data cable shall be end-to-end tested as outlined in TIA/EIA 568B-B.1 Section 11, for acceptance by the Project Manager. The test reports will be provided in either hard copy or electronic format. If provided in electronic format, the software necessary to view, evaluate, manipulate and print the data will be provided The test shall be performed after the final cable and device termination has been completed and the faceplate installed. The test shall be of the Permanent Link from completed end to completed end The test shall be conducted utilizing testers per TIA/EIA-568-B.1 chapter 11 and will be tested to a minimum of 100 megahertz. Each Permanent Link will be tested for: 3

4 a) Wire map b) Length c) Insertion loss d) Near-end crosstalk (NEXT) loss e) Power sum near-end crosstalk (PSNEXT) loss f) Equal-level far-end crosstalk (ELFEXT) g) Power sum equal-level far-end crosstalk (PSELFEXT) h) Return loss i) Propagation delay j) Delay skew 3.5 LABELING Both ends of each cable shall bear a secure label, which clearly identifies its cable number. The numbering format must be approved by Telecommunication Operations prior to the installation. See attachment #1 for typical station numbering format Cabling Contractor shall furnish and install printed labels (except for the allowance in section 3.4.5), handwritten labels are not acceptable. Lettering is to be 3/8 high, bold type Labels are to be placed on each end of all the cable and fiber jackets, on the workstation faceplates, and the patch panel faceplates Labels are to be made from self-adhesive backed labels, be smear resistant and not easily removed. Quality of labels and workmanship shall minimize the possibility of a label becoming loose or detached once affixed When 66 type terminations are used in telecommunications rooms, designations on the 66MI-50 blocks shall be neatly handwritten using a permanent Sharpie marker The Contractor shall provide cable records or jumper sheets, in a format acceptable to Telecommunication Operations, showing the pair assignments used for stations DATA HARDWARE Patch Cords Category 5e Patch Cords shall be factory terminated with enhanced performance modular plugs featuring a one-piece, tangle-free latch design eliminating the need for strain-relief boots to provide easy moves, adds and changes. They shall be constructed with enhanced 24 AWG stranded UTP cable, and shall have an average reduction of greater than 3.5dB in near end cross talk when compared to industry standard Category 5e patch cords tested in a worst-case, 100- meter channel to the TIA/EIA Category 5e standard. Each patch cord shall be 100% verified for wiring sequence and continuity at the factory The contractor shall supply two Category 5e patch cables (one 7 foot and one 10 foot) for each station that is wired. Unless otherwise specified the cable color shall be white. 4

5 Part No: UTPCH7Y UTPCH10Y The contractor shall supply three Category 5e patch cables (one 5 foot and two 7 foot) cables for each wireless access point that is wired. Unless otherwise specified the cable color shall be yellow Part No: UTPCH7YLY UTPCH5YLY Patch Panels Patch panels are 19 rack mountable, category 5e high density modular to 110 type connections wired T568B and utilized for the termination of data cables Horizontal wire management should be used above and below each patch panel Part No: DP245E88 TGY (24 Ports) DP485E88 TGY (48 Ports) CPPL48WBL ( 48 Port modular snap-in panel for wall mounted racks) UICMPP24BLY ( 24 Port blank patch panel for wireless access points) Wireless access points shall be terminated onto yellow Category 6 jacks (see section ) and snapped into a separate 24 port snap in patch panel port, 1U, Blank Patch Panel Part No: UICMPP24BLY Equipment in Racks Racks shall be kept at less than 50% fill with wiring equipment (LIU, patch panels, wire management, etc.). The remainder of the rack is reserved for network equipment The contractor shall supply a rack mounted UPS for each rack designated to have data equipment Specific UPS is to be determined by Telecommunication Operations based on equipment to be installed. Typical UPS is a Tripp Lite model # SU2200RTXL2UA for IDFs and model # SU10KRT3U for core equipment in MDFs The contractor shall supply an 8 port Midspan Power injector and mounting shelf for each IDF or MDF closet which has wireless access point wiring. 5

6 Compact 8 port midspan kit (includes unit, power supply, and cord) Part: DPOE8KIT Shelf for midspan 1 RU Part No: DPOESHELF The contractor shall supply 1 power strip with mounting bracket for each rack that is designated to have equipment mounted in it Power Strip 6 0 (12) Nema 5-20R outlet plug mold with single circuit (outlets on 6 center) - ivory. Manufacturer: WireMold Part No: 7712ULDC20R Mounting Bracket Z bracket for plug strip mounting black. Manufacturer: B-Line Part No: SK Equipment Rack: Standard Seven foot high 19 inch, EIA-TIA conforming, aluminum with two top angles and selfsupporting base Manufacturer: CPI Part No: (Black) (Gray) Equipment Rack: Wall Mounted Wall mounted rack shall be 38.5 high, 19 wide, black in color, and capable of supporting 200 lbs. with universal 5/8-5/8-1/2 alternating hole pattern Manufacturer: CPI Part No: CPI For larger wall mount installations rack shall be 73.5 high and 19 wide Manufacturer: CPI Part No: CPI Mini-Com modular patch panels supplied with 12 CFFPL type snap-in faceplates with labels (CPPL48WBL) shall be used on wall mounted racks. 6

7 Swing gate wall mounted racks are allowed with prior permission from Telecommunication Operations Equipment Rack: Four Post Four post racks will be used where necessary to support heavy equipment Manufacturer: CPI Part No: CPI Cable Management Ladder rack shall be installed from the top of the 19 rack to the wall Installations with multiple 19 racks shall have ladder rack installed to the top of all racks Horizontal and Vertical Cable Management A two-rack space panel manages front and rear cables, it includes a 3 x 3 duct on front and a 2 x 2 duct on rear. Black in color, 19 W and conforms to EIA rack standards Multiple 19 racks installed in the same row shall have horizontal wire management installed at the same height Multiple 19 racks installed in the same row shall have a vertical wire management installed between each rack Horizontal Part No: WMPH2E Vertical Part No: WMPV22E Side PART No: WMPV45E 2 Sided Center Bracket Kit Part No: WMPVCBE - Center Bracket Kit Grounding All installations must follow specifications set by the joint standard ANSI/EIA/TIA J STD 607- A for grounding and bonding. 5.0 STATION TERMINATION 7

8 5.0.0 Every station shall be wired with Cook County s standard configuration which consists of two category 5e cables and one category 3 cable. See attachments #2 & #3 for specifications on outlet layout and pin assignments Single Gang (4 module) Faceplate Mini-Com faceplates accommodate up to 4 ports using Mini-Com snap in modules Part No: CFPE4EI Ivory flush mount CBXC4EI-A Ivory surface mount Data Category 5e modular jack with lead frame, IDC contacts, 8 position-8 wire universal jack. Part No: CJ5E88TGOR (Cat 5e, Data 1, Orange) CJ5E88TGRD (Cat 5e, Data 2, Red) Voice One category 3 cable split between two jacks. Category 5 modular jacks with lead frame, IDC contacts, 8 position-8 wire universal jacks. See Attachment #3 for pin assignments Part No: CJ5E88TGEI (Cat 5 Voice Ivory) CJ5E88TGIG (Cat 5 Voice Light Gray) Blanks Snap into unused openings on faceplate Part No: CMBEI-X Flush Poke Through City of Chicago approved floor penetration method used to provide a flush mounted floor outlet for data outlets, with brass finish ring Manufacturer: Walker Part No: RC3 or RC4 series Poke Through Adapter

9 Part No: CHI2M * * - X (* * denotes color) Unless otherwise specified the standard color shall be black (BL) MDF/IDF Terminations type wiring blocks will be the primary choice for terminations The secondary choice for terminations shall be 110 type wiring blocks. Use of 110 wiring blocks must be reviewed and approved by Telecommunication Operations prior to installation Wiring Block Manufacturer: Siemon Part No: S66MI Manufacturer: Systimax Part No: 110AW2-100 (100 pr. With legs) Com Code: Wiring Block Biscuits Manufacturer: Systimax Part No: 110C-4 (4 pair for station terminations) Com Code Part No: 110C-5 (5 pair for riser terminations) Com Code Stand Off Bracket Manufacturer: Siemon Part No: S89B Backboard The contractor shall mount plywood on the entire surface of any wall that will have equipment mounted on it On New Construction of Telephone/Data rooms the contractor shall mount plywood on all four walls Plywood shall be ¾ (with proper fire rating) mounted smooth surface facing out. If Plywood is painted the fire rating stamp must be left exposed Distribution Rings 9

10 Manufacturer: Senior Industries Part No: SI 4753 small SI 4754 medium SI 4755 large OPTICAL FIBER CABLE Fiber Optic Cables Non Plenum Riser Rated Factory-fabricated, low-loss, glass-type fiber-optic cable shall be used The type of multi mode fiber (62.5 or 50 micron) will be determined by Telecommunication Operations based on job criteria: new installation vs. installed base, bandwidth requirements, special circumstances and/or needs Single mode fiber shall be installed alongside the multi mode fiber Fibers (50 micron, 62.5 micron, or single mode) shall not be mixed at a patch panel. Each type shall have its own panel and be clearly marked Number of fibers: TBD by Telecommunication Operations. Typical IDF shall have 24 strands of MM and 6 strands of SM. Typical MDF in a campus environment shall have 48 strands of MM and 24 strands of SM Multi Mode 50 micron: Manufacturer: CommScope Designation: 5M (150/800 meter) 5L (300/1020 meter) 5K (500/1100 meter) Multi Mode 62.5 micron: Manufacturer: CommScope Designation: 6F Optical Fiber Single Mode: Manufacturer: CommScope Designation: 8W (LightScope ZWP) Fiber Jumpers Fiber jumpers shall match the fiber installed (single mode, 50 or 62.5 micron multi mode) Fiber jumper colors: MM 62.5 micron Orange MM 50 micron Aqua SM - Yellow 10

11 Type of connector ends (ST-ST, ST-MTRJ, ST-SC, ST-LC, etc.) and length will be dictated by application and should be confirmed with Telecommunication Operations Fiber Optic Patch Panels Fiber optic panel shall be rack mountable with bend limiting management for maintaining bend radius The Fiber optic panel shall be mounted at the top of the 19 rack Fiber optic panel shall be factory assembled with adapters: ST adapters with phosphor bronze sleeves for 62.5 MM fiber. SC duplex adapters with ceramic split sleeve for 50 micron MM fiber. SC duplex adapters with ceramic split sleeve for SM fiber Fiber Rack Mount Enclosure. Part Number: Number: FRME * (* denotes number of rack spaces) Fiber Adapter Panels (62.5 MM). Part Number: FAP8WST Fiber Adapter Panels (50 micron MM). Part Number: FAP6WBLDSC Fiber Adapter Panels (SM) Part Number: FAP6WBUDSCZ Notify Telecommunication Operations for alternative solutions if space is an issue Fiber Optic End Connector Multimode ST pull proof fiber optic connectors for 62.5 MM. Multimode duplex SC pull proof fiber optic connectors for 50 micron MM. Singlemode SC pull proof fiber optic connector Innerduct Required for all fiber optic installations: Meets the requirements of UL standard test method No (version of UL1666 for riser raceways). Use with riser rated cables only. 11

12 Manufacturer: Thomas & Betts Part No: DF4X1C 1 inch orange with pull tape Plenum Innerduct Adapter: Aluminum adapters used to join sections of corrugated innerduct Manufacturer: Thomas & Betts Part No: A340F Plenum Coupler Metallic Terminal Adapter: Connects innerduct to pullboxes Manufacturer: Thomas & Betts Part No: E-147F (1 inch) 6.1 FIBER OPTIC CABLE TESTING Cables are to be tested after the installation is complete Prior to usage, all test equipment and components must be calibrated in accordance with manufacturers published procedures Test the cable installation with an optical time domain reflectometer (OTDR) with strip chart recording or trace saving capability and anomaly resolution to within one foot in runs up to 1,000 feet in length. OTDR traces for each link will be provided with the final certification documentation. IF the OTDR traces are provided in electronic format, the software necessary to view and evaluate the traces will also be provided. Test all cable segments for faulty connectors, splices, and terminations and for the integrity of the cable and its component parts. Replace malfunctioning or damaged items with new materials, then retest until satisfactory performance is achieved The test shall be performed after the final cable termination has been completed and each strand has been installed in the fiber termination panel coupler. The test shall be of the Link Segment from termination panel to termination panel or faceplate to drop location. Patch cables utilized for test equipment connections are not to be a figured as part the db loss. Testing shall be done according to ANSI/TIA/EIA Chapter 11.3 Optical Fiber transmission performance and test requirements Test shall be conducted utilizing a light loss fiber optic tester. The test shall indicate at a minimum: a. Cable length b. db loss. 12

13 6.1.6 Cable loss acceptance shall be figured to the cable manufacturer s calculated db loss per km plus an average 0.75 per connector set and 0.3 db loss per splice. Reference ANSI/TIA/EIA-568- B VERTICAL RISER Vertical conduits shall be supported by heavy wrought iron clamps or collars anchored to construction at each floor Provide sleeves and wireways where they pass through walls or floors Sleeves shall not be less than 1 larger than outside dimension of raceways Floor sleeves shall be galvanized steel pipe and stubbed 3 above floor. Unused sleeves Shall be capped Provide 3 high concrete curbs around openings through floors where slots are used Sleeves through equipment room walls and floors, sound rooms, private offices, classrooms and similar quiet areas shall have the net openings packed with glass fiber insulation and both ends of sleeve caulked with waterproof mastic to prevent noise, dirt, air and water transmission Where conduits pass through floor, caulk sleeves with oakum and lead wool at both ends to ensure waterproofing around pipe Pack or fill sleeves and openings to prevent leakage of liquid and the spread of fire and smoke Fire rated walls/floors shall be fire stopped to match rating of original construction. Materials and methods shall comply with Underwriters Laboratories Directory Fire Resistance Vol. 1 and Vol Protect conduct and wire way openings against the entrance of foreign matter by means of plugs or caps. Cover fixtures, materials, equipment, and devices furnished or installed under this section or otherwise protect against damage, both before and after installation. Fixtures, materials, equipment, or devices damaged prior to final acceptance of the work shall be restored to their original condition or replaced. 7.1 METALLIC CONDUIT AND FITTINGS Conduits shall be ¾ minimum size, unless indicated otherwise Electrical metallic tubing (EMT) thinwall conduit shall be 2 and smaller. EMT shall be hotdipped galvanized or electro-galvanized steel. 13

14 7.1.3 Intermediate grade conduit (IMC) and heavy-wall conduit (HWC) shall be hot-dipped galvanized or electro-galvanized steel IMC and HWG conduit runs shall be made up with threaded joints and fittings Conduit and EMT fittings shall be made of steel or malleable iron Die-cast fittings of pot metal shall not be accepted Conduits shall be run concealed. Where exposed conduit runs are shown or required, they shall run parallel to building construction and shall be suitably supported at required intervals Ends of conduits shall be equipped with insulating bushings for 1 and smaller and insulated metallic bushings for 1-1/4 and larger. Ends of conduit shall be temporarily capped prior to installation and during construction to exclude foreign material Conduits run to and from cabinets shall be run neatly, in accurate manner, and shall emerge from the floors and ceilings at right angles thereto Conduit risers shall be supported on the building structure, using appropriate supports only Conduit stub-ups and stub-downs shall be arranged in a neat and orderly manner and shall emerge at right angles to floors or ceilings Conduits shall be separated by at least 12 from parallel runs of steam or hot water piping Conduits and other electrical items shall not be fastened or supported from ventilating ducts, but shall be separately supported. The Engineer shall review the method of supporting and details of the supporting members. In no case shall screws penetrate the sheet metals of the ducts Exposed conduit run on surface shall be supported according to code and within 3-0 of each outlet, junction box, or cabinet, by galvanized malleable conduit clamps and clamp backs. Suspended conduits shall be supported every 5-0 by conduit hangers and round rods or, where 2 or more conduits are run parallel, by trapeze hangers suitably braced to prevent swaying All conduit and raceway shall be bonded to the telecommunications ground All bends or turns shall have a minimum radius of 10 times the diameter of the conduit Provide an insulating bushing at the termination of each conduit Install a pull string or wire in each empty conduit. Leave one pull string in each filled conduit Total length of conduit run from workstation outlet to closet shall not exceed two hundred ninety (290) feet. 14

15 All pullboxes shall be placed in a straight section of conduit. Do not use pullboxes in lieu of a bend A pull box is required every 100 feet Provide hinged access panel in the ceiling below all pullboxes. Coordinate exact location with Engineer. 7.2 BUSHINGS Bushings for 1 conduit and smaller shall be self-extinguishing thermoplastic type 150 degrees C temperature rating Bushings for 1-1/4 conduit and larger shall be malleable iron body with 150 degrees C insulating ring. Insulating material shall be locked in place and non-removable. 8.0 OUTLET BOXES (FOR RECESSED OUTLETS) Outlet boxes shall be galvanized pressed steel, knockout type with suitable plaster rings and covers or plates Unused knockout holes shall remain closed and those opened by error shall be closed with snap-in blanks Outlet boxes shall not be smaller than required by code for the number and size of wires to be installed. Outlet boxes shall be 2 ½ deep minimum, 4 square Outlet boxes for exposed interior work and all exterior work shall be cast metal or alloy with screw-fastened, covers, gaskets and with threaded conduit connections. Fasteners shall be stainless steel or brass. Manufacturers: Adalet, Appleton, Crouse-Hinds, and Pyle National. 9.0 FIRE RATED FLOOR FITTINGS Where floor fittings require penetration of the floor slab, they shall be a standard device listed by UL for the purpose and have a UL fire rating of 4 hours The service fittings above the floor shall be finished to match existing hardware and be suitable for specified communications devices The junction box in the ceiling space below shall be suitable to accommodate power and communications in separated sections. 15

16 10.0 INSTALLATION OF JUNCTION AND PULL BOXES Install junction and pull boxes to be accessible A pull box ie required every 100 feet Boxes in plenum ceilings shall comply with code requirements On new construction As Built drawings must be supplied showing cable runs and pull boxes INSTALLATION OF OUTLET BOXES Outlet boxes shall be installed true and plumb, so that the covers or plates will be level and at uniform elevations for the types of outlets contained Outlet box locations as indicated shall be considered to be approximate only. Determine exact locations from field instructions Outlet boxes in plenum ceilings shall comply with code requirement The outlet boxes shall be staggered for wiring devices located at both sides of a common partition to prevent sound transmission Outlet boxes for recessed telecommunication outlets shall be 4 square x 2 ½ deep with single gang trim rings, placed in a horizontal position FLOOR CORES AND WALL OPENINGS All cores and openings are to be sleeved when utilizing a metal conduit properly sealed between the outer conduit surface and the hole The conduit sleeve is to extend a minimum of 3 from the wall surface and to be firmly supported to prevent movement Each end of the conduit sleeve is to have a standard bushing for the protection of the cables routed within 13.0 HOUSEKEEPING The Cabling Contractor shall take all necessary precautions and provide all necessary protection and enclosures to insure that dust and debris created as a result of the installation does not get out of the work area and into other parts of the building(s). 16

17 The Cabling Contractor shall have on site a portable shop vacuum cleaner capable of cleaning up all debris and dust caused by the installation. All finished surfaces are to be kept clean of any installation debris and dust The Cabling Contractor shall, at all times, keep the premises free from the accumulation of waste material and/or rubbish caused by their installation work. The Cabling Contractor, at their expense, off the building site shall suitably and legally dispose of all waste material and/or rubbish The areas of work are to be cleaned of any all installation dust and debris at the end of the day s work. Drop cloths are to be used to protect all furniture from damage, and surfaces are to be cleaned to their existing conditions The Cabling Contractor shall provide and maintain suitable barriers to regulate access to assure public safety and to protect the work in progress At the completion of the project, the Cabling Contractor shall: a) remove all their waste materials and rubbish from and about the installation site; b) remove all their tools, installation equipment and surplus materials and c) leave finished areas free of installation dust and non-finished areas broom clean INVENTORY Provide written list of all system components, and approved shop drawings (3 sets) and record As-Built drawings (3 sets) of complete installed system. One set of as-built drawings to be provided in electronic (CADD) format WARRANTY All work shall be warranted to be free from defects. Any defective materials or workmanship, as well as damage to the work of all trades resulting from same, shall be replaced or repaired as directed for the duration of stipulated warrantee periods The Contractor must be certified by the manufacturer of the installed product and will provide proof of all certifications with response The duration of warrantee periods following the date of acceptance of the work shall be, for work not otherwise specified, fifteen (15) years for both parts and labor The date of acceptance shall be the date of final payment for the work or the date of a formal notice of acceptance, whichever is earlier PROHIBITED SURFACES 17

18 Bureau of Technology Revised November, Any materials that are considered to be unsafe to life or the environment, such as asbestos, are not to be used or installed UNION LABOR All cable and equipment installation work is to be performed by IBEW Local 134 union members. Typical IDF Telecommunications Room Adjust room size for site capacity. Final design subject to approval 10'-0" 240v (8.5 ft) AFF 240v TGB Bussbar Line Walls with 3/4" fireproof plywood 240v 240v 110v 20A 240v 110v 20A 240v 8'-0" Sleeves or conduits with bushing & firestop (8.5 ft) AFF 240v Sleeves or conduits with bushing & firestop 240v 240v HVAC Supply/Return 18

19 ATTACHMENT #1 STATION NUMBERING FORMAT X - X - XXX FLOOR # RISER DESIGNATION (E) EAST, (W) - WEST CABLE NUMBER PER IDF NOTES IDENTIFICATION FORMAT SHALL BE APPROVED BY CENTRAL SERVICES BEFORE INSTALLATION. Example: CABLE NUMBER 12 IN EAST IDF ON 1 st FLOOR: 1 E 12 CABLE NUMBER 33 IN WEST IDF ON 4 th FLOOR: 4 W -33 PROVIDE IDENTIFICATION FOR EACH STATION AT BOTH THE OUTLET AND THE HORIZONTAL TERMINATION POINT (PATCH PANEL OR 66 BLOCK). PROVIDE IDENTIFICATION TAG ON THE FRONT AND THE TOP OF EACH OUTLET FACEPLATE. 19

20 ATTACHMENT #2 STATION OUTLET CONFIGURATION OUTLET CONFIGURATION JACK CABLE PORT TYPE JACK COLOR TYPE JACKET COLOR APPLICATION 1 RJ 45 ORANGE 4-PAIR CAT-5E BLUE DATA-1 (D1) 2 RJ 45 RED 4-PAIR CAT-5E WHITE DATA-2 (D2) 3 RJ 45 IVORY 4-PAIR CAT-3 GREY VOICE-1 (V1) 4 RJ 45 LIGHT GREY NOTE 1 NOTE 1 VOICE-2 (V2) NOTES: 1. PORTS V1 AND V2 ARE WIRED FROM ONE SPLIT CAT-3 CABLE. REFER TO ATTACHMENT #3 FOR PIN CONFIGURATION. X-X-XXX IDENTIFICATION TAG TOP EDGE AND FRONT X-X-XXX X-X-XXX PORT FACEPLATE (TYPICAL) X-X-XXX PORT NUMBER (SEE CHART ABOVE) 1 2 IF MOUNTED HORIZONTALLY WALL PHONE JACK, DATA WIRES SPARE BEHIND JACK. 20

21 ATTACHMENT #3 VOICE-1 AND VOICE-2 PIN ASSIGNMENTS 4-PAIR VOICE CABLE GREEN / WHITE WHITE / BROWN BROWN / WHITE WHITE / GREEN ORANGE / WHITE WHITE / ORANGE WHITE / BLUE BLUE / WHITE VOICE-1 VOICE-2 21

COMMUNICATIONS CABLING SECTION COMMUNICATIONS CABLING PART 1 - GENERAL

COMMUNICATIONS CABLING SECTION COMMUNICATIONS CABLING PART 1 - GENERAL 13686.00 COMMUNICATIONS CABLING 271513-1 1.1 RELATED SECTIONS SECTION 27 1513 COMMUNICATIONS CABLING PART 1 - GENERAL A. Drawings and general provisions of the Contract, including General and Supplementary

More information

A. Drawings and general provisions of the Contract, including General Conditions and Division 1 Specification sections, apply to work of this Section.

A. Drawings and general provisions of the Contract, including General Conditions and Division 1 Specification sections, apply to work of this Section. SECTION 27 00 00 TELECOMMUNICATIONS CABLE PLANT 1. GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 1 Specification sections,

More information

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS (NOTE TO DESIGNER: These Specifications are basic minimum criteria to be met in preparing the final specifications for this section, which is the responsibility of the Designer.) PART 1 - GENERAL 1.1 SECTION

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

SECTION HORIZONTAL CABLING

SECTION HORIZONTAL CABLING PART 1 - GENERAL 1.1 SUMMARY SCOPE OF WORK SECTION 25160 HORIZONTAL CABLING 1. Horizontal cabling is the portion of the cabling system that extends from the work area to the Telecommunications Room or

More information

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 05 28 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. AFC Cable Systems, Inc. Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-MC

More information

Kaf-Tech Product Specification

Kaf-Tech Product Specification Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-LUMINARY CABLE

More information

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS SECTION 270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Communications equipment coordination and installation. 2. Sleeves for pathways and cables. 3. Raceway

More information

A. Drawings and general provisions of the Contract, including General Conditions and Division 1 Specification sections, apply to work of this Section.

A. Drawings and general provisions of the Contract, including General Conditions and Division 1 Specification sections, apply to work of this Section. SECTION 270000 TELECOMMUNICATIONS CABLE PLANT 1. GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 1 Specification sections, apply

More information

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS SECTION 16711-27 05 28.33 PART 1 - GENERAL 1.01 SUMMARY A. This section includes Labor, materials and equipment necessary to complete the installation required for the items specified under this Section,

More information

TABLE OF CONTENTS DIVISION 27 - COMMUNICATIONS

TABLE OF CONTENTS DIVISION 27 - COMMUNICATIONS TABLE OF CONTENTS DIVISION 27 - COMMUNICATIONS 27 00 00 COMMUNICATIONS... 2 27 00 01 GENERAL... 2 27 00 02 REFERENCES, REGULATORY REQUIREMENTS... 2 27 00 03 REFERENCES, RELATED SECTIONS of the SPECIFICATIONS...

More information

1 data PIC location (with 2 ports) typically asf for multiple staff members

1 data PIC location (with 2 ports) typically asf for multiple staff members 1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new

More information

Communications Page 1 of 9

Communications Page 1 of 9 Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a

More information

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS 1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new

More information

SECTION PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY

SECTION PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY SECTION 280528 - PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Metal conduits, tubing, and fittings. 2. Nonmetallic conduits, tubing, and fittings. 3.

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 26 ELECTRICAL SECTION RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 26 ELECTRICAL SECTION RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS SECTION 260533 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes raceways, fittings, boxes, enclosures, and cabinets for electrical wiring. B. See Division

More information

SECTION CONDUIT AND BOXES

SECTION CONDUIT AND BOXES PART 1 - GENERAL 1.01 SUMMARY SECTION 27 05 33 CONDUIT AND BOXES A. This Section includes specific requirements for conduits and boxes within the Communications Pathway System as defined in Division 27

More information

The University of Texas at Austin September 30, 2011

The University of Texas at Austin September 30, 2011 SECTION 27 11 00 COMMUNICATIONS EQUIPMENT ROOM FITTINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes basic communications room requirements. Refer to T series drawings for specific communication

More information

SECTION A. Underwriters Laboratories, Inc., listed and NEC approved

SECTION A. Underwriters Laboratories, Inc., listed and NEC approved PART 1 GENERAL 1.01 DESCRIPTION A. Provide all raceways, fittings, and boxes of specified type required for complete project. Install all systems in raceways unless specifically noted otherwise. Provide

More information

DTW Works Master Specification Version 2006 Issued 2006/08/01 Section Data System Page 1 of 7

DTW Works Master Specification Version 2006 Issued 2006/08/01 Section Data System Page 1 of 7 Issued 2006/08/01 Section 16743 Data System Page 1 of 7 PART 1 GENERAL 1.1 SYSTEM DESCRIPTION.1 Data system includes data outlets and wiring for office and school applications..2 Data system equipment

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 260533 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes raceways, fittings, boxes, enclosures, cabinets, and track busway for electrical wiring.

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section

More information

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0528 Pathways. Page 1 of 6

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0528 Pathways. Page 1 of 6 1 General 1.1 Scope of work 1.1.1 The Contractor is held responsible to be familiar with the provisions contained herein and with other Sections of this Specification as applicable to the completion of

More information

GLENWOOD PLACE 2 MAR 2015

GLENWOOD PLACE 2 MAR 2015 PART 1 - GENERAL 1.01 SUMMARY: SECTION 16110 RACEWAYS A. Description: 1. Provide continuous conduit systems - beginning at the service point, to all distribution equipment and to every outlet and piece

More information

The following sections are included in Division 27: Section : Underground Ducts and Raceways for Communication SysteMS 283

The following sections are included in Division 27: Section : Underground Ducts and Raceways for Communication SysteMS 283 P a r t IV: De s i g n St a n d a r d s 279 Division 27: Communications Ge n e ra l Professionals shall verify that all applicable portions of these standards are incorporated into the final construction

More information

SECTION RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

SECTION RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS SECTION 26 05 33 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes conduit and tubing, surface raceways, wireways, outlet boxes, pull and junction boxes, and handholes.

More information

Flush Service Floor Boxes

Flush Service Floor Boxes Flush Service Floor Boxes PRODUCT SPECIFICATION: Flush Service Floor Boxes PART 1: Overview Considerations when writing specifications: Floor boxes are manufactured in various sizes, configurations and

More information

1510 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

1510 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS SECTION 260533-RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section includes conduit raceways, and tubing, surface raceways, wireways, outlet boxes, pull and junction boxes, and

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

Request for Proposal

Request for Proposal Request for Proposal Dillon School District Three Telecommunications Cabling for Latta Middle School Contact: Robert McIntyre, Director of Technology (843) 752-7101 office phone (843)752-2081 office fax

More information

SECTION COMMUNICATIONS EQUIPMENT ROOM FITTINGS

SECTION COMMUNICATIONS EQUIPMENT ROOM FITTINGS SECTION 271100 COMMUNICATIONS EQUIPMENT ROOM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 00 and

More information

Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington

Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington Rev 062017 Provided by UNCW Physical Security and Access OVERVIEW... 3 CABLE INSTALLATION... 3

More information

Youngstown State University

Youngstown State University SECTION 260533 - RACEWAYS PART 1 - GENERAL SUMMARY A. This section includes raceways for electrical wiring. Types of raceways in this section include the following: 1. Flexible metal conduit 2. Liquid

More information

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS PART 1 - GENERAL 01.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this Section.

More information

c. Army Reserve Design Process Submittal Requirements (DPSR) d. USARC G-2/6 IT Design Criteria Updates, 26 March 2013 ( ENCLOSURE 1)

c. Army Reserve Design Process Submittal Requirements (DPSR) d. USARC G-2/6 IT Design Criteria Updates, 26 March 2013 ( ENCLOSURE 1) CELRL-PM-R March ARCOS BULLETIN - SUBJECT: IT Design. REFERENCE: a. UFC --0, Army Reserve Facilities b. Army Reserve IT Manual, Change c. Army Reserve Design Process Submittal Requirements (DPSR) d. USARC

More information

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC).

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC). SECTION 16111 CONDUITS PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide conduits, complete, as shown, specified or required per Contract Documents. Principal items include: 1. Rigid aluminum conduit.

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

SECTION RACEWAYS

SECTION RACEWAYS SECTION 16110 RACEWAYS PART 1 GENERAL 1.1 SYSTEM DESCRIPTION A. Provide a complete raceway system suitable for receiving wire and cable and continuous from outlet to outlet. System shall be complete with

More information

Portland State University OIT Networking & Telecommunications Services

Portland State University OIT Networking & Telecommunications Services Portland State University OIT Networking & Telecommunications Services TELECOMMUNICATIONS CABLING/WIRING INSTALLATION & RELATED FACILITIES STANDARDS 2009-2011 Introduction The Office of Information Technology/

More information

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification

More information

1. General Telecommunications Design Considerations

1. General Telecommunications Design Considerations 1. General Telecommunications Design Considerations 1.1. Entrance Point and Main Telecommunications Room Design 1.1.1. Conduit entrances typically consist of three 4 conduits. Conduit quantities are determined

More information

RFB for Fiber Optic Cabling Attachment A Project Scope October 6, 2016

RFB for Fiber Optic Cabling Attachment A Project Scope October 6, 2016 RFB for Fiber Optic Cabling Attachment A Project Scope October 6, 2016 1.0 Project Description 1.1 General 1.1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions,

More information

UMass Amherst Information Technology. Design and Construction Guidelines

UMass Amherst Information Technology. Design and Construction Guidelines UMass Amherst Information Technology Design and Construction Guidelines December 2018 2.13 INFORMATION TECHNOLOGY AND COMMUNICATIONS 2.13.1. General A. UMass IT/ Cable Engineering Services (CES) is here

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION SECTION 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 - GENERAL 1.1 SUMMARY A. This section supplements all sections in this division, including pipe, fittings, valves, and connections for sprinkler

More information

SECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes.

SECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes. SECTION 16111 CONDUITS AND BOXES 1.01 DESCRIPTION PART 1- GENERAL A. Work covered by this section includes the furnishing and installation of conduits and boxes. 1.02 SUBMITTALS A. The Contractor shall

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION TELECOMMUNICATIONS SYSTEMS

SECTION TELECOMMUNICATIONS SYSTEMS SECTION 16742 TELECOMMUNICATIONS SYSTEMS The following guidelines are provided for installation of telecommunications infrastructure for Dartmouth College supported by Computing, Network Services. These

More information

Design Standard Conduit for Electrical Systems

Design Standard Conduit for Electrical Systems Design Standard Purpose: This design standard has the purpose of creating a consistent application for the installation of conduits throughout the East Side Union High School District, therefore achieving

More information

BASIC ELECTRICAL MATERIALS AND METHODS

BASIC ELECTRICAL MATERIALS AND METHODS BASIC ELECTRICAL MATERIALS AND METHODS General Scope Provide raceways for all wiring. All exposed and concealed wiring (including low voltage control, telecommunications, and power limited wiring) shall

More information

SECTION CONDUITS AND BOXES

SECTION CONDUITS AND BOXES PART 1 GENERAL 1.01 DESCRIPTION A. Work covered by this section includes the furnishing and installation of conduits and boxes and the testing of the completed electrical systems 1.02 SUBMITTALS A. The

More information

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING 2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending

More information

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets Seismic Frame Two-Post Rack Page 11-3 Seismic Protection Products - Racks Page 11-6 Seismic Protection Products - Runway Page 11-8 Seismic

More information

SECTION OUTLET, PULL, AND JUNCTION BOXES

SECTION OUTLET, PULL, AND JUNCTION BOXES SECTION 16131 OUTLET, PULL, AND JUNCTION BOXES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16112 - Raceways and Conduits. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:

More information

SECTION INTERIOR COMMUNICATION PATHWAYS

SECTION INTERIOR COMMUNICATION PATHWAYS PART 1 - GENERAL 1.1 SUMMARY SCOPE SECTION 25130 INTERIOR COMMUNICATION PATHWAYS 1. This section includes minimum requirements for the following: a) Interior Horizontal Cabling Communication Pathways b)

More information

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017 SECTION 27 05 26 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

VERTICALLY MOUNTED S210 BLOCKS (page 7.7) S210 TOWER SYSTEM (pages ) Mounting Options Wall 89D Bracket Wall 19 inch Rack 23 or 35 inch Frame

VERTICALLY MOUNTED S210 BLOCKS (page 7.7) S210 TOWER SYSTEM (pages ) Mounting Options Wall 89D Bracket Wall 19 inch Rack 23 or 35 inch Frame PRODUCTS CONNECTION SYSTEM (pages 7.2 7.7) VERTICALLY MOUNTED BLOCKS (page 7.7) TOWER SYSTEM (pages 7.4 7.5) FIELD TERMINATED 19 INCH PANELS (pages 7.6 7.7) XLBET FRAMES (pages 8.8 8.9) Racks Product Stard

More information

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers. SECTION 230529 - HANGERS AND SUPPORTS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe hangers and supports. 2. Hanger rods. 3. Inserts. 4. Flashing. 5. Sleeves. 6. Mechanical sleeve seals. 7. Firestopping

More information

FORMAT Technical specifications content and numbering system shall be based on 2004 CSI MasterFormat.

FORMAT Technical specifications content and numbering system shall be based on 2004 CSI MasterFormat. DIVISION 27 00 00 COMMUNICATIONS FORMAT Technical specifications content and numbering system shall be based on 2004 CSI MasterFormat. BASIS OF DESIGN Design guidelines supplement building, fire, and other

More information

SECTION RACEWAYS AND BOXES FOR ELECTRONIC SAFETY AND SECURITY

SECTION RACEWAYS AND BOXES FOR ELECTRONIC SAFETY AND SECURITY SECTION 28 05 33 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies the furnishing, installation, and connection of conduit, fittings, and boxes to form complete, coordinated, raceway systems.

More information

RESEARCH AND TECHNOLOGY BUILDING RENOVATION MAY 18, 2009 SECTION COMMUNICATIONS

RESEARCH AND TECHNOLOGY BUILDING RENOVATION MAY 18, 2009 SECTION COMMUNICATIONS SECTION 27 00 00 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following items for wiring systems used as signal pathways for voice and highspeed data transmission: 1. Communication outlets.

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

B. Provide a complete conduit system with associated couplings, connectors, and fittings.

B. Provide a complete conduit system with associated couplings, connectors, and fittings. SECTION 26 05 33 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 260500. B. Provide a complete conduit system with associated couplings, connectors, and fittings. 1.02 RELATED

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14 SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Raceway and Boxes for Electrical Systems Page 1 of 7

Raceway and Boxes for Electrical Systems Page 1 of 7 Last Update: May 12, 2017 A. Conduits: Page 1 of 7 1. All conductors for each and every electrical system shall be installed in a raceway except communications and A/V systems which shall have stubs to

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 GROUNDING AND BONDING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS SECTION 13096 MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS Prepared by: NELCO 125 Chenoweth Lane, Ste. 206 Louisville, KY 40207 (502) 899-3726 13096-1 MODULAR GALVANIZED RF SHIELDING SYSTEM PART

More information

ELECTRICAL SECTION 2

ELECTRICAL SECTION 2 ELECTRICAL SECTION 2 COMMON WORK RESULTS FOR ELECTRICAL PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. This Section includes raceways, conductors and cables, grounding materials, boxes, electrical identification

More information

COMMUNICATIONS EQUIPMENT ROOM FITTINGS

COMMUNICATIONS EQUIPMENT ROOM FITTINGS SECTION 271100 - COMMUNICATIONS EQUIPMENT ROOMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 16060 Grounding and Bonding This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or

More information

EXTERIOR ASSIST PHONES REVISIONS Summary of Change Date 4/11/11 Blue Light Updated Manufacturer Information

EXTERIOR ASSIST PHONES REVISIONS Summary of Change Date 4/11/11 Blue Light Updated Manufacturer Information EXTERIOR ASSIST PHONES REVISIONS Revision Section Summary of Change Date 4/11/11 Blue Light Updated Manufacturer Information UNIVERSITY CONTACT: Network Services (302) 831-3722 EXTERIOR ASSIST PHONES Table

More information

A. This Section includes steel cable trays and accessories.

A. This Section includes steel cable trays and accessories. SECTION 26 05 36 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 092216 - NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION PLUMBING PIPING SYSTEMS

SECTION PLUMBING PIPING SYSTEMS SECTION 15300 PLUMBING PIPING SYSTEMS PART 1 - GENERAL 1.01 SPECIAL NOTICE A. Each contractor shall read all relevant documents, become familiar with the job, the scope of work, type of general construction,

More information

Design Guidelines for Facilities Construction:

Design Guidelines for Facilities Construction: Western Michigan University Office of Information Technology & Campus Planning, Design & Construction Design Guidelines for Facilities Construction: DESIGN GUIDELINE DG17-1 Outside / Inter-building Systems

More information

City and County of San Francisco CONTRACT No A SFO - Data Center, Building 60 SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

City and County of San Francisco CONTRACT No A SFO - Data Center, Building 60 SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Cable Trays for Communications Cabling 1. Cable Trays 2. Cable Runways 3. Basket Tray B. Cable Tray Support

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

A. Basket Cable Tray: A fabricated structure consisting of wire mesh bottom and side rails.

A. Basket Cable Tray: A fabricated structure consisting of wire mesh bottom and side rails. SECTION 27 11 00 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

PATHWAYS FOR COMMUNICATIONS SYSTEMS

PATHWAYS FOR COMMUNICATIONS SYSTEMS 270528 PATHWAYS FOR PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all labor, materials, and equipment for the complete installation of work called for in the Contract Documents. 1.2 SCOPE OF WORK A. This

More information

A. Section includes busway and fittings including plug-in units.

A. Section includes busway and fittings including plug-in units. SECTION 26 25 00 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes busway and fittings including plug-in units. 1.2 REFERENCES A. Institute of Electrical and Electronics Engineers:

More information

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS PART 1 GENERAL 1.01 DESCRIPTION SECTION 27-05-33 CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS A. The work covered by this section of the Specifications includes all labor necessary to perform and

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 102239 - FOLDING PANEL PARTITIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

1. Hangers and supports for electrical equipment and systems.

1. Hangers and supports for electrical equipment and systems. PART 1 - GENERAL... 1 1.1 RELATED DOCUMENTS... 1 1.2 SUMMARY... 1 1.3 DEFINITIONS... 1 1.4 PERFORMANCE REQUIREMENTS... 1 1.5 SUBMITTALS... 2 1.6 QUALITY ASSURANCE... 2 1.7 COORDINATION... 2 PART 2 - PRODUCTS...

More information

SECTION COMMON WORK RESULTS FOR COMMUNICATIONS

SECTION COMMON WORK RESULTS FOR COMMUNICATIONS SECTION 27 05 00 COMMON WORK RESULTS FOR COMMUNICATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS. A. ANSI C Electrical Rigid Steel Conduit, Zinc Coated.

SECTION RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS. A. ANSI C Electrical Rigid Steel Conduit, Zinc Coated. SECTION 26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS PART 1 -GENERAL 1.1 SUMMARY A. Section includes conduit and tubing, surface raceways, wireways, outlet boxes, pull and junction boxes, and handholes.

More information

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION A. This section specifies the furnishing, installation, and connection of precast manholes and pullboxes with ducts

More information

LACCD INFORMATION TECHNOLOGY STANDARD

LACCD INFORMATION TECHNOLOGY STANDARD Page 1 of 21 TABLE OF CONTENTS I. Instructions... 3 II. Purpose... 3 III. Scope... 4 IV. Key Terms... 4 V. Standards... 4 1. Section 1: STRUCTURED CABLING SYSTEM GENERAL REQUIREMENTS... 4 2. Section 2:

More information

OREGON UNIVERSITY SYSTEM STANDARD PUBLIC IMPROVEMENT CONTRACT BID FORM. FROM: Name of Contractor

OREGON UNIVERSITY SYSTEM STANDARD PUBLIC IMPROVEMENT CONTRACT BID FORM. FROM: Name of Contractor OREGON UNIVERSITY SYSTEM STANDARD PUBLIC IMPROVEMENT CONTRACT BID FORM OUS CAMPUS: PROJECT: BID CLOSING: University of Oregon Chiles Hall 3 rd Floor Business Technology Center Improvements Project June

More information

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 11 00 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: SECTION 27 05 33 SPEC WRITER NOTES: 1. Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text

More information

Telecommunications Cabling System Technical Specification

Telecommunications Cabling System Technical Specification 1.0 INTRODUCTION Telecommunications Cabling System Technical Specification 1.1 PURPOSE The intent of this document is to provide a standard specification that will be used for all University of Northern

More information

SECTION DUCTS PART 1 GENERAL 1.01 SUMMARY

SECTION DUCTS PART 1 GENERAL 1.01 SUMMARY 1 1 1 1 1 1 1 1 0 1 0 1 SECTION 1 DUCTS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Duct Materials.. Insulated flexible ducts.. Single wall spiral round ducts.. Ductwork fabrication.. Duct cleaning.

More information

SECTION CHAIN LINK FENCING

SECTION CHAIN LINK FENCING SECTION 02835 - CHAIN LINK FENCING 1.0 GENERAL 1.1 Furnish and install chain link fencing complete in place with gates and accessories as specified herein and as shown on the Contract Drawings. 1.2 Reference

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR GALVANIZED SYSTEM PART

More information

LOW VOLTAGE INSTALLATION SPECIFICATIONS AND STANDARDS. All equipment shall be mounted with Phillips screws, unless otherwise specified.

LOW VOLTAGE INSTALLATION SPECIFICATIONS AND STANDARDS. All equipment shall be mounted with Phillips screws, unless otherwise specified. LOW VOLTAGE INSTALLATION SPECIFICATIONS AND STANDARDS DEFINITIONS 1. A rack is defined as a sideless, bottomless, topless open-rammed support structure for equipment. A rack may be mounted to a wall, ceiling,

More information

SECTION TELECOMMUNICATIONS GENERAL REQUIREMENTS

SECTION TELECOMMUNICATIONS GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Scope of Work B. Other Affected Trades C. Codes and Standards D. General Requirements and Conditions E. Telecommunication Contractor Qualifications F. Qualifications

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

Please check with your local inspection authority for any additional requirements before installation.

Please check with your local inspection authority for any additional requirements before installation. Specifications for Residential Underground Electric Service Installation This brochure addresses most typical residential underground service installations. Variances for the following specifications must

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1 SECTION SUPPORTING DEVICES

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1 SECTION SUPPORTING DEVICES KNOXVILLE, TENNESSEE SECTION 26 05 29 PAGE 1 PART 1 - GENERAL: 1.01 DESCRIPTION OF WORK: SECTION 26 05 29 A. Extent of supports, anchors, sleeves and seals is indicated by drawings and schedules and/or

More information