Siding Installation Manual for: Color Natura Rustica Rivets
|
|
- Junior Chase
- 6 years ago
- Views:
Transcription
1 Siding Installation Manual for: Color Natura Rustica Rivets 1
2 Ventilated Siding, Principle For easy handling of the Panels use when mounting Ventilated Siding systems consist of five main components: 1 Support structure 2 Ventilated cavity 3 Thermal insulation layer 4 Siding (Color Natura Rustica - 5/16 thickness) 5 Sub mounting frame (Aluminium Galvanized steel) 1 : Support Structure The exterior wall of a building is mainly made of concrete, CMU blocks, brickwork, steel or timber frame with studs and planked by gypsum panels, M4 panels, OSB or Plywood. Use a BLACK Water Restrictive Barrier (WRB) behind the Siding (no white WRB as gaps so are more visible). 2 : Ventilated Cavity The main task of the air cavity is the evacuation of moisture and excess heat. The air circulation occurs naturally thanks to the pressure difference between bottom and top 3 : Thermal Insulation Layer The advantage of an exterior thermal insulation is to keep the entire building structure at a constant temperature and to minimize thermal bridges and thus reduce the loss of energy to a minimum. Economic as well as ecological advantages result. 2
3 4 : Siding (Color Natura Rustica) The outer skin of the building envelope has two main functions; to be aesthetically attractive as well as to protect against influences from the climate and environment. 5 : Sub frame Multi-Panels façade panels are installed on aluminum or metal supports. The Multi-Panels siding concept is based on natural rear ventilation as it is the most reliable and sustainable, and provides maximum longevity to exterior Siding Important! Siding with Multi-Panels products must always be carried out as a ventilated facade with min 1 (25 mm) distance between the Siding and the rear wind barrier lining (insulation material). In special situations (e.g. high rise buildings), local regulations may demand a larger ventilation gap, but normally 0.25% - 0.5% of the Siding area must be evenly ventilated and/or the inlet and outlet openings must have a cross section of at least 20 ft2/ft. Fastening of Multi-Panels Siding Multi-Panels panels are installed on metal substructures. The fastening method using rivets allows an efficient attachment to the supporting structures (see below picture). In fact using rivets, (A4 material) are hardly visible even at a slight distance away as they fit with the overall surface and are available in the same shades of color as the panels delivered. Sub-frames are to be designed by a structural engineer/contractor. Thermal expansion/retraction is to be accounted for. 3
4 Fixed and Gliding Points Diameter of the fixed point hole (F) use #8 drill fit (0.2") (SFS ) and of the gliding point (G) use SFS drill guage (SFS ) range.354"-.390" (See page 5) Two fixed points (F) are required per panel. are: always the same height in each panel, close to center of panel as possible, and then either the next adjacent point to the left or right. Be consistent in panel-to-panel location (center and left or center and right, so fixed points are at the same level horizontally for attachment to vertical profiles). Two fixed points on one panel can not be on the same profile, and no two fixed points on two adjacent panels can be on the same profile. For smaller panel sizes with only two rows of fasteners, fixed points to be top center and top left or top right (horizontal applications on vertical profiles). For vertical narrow panel applications on vertical profiles, vertical joints must incorporate two separate profiles Rivets to be located 4
5 Fixed Point Gliding Point SFS SSO-D15 Blind Rivets Diameter & Length - Part No.- Global Code - Grip Range 5 x 14mm SSO-D A mm ( ) 5 x 18mm SSO-D A mm ( ) 5 x 22mm SSO-D A mm ( ) Drill Gauge SFS for Gliding Points SFS SSO-D15 Rivets Material No. Description for pre-drilled gliding hole diameter Drill Gauge mm ( ) DG-146X20-7, Drill Gauge mm ( ) DG-146X20-8, Drill Gauge mm ( ) DG-146X20-9, Drill Gauge mm ( ) DG-146X20-10, Replacement Drill Bit 5.1 x 110 mm (.201 x 4.33 ) #7 bit 5
6 AccuBird For standard blind rivets 2-5 mm Allways use the special stand-off nosepiece (item no # ) for AccuBird for the standard SFS SSO-D15 rivets to avoid force on the panel as leaves a small gap between panel and rivet. Guideline operation parameters for Multi-Panels saw blades D b d Z rpm , A , A , A , A , A , A
7 Panels cannot bridge a break in the aluminum profile. 7
8 Fastening with Rivets when Wind Load For wind load demand please see below. This table applies to 5/16 (8 mm) panels, fastened with rivets onto metal sub-framing. Panels vertical mounted. Structural Engineer/Contractor shall assume overall responsibility for the facade engineering. Intermediate values for wind load/ spacing can be interpolated. A safety factor of 3.0 is taken into account for the admissible system load (rivet and panel). The value means the actual wind load occurring on the Siding. Fastener to panel edge distance of 1.57 (40 mm) horizontally and 3.15 (80 mm) vertically. System Type Visible Rivets System Actual Thickness 5/16 Allowable Transverse wind load - ASTM E Positive Negative 53 psf 47,7 psf Fastening with Rivets The installer is responsible for establishing a plane and strong sub-construction and observing the fixing distances. Facade panels are normally installed in a vertical position on a vertical sub-structure. However, it is also possible to install the panels in a horizontal position. The guidelines for fixing are the same. Thermal expansion/retraction. Wind loads appearing on the actual facade and Applicable wind load values are to be determined for each project in accordance with the local standards and for high-rise buildings with specific wind load studies. Processing and Storing CUTTING All Multi-Panels panels may be cut with a circular saw or a jigsaw equipped with a diamond tipped blade. Sharp edges are made with fast running diamond tipped tools. Cutting to size may be done with normal slow or fast running hand tools or stationary equipment. When using fast running tools, dust exhaustion must be employed. Note: When using hand tools, cut the panels backside up. When using stationary saw equipment, cut the panels front-side up (the saw blade must always attack the board from the front-side). The periphery speed of the circular saw should be as depicted in the below table. Cutting depth should be 3/8 5/8 (10-15 mm) beyond the board. 8
9 CUT-OUTS Cut-outs may be made with a jigsaw or a key-hole saw equipped with bi-metal or diamond tipped blade. It is recommended to drill a min 7/16 (8 mm) hole before cutting in the inside corner. In order to avoid creating a notch at the inside corner, cut edges should be sanded. CLEANING OF PANELS AFTER CUTTING AND DRILLING It is important to immediately remove dust caused by cutting and drilling from the front and backside of the panels with a soft brush/duster or a vacuum cleaner as it might damage the panel surface. Ensure that the panels are properly cleaned before installation, and if necessary use clean water or water with a mild detergent and a soft sponge or brush to remove dirt and dust from the surface. Thereafter, wipe the panels with a damp cloth. It may also be necessary to wash the surface after installation if the building site conditions have been unfavorable. This is done with clean water or water with a mild detergent and a soft sponge or brush and finally wiping the panels with a damp cloth. PROTECTIVE FILM Multi-Panels painted panels (Color and Natura) are equipped with polyethylene film between the panels for protection of the surface during transport and processing, which can be disposed of during installation. SAFETY As with all other building materials, safety precautions must be taken into account and local laws and regulations must be observed. Cutting and drilling are subject to dust development, and proper precautions must be taken by using appropriate dust extraction equipment. Dust from fiber cement panels is characterized as mineral dust and prolonged exposure to this may cause lung disease. Fast running electrical equipment such as hand held circular saws leave a fine and sharp edge on the panels and provide fine dust. Due to the speed of the blade the dust is dispersed over a larger area. Therefore, it is necessary to establish sufficient exhaustion and it is recommended the operator carry personal safety equipment. APPLICATION CONDITIONS Board temperature and ambient temperature should be + 44 F (+7 C) - 86 F (+30 C) and relative humidity <85 % (optimally 60 %). Process temperature must be min +44 F (+7 C). APPLICATION - FINISHING THE EDGES TO CUT WITH HYDRO BLOCK EDGE SEALER Note: These Instructions are mandatory for Color, Natura and Rustica siding panels. Before use, shake the Hydro Block thoroughly. In case of unventilated premises, use required protective respiratory equipment, wear protective clothing, safety goggles and gloves according to the Safety Datasheet. Carefully apply the solvent-based Hydro Block in a thin layer with a short hair roller. Excess Hydro Block on top of the surface should be removed immediately after painting. Disposal of this product must be with reference to local and national regulations. 9
10 STORING AND PROPER HANDLING Multi-Panels products are delivered with plastic protection cover on the pallet. If undamaged, the plastic cover protects against weather conditions during transportation. The plastic cover is for dust protection only and should be removed upon arrival at the building site. Hereafter the pallets should be kept under a roof, leaving the possibility of ventilation around the panels. Multi-Panels must be stored on a flat and dry level surface on pallets or sleepers with a minimum distance of 12 between the stacks on all sides. Note: Max. 5 pallets in a stack at the warehouse and on the building site max. 2 pallets in a stack. The panels must be lifted up and off the pallet and not drawn over the next board, as this will cause scratches and damage on the surface. Lift pallet crosswise and set forks apart to minimize bending of pallet. Fork length must support pallet entirely; if required, use fork extensions. General Information ANNUAL INSPECTION Normally, a Multi-Panels facade does not require maintenance to maintain its strength, properties and function, but an annual inspection of the surface, ventilation gaps, joints and fixings is recommended. Environmental impacts may, however, influence the visual appearance of the façade. Detection and repair of possible damages help promote a prolonged lifetime for the facade. HIGH PRESSURE CLEANING Warning High Pressure Cleaning is a rough treatment of a fiber cement siding. Use of a high pressure cleaner may damage the surface. Therefore, high pressure cleaning is not recommended. CLEANING OF DIRT Never clean a facade in bright sunlight, the Multi-Panels facade panels can be cleaned with cold or hot water with the addition of a mild household detergent not containing solvents. Before full scale cleaning it is recommended to test the selected cleaning method on a smaller area to make sure it performs as expected. Rinse with plenty of clean water until the facade is perfectly clean. MOSS AND ALGAE REMOVAL Never clean a facade in bright sunlight. Moss and algae growth can be removed with common detergents available on the market, examples are: Chlorine or Rodalon 2.5% active that has a long-term effect of preventing new growth. After wetting the Multi-panels with clean water, apply detergents according to the supplier s instructions. Do not leave the detergents to dry completely and be sure to rinse with plenty of clean water to remove the moss and algae. IMPACT BY POLLUTION AND NATURE Weather and nearby vegetation may affect the appearance of the panels. Take caution to avoid pollution, dust and leaves from trees, bushes and flowers to not impact the integrity of the panels. 10
11 SERVICE If you have any questions regarding the Multi-Panels facade panels, our dedicated service team is ready to assist you with advice and guidance. Please visit our website for more information. Warranty This warranty Covers: The warranty covers the ICC-ES certification AC 90 scope/values (US certification of fiber cement) and we confirm that we give a warranty for a period of 10 years, beginning on date of delivery, provided that, the panels were cut/drilled/stored/installed/used prescribed system components etc. according to this Installation Manual. The warranty does not cover: color fading due to the UV light, environmental impact on the panels such as pollution, etc. For the Rustica panel additionally not covered: Color differences between batch/production series. The Rustica panel has a raw look, including some small white spots in different sizes and amounts on the panels. Replacement: Any Multi-panels product which does not comply with these results in the datasheet tested according to ICC-ES AC 90 will be replaced free of charge, ex works Los Angeles, on condition that Multi- Panels Corporation is notified within a period of 4 weeks after the appearance of any accepted claim by Multi-Panels Corporation. In particular, the warranty covers neither the transport costs nor labor expenses for dismantling and dumping defective panels and installing new panels. Multi-Panels Corporation shall not be liable for failure of performance hereunder due to force majeure. DISCLAIMER The information contained in this manual is based on Multi-Panels general experience, best knowledge and belief; however because of factors that fall beyond Multi-Panels knowledge and control, which can affect the use and function of the products, no warranty is given or implied with respect to the information. Multi-Panels policy is one of continuous improvement and therefore reserves the right to alter specifications at any time and without notice. In case of doubt, please contact your local Multi-Panels representative. 11
Siding Installation Manual for: Color Natura Rustica Rivets
Siding Installation Manual for: Color Natura Rustica Rivets 1 Ventilated Siding, Principle For easy handling of the Panels use when mounting Ventilated Siding systems consist of five main components: 1
More informationSiding Installation Manual for: Color Natura Rustica Wood Furring
Siding Installation Manual for: Color Natura Rustica Wood Furring 1 Ventilated Siding, Principle For easy handling of the Panels use when mounting Ventilated Siding systems consist of five main components:
More informationSiding Installation Manual for: Color Natura Rustica 1
Siding Installation Manual for: Color Natura Rustica 1 Ventilated Siding, Principle Ventilated siding systems consist of five main components: 1. Support structure 2. Ventilated cavity 3. Thermal insulation
More informationCembrit Windstopper Basic Cembrit Windstopper Extreme
Cembrit Windstopper Basic Cembrit Windstopper Extreme Installation Table of Contents Product Description 2 Dimensions 3 Accessories 4 Applications 5 Fixing Details 6 Joint Details 8 Storing, Handling and
More informationInstallation. Cembrit Cover, Solid and Transparent
Installation Cembrit Cover, Solid and Transparent Table of Contents Product Information 2 Product Datasheet 5 Accessories 6 Installation on wooden sub-cunstruction 8 Installation on aluminium sub-construction
More informationInstallation. Cembrit Patina
Installation Cembrit Patina Table of Contents Product Information 2 Product Datasheet 5 Accessories 6 Installation on wooden sub-cunstruction 8 Installation on aluminium sub-construction 15 Installation
More informationProduct Catalog and Installation Manual for: Multi-Panels XPS Tile Backer Board, Shower Tray and Underlayment for Floor Heating
Product Catalog and Installation Manual for: Multi-Panels XPS Tile Backer Board, Shower Tray and Underlayment for Floor Heating 1 Product Description and Range Certification The XPS Tile-Backer Boards
More informationExterior System installation instructions
Exterior System installation instructions 11/20/14 WPS ES-400 & 500 INSTALLATION INSTRUCTION. The WPS ES-400 & 500 systems Façade panels are designed for use as an external wall cladding in conjunction
More informationEQUITONE is a material supplier. Installation Contractors shall be trained and approved by EQUITONE.
This specification has been numbered, organized and formatted in accordance with the MasterFormat, Section Format and Page Format documents published jointly by Construction Specifications Institute (CSI)
More informationSUCCESS ON THE JOB SITE
Guide to SUCCESS ON THE JOB SITE Storage, handling and preparation Complete guide to pre-finished materials always there, naturally Woodtone Success on the Job Site Section 1: Before you Begin Please ensure
More informationINDOOR RUBBER FLOORING INTERLOCKING INSTALLATION / MAINTENANCE GUIDELINES MARATHON SERIES. Four-Side Interlock Loose Lay Installation
INDOOR RUBBER FLOORING INTERLOCKING INSTALLATION / MAINTENANCE GUIDELINES MARATHON SERIES Four-Side Interlock Loose Lay Installation The following pages are guidelines only... please read this manual thoroughly
More informationGENERAL SHALE NATURAL THIN ROCK VENEER Installation Guide. GeneralShale.com
GENERAL SHALE NATURAL THIN ROCK VENEER Installation Guide GeneralShale.com GENERAL SHALE NATURAL THIN ROCK VENEER Page 2 INTRODUCTION - TABLE OF CONTENTS Check local building codes for proper installation
More informationEQUITONE is a material supplier. Installation Contractors shall be trained and approved by EQUITONE.
This specification has been numbered, organized and formatted in accordance with the MasterFormat, Section Format and Page Format documents published jointly by Construction Specifications Institute (CSI)
More informationImpression Graphic panels
Impression Graphic panels Installation Guidelines 6003.I Rev. 02 8/15 Please Read Disclaimers: PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION!! These guidelines are provided in good faith to
More informationCl/SfB l (42) Rf9 l l May Cembrit HD. Rainscreen cladding/building board for external applications. 1
Cl/SfB l (42) Rf9 l l May 2018 l Cembrit HD Rainscreen cladding/building board for external applications 1 Garden offices, equipment storage buildings, shelters and stockades Cembrit HD fibre cement boards
More informationOLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. RobinsonBrick.com
OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide RobinsonBrick.com OLD BRICK ORIGINALS THIN BRICK VENEER Page 2 INTRODUCTION Check local building codes for proper installation guidelines
More informationINSTALLATION MANUAL. METAL INSULATED PANELS -ROXUL -Expanded Polystyrene
INSTALLATION MANUAL METAL INSULATED PANELS -ROXUL -Expanded Polystyrene Insulated Metal Panels London Eco-Metal Manufacturing Inc. **Also see Eco-Metal s Handling Manual** These instructions are provided
More informationInstallation Guide Wall Panels
Installation Guide Wall Panels Jointless or Dry-Stacked Installation (Read Prior to installation) The MStone system is a jointless / dry-stacked installation where panels and corners fit tightly together
More informationCladding Installation
January 2013 Cladding Installation Cembrit Cembonit Table of Contents Product Information 2 Product Datasheet 5 Accessories 6 Sub Constructions 7 Fixing Details 8 Storing, Handling and Processing 36 Maintenance
More informationGlass Care. Frame Cleaning
Frame Cleaning Glass Care Keeping your windows and doors clean means more than just the glass. Here are some helpful tips for cleaning your window and door frames effectively without damaging them. Vacuum
More informationMONOLITH. Basin System. installation + maintenance
MONOLITH Basin System installation + maintenance contents 3 Monolith 5 4 Components List 5 Technical Data 6 Before you Install 10 Installation 14 ADA Compliance 15 Operation 15 Maintenance 16 Cleaning
More informationLAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING
LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s
More informationLAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING
LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s satisfaction.
More informationINSTALLATION GUIDE DUOFUSE DECKING
INSTALLATION GUIDE DUOFUSE DECKING We recommend reading through the entire installation instructions before starting, and check the website for the latest installation instructions. Plastivan disclaims
More informationDynamic Bonding Systems B.V. A division of Dutch Bonding Group B.V.
for the bonding of facade cladding with KOMO-certified bonding system Dynamic Bond METALS - HPL - FIBRECEMENT Dynamic Bond For panels up to the maximum diagonal. Based on MS-hybrid-polymers, one component.
More informationVertigo Cladding Board
Installation guide Vertigo Cladding Board Geolam: a stunning alternative to wood cladding Vertigo is a composite wood cladding board requiring minimum maintenance. Durable and fade resistant, it will not
More informationExterior Wall Solutions Building Shell
A strong, water tight and thermally insulated building shell will ensure the buildings sustainability of usage over time. The Exterior Shell is the most important factor of protection to ensure that the
More informationRev. 08 9/15 Please Read Disclaimers:
NuPoly panels Guidelines 6006.NP Rev. 08 9/15 Please Read Disclaimers: PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION!! These guidelines are provided in good faith to help prevent any problems
More informationARDEX GUIDE SPECIFICATION ARDEX GS-4 Self-Leveling Repair Underlayment for Distressed Gypsum and Wood Subfloors
ARDEX GUIDE SPECIFICATION ARDEX GS-4 Self-Leveling Repair Underlayment for Distressed Gypsum and Wood Subfloors SECTION 03 54 13 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings, general provisions of
More informationSPECIFICATION FOR INSTALLATION OF WALKER ZANGER KAZA CONCRETE TILES ONTO VARIOUS SUBSTRATES
INSTALLATION INSTRUCTIONS SPECIFICATION FOR INSTALLATION OF WALKER ZANGER KAZA CONCRETE TILES ONTO VARIOUS SUBSTRATES QUALITY REQUIREMENTS All work to be carried out in accordance with TCNA (Tile Council
More informationSECTION FIBER CEMENT SIDING. A. Furnish and install CERACLAD fiber cement rain screen siding system.
SECTION 07466 FIBER CEMENT SIDING PART 1 GENERAL 1.1 SCOPE A. Furnish and install CERACLAD fiber cement rain screen siding system. 1.2 RELATED SECTIONS A. Division 06 - Wood and plastics B. Section 07210-
More informationDIVISION: THERMAL AND MOISTURE PROTECTION SECTION: FIBER-CEMENT SIDING REPORT HOLDER: EQUITONE
0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3910 Issued 04/2017 This report is subject to renewal 04/2018. DIVISION: 07 00 00
More informationAPPLICATION INSTRUCTIONS REALSIDE TM
APPLICATION INSTRUCTIONS REALSIDE TM GENERAL INFORMATION: RealSide is a natural, real wood siding product designed for use in exterior cladding applications. RealSide is manufactured from hand selected,
More informationGuide Specifications for Prodema PRODEX External Cladding
Guide Specifications for Prodema PRODEX External Cladding SECTION 07420 Exterior Wall Cladding Note: These specifications were current at the time of publication but are subject to change at any time without
More informationmaintenance-free free from painting easy to install Fixing Guide Cedral Click
maintenance-free free from painting easy to install Fixing Guide Cedral Click www.cedralsidings.com CONTENT Step by step guide to installing your Cedral Click façade Required materials and tools 1. Prepare
More informationInstallation Guide. IMPORTANT: Read all sections before starting. For the most up-to-date information, visit our website: leadvisioninternational.
Installation Guide IMPORTANT: Read all sections before starting. For the most up-to-date information, visit our website: leadvisioninternational.com Before installing a composite wall cladding, it is recommended
More informationTriton BK Backer Board & Tile Underlayment
1 Backer Board & Tile Underlayment Lightest Cementitious Backer Board High strength cement technology Free of Crystalline Silica, VOCs, and harsh chemicals Easy to score and snap, fasten, and install Description
More informationDIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: TRESPA NORTH AMERICA, LTD.
0 ICC ES Report ICC ES (800) 423 6587 (562) 699 0543 www.icc es.org 000 Most Widely Accepted and Trusted ESR 1687 Reissued 02/2016 This report is subject to renewal 02/2017. DIVISION: 07 00 00 THERMAL
More informationDIVISION: THERMAL AND MOISTURE PROTECTION SECTION: FIBER CEMENT SIDING REPORT HOLDER: RIEDER FASERBETON ELEMENTE GmbH
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2810 Reissued 02/2018 This report is subject to renewal 07/2018. DIVISION: 07 00
More informationRev. 07 8/15 Please Read Disclaimers:
FiberCorr panels Guidelines 6005.FC Rev. 07 8/15 Please Read Disclaimers: PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION!! These guidelines are provided in good faith to help prevent any problems
More informationTruGrain 12 Inch Commercial Profile Installation Recommendations
TruGrain 12 Inch Commercial Profile Installation Recommendations o Delivery, Storage and Handling o General Requirements o Application of Stain & Sealer o Storage and Handling (Post-Treatment) o Installation
More informationDIVISION: THERMAL AND MOISTURE PROTECTION SECTION: WATER RESISTIVE BARRIERS/WEATHER BARRIERS REPORT HOLDER: PAREX USA, INC.
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2045 Reissued 01/2017 This report is subject to renewal 01/2019. DIVISION: 07 00
More informationKingspan Day-Lite Klick
Insulated Panel Envelope Systems Roof Wall Façades Lighting Rooftop PV Coldstore Structural Products Cleanrooms UK & Ireland Kingspan Day-Lite Klick Installation Guide Page 2 Accessories Overview Designation
More informationGlasboard Liners. installation details. Installation Guide for Glasbord Fibreglass Reinforced Plastic (FRP) panels
Glasboard Liners installation details Installation Guide for Glasbord Fibreglass Reinforced Plastic (FRP) panels PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION These guidelines are provided
More informationInstallation Guide. PAROC panel solutions
Installation Guide PAROC panel solutions Panel System 4.00 INT January 2008 THESE INSTRUCTIONS ARE FOR NORMAL APPLICATIONS Work safety Preparation Wear protective gloves and clothing when handling the
More informationSTORAGE AND TRANSPORTION
Content 1. General & Notes 2. Substrate Processing 3. Panel Layout 4. Tools 5. Screws 6. Installation instructions 7. Cleaning 8. FAQS 8. MSDS General & Notes In comparison to natural or cast stone, Questone
More informationGeneral and Installation Instructions Laminate - 2G + 2G
STOP Please inspect product for color, finish, quality and style BEFORE installing any material. SLCC Enterprise, Inc. warranty DOES NOT cover materials with visible defects once they have been installed.
More informationCENTURY HOME LIVING HOLLOW DECKING INSTALLATION GUIDE
CENTURY HOME LIVING HOLLOW DECKING INSTALLATION GUIDE PRODUCT INFORMATION Century Home Living is a new type of material made by mixing bamboo/wood powder with HDPE (High Density Polyethylene) and other
More informationFor more information on Pictura visit CI/SfB (41) R December New. Pictura. High performance cladding
New CI/SfB (41) R December 2008 Pictura High performance cladding Introduction The new Pictura coating system incorporates an additional surface treatment for Fibre Cement panels. The main characteristic
More informationCl/SfB 1 (4-) RJ July Cempanel BUILDING BOARD CEMENT PARTICLE BOARD.
Cl/SfB 1 (4-) RJ7 1 1 1 July 2010 Cempanel BUILDING BOARD CEMENT PARTICLE BOARD Cempanel Class 0 cement particle board with excellent impact, fire and acoustic properties. Its durability, consistently
More informationAttainSilence & Attain
AttainSilence & Attain Attain 4.2mm Click over 1mm ECOsilence, Attain 4.2mm Click AttainSilence Click 4.2.1 & Attain Click 4.2 Technical Manual Installation Maintenance Warranty Manufactured in the U.S.A.
More informationInstall & Maintenance Instructions
Arterra Installation Please read these instructions thoroughly prior to beginning the Arterra installation. Inspect all materials for damage or missing parts. If you discover damaged or missing materials,
More informationYARRABEE 360 GEOLOGY
Thank you for choosing our fine hand crafted GEOLOGY slate panels. For the best results, we believe that a contractor or professional wall covering installer with the correct tools should hang this material.
More informationTRUSSCORE PVC INTERLOCKING LINER PANEL
Project Number Page 1 of 6 TRUSSCORE PVC INTERLOCKING LINER PANEL NOTE: THESE MASTER SPECIFICATIONS ARE TO BE UTILIZED AS A GUIDELINE AND IT IS ADVISED THAT THE EDITOR CONTACT A DOMTEK BUILDING PRODUCTS
More informationAsbestos cement products in your home
Asbestos cement products in your home What is asbestos? Asbestos is a naturally occurring fibrous crystalline mineral, found in rock formations. Three main types of asbestos have been mined in Australia,
More informationDIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: 3A COMPOSITES USA INC.
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1114 Reissued 09/2017 This report is subject to renewal 09/2019. DIVISION: 07 00
More informationGENERAL SPECIFICATION FOR FIRE RATED APPLICATIONS
I N SULROCK FIRE RATED METAL PANELS GENERAL SPECIFICATION FOR FIRE RATED APPLICATIONS 1. GENERAL 1.1. Summary Fire-rated panels as shown on the drawings shall be INSULROCK brand panels as supplied by Green
More informationifix INSTALLATION MANUAL PV flat roof installation system Version
ifix PV flat roof installation system INSTALLATION MANUAL Version 2012-09-06 ifix Installation Manual Version 2012-09-06 Seite 1 Table of contents Table of contents... 1 Special characteristics of ifix...
More informationInstallation Guide DROP-IN OR FREESTANDING CAST IRON BATH. English page T01-B
Installation Guide DROP-IN OR FREESTANDING CAST IRON BATH 368 201419 English page 1-8 9-15 Before You Begin A. Introduction Please read these instructions carefully to familiarize yourself with the required
More informationInstructions for On-Site Coating of Vinyl Windows
www.aqua-diy.com Instructions for On-Site Coating of Vinyl Windows Aqua DIY D100 is a high performance heat reflective water-based coating. It has been shipped to you with a thickness suitable for manual
More informationINSTALLATION INSTRUCTIONS LAMINATE
INSTALLATION INSTRUCTIONS LAMINATE DROP LOCK GENERAL INSTRUCTIONS FOR LAMINATE HARDWOOD FLOORING ACCLIMATION Acclimation is a recommended procedure prior to installation of laminate flooring either on
More informationPANEL INSTALLATION GUIDE
PANEL INSTALLATION GUIDE AVENERE CLADDING LLC IMPORTANT NOTE: All concrete and clay products - when machined or mechanically cut - will release dust which may contain quartz particles. Inhalation of high
More informationGA APPLICATION OF GYPSUM SHEATHING
1. Scope 1.1 This specification describes the minimum requirements for, and the methods of handling, storage, and application of, gypsum sheathing for use as a substrate for exterior claddings. 1.1.1 Exterior
More informationInsulation. First Revison October DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS
Insulation First Revison October 2016 DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS 1. General Information This Guide describes the use of Kingspan GreenGuard DC14 Drainage
More informationTechnical Data Sheet
Technical Data Sheet Perimeter Installation Procedures Concrete Faced Insulated Perimeter Wall Panels Concrete Faced Insulated Perimeter Wall Panels are prefinished, one-step exterior insulating panels
More informationECAILLE Implementation Guide
-1- ECAILLE Implementation Guide Published 21 August 2007 PMA by Arval ZA du Pays de Podensac 33720 CERONS - France Tel. +33 (0)5.57.98.14.50 Fax. +33 (0)5.57.98.14.60 commercial@pma.fr www.pma.fr -2PRESENTATION
More informationINSTALLATION GUIDE MODELS DMV2402 / DMV3002 / DMV3602
INSTALLATION GUIDE MODELS DMV2402 / DMV3002 / DMV3602 Getting Started 01 Required Tools & Materials 01 Floating Vanity Installation 02 Drawer & Door Adjustment 03 Soft-Close Drawer Removal/Installation
More informationRigid Core Installation & Maintenance Instructions
Rigid Core Installation & Maintenance Instructions Suitability Rigid Core Click Vinyl Flooring is completely waterproof floating floor and has got exceptional acoustic and insulation properties due to
More informationeos LightPanel Systems User Guide
eos LightPanel Systems User Guide Read this manual before using eos LightPanel Products eos LightPanel Systems 5819 Uplander Way Culver City, CA 90230 P 310.616.5070 F 310.616.5056 info@lightwithart.com
More informationResysta Wall Cladding Installation Guidelines
Resysta Wall Cladding Installation Guidelines NOTE: Proper planning of the wall cladding layout is essential for ease of installation of wall cladding boards and wall cladding components. Thoroughly read
More informationSamrat External Wall Cladding.
Samrat External Wall Cladding www.samratcladage.com Wall Cladding Dictionary Meaning A covering or coating on a structure or material. Definition Is an application of one material over another to provide
More informationMANUAL. landscape orientation. portrait orientation. metal roof mounting system for solar panels METAL ROOF MOUNTING SYSTEM. Rev
MANUAL METAL ROOF MOUNTING SYSTEM EN landscape orientation portrait orientation metal roof mounting system for solar panels ESDEC BV 2018 CONTENTS 1. Introduction 1 2. General installation conditions 1
More informationFacade panel PICTURA Product Information Sheet
Facade panel PICTURA Product Information Sheet 1 Product range PICTURA fibre cement facade panels are made from: Portland cement Mineral filler Natural organic fibres (cellulose), synthetic organic fibres
More informationPART 1-SAWN THIN VENEER GENERAL
PART 1-SAWN THIN VENEER GENERAL WORK INCLUDED: All labor and material for the furnishing and installing of exterior or interior stone building veneer. RELATED WORK: Masonry Contractor shall include building
More informationARDEX GUIDE SPECIFICATION ARDEX K 22 F High Flow, Fiber Reinforced, Self-Leveling Underlayment
ARDEX GUIDE SPECIFICATION ARDEX K 22 F High Flow, Fiber Reinforced, Self-Leveling Underlayment SECTION 03 54 13 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings, general provisions of the Contract, and
More informationThis Installation Guide uses the following symbols to indicate important information. Always observe the instructions indicated by these symbols.
VIGO INDUSTRIES INSTALLATION GUIDE FOR STANDING SHOWER CABIN (MODEL VG06062) SAFETY PRECAUTIONS This Installation Guide uses the following symbols to indicate important information. Always observe the
More informationMODEL NUMBER: 1419 SERIES
1 PRODUCT DESCRIPTION Semi-Recessed Rectangular Vitreous China Lavatory with Overflow Semi Recessed 2" Above Counter 8" Spread Faucet Drilling Vitreous China High Gloss Ceramic Finish PRODUCT MEASUREMENTS
More informationInstallation Guidelines: Magnolia
Installation Guidelines: Magnolia 3/8 Engineered Hardwood Staple Down Installation ATTENTION Inspect ALL materials carefully BEFORE Warranties DO NOT cover materials with visible defects once they are
More informationLUXAPOOL CHLORINATED RUBBER POOL COATING
Page 1 LUXAPOOL CHLORINATED RUBBER POOL COATING POOLS PREVIOUSLY PAINTED WITH CHLORINATED RUBBER SURFACE PREPARATION 1. Using a stiff brush or broom, scrub the entire surface with diluted LUXAPOOL Concentrated
More informationApplication Instructions for Dryvit Backstop NT For Use Beneath Claddings Other Than Dryvit EIFS
Application Instructions for Dryvit Backstop NT For Use Beneath Claddings Other Than Dryvit EIFS CHECKLIST PRIOR TO THE INSTALLATION OF BACKSTOP NT - SMOOTH AND TEXTURE Project Conditions Maximum storage
More informationHOLLOW DECKING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE
HOLLOW DECKING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE HOLLOW DECKING CN-007A / CN-001T Prior to the installation of any form of Decking, it is recommended that you check
More informationBulldog Coatings, LLC Limited Product Warranty Bulldog Coatings, LLC Finished-to-Order & Custom-Finished products
Bulldog Coatings, LLC Limited Product Warranty Bulldog Coatings, LLC Finished-to-Order & Custom-Finished products (Note: This warranty does not cover Standard Collection products.) Bulldog Coatings, LLC
More informationENGINEERED LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING
ENGINEERED LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to
More informationTechnical Data Sheet
Technical Data Sheet ProGUARD Concrete Insulated Sheathing Specifications & Installation Table Of Contents Product Description... pg. 1 Basic Use... pg. 1 Exterior Finishes... pg. 1 Standard Sizes... pg.
More informationFire Resistant: Achieves FRL levels of 90/90/90 for load bearing walls.
( ) is a new and innovative system designed to provide high performance separating walls between units and apartments in low-rise residential and commercial projects. provides exceptional fire and acoustic
More informationSECTION Fiber Reinforced Stucco 1
CSI SECTION 09200 FIBER REINFORCED STUCCO PART 1 GENERAL 1.01 SUMMARY A. Section Description: Provided lath and plaster where shown on the Drawings, as specified herein, and as needed for complete and
More informationGenesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions
Genesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions Thank you for purchasing the Genesis Dura-Max Brick Panel system for your project. The system allows you to have the look
More informationA. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars
SECTION 04850 (04 40 00) MSI PRECAST STONE VENEER SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. MSI Precast Stone Veneer for exterior and interior vertical surfaces. 1.2 RELATED SECTIONS Specifier Notes:
More informationaquapanel InstallatIon GuIde
Installation Guide AQUAPANEL BEFORE YOU START It s a good idea to stand the AQUAPANEL sheets in the area for 2 days prior to cutting and installing, to allow the sheets to breathe and reach moisture equilibrium.
More informationPorcelain Paver Installation Guide
Porcelain Paver Installation Guide Before any project be sure to thoroughly read, and understand all precautions and warnings. The type of installation will depend on traffic, region, and existing substrate.
More informationTABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers
version 2.5 updated as of 08.04.2017 2 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers 2.0 ASSEMBLY 2.1 Sequence of Assembly 2.2 Preparation
More information1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights
1 Exam Prep Application and Finishing of Gypsum Board GA-216-2013 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2013 Application and Finishing of Gypsum Panel Products. Each
More informationUSG Tile & Flooring Solutions. Lightweight cement board. Easy to cut and fasten. Faster installation USG DUROCK BRAND CEMENT BOARD INSTALLATION GUIDE
USG Tile & Flooring Solutions Lightweight cement board Easy to cut and fasten Faster installation USG DUROCK BRAND CEMENT BOARD INSTALLATION GUIDE USG DUROCK BRAND CEMENT BOARD For more than 30 years,
More informationTextura Façade panel Product information sheet 1
Textura Façade panel Product information sheet 1 1 Product range Textura fibre cement facade panels are made from: Portland cement Mineral filler Natural organic fibres (cellulose), synthetic organic fibres
More informationDIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: FUNDERMAX GMBH
0 Most Widely Accepted and Trusted ICC-ES Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3340 Reissued 05/2017 This report is subject to renewal 05/2018. DIVISION: 07 00 00 THERMAL
More informationRe-Grouting Floor Joints in Commercial Kitchens and Industrial Applications
Re-Grouting Floor Joints in Commercial Kitchens and Industrial Applications GENERAL CONDITIONS Degradation or deterioration of an epoxy grout can occur when the circumstances are right or when the wrong
More informationSLP-ThermoWood Installation and maintenance instruction
SLP-ThermoWood Installation and maintenance instruction Feel the value of wood Suomen Lämpöpuu SUOMEN LÄMPÖPUU AND SLP-THERMOWOOD Thermo-treatment provides the wood with quality characteristics. It improves
More informationDEEP SOAK PRODUCT REQUIREMENTS. A. Product Requirements. B. Product Inspection. C. Clearance Requirements T01-A
DEEP SOAK INSTALLATION INSTRUCTIONS / INTEGRATED ACRYLIC BATH(WITH APRON/DRAIN) K-98156T/K-98157T/K-98158T/K-98159T BEFORE YOU BEGIN Please read these instructions carefully to familiarize yourself with
More information1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights
1 Exam Prep Application and Finishing of Gypsum Board GA-216-2016 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2016 Application and Finishing of Gypsum Panel Products. Each
More informationBACKSTOP NT - Texture A high performance, non-cementitious water-resistive membrane and air barrier. Backstop NT - Texture Application Instructions
BACKSTOP NT - Texture A high performance, non-cementitious water-resistive membrane and air barrier Backstop NT - Texture Application Instructions CHECKLIST PRIOR TO THE INSTALLATION OF BACKSTOP NT TEXTURE
More information