1 10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska ISSUES ON USING WELDED BUILT-UP BOX COLUMNS IN STEEL SPECIAL MOMENT FRAMES P. Lee 1, R. Garai 2, G. Ozkula 3, C. M. Uang 4 and M. Sarkisian 5 ABSTRACT This paper summarizes key issues resulting from the cyclic testing of steel moment frame specimens using large built-up box column and reduced beam section (RBS) welded moment connections. The test program was initiated in the design development of the new 24-story San Diego Central Courthouse facility to investigate extending the moment frame connection prequalification limits of AISC 358 for effective, economical and reliable application of steel special moment frames with large built-up box columns in regions of high seismicity. Primary issues investigated in the testing program included evaluating connection response with respect to: 1) the use of electro-slag welding (ESW) process for making the continuity plate completejoint-penetration groove weld; 2) RBS geometry and beam-to-column force transfer mechanism; and, 3) what modifications, if any, to the AISC and AWS detailing requirements can be introduced to further improve connection response. A total of three full-scale moment connection specimens were fabricated and cyclically tested in accordance with AISC 341. Testing of the first two specimens revealed the detrimental notch effect built into the ESW process, although one specimen passed the AISC acceptance criteria. Measures were then made to improve not only the RBS dimensioning, beam top flange steel backing treatment, weld access hole geometry, and especially the ESW weld details in an attempt to mitigate the notch effect inside the column. With these improvements, the cyclic performance of the third specimen was significantly improved. 1 SE, Associate Director, Skidmore, Owings & Merrill, LLP, San Francisco, CA PE, Associate, Skidmore, Owings & Merrill, LLP, San Francisco, CA Graduate Student Researcher, Dept of Structural Engineering, University of California, San Diego, CA PhD, Professor, Dept. of Structural Engineering, University of California, San Diego, CA SE, Partner, Skidmore, Owings & Merrill, LLP, San Francisco, CA Lee P, Garai R, Ozkula G, Uang C M, Sarkisian M. Issues for using welded built-up box columns in steel special moment frames. Proceedings of the 10 th National Conference in Earthquake Engineering, Earthquake Engineering Research Institute, Anchorage, AK, 2014.
2 6 10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska Issues On Using Welded Built-Up Box Columns In Steel Special Moment Frames P. Lee 1, R. Garai 2, G. Ozkula 3, C. M. Uang 4, and M. Sarkisian 5 ABSTRACT This paper summarizes key issues resulting from the cyclic testing of steel moment frame specimens using large built-up box column and reduced beam section (RBS) welded moment connections. The test program was initiated in the design development of the new 24-story San Diego Central Courthouse facility to investigate extending the moment frame connection prequalification limits of AISC 358 for effective, economical and reliable application of steel special moment frames with large built-up box columns in regions of high seismicity. Primary issues investigated in the testing program included evaluating connection response with respect to: 1) The use of electro-slag welding (ESW) process for making the continuity plate complete-jointpenetration groove weld; 2) RBS geometry and beam-to-column force transfer mechanism; and, 3) What modifications, if any, to the AISC and AWS detailing requirements can be introduced to further improve connection response. A total of three full-scale moment connection specimens were fabricated and cyclically tested in accordance with AISC 341. Testing of the first two specimens revealed the detrimental notch effect built-into the ESW process, although one specimen passed the AISC acceptance criteria. Measures were then made to improve not only the RBS dimensioning, beam top flange steel backing treatment, weld access hole geometry, and especially the ESW weld details in an attempt to mitigate the notch effect inside the column. With these improvements, the cyclic performance of the third specimen was significantly improved. Introduction Welded built-up box columns are frequently used in the construction of steel Special Moment Frames (SMF) to provide effective bi-axial column strength and stiffness, especially in taller SMF structures where seismic drift demands and impact on architectural layout, as well as efficient and economical structures are particularly important. The AISC 358 [1] standard Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications provides several prequalified moment connection types. These design requirements are based mainly on cyclic testing of moment connections with W-shaped columns, although built-up columns with some dimensional limitations (up to 24-in width and depth) are also allowed. 1 SE, Associate Director, Skidmore, Owings & Merrill, LLP, San Francisco, CA PE, Associate, Skidmore, Owings & Merrill, LLP, San Francisco, CA Graduate Student Researcher, Dept of Civil Engineering, University of California, San Diego, CA PhD, Professor, Dept. of Civil Engineering, University of California, San Diego, CA SE, Partner, Skidmore, Owings & Merrill, LLP, San Francisco, CA Uang CM, Lee P, Ozkula G, Garai R, Sarkisian M. Issues for using welded built-up box columns in steel special moment frames. Proceedings of the 10 th National Conference in Earthquake Engineering, Earthquake Engineering Research Institute, Anchorage, AK, 2014.
3 Several issues arise when using built-up box columns, yet these are not addressed in the AISC or AWS [3, 5] design provisions. Consider fabrication first. Continuity plates at the beam top and bottom flange levels are almost always required. Since these plates are placed inside the box section, they can only be welded to three sides when one side of the column is still open, while the last weld is performed using the electro-slag welding (ESW) process when the closing plate of the built-up column is in position. ESW is prone to creating a notch condition inside the column, yet there is no way to get access to it for insepction once welding is completed. This notch condition is further prone to initiate brittle and premature fracture under cyclic loading. Next consider the design issue. Unlike that of when a W-shaped column is used where column web is aligned with beam web, the two webs in a box column constitute a very strong panel zone, which forces the beam to deliver all the inelastic deformation. Additionally, the stress flow between the beam and column is also altered because the stiffer web is not located at the midwidth of the beam flange as in the W-shape column case. During the design development and construction document phases of the new San Diego Central Courthouse, a total of three full-scale RBS moment connection subassemblies were cyclically tested. The box column consisted of A572 Gr. 50 steel with dimensions of 24-in. wide and 36-in deep with 2-in. thick plate material. The beam consisted of a W rolled section of A992 steel. The first two specimens incorporated a 32% total flange width cut in the RBS region. While tests demonstrated that only one of the first two specimens reached the target story drift angle of 0.04 rad, both specimens failed in nearly identical brittle failure modes. The undesirable brittle fracture in the welded connection was neither desirable nor typical of RBS moment connection behavior even though the first specimen did pass AISC 341 [2] acceptance criteria. A detailed analysis of the fractured welded joints showed that a notch condition was created, during fabrication, inside the column at the ESW of the continuity plate, which caused the brittle fracture of the connection. Since the first two specimen tests demonstrated that the current practice of fabricating built-up box columns needs to be improved, two major steps were undertaken for the construction of the third specimen which retained identical built-up box column and beam sections as for the first two specimens. Finite element analysis indicated that reducing the RBS beam flange width dimension up to about 50% was helpful in reducing the stress demand at the welded joints. More significantly, a modified detail for ESW welding was incorporated in an attempt to minimize the notch condition. The third specimen testing successfully reached a story drift angle of 2 cycles at 0.05 rad and exhibited RBS ductile behavior as was expected based on AISC design equations and predicted finite element modeling of the test specimen. Based on additional post-test analysis and observations, and to further assure a positive outcome of the testing program for the project, two additional detailing improvements had been incorporated in the third specimen testing, which included the use of alternate AWS D1.8 [3] beam weld access hole geometry, and the removal of steel backing for the beam top flange CJP weld. Project Description The design of the new San Diego Central Courthouse facility for the California Administrative Office of the Courts (AOC) consists of a 24-story superstructure above grade with two below grade basement levels, encompassing a full city block with a total of 704,000 gross sq. ft. of building area is shown in Fig. 1. The superstructure lateral force resisting system consists of
4 two-way steel SMF. Typical SMF consists of W24 and W36 beams with RBS connections, as well as two-w30 cruciform columns and built-up box columns typically 33 in. square range from 20 to 36 in. dimension. Additional energy dissipation and drift control is provided by supplemental viscous damping devices in the transverse SMF direction. Fig. 2 shows the test set-up and specimen for cyclic testing [4]. Figure 1. New San Diego Central Courthouse Figure 2. Test Set-up at UCSD Laboratory Use of Welded Built-Up Box Columns in Steel SMF AISC 358 SMF RBS Connection Limitations AISC 358 [2] provides several prequalified moment connection types. These design requirements are based mainly on cyclic testing of moment connections with W-shaped columns, although cruciform columns and built-up columns with some dimensional limitations up to 24 in. in width and depth are also allowed. If the design is tied to these limitations of AISC 358, it results in heavy thick plates for columns, which is not an efficient use of material. Thus, the designers herein are of the opinion that for a high-rise structure, where the design is governed by the lateral stiffness, using a larger box column while maintaining the b/t ratio limitation is the most cost-effective solution and, hence, the need for further testing and research is warranted to extend the AISC 358 limits. Additional limitations include the depth and weight of rolled shape beams to 36 in. and 300 lbs/ft, respectively, with flange thickness limited to 1¾ in. Fabrication of Built-Up Box Columns Figure 3 shows typical moment connection detailing for SMF built-up box column. The member sizes and RBS dimensions are listed in Table 1. The beam was framed into the narrow 24-in. wide face of the built-up column. Complete-joint penetration (CJP) groove welds were used to connect 1¾ in. continuity plates to the column. Three sides of each continuity plate were connected to the column by flux-cored arc welding (FCAW) [Figure 4 (a)] while the electro-slag welding (ESW) process was used to complete the fourth side [Figure 4 (b)]. The ESW joint used a 7/8-in. root with conventional AWS D1.1 [5] containment plates [Figure 11(a)] were used for Specimens 1 and 2, which were subsequently improved for Specimen 3. The ESW was
5 purposely configured to align opposite the beam top and bottom flange CJP welds. (a) Elevation (b) Plan Figure 3. Box Column Connection Detail Table 1. Member Sizes and RBS Dimensions Detail (a) FCAW Joint (b) ESW Joint Overview (c ) ESW Joint (Detail) Figure 4. Continuity Plate Welded Joints Notch Condition Continuity Plates, Electro-Slag Weld at Closure, ESW Prone to Notch condition Based on standard U.S. building practice, the ESW backing consists of two to three consumable containment plates on either side of the electro-slag weld in conformance with AWS D1.1 [5]
6 procedures. Due to the fabrication process, a notch effect or gap is created at the juncture of the innermost containment plate and inside face of the column plate which is easily identified in the macro-etch analysis. Under cyclic load, the notch condition is prone to initiate premature crack propagation and fracture through the column flange plate at each side of the weld. ESW Design Limitations of AWS D1.1 and AWS D1.8 While the ESW is necessary to connect at least one edge of the continuity plate to the column, it is generally recognized as the weaker weld when compared with the FCAW process and it is therefore generally recommended that the beam moment connection be located on the FCAW side of the column. However, this would add complexity to the on-site coordination. Moreover, for conditions where SMF beam occurs on all four sides subjected to biaxial frame action, moment connections on the ESW face of the column are inevitable and desirable. Welding provisions in AISC 341 [2] and AWS D1.8 [3] do not explicitly address ESW requirements as a demand critical weld in the SMF. AWS D1.1 [5] refers only the Procedure Qualification Record (PQR) essential variable changes in requiring Welding Procedure Specification (WPS) requalification. Even though the ESW is an essential or demand critical weld in the moment connection load path, AWS D1.8 does not include any discussion on the processes, procedures and weld preparation for ESW such as requirements for electrodes, guide tubes, type of flux, Charpy V-Notch toughness and hardness requirements for weld metal and heat affected zone, etc., whereas, the AWS D1.5 [6] Bridge Welding Code does provide some information regarding the ESW. It should be noted that for bridge construction, ESW is primarily used for groove welds in butt joints, which is different from the T-joint application in the case of continuity plate welding to column flange. As a result of significant findings during the test, a well documented design and acceptance criteria was established for the moment connection to be used for this project. Specific WPS with supporting PQR were developed for the ESW used in the test specimens in conformance with the demand critical filler and weld metal criteria of AWS D1.8 [3] 6.3 and Tables 6.1 and 6.2. Full-Scale Cyclic Testing of RBS Moment Connection Subassemblies Test Set-up and Loading Protocol The overall geometry of the test setup is shown in Figure 5. Each test specimen was tested in an upright position so that simulated field welding of the moment connection could be performed properly in the testing laboratory. Two servo-controlled ±450-kip actuators with a ±24 in. stroke were used to apply cyclic loading at the end of the beam. The beam was laterally braced at the beam end near the actuators. The AISC 341 [2] loading sequence expressed in terms of the story drift angle for beam-to-column moment connection test was used as illustrated in Figure 6. Displacement was applied to the end of the beam. The loading began with six cycles each at 0.375%, 0.5% and 0.75% drift. The next four cycles in the loading sequence were at 1% drift, followed by two cycles each at 1.5%, 2%, 3%, 4%, 5%, 6%, or until the specimen failed. According to Section E3.6b of AISC 341 [2], beam-to-column connections used in the seismic load-resisting system shall satisfy the following requirements: 1) the connection must be capable of sustaining a story drift angle of at least 0.04 radians for one cycle, and 2) the required flexural strength of the connection, determine at the column face must be equal at least 80 percent of the nominal plastic moment of the connected beam at a story drift angle of 0.04 radians.
7 Figure 5. Test Set-up Figure 6. Test Protocol AISC 341 K3.4c [2] Specimen 1 Testing Summary Results Minor yielding in the beam flanges was observed at 1% drift. Minor beam web local buckling started at 2% drift. The yielding deformations at 4% drift and hysteretic response are shown in Figure 7(a) and (b). Although Specimen 1 testing met AISC 341 [2] qualification test acceptance criteria of one cycle at 4% drift, both flange local buckling and web local buckling was limited, exhibiting no strength reduction as might be expected for an RBS connection [7]. After successfully completing two cycles at 4% drift, the sudden and brittle mode of failure was bottom flange rupture at the start of the 5% drift cycle. Contributing to the poor RBS connection behavior was: 1) the beam width-thickness ratios were low, and 2) the amount of RBS cut (c dimension) of 0.16b f was relatively low compared to the maximum allowed by AISC 358 [1] of 0.10b f min, and 0.25b f max. (a) Yielding and Buckling Patterns (b) Figure 7. Specimen 1 at 4% Drift (2 Cycles) Global Hysteretic Response Additionally, significant cracking at one edge of the beam top flange was observed after 2nd cycle at 4% drift at one-half cycle prior to beam bottom flange rupture failure mode. Two factors contributed to this crack propagation: 1) strain and stress concentrations are higher at both ends across the beam flange width when the beam is connected to a box column, and 2) CJP
8 steel backing was left in place, although a reinforcing fillet weld was placed underneath the steel backing connecting directly to face of column as permitted by AISC 341 [2]. This detail creates a discontinuity of weld material between the flange CJP weld and backing fillet weld. Specimen 2 Testing Summary Results Specimen 2 experienced premature brittle fracture similar to Specimen 1, but at a drift of 3.9% during the first positive excursion cycle to 4% drift as shown in Figure 8(a) and (b). Unlike Specimen 1, Specimen 2 did not meet the AISC 341 [2] acceptance criteria of achieving one complete cycle at 4% drift. Additionally, as was observed in Specimen 1, a crack at the top flange edge condition was observed prior to failure mode at lower drift levels and propagated further at subsequent increasing drift levels. Again, the crack initiated at the interface of the top of the backing bar and extended into the CJP weld root. It is believed that this discontinuity between the CJP root and the backing bar fillet weld may have contributed to increased levels of strain prior to the brittle bottom flange rupture. (a) Fracture at Beam Bottom Flange (b) Global Hysteretic Response Figure 8. Specimen 2 at 3.9% Drift (1 st Cycle) Post-test analysis and investigation of Specimen 1 and 2 Testing In addition to the two continuity plates that were installed at beam flange levels, the continuity plate at the top end of the column where the column connected to the reaction wall had also been detailed in the same manner which provided an opportunity to cut pieces from that location to examine the condition of the similarly welded joints but outside the moment connection region. This sampling of Specimen 1 allowed for baseline comparisons with samples taken at Specimen 2 top and bottom flange welded joints as discussed below. Results from hardness testing of macro-etched sections indicate that the hardness of the ESW weld was not significantly higher than that of the base metal and similar at both locations. Although brittle fracture did not occur at the beam top flange level, Figure 9(a) and (b) illustrate that distinct and sharp notches are created during the ESW welding. The notch condition initiates at the non-welded juncture of the ESW containment plates and inside column face. From Figure 9(a), it is further noted that the ESW joint was shifted during fabrication creating a fully fused but a somewhat eccentric ESW condition and beam flange to continuity plate load path.
9 (a) Overall Macro-etch View (b) Detail Illustrating Notch Condition Figure 9. Specimen 2 ESW Welded Joint at Beam Top Flange Level The macro-etch cross sections taken at the beam bottom flange are shown in Figure 10(a) and (b). It is observed that the formation of a crack initiating at the ESW notch condition also triggered a crack that propagated into and through the column flange plate. Therefore, the notches that were created by the ESW process are responsible for the brittle fracture at the bottom flange level. (a) East Section (b) West Section Figure 10. Specimen 2 ESW Welded Joint at Beam Bottom Flange Level Fabrication of Built-Up Box Column ESW to Mitigate Notch Condition Fabrication of Specimens 1 and 2 utilized conventional ESW containment plates made up of three ½-in plates at each side of the weld as shown in Figure 11(a). To mitigate the notch effect, the Specimen 3 detail was made up with two ¾-in containment plates on each face of the weld with a 45-degree 3/8-in transition bevel at the innermost containment plates at the juncture of the containment plate and inside column face as shown on Figure 11(b). Additionally, 1/8-in shims were introduced between the innermost containment plate and the continuity plate. This modified containment plate configuration results in a larger diameter and smoother transition of the electro-slag weld bulb. The effect is to postpone the potential of cracking from the notch effect, if not eliminate it completely, by increasing the length of the weld in the fused column plate heat effected zone. Also, the larger electro-slag weld bulb helps to provide some redundancy for offset fabrication tolerances between the beam flange and continuity plate alignment. More work can be done to further improve the ESW fit-up and process to address the containment plate notch effect. Prior to the fabrication of Specimen 3, a new ESW weld procedure specification (WPS) with supporting procedure qualification (PQR) testing was conducted in conformance with both AWS D1.1/D1.8 and AWS D1.5 specifications.
10 (a) Specimen 1 and 2 (b) Specimen 3 Specimen 3 Testing Summary Results Figure 11. ESW Joint Details In addition to ESW beveled weld backing plates, three other improvements were made to Specimen 3 including (1) Increasing the RBS cut c dimension from in (16%) to in (25%); (2) Instead of using AISC 360 [8] Alternate 1 Fig. C-J1.2, the modified beam weld access hole geometry per AWS D1.8 Fig. 6.2 was used; and (3) At beam top flange CJP, the backing bar was removed, back gouged, and reinforcing fillet was provided similar to AISC 341 [2] requirement for the bottom flange CJP. Specimen 3 successfully underwent two cycles at 4% and 5% drifts each exhibiting very good RBS ductile behavior and exceeded AISC acceptance criteria with no beam flange welded joint failures as had been seen in Specimens 1 and 2. Figure 12(a) illustrates that the beam experienced significantly more local flange, web and lateral-torsional buckling as compared to Specimens 1 and 2. Additionally, by increasing the c dimension of the RBS section, beam flange weld demands were reduced. As indicated by earlier research by Ricles, et al [9], use of an improved weld access hole geometry and removing steel backing in the top flange also eliminated the development of top flange edge condition cracks as had been witnessed in Specimens 1 and 2. The beam eventually fractured in the beam top flange RBS region due to low cycle fatigue during the first cycle at 6% drift shown in Fig. 12(b). The test specimen response is illustrated in Figure 12(c), demonstrating overall ductility and RBS behavior with distinct levels of stiffness degradation while meeting AISC acceptance criteria. (a) Specimen 3 at 6% Drift (b) Fracture RBS Top Flange (c) Global Hysteretic Response Figure 12. Specimen 3 RBS Results
11 Conclusions The results of the testing program described herein amount to a significant contribution to available knowledge on the performance of welded built-up box columns in steel special moment frames (SMF). This is particularly important given the very limited amount of testing conducted in the U.S. using these connections, notwithstanding, the widespread use of the built-up box column in regions of high seismicity for use in complex structures such as tall buildings. This testing program identified a notch effect condition inherent in the fabrication process of ESW electro-slag welding that when used as a closer weld in a built-up box column continuity plate moment connection, is prone to initiate a crack that propagates through the weld heat effected zones and column plate material leading to brittle premature fracture under cyclic seismic loading. Additionally, this testing program developed several measures to significantly improve performance and reliability of the built-up box column RBS moment connection. Most significantly, improvements included the beveled transition of the ESW containment plates at the continuity plate to inside column plate face and thereby mitigating the ESW notch effect, whereby, prolonging the premature onset of brittle fracture allowing predicted ductile moment connection behavior. The application of the SMF RBS qualification testing herein is limited to the San Diego Central Courthouse project, however, significant care was employed in configuring the test specimens in the interest of contributing to extending the AISC 358 qualification limits. Beyond the scope of this paper, additional finite element modeling of this test specimen has demonstrated that good ductile behavior of the built-up box column RBS connection is achieved, and therefore, is limited primarily by the reliability of the ESW. Two potential contributions beyond the scope of this project can be achieved as a consequence of this moment frame connection qualification testing program: (1) Extend limits of AISC 358 prequalification for large built-up box columns with reduced beam section (RBS) moment connections; and, (2) Address the reliability of the ESW in moment connections as a demand critical weld and integral component of the load path under peak cyclic seismic loads to achieve intended ductile performance of the qualified connection. An AWS ESW Task Group has been formed as a result of this testing to address brittle failure mode issues and identify further research and/or testing to reduce or eliminate brittle behavior. Acknowledgments The authors are very grateful to the support provided by the Judicial Council of California and Administrative Office of the Courts (AOC) in pursuing this testing effort, thus contributing to furthering the state-of-practice and research. References 1. AISC 358, Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications, Including Supplement No. 1, ANSI/AISC , ANSI/AISC 358s1-11, American Institute of Steel Construction, Chicago, IL. 2. AISC 341, Seismic Provisions for Structural Steel Buildings, ANSI/AISC , American Institute of Steel Construction,, Chicago, IL. 3. AWS D1.8, American Welding Society, AWS D1.8/D1.8M: 2009, Structural Welding Code Seismic
12 Supplement, 2 nd Edition, Miami, FL. 4. Ozkula, G. and Uang, C. M. (2013), Cyclic Testing of Steel RBS Moment Connections with Built-up Box Column for the San Diego Central Courthouse, Report No. TR-13/01, Department of Structural Engineering, University of California, San Diego, La Jolla, CA. 5. AWS D1.1, American Welding Society, AWS D1.1/D1.1M: 2011, Structural Welding Code Steel, 22nd Edition, Miami, FL. 6. AWS D1.5, American Welding Society, AASHTO/AWS D1.5M/D1.5: 2008, Bridge Welding Code, 5th Edition, A Joint Publication of American Association of State Highway and Transportation Officials and American Welding Society. 7. Zhang, X., Ricles, J.M., (2006), Experimental Evaluation of Reduced Beam Section Connections to Deep Columns, Journal of Structural Engineering, American Society of Civil Engineers. 8. AISC 360, Specification for Structural Steel Buildings, ANSI/AISC , American Institute of Steel Construction, Chicago, IL. 9. Ricles, J.M., Fisher, J.W., Lu, L.-W. and Kaufmann, E.J. (2002), Development of Improved Welded Moment Connections for Earthquake-Resistant Design, Journal of Constructional Steel Research. Vol. 58, pp
EFFECTS OF LOADING HISTORY ON CYCLIC PERFORMANCE OF STEEL RBS MOMENT CONNECTIONS
EFFECTS OF LOADING HISTORY ON CYCLIC PERFORMANCE OF STEEL RBS MOMENT CONNECTIONS C M UANG 1, Q S YU 2 And C S GILTON 3 SUMMARY The cyclic response of steel reduced beam section moment connections under
More informationACHIEVING DUCTILE BEHAVIOR OF MOMENT CONNECTIONS PART II
Beam Seismic Design Panel zone ACHIEVING DUCTILE BEHAVIOR OF MOMENT CONNECTIONS PART II The results of additional tests provide further confirmation that weld metal toughness is key in achieving ductile
More informationSeismic Performance of Flange Plate Connections to Built-up Box Columns
Seismic Performance of Flange Plate Connections to Built-up Box Columns A. Deylami, M. Tehranizadeh & M. Gholami Amirkabir University of Technology, Iran SUMMURY This paper presents analytical and experimental
More informationCYCLIC BEHAVIOR OF STEEL SHEAR LINKS USED IN REPLACEABLE COUPLING BEAMS
10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska CYCLIC BEHAVIOR OF STEEL SHEAR LINKS USED IN REPLACEABLE COUPLING
More informationSupplemental Structural Correction Sheet Steel Moment Frame Design (2017 LABC)
Supplemental Structural Correction Sheet Steel Moment Frame Design (2017 LABC) Plan Check/PCIS Application No.: Checked By: Your feedback is important, please visit our website to complete a Custom Survey
More informationEngDoc.ir. Page 1 of 51
Page 1 of 51 1994 Northridge Earthquake Widespread failure of welded flange - bolted web moment connections Page 2 of 51 Damage Observations: Steel Moment Connections Pre-Northridge Welded Flange Bolted
More information3. CLASSIFICATION AND IMPLICATIONS OF DAMAGE
3. CLASSIFICATION AND IMPLICATIONS OF DAMAGE 3.1 Summary of Earthquake Damage There are no modifications to the Guidelines or Commentary of Section 3.1 at this time. 3.2 Damage Types There are no modifications
More informationTHE REDUCED BEAM SECTION MOMENT CONNECTION WITHOUT CONTINUITY PLATES
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 1504 THE REDUCED BEAM SECTION MOMENT CONNECTION WITHOUT CONTINUITY PLATES Scott M. ADAN 1 and Lawrence
More informationSEISMIC PERFORMANCE OF SCBF BRACED FRAME GUSSET PLATE CONNECTIONS
4th International Conference on Earthquake Engineering Taipei, Taiwan October 12-13, 2006 Paper No. 80 SEISMIC PERFORMANCE OF SCBF BRACED FRAME GUSSET PLATE CONNECTIONS Charles W. Roeder 1, Dawn E. Lehman
More informationCold-Formed Steel Special Bolted Moment Frames: Cyclic Testing and Numerical Modeling of Moment Connections
Cold-Formed Steel Special Bolted Moment Frames: Cyclic Testing and Numerical Modeling of Moment Connections by Chia-Ming Uang 1, Jong-Kook Hong 2, Atsushi Sato 3 and Ken Wood 4 ABSTRACT Cyclic tests on
More informationSurvey and Testing of Pre-1988 Braced Frame Structures From The West Coast of the United States
Survey and Testing of Pre-1988 Braced Frame Structures From The West Coast of the United States Dan Sloat 1, Charles W. Roeder 2, Dawn E. Lehman 3, and Jeffrey W. Berman 4 1 Graduate Student, Dept. of
More informationFull-scale Testing of the Cast Steel Yielding Brace System
Full-scale Testing of the Cast Steel Yielding Brace System M.G. Gray, C. Christopoulos & J.A. Packer Department of Civil Engineering, University of Toronto, Toronto, Canada ABSTRACT: The cast steel Yielding
More informationSEISMIC BEHAVIOR AND DESIGN OF STEEL SHEAR CONNECTIONS WITH FLOOR SLABS
SEISMIC BEHAVIOR AND DESIGN OF STEEL SHEAR CONNECTIONS WITH FLOOR SLABS Judy LIU 1 And Abolhassan ASTANEH-ASL 2 SUMMARY The 1994 Northridge earthquake raised many questions regarding welded steel moment
More informationmanualwise BRACED FOR BETTER SEISMIC DESIGN
An introduction to the newest edition of AISC s Seismic Design Manual. manualwise BRACED FOR BETTER SEISMIC DESIGN BY ERIC BOLIN, PE, AND MICHAEL GANNON, SE, PE DO YOU DESIGN PROJECTS with seismic systems?
More informationCHAPTER 14 SLOTTEDWEB (SW) MOMENT CONNECTION
1 CHAPTER 14 SLOTTEDWEB (SW) MOMENT CONNECTION The user s attention is called to the fact that compliance with this chapter of the standard requires use of an invention covered by patent rights. 1 By publication
More informationRECENT RESEARCH ON LINK PERFORMANCE IN STEEL ECCENTRICALLY BRACED FRAMES
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 302 RECENT RESEARCH ON LINK PERFORMANCE IN STEEL ECCENTRICALLY BRACED FRAMES Taichiro OKAZAKI 1, Gabriela
More informationCYCLIC BEHAVIOR OF AN INNOVATIVE STEEL SHEAR WALL SYSTEM
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 2576 CYCLIC BEHAVIOR OF AN INNOVATIVE STEEL SHEAR WALL SYSTEM Qiuhong ZHAO 1 and Abolhassan ASTANEH-ASL
More informationSTEEL MOMENT RESISTING CONNECTIONS SUBJECT TO EARTHQUAKE LOADING. ENCE 710 STEEL STRUCTURES Kirk P. Volovar, P.E. & C. C. Fu, P.E.
STEEL MOMENT RESISTING CONNECTIONS SUBJECT TO EARTHQUAKE LOADING ENCE 710 STEEL STRUCTURES Kirk P. Volovar, P.E. & C. C. Fu, P.E. 1 STEEL MRF SEISMIC CONNECTION INTRO AND PRESENTATION OVERVIEW Early development
More informationsteelwise WHAT S NEW WITH PREQUALIFIED CONNECTIONS? A look at the latest version of AISC 358.
A look at the latest version of AISC 358. steelwise WHAT S NEW WITH PREQUALIFIED CONNECTIONS? BY MICHAEL D. ENGELHARDT, PhD, AND MARGARET A. MATTHEW, PE WHEN IT COMES to the chronicles of steel construction,
More informationEffect of Geometry of Vertical Rib Plate on Cyclic Behavior of Steel Beam to Built-up Box Column Moment Connection
Available online at www.sciencedirect.com Procedia Engineering 14 (2011) 3010 3018 The Twelfth East Asia-Pacific Conference on Structural Engineering and Construction Effect of Geometry of Vertical Rib
More informationCYCLIC TESTING OF BOLTED CONTINUOUS I-BEAM-TO-HOLLOW SECTION COLUMN CONNECTIONS
10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska CYCLIC TESTING OF BOLTED CONTINUOUS I-BEAM-TO-HOLLOW SECTION COLUMN
More informationDuctility of Welded Steel Column to Cap Beam Connections Phase 2
Ductility of Welded Steel Column to Cap Beam Connections Phase 2 Test 2 Summary Report 1 June 2011 1. Executive Summary Prepared for: Alaska Department of Transportation and Public Facilities Alaska University
More informationSupplemental Structural Correction Sheet Steel Brace Frame Design (2017 LABC)
Supplemental Structural Correction Sheet Steel Brace Frame Design (2017 LABC) Plan Check Submittal Date: Plan Check / PCIS App #: Job Address: Applicant: P.C. Engineer: (print first / last name) E-mail:
More informationEVALUATION OF WELDED FLANGE PLATE CONNECTIONS BETWEEN STEEL BEAMS AND BOX COLUMNS
Advanced Steel Construction Vol. 9, No. 1, pp. 59-76 (2013) 59 EVALUATION OF WELDED FLANGE PLATE CONNECTIONS BETWEEN STEEL BEAMS AND BOX COLUMNS M. Gholami, M. Tehranizadeh* and A. Deylami Department of
More informationSEISMIC PERFORMANCE OF PARTIAL JOINT PENETRATION WELDS IN COLUMN SPLICES
10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska SEISMIC PERFORMANCE OF PARTIAL JOINT PENETRATION WELDS IN COLUMN SPLICES
More informationSeismic Evaluation of Steel Moment Resisting Frame Buildings with Different Hysteresis and Stiffness Models
Seismic Evaluation of Steel Moment Resisting Frame Buildings with Different Hysteresis and Stiffness Models ABSTRACT : Jiwook Shin 1 and Kihak Lee 2* 1 M.S. student, Dept. of Architectural Engineering,
More informationCopyright. Apostolos Drolias
Copyright by Apostolos Drolias 2007 Experiments on Link-to-Column Connections in Steel Eccentrically Braced Frames by Apostolos Drolias, DCE Thesis Presented to the Faculty of the Graduate School of The
More informationICC-ES Evaluation Report Issued November 1, 2011 This report is subject to renewal November 1, 2012.
ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-1093* Issued November 1, 2011 This report is subject to renewal November 1, 2012. A Subsidiary of the International Code Council
More informationANALYTICAL AND EXPERIMENTAL STUDIES ON SEISMIC BEHAVIOR OF DEEP COLUMN-TO-BEAM WELDED REDUCED BEAM SECTION MOMENT CONNECTIONS
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 24 Paper No. 1599 ANALYTICAL AND EXPERIMENTAL STUDIES ON SEISMIC BEHAVIOR OF DEEP COLUMN-TO-BEAM WELDED REDUCED BEAM
More informationTests of R/C Beam-Column Joint with Variant Boundary Conditions and Irregular Details on Anchorage of Beam Bars
October 1-17, 8, Beijing, China Tests of R/C Beam-Column Joint with Variant Boundary Conditions and Irregular Details on Anchorage of Beam Bars F. Kusuhara 1 and H. Shiohara 1 Assistant Professor, Dept.
More informationLearning Objectives. Topics. Moment Frames: Design and Detailing per AISC 341 and 358. Topics. Lateral Analysis/Choosing your Code
Topics Moment Frames: Design and Detailing per AISC 341 and 358 By Matthew J. Mester, PE, SE SidePlate Systems, Inc. SE University, June, 2017 www.learnwithseu.com 2 Learning Objectives Topics Identify
More informationTHE PLAZA AT PPL CENTER ALLENTOWN, PA
: MOMENT FRAME COMPARISON Introduction Design Intent IBC 2000 and ASCE 7-98 recognizes steel frames designed with a response modification factor, R, less than or equal to three as structural steel systems
More informationDESIGN OF A SHEAR CONNECTOR FOR A NEW SELF-CENTERING WALL SYSTEM
DESIGN OF A SHEAR CONNECTOR FOR A NEW SELF-CENTERING WALL SYSTEM R.S. Henry 1, S. Aaleti 2, S. Sritharan 3 and J.M. Ingham 4 1 Ph.D Candidate, Dept. of Civil and Environmental Engineering, University of
More informationCHAPTER 1 INTRODUCTION 1.1 MOMENT END-PLATE CONNECTIONS
CHAPTER 1 INTRODUCTION 1.1 MOMENT END-PLATE CONNECTIONS The typical moment end-plate connection shown in Fig. 1-1 consists of a plate that is shop-welded to the end of a beam which is then bolted to the
More informationCHEVRON BRACED FRAMES WITH YIELDING BEAMS: EXPERIMENTS AND NUMERICAL ANALYSIS
Eleventh U.S. National Conference on Earthquake Engineering Integrating Science, Engineering & Policy June 25-29, 2018 Los Angeles, California CHEVRON BRACED FRAMES WITH YIELDING BEAMS: EXPERIMENTS AND
More informationDIVISION: METALS SECTION: STRUCTURAL STEEL FRAMING REPORT HOLDER: SEISMIC STRUCTURAL DESIGN ASSOCIATES, INC.
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1093 Reissued 03/2018 This report is subject to renewal 03/2019. DIVISION: 05 00
More informationSTEEL REACTION FRAME
STEEL REACTION FRAME Kyle Coleman, CEE Laboratory Manager Andrew Myers, Assistant Professor Jerome F. Hajjar, Professor and Chair, Director, STReSS Laboratory Department of Civil and Environmental Engineering,
More informationLateral Force-Resisting Capacities of Reduced Web-Section Beams: FEM Simulations
Lateral Force-Resisting Capacities of Reduced Web-Section Beams: FEM Simulations *Seungpil Kim 1), Myoungsu Shin 2), and Mark Aschheim 3) 1), 2) School of Urban and Environmental Engineering, UNIST, Ulsan
More informationAnalysis of Fracture Behavior of Large Steel Beam-Column Connections
12 th International Conference on Advances in Steel-Concrete Composite Structures (ASCCS 2018) Universitat Politècnica de València, València, Spain, June 27-29, 2018 Doi: http://dx.doi.org/10.4995/asccs2018.2018.7122
More informationCYCLIC BEHAVIOR OF TRADITIONAL AND INNOVATIVE COMPOSITE SHEAR WALLS
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 2578 CYCLIC BEHAVIOR OF TRADITIONAL AND INNOVATIVE COMPOSITE SHEAR WALLS Qiuhong ZHAO 1 and Abolhassan
More informationSEISMIC PERFORMANCE OF US STEEL BOX COLUMN CONNECTIONS
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 981 SEISMIC PERFORMANCE OF US STEEL BOX COLUMN CONNECTIONS Taejin KIM 1, Bozidar STOJADINOVIC 2 and Andrew
More informationStudy of Reduced Beam Section Connections with Web Opening
Study of Reduced Beam Section Connections with Web Opening Mohammad Taghi Kazemi & Seyed-Babak Momenzadeh Sharif University of Technology, Iran Masoud Hoseinzadeh Asl Tabriz University, Iran SUMMARY: Seismic
More informationSpan Length Effect on Seismic Demand on Column Splices in Steel Moment Resisting Frames
Span Length Effect on Seismic Demand on Column Splices in Steel Moment Resisting Frames B. Akbas Gebze Institute of Technology, Turkey Blank Line 9 pt O. Seker Yildiz Technical University, Turkey Blank
More informationA New Rigid Connection for Heavy Beams and Columns in Steel Moment Resisting Frames
Proceedings of the 21 Convention of the Structural Engineers Association of California A New Rigid Connection for Heavy Beams and Columns in Steel Moment Resisting Frames Farzad Naeim, Kan Patel and Kai-Chen
More informationFigure 1 Example of HSS column splice
HSS Column Splices Mike Manor, PE, MLSE FORSE Consulting Technical Consultant to the Steel Tube Institute Hollow Structural Sections (HSS) columns are prevalent in many types of construction, especially
More informationExperimental research on reduced beam section to concrete-filled steel tubular column joints with RC slab
Proceedings of the Tenth Pacific Conference on Earthquake Engineering Building an Earthquake-Resilient Pacific 6-8 November 15, Sydney, Australia Experimental research on reduced beam section to concrete-filled
More informationM. Bruneau 1, Y. Alzeni 2, P. Fouché 2
Steel Innovations Conference 2013 Christchurch, New Zealand 21-22 February 2013 SEISMIC BEHAVIOR OF CONCRETE-FILLED STEEL SANDWICH WALLS AND CONCRETE-FILLED STEEL TUBE COLUMNS M. Bruneau 1, Y. Alzeni 2,
More informationParametric study and design of rib-reinforced steel moment connections
Engineering Structures 27 (2005) 699 708 www.elsevier.com/locate/engstruct Parametric study and design of rib-reinforced steel moment connections Cheng-Chih Chen,Cheng-An Lu, Chun-Chou Lin Department of
More informationStructural Performance of 800 MPa High-Strength Steel Members
ctbuh.org/papers Title: Author: Subject: Keywords: Structural Performance of 800 MPa High-Strength Steel Members Cheol H. Lee, Department of Architecture and Architectural Engineering, Seoul National University
More informationINNOVATIVE DESIGN AND TESTING OF A SEISMIC RETROFITTED STEEL DECK TRUSS BRIDGE
INNOVATIVE DESIGN AND TESTING OF A SEISMIC RETROFITTED STEEL DECK TRUSS BRIDGE Dr. Majid Sarraf, P.E., P.Eng Dr. Michel Bruneau, P.Eng Dr. Sarraf is a Senior Project Engineer and Seismic Specialist at
More informationOverview of Presentation. SCBFs are Conceptually Truss Structures
Ultimate Strength and Inelastic Behavior of Braced Frame Gusset Plate Connections Charles W. Roeder University of Washington Department of Civil and Environmental Engineering Seattle, WA 98195 Structural
More informationRecommended Seismic Design Criteria for New Steel 1. INTRODUCTION
1. INTRODUCTION 1.1 Purpose This report, Recommended Seismic Design Moment- Frame Buildings has been developed by the SAC Joint Venture under contract to the Federal Emergency Management Agency (FEMA)
More informationEffects of Width-to-Thickness Ratio of RHS Column on the Elasto-Plastic Behavior of Composite Beam
Memoirs of the Graduate Schools of Engineering and System Informatics Kobe University No. 6, pp. 1 6, 2014. doi:10.5047/gseku.e.2014.001 Effects of Width-to-Thickness Ratio of RHS Column on the Elasto-Plastic
More informationSEISMIC BEHAVIOR OF FOUR-CIDH PILE SUPPORTED FOUNDATIONS
SEISMIC BEHAVIOR OF FOUR-CIDH PILE SUPPORTED FOUNDATIONS José I. Restrepo 1, Inho Ha 2 and M.J.Nigel Priestley 3 Abstract This paper discusses the results of two large-scale models of Four-Cast-In-Drilled-
More informationPrequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications
ANSI/AISC 358-05 An American National Standard Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications December 13, 2005 Approved by the AISC Connection Prequalification
More informationSeismic Behavior of Composite Shear Wall Systems and Application of Smart Structures Technology
Steel Structures 7 (2007) 69-75 www.ijoss.org Seismic Behavior of Composite Shear Wall Systems and Application of Smart Structures Technology Qiuhong Zhao 1 and Abolhassan Astaneh-Asl 2, * 1 Assistant
More informationEXPERIMENTAL EVALUATION OF NONLINEAR REPLACEABLE LINKS IN ECCENTRICALLY BRACED FRAMES AND MOMENT RESISTING FRAMES
EXPERIMENTAL EVALUATION OF NONLINEAR REPLACEABLE LINKS IN ECCENTRICALLY BRACED FRAMES AND MOMENT RESISTING FRAMES Nabil Mansour 1, Yunlu Shen 1, Constantin Christopoulos 2 and Robert Tremblay 3 1 Graduate
More informationBeam-column joint tests with grade 500E reinforcing
Beam-column joint tests with grade 500E reinforcing L.M. Megget & N.J. Brooke Department of Civil & Environmental Engineering, University of Auckland, New Zealand. R.C. Fenwick Visitor, Department of Civil
More informationSeismic Retrofitting of Moment-Resisting Connections Using Beam Web Opening
Seismic Retrofitting of Moment-Resisting Connections Using Beam Web Opening A. Deylami Professor, Dept. of Structural Engineering, Amirkabir University of Technology, Tehran, Iran M. Aminifar Msc Structural
More informationDIVISION: METALS SECTION: STRUCTURAL STEEL FRAMING REPORT HOLDER: CAST CONNEX CORPORATION
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3031 Reissued 12/2017 This report is subject to renewal 12/2019. DIVISION: 05 00
More informationPRELIMANARY INVESTIGATION OF SMA-BASED RECENTERING BEAM- COLUMN CONNECTION
PRELIMANARY INVESTIGATION OF SMA-BASED RECENTERING BEAM- COLUMN CONNECTION M.S. Speicher 1, R. DesRoches 2, and R.T. Leon 3 1 Ph.D. Candidate, Dept. of Civil and Environmental Engineering, Georgia Institute
More informationTEMPERING. Tremors. San Bernardino s new courthouse features a comprehensive seismic design that minimizes life-cycle costs.
TEMPERING Tremors BY MARK SARKISIAN, S.E., P.E., PETER LEE, S.E., P.E., LINDSAY HU, P.E., AND ALVIN TSUI, S.E., P.E. San Bernardino s new courthouse features a comprehensive seismic design that minimizes
More informationMOMENT RESISTING CONNECTION WITH SIDEPLATE (GEOMETRIC ASPECTS)
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 194 MOMENT RESISTING CONNECTION WITH SIDEPLATE (GEOMETRIC ASPECTS) Ardeshir DEYLAMI 1, and R. ASHRAF
More informationSeismic Performance of WUF-W Moment Connections According to Access Hole Geometries
Seismic Performance of WUF-W Moment Connections According to Access Hole Geometries Sang Whan Han, a) M.EERI, Jin Jung, a) and Sung Jin Ha a) The welded unreinforced flange-welded web (WUF-W) moment connection
More informationDuctile Design of Steel Structures
Ductile Design of Steel Structures Michel Bruneau, Ph.D., P.Eng. Chia-Ming Uang, Ph.D. Rafael Sabelli, S.E. Second Edition Mc Grain/ Hill New York Chicago San Francisco Lisbon London Madrid Mexico City
More informationHYBRID MOMENT RESISTING STEEL FRAMES
HYBRID MOMENT RESISTING STEEL FRAMES Finley A. Charney 1 and Ozgur Atlayan 2 1 Associate Professor, Department of Civil and Environmental Engineering, Virginia Tech, Blacksburg, VA, 2461, USA 2 Graduate
More information22. DESIGN OF STEEL BRACED FRAMES Eccentrically Braced Steel Frames
22. DESIGN OF STEEL BRACED FRAMES 22.1 Eccentrically Braced Steel Frames Objective is to dissipate energy in the shear or moment links and to protect the remainder of the frame from inelastic action, including
More informationGlobal Performance of Lateral Drift and Gravity Load Tests for Prefabricated Stair Assemblies as Manufactured by Pacific Stair Company
Global Performance of Lateral Drift and Gravity Load Tests for Prefabricated Stair Assemblies as Manufactured by Pacific Stair Company Christopher Higgins Associate Professor of Structural Engineering
More informationEVALUATION OF SEISMIC PERFORMANCE FACTORS FOR CHEVRON BUCKLING RESTRAINED BRACED FRAMES
EALUATION OF SEISMIC PERFORMANCE FACTORS FOR CHERON BUCKLING RESTRAINED BRACED FRAMES M.B. Bozkurt 1, Y.O. Özkılıç 2 and C. Topkaya 3 1 Res. Assist. Dr., Civil Eng. Department, Manisa Celal Bayar University,
More informationCyclic Testing of the Column-tree Type and the WUF-B Weak-axis Steel Moment Connections
Cyclic Testing of the Column-tree Type and the WUF-B Weak-axis Steel Moment Connections Kangmin Lee, Rui Li & Liuyi Chen Chungnam National University, Korea Kyoung Hwan Oh Samsung Construction and Trading,
More informationJournal of Constructional Steel Research. Experimental investigation of link-to-column connections in eccentrically braced frames
Journal of Constructional Steel Research 65 (2009) 1401 1412 Contents lists available at ScienceDirect Journal of Constructional Steel Research journal homepage: www.elsevier.com/locate/jcsr Experimental
More informationCyclic testing of steel column-tree moment connections with various beam splice lengths
Steel and Composite Structures, Vol. 16, No. 2 (2014) 221-231 DOI: http://dx.doi.org/10.12989/scs.2014.16.2.221 221 Cyclic testing of steel column-tree moment connections with various beam splice lengths
More informationDeformation Capacity of RC Structural Walls without Special Boundary Element Detailing
Proceedings of the Tenth Pacific Conference on Earthquake Engineering Building an Earthquake-Resilient Pacific 6-8 November 2015, Sydney, Australia Deformation Capacity of RC Structural Walls without Special
More informationOriginally Issued: 09/28/2017 Valid Through: 09/30/2018
SIDEPLATE SYSTEMS, INC. SidePlate Steel Frame Connection Technology: Field-Welded and Field-Bolted Connections CSI Sections: 05 12 00 Structural Steel Framing 1.0 RECOGNITION SidePlate Steel Frame Connection
More informationTHE AISC SEISMIC PROVISIONS: PAST, PRESENT AND FUTURE
THE AISC SEISMIC PROVISIONS: PAST, PRESENT AND FUTURE J.O. MALLEY BIOGRAPHY OF AUTHOR James O. Malley is a Senior Principal with Degenkolb Engineers of San Francisco, California. He received both his Bachelors
More informationCold-Formed Steel Special Bolted Moment Frames: Capacity Design Requirements
Cold-Formed Steel Special olted Moment Frames: Capacity Design Requirements by Atsushi Sato 1 and Chia-Ming Uang 2 ASTRACT Design provisions of the Cold-Formed Steel Special olted Moment Frame (CFS SMF)
More informationSteel moment frames have been one of the most frequently
Seismic Demand on Splices in Steel Moment Frames JAY SHEN, THOMAS A. SABOL, BULENT AKBAS and NARATHIP SUTCHIEWCHARN ABSTRACT This study addresses seismic demands on column splices in steel moment-resisting
More information2016 AISC Standards. Specification for Structural Steel Buildings & Code of Standard Practice for Steel Buildings and Bridges.
2016 AISC Standards Specification for Structural Steel Buildings & Code of Standard Practice for Steel Buildings and Bridges Eric Bolin Staff Engineer June 1, 2017 2016 AISC Standards 2018 INTERNATIONAL
More informationThe Effect of Straightening Method on the k Area Loading Behavior of Rolled Column Sections
Lehigh University Lehigh Preserve ATLSS Reports Civil and Environmental Engineering 12-1-2001 The Effect of Straightening Method on the k Area Loading Behavior of Rolled Column Sections E. Kaufmann John
More informationEXPERIMENTAL STUDY ON SEISMIC PERFORMANCE OF STEEL BEAM TO SRC COLUMN CONNECTIONS
Journal of the Chinese Institute of Engineers, Vol. 31, No. 2, pp. 239-252 (28) 239 EXPERIMENTAL STUDY ON SEISMIC PERFORMANCE OF STEEL BEAM TO SRC COLUMN CONNECTIONS Cheng Chiang Weng*, Yen Liang Yin,
More informationSeismic design of braced frame gusset plate connections
Earthquake Resistant Engineering Structures V 105 Seismic design of braced frame gusset plate connections C. W. Roeder, D. E. Lehman, A. Christopolus, I. Gunnarson, S. Johnson & J. H. Yoo Department of
More informationEFFECTS OF END REGION CONFINEMENT ON SEISMIC PERFORMANCE OF RC CANTILEVER WALLS
10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska EFFECTS OF END REGION CONFINEMENT ON SEISMIC PERFORMANCE OF RC CANTILEVER
More informationTesting of a Laterally Stable Eccentrically Braced Frame for Steel Bridge Piers
.1.. Testing o a Laterally Stable Eccentrically Braced Frame or Steel Bridge Piers Jerey W. Berman Ph.D. Student, Dept. o Civil Structural and Environmental Engineering, University at Bualo Research Supervisor:
More informationSHEAR FUSE I 2. systems. heights, equipped with the. replaced. Moment. that are expected. to dissipate decades, made to. specific segments of the beam
INITE ELEMENT INVESTIGATION O MOMENT RESISTING RAMES WITH A NEW SHEAR STRUCTURAL USE M.T. NIKOUKALAM 1 and Kiarash M. DOLATSHAHI I 2 ABSTRACT Special moment resisting frames (SMRs) are of the most desirable
More informationINFLUENCE OF DIFFERENT TYPES OF FULLY RESTRAINED CONNECTIONS ON THE RESPONSE OF SMRF STRUCTURES
INFLUENCE OF DIFFERENT TYPES OF FULLY RESTRAINED CONNECTIONS ON THE RESPONSE OF SMRF STRUCTURES Akshay GUPTA And Helmut KRAWINKLER SUMMARY The behavior, response, and performance of code-compliant designs
More informationThe SlottedWeb Steel Moment Connection
The SlottedWeb Steel Moment Connection Seismic Structural Design Associates http://slottedweb.com Jay Allen, S.E. Jay Allen President (602)President 251-0329 Jim Partridge, C.E. Jim Partridge Secretary
More informationThe Professional Journal of the Earthquake Engineering Research Institute PREPRINT
The Professional Journal of the Earthquake Engineering Research Institute PREPRINT This preprint is a PDF of a manuscript that has been accepted for publication in Earthquake Spectra. It is the final version
More informationWeld Effective Lengths for Round HSS Connections
Weld Effective Lengths for Round HSS Connections by Jeffrey A. Packer Bahen/Tanenbaum Professor of Civil Engineering, University of Toronto, Ontario, Canada The AISC Specification (AISC 2016) gives weld
More informationInterpretation of SECTION 12 DESIGN AND DETAILING FOR EARTHQUAKE LOADS IS
Interpretation of SECTION 12 DESIGN AND DETAILING FOR EARTHQUAKE LOADS 12.1 General IS 800-2007 Steel frames shall be so designed and detailed as to give them adequate strength, stability and ductility
More informationBEHAVIOR OF STEEL PLATE SHEAR WALLS WITH IN-SPAN PLASTIC HINGES
716 BEHAVIOR OF STEEL PLATE SHEAR WALLS WITH IN-SPAN PLASTIC HINGES Ronny Purba 1 and Michel Bruneau 2 1 Graduate Research Assistant, Department of Civil, Structural, and Environmental Engineering, University
More informationCISC HANDBOOK OF STEEL CONSTRUCTION REVISIONS LIST NO. 1 - MAY 2011
CISC HANDBOOK OF STEEL CONSTRUCTION 10 th Edition, 1 st Printing 2010 REVISIONS LIST NO. 1 - MAY 2011 The following revisions and updates have been incorporated into the 2 nd Printing (2011) of the 10
More informationEXPERIMENTAL RESPONSE OF BOUNDARY ELEMENTS OF CODE- COMPLIANT REINFORCED CONCRETE SHEAR WALLS
10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska EXPERIMENTAL RESPONSE OF BOUNDARY ELEMENTS OF CODE- COMPLIANT REINFORCED
More informationANSI/AWS D An American National Standard. Structural Welding Code Sheet Steel
ANSI/AWS D1.3-98 An American National Standard Structural Welding Code Sheet Steel Key Words Sheet steel, allowable stresses, details of welded joints, workmanship qualification, visual acceptance criteria,
More informationIMPROVED WELDED CONNECTIONS FOR EARTHQUAKE LOADING
IMPROVED WELDED CONNECTIONS FOR EARTHQUAKE LOADING Wolfgang SCHOLZ 1 And Charles CLIFTON 2 SUMMARY This paper presents an overview of fracture tests performed on welded samples representing the column/
More informationCold-formed Steel Special Bolted Moment Frames Capacity Design Requirements
Missouri University of Science and Technology Scholars' Mine International Specialty Conference on Cold- Formed Steel Structures (2008) - 19th International Specialty Conference on Cold-Formed Steel Structures
More informationGUIDELINES ON NONLINEAR DYNAMIC ANALYSIS FOR SEISMIC DESIGN OF STEEL MOMENT FRAMES
Eleventh U.S. National Conference on Earthquake Engineering Integrating Science, Engineering & Policy June 25-29, 2018 Los Angeles, California GUIDELINES ON NONLINEAR DYNAMIC ANALYSIS FOR SEISMIC DESIGN
More informationSPECIAL PROVISION FOR STRUCTURAL STEEL AND ALUMINUM CONSTRUCTION. C&T:SJC 1 of 10 C&T:APPR:DAJ:DBP: FHWA:APPR:
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STRUCTURAL STEEL AND ALUMINUM CONSTRUCTION C&T:SJC 1 of 10 C&T:APPR:DAJ:DBP:07-09-07 FHWA:APPR:07-19-07 a. Description. This specification covers
More informationSEISMIC SIMULATION OF AN EXISTING STEEL MOMENT-FRAME BUILDING RETROFITTED WITH EXTERNAL CABLE-STAYED SYSTEM
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 561 SEISMIC SIMULATION OF AN EXISTING STEEL MOMENT-FRAME BUILDING RETROFITTED WITH EXTERNAL CABLE-STAYED
More informationCanadian Welding Bureau Welding Procedure Qualification AWS D1.1 vs CSA W47.1
Welding Procedure Qualification Canadian Welding Bureau Welding Procedure Qualification Comparison of Key Concepts and Requirements This document provides a general comparison of key concepts and requirements
More informationExperimental and analytical investigation of tubular links for eccentrically braced frames
Engineering Structures 29 (2007) 1929 1938 www.elsevier.com/locate/engstruct Experimental and analytical investigation of tubular links for eccentrically braced frames Jeffrey W. Berman a,, Michel Bruneau
More information