1 10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska ISSUES ON USING WELDED BUILT-UP BOX COLUMNS IN STEEL SPECIAL MOMENT FRAMES P. Lee 1, R. Garai 2, G. Ozkula 3, C. M. Uang 4 and M. Sarkisian 5 ABSTRACT This paper summarizes key issues resulting from the cyclic testing of steel moment frame specimens using large built-up box column and reduced beam section (RBS) welded moment connections. The test program was initiated in the design development of the new 24-story San Diego Central Courthouse facility to investigate extending the moment frame connection prequalification limits of AISC 358 for effective, economical and reliable application of steel special moment frames with large built-up box columns in regions of high seismicity. Primary issues investigated in the testing program included evaluating connection response with respect to: 1) the use of electro-slag welding (ESW) process for making the continuity plate completejoint-penetration groove weld; 2) RBS geometry and beam-to-column force transfer mechanism; and, 3) what modifications, if any, to the AISC and AWS detailing requirements can be introduced to further improve connection response. A total of three full-scale moment connection specimens were fabricated and cyclically tested in accordance with AISC 341. Testing of the first two specimens revealed the detrimental notch effect built into the ESW process, although one specimen passed the AISC acceptance criteria. Measures were then made to improve not only the RBS dimensioning, beam top flange steel backing treatment, weld access hole geometry, and especially the ESW weld details in an attempt to mitigate the notch effect inside the column. With these improvements, the cyclic performance of the third specimen was significantly improved. 1 SE, Associate Director, Skidmore, Owings & Merrill, LLP, San Francisco, CA PE, Associate, Skidmore, Owings & Merrill, LLP, San Francisco, CA Graduate Student Researcher, Dept of Structural Engineering, University of California, San Diego, CA PhD, Professor, Dept. of Structural Engineering, University of California, San Diego, CA SE, Partner, Skidmore, Owings & Merrill, LLP, San Francisco, CA Lee P, Garai R, Ozkula G, Uang C M, Sarkisian M. Issues for using welded built-up box columns in steel special moment frames. Proceedings of the 10 th National Conference in Earthquake Engineering, Earthquake Engineering Research Institute, Anchorage, AK, 2014.

2 6 10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska Issues On Using Welded Built-Up Box Columns In Steel Special Moment Frames P. Lee 1, R. Garai 2, G. Ozkula 3, C. M. Uang 4, and M. Sarkisian 5 ABSTRACT This paper summarizes key issues resulting from the cyclic testing of steel moment frame specimens using large built-up box column and reduced beam section (RBS) welded moment connections. The test program was initiated in the design development of the new 24-story San Diego Central Courthouse facility to investigate extending the moment frame connection prequalification limits of AISC 358 for effective, economical and reliable application of steel special moment frames with large built-up box columns in regions of high seismicity. Primary issues investigated in the testing program included evaluating connection response with respect to: 1) The use of electro-slag welding (ESW) process for making the continuity plate complete-jointpenetration groove weld; 2) RBS geometry and beam-to-column force transfer mechanism; and, 3) What modifications, if any, to the AISC and AWS detailing requirements can be introduced to further improve connection response. A total of three full-scale moment connection specimens were fabricated and cyclically tested in accordance with AISC 341. Testing of the first two specimens revealed the detrimental notch effect built-into the ESW process, although one specimen passed the AISC acceptance criteria. Measures were then made to improve not only the RBS dimensioning, beam top flange steel backing treatment, weld access hole geometry, and especially the ESW weld details in an attempt to mitigate the notch effect inside the column. With these improvements, the cyclic performance of the third specimen was significantly improved. Introduction Welded built-up box columns are frequently used in the construction of steel Special Moment Frames (SMF) to provide effective bi-axial column strength and stiffness, especially in taller SMF structures where seismic drift demands and impact on architectural layout, as well as efficient and economical structures are particularly important. The AISC 358 [1] standard Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications provides several prequalified moment connection types. These design requirements are based mainly on cyclic testing of moment connections with W-shaped columns, although built-up columns with some dimensional limitations (up to 24-in width and depth) are also allowed. 1 SE, Associate Director, Skidmore, Owings & Merrill, LLP, San Francisco, CA PE, Associate, Skidmore, Owings & Merrill, LLP, San Francisco, CA Graduate Student Researcher, Dept of Civil Engineering, University of California, San Diego, CA PhD, Professor, Dept. of Civil Engineering, University of California, San Diego, CA SE, Partner, Skidmore, Owings & Merrill, LLP, San Francisco, CA Uang CM, Lee P, Ozkula G, Garai R, Sarkisian M. Issues for using welded built-up box columns in steel special moment frames. Proceedings of the 10 th National Conference in Earthquake Engineering, Earthquake Engineering Research Institute, Anchorage, AK, 2014.

3 Several issues arise when using built-up box columns, yet these are not addressed in the AISC or AWS [3, 5] design provisions. Consider fabrication first. Continuity plates at the beam top and bottom flange levels are almost always required. Since these plates are placed inside the box section, they can only be welded to three sides when one side of the column is still open, while the last weld is performed using the electro-slag welding (ESW) process when the closing plate of the built-up column is in position. ESW is prone to creating a notch condition inside the column, yet there is no way to get access to it for insepction once welding is completed. This notch condition is further prone to initiate brittle and premature fracture under cyclic loading. Next consider the design issue. Unlike that of when a W-shaped column is used where column web is aligned with beam web, the two webs in a box column constitute a very strong panel zone, which forces the beam to deliver all the inelastic deformation. Additionally, the stress flow between the beam and column is also altered because the stiffer web is not located at the midwidth of the beam flange as in the W-shape column case. During the design development and construction document phases of the new San Diego Central Courthouse, a total of three full-scale RBS moment connection subassemblies were cyclically tested. The box column consisted of A572 Gr. 50 steel with dimensions of 24-in. wide and 36-in deep with 2-in. thick plate material. The beam consisted of a W rolled section of A992 steel. The first two specimens incorporated a 32% total flange width cut in the RBS region. While tests demonstrated that only one of the first two specimens reached the target story drift angle of 0.04 rad, both specimens failed in nearly identical brittle failure modes. The undesirable brittle fracture in the welded connection was neither desirable nor typical of RBS moment connection behavior even though the first specimen did pass AISC 341 [2] acceptance criteria. A detailed analysis of the fractured welded joints showed that a notch condition was created, during fabrication, inside the column at the ESW of the continuity plate, which caused the brittle fracture of the connection. Since the first two specimen tests demonstrated that the current practice of fabricating built-up box columns needs to be improved, two major steps were undertaken for the construction of the third specimen which retained identical built-up box column and beam sections as for the first two specimens. Finite element analysis indicated that reducing the RBS beam flange width dimension up to about 50% was helpful in reducing the stress demand at the welded joints. More significantly, a modified detail for ESW welding was incorporated in an attempt to minimize the notch condition. The third specimen testing successfully reached a story drift angle of 2 cycles at 0.05 rad and exhibited RBS ductile behavior as was expected based on AISC design equations and predicted finite element modeling of the test specimen. Based on additional post-test analysis and observations, and to further assure a positive outcome of the testing program for the project, two additional detailing improvements had been incorporated in the third specimen testing, which included the use of alternate AWS D1.8 [3] beam weld access hole geometry, and the removal of steel backing for the beam top flange CJP weld. Project Description The design of the new San Diego Central Courthouse facility for the California Administrative Office of the Courts (AOC) consists of a 24-story superstructure above grade with two below grade basement levels, encompassing a full city block with a total of 704,000 gross sq. ft. of building area is shown in Fig. 1. The superstructure lateral force resisting system consists of

4 two-way steel SMF. Typical SMF consists of W24 and W36 beams with RBS connections, as well as two-w30 cruciform columns and built-up box columns typically 33 in. square range from 20 to 36 in. dimension. Additional energy dissipation and drift control is provided by supplemental viscous damping devices in the transverse SMF direction. Fig. 2 shows the test set-up and specimen for cyclic testing [4]. Figure 1. New San Diego Central Courthouse Figure 2. Test Set-up at UCSD Laboratory Use of Welded Built-Up Box Columns in Steel SMF AISC 358 SMF RBS Connection Limitations AISC 358 [2] provides several prequalified moment connection types. These design requirements are based mainly on cyclic testing of moment connections with W-shaped columns, although cruciform columns and built-up columns with some dimensional limitations up to 24 in. in width and depth are also allowed. If the design is tied to these limitations of AISC 358, it results in heavy thick plates for columns, which is not an efficient use of material. Thus, the designers herein are of the opinion that for a high-rise structure, where the design is governed by the lateral stiffness, using a larger box column while maintaining the b/t ratio limitation is the most cost-effective solution and, hence, the need for further testing and research is warranted to extend the AISC 358 limits. Additional limitations include the depth and weight of rolled shape beams to 36 in. and 300 lbs/ft, respectively, with flange thickness limited to 1¾ in. Fabrication of Built-Up Box Columns Figure 3 shows typical moment connection detailing for SMF built-up box column. The member sizes and RBS dimensions are listed in Table 1. The beam was framed into the narrow 24-in. wide face of the built-up column. Complete-joint penetration (CJP) groove welds were used to connect 1¾ in. continuity plates to the column. Three sides of each continuity plate were connected to the column by flux-cored arc welding (FCAW) [Figure 4 (a)] while the electro-slag welding (ESW) process was used to complete the fourth side [Figure 4 (b)]. The ESW joint used a 7/8-in. root with conventional AWS D1.1 [5] containment plates [Figure 11(a)] were used for Specimens 1 and 2, which were subsequently improved for Specimen 3. The ESW was

5 purposely configured to align opposite the beam top and bottom flange CJP welds. (a) Elevation (b) Plan Figure 3. Box Column Connection Detail Table 1. Member Sizes and RBS Dimensions Detail (a) FCAW Joint (b) ESW Joint Overview (c ) ESW Joint (Detail) Figure 4. Continuity Plate Welded Joints Notch Condition Continuity Plates, Electro-Slag Weld at Closure, ESW Prone to Notch condition Based on standard U.S. building practice, the ESW backing consists of two to three consumable containment plates on either side of the electro-slag weld in conformance with AWS D1.1 [5]

6 procedures. Due to the fabrication process, a notch effect or gap is created at the juncture of the innermost containment plate and inside face of the column plate which is easily identified in the macro-etch analysis. Under cyclic load, the notch condition is prone to initiate premature crack propagation and fracture through the column flange plate at each side of the weld. ESW Design Limitations of AWS D1.1 and AWS D1.8 While the ESW is necessary to connect at least one edge of the continuity plate to the column, it is generally recognized as the weaker weld when compared with the FCAW process and it is therefore generally recommended that the beam moment connection be located on the FCAW side of the column. However, this would add complexity to the on-site coordination. Moreover, for conditions where SMF beam occurs on all four sides subjected to biaxial frame action, moment connections on the ESW face of the column are inevitable and desirable. Welding provisions in AISC 341 [2] and AWS D1.8 [3] do not explicitly address ESW requirements as a demand critical weld in the SMF. AWS D1.1 [5] refers only the Procedure Qualification Record (PQR) essential variable changes in requiring Welding Procedure Specification (WPS) requalification. Even though the ESW is an essential or demand critical weld in the moment connection load path, AWS D1.8 does not include any discussion on the processes, procedures and weld preparation for ESW such as requirements for electrodes, guide tubes, type of flux, Charpy V-Notch toughness and hardness requirements for weld metal and heat affected zone, etc., whereas, the AWS D1.5 [6] Bridge Welding Code does provide some information regarding the ESW. It should be noted that for bridge construction, ESW is primarily used for groove welds in butt joints, which is different from the T-joint application in the case of continuity plate welding to column flange. As a result of significant findings during the test, a well documented design and acceptance criteria was established for the moment connection to be used for this project. Specific WPS with supporting PQR were developed for the ESW used in the test specimens in conformance with the demand critical filler and weld metal criteria of AWS D1.8 [3] 6.3 and Tables 6.1 and 6.2. Full-Scale Cyclic Testing of RBS Moment Connection Subassemblies Test Set-up and Loading Protocol The overall geometry of the test setup is shown in Figure 5. Each test specimen was tested in an upright position so that simulated field welding of the moment connection could be performed properly in the testing laboratory. Two servo-controlled ±450-kip actuators with a ±24 in. stroke were used to apply cyclic loading at the end of the beam. The beam was laterally braced at the beam end near the actuators. The AISC 341 [2] loading sequence expressed in terms of the story drift angle for beam-to-column moment connection test was used as illustrated in Figure 6. Displacement was applied to the end of the beam. The loading began with six cycles each at 0.375%, 0.5% and 0.75% drift. The next four cycles in the loading sequence were at 1% drift, followed by two cycles each at 1.5%, 2%, 3%, 4%, 5%, 6%, or until the specimen failed. According to Section E3.6b of AISC 341 [2], beam-to-column connections used in the seismic load-resisting system shall satisfy the following requirements: 1) the connection must be capable of sustaining a story drift angle of at least 0.04 radians for one cycle, and 2) the required flexural strength of the connection, determine at the column face must be equal at least 80 percent of the nominal plastic moment of the connected beam at a story drift angle of 0.04 radians.

7 Figure 5. Test Set-up Figure 6. Test Protocol AISC 341 K3.4c [2] Specimen 1 Testing Summary Results Minor yielding in the beam flanges was observed at 1% drift. Minor beam web local buckling started at 2% drift. The yielding deformations at 4% drift and hysteretic response are shown in Figure 7(a) and (b). Although Specimen 1 testing met AISC 341 [2] qualification test acceptance criteria of one cycle at 4% drift, both flange local buckling and web local buckling was limited, exhibiting no strength reduction as might be expected for an RBS connection [7]. After successfully completing two cycles at 4% drift, the sudden and brittle mode of failure was bottom flange rupture at the start of the 5% drift cycle. Contributing to the poor RBS connection behavior was: 1) the beam width-thickness ratios were low, and 2) the amount of RBS cut (c dimension) of 0.16b f was relatively low compared to the maximum allowed by AISC 358 [1] of 0.10b f min, and 0.25b f max. (a) Yielding and Buckling Patterns (b) Figure 7. Specimen 1 at 4% Drift (2 Cycles) Global Hysteretic Response Additionally, significant cracking at one edge of the beam top flange was observed after 2nd cycle at 4% drift at one-half cycle prior to beam bottom flange rupture failure mode. Two factors contributed to this crack propagation: 1) strain and stress concentrations are higher at both ends across the beam flange width when the beam is connected to a box column, and 2) CJP

8 steel backing was left in place, although a reinforcing fillet weld was placed underneath the steel backing connecting directly to face of column as permitted by AISC 341 [2]. This detail creates a discontinuity of weld material between the flange CJP weld and backing fillet weld. Specimen 2 Testing Summary Results Specimen 2 experienced premature brittle fracture similar to Specimen 1, but at a drift of 3.9% during the first positive excursion cycle to 4% drift as shown in Figure 8(a) and (b). Unlike Specimen 1, Specimen 2 did not meet the AISC 341 [2] acceptance criteria of achieving one complete cycle at 4% drift. Additionally, as was observed in Specimen 1, a crack at the top flange edge condition was observed prior to failure mode at lower drift levels and propagated further at subsequent increasing drift levels. Again, the crack initiated at the interface of the top of the backing bar and extended into the CJP weld root. It is believed that this discontinuity between the CJP root and the backing bar fillet weld may have contributed to increased levels of strain prior to the brittle bottom flange rupture. (a) Fracture at Beam Bottom Flange (b) Global Hysteretic Response Figure 8. Specimen 2 at 3.9% Drift (1 st Cycle) Post-test analysis and investigation of Specimen 1 and 2 Testing In addition to the two continuity plates that were installed at beam flange levels, the continuity plate at the top end of the column where the column connected to the reaction wall had also been detailed in the same manner which provided an opportunity to cut pieces from that location to examine the condition of the similarly welded joints but outside the moment connection region. This sampling of Specimen 1 allowed for baseline comparisons with samples taken at Specimen 2 top and bottom flange welded joints as discussed below. Results from hardness testing of macro-etched sections indicate that the hardness of the ESW weld was not significantly higher than that of the base metal and similar at both locations. Although brittle fracture did not occur at the beam top flange level, Figure 9(a) and (b) illustrate that distinct and sharp notches are created during the ESW welding. The notch condition initiates at the non-welded juncture of the ESW containment plates and inside column face. From Figure 9(a), it is further noted that the ESW joint was shifted during fabrication creating a fully fused but a somewhat eccentric ESW condition and beam flange to continuity plate load path.

9 (a) Overall Macro-etch View (b) Detail Illustrating Notch Condition Figure 9. Specimen 2 ESW Welded Joint at Beam Top Flange Level The macro-etch cross sections taken at the beam bottom flange are shown in Figure 10(a) and (b). It is observed that the formation of a crack initiating at the ESW notch condition also triggered a crack that propagated into and through the column flange plate. Therefore, the notches that were created by the ESW process are responsible for the brittle fracture at the bottom flange level. (a) East Section (b) West Section Figure 10. Specimen 2 ESW Welded Joint at Beam Bottom Flange Level Fabrication of Built-Up Box Column ESW to Mitigate Notch Condition Fabrication of Specimens 1 and 2 utilized conventional ESW containment plates made up of three ½-in plates at each side of the weld as shown in Figure 11(a). To mitigate the notch effect, the Specimen 3 detail was made up with two ¾-in containment plates on each face of the weld with a 45-degree 3/8-in transition bevel at the innermost containment plates at the juncture of the containment plate and inside column face as shown on Figure 11(b). Additionally, 1/8-in shims were introduced between the innermost containment plate and the continuity plate. This modified containment plate configuration results in a larger diameter and smoother transition of the electro-slag weld bulb. The effect is to postpone the potential of cracking from the notch effect, if not eliminate it completely, by increasing the length of the weld in the fused column plate heat effected zone. Also, the larger electro-slag weld bulb helps to provide some redundancy for offset fabrication tolerances between the beam flange and continuity plate alignment. More work can be done to further improve the ESW fit-up and process to address the containment plate notch effect. Prior to the fabrication of Specimen 3, a new ESW weld procedure specification (WPS) with supporting procedure qualification (PQR) testing was conducted in conformance with both AWS D1.1/D1.8 and AWS D1.5 specifications.

10 (a) Specimen 1 and 2 (b) Specimen 3 Specimen 3 Testing Summary Results Figure 11. ESW Joint Details In addition to ESW beveled weld backing plates, three other improvements were made to Specimen 3 including (1) Increasing the RBS cut c dimension from in (16%) to in (25%); (2) Instead of using AISC 360 [8] Alternate 1 Fig. C-J1.2, the modified beam weld access hole geometry per AWS D1.8 Fig. 6.2 was used; and (3) At beam top flange CJP, the backing bar was removed, back gouged, and reinforcing fillet was provided similar to AISC 341 [2] requirement for the bottom flange CJP. Specimen 3 successfully underwent two cycles at 4% and 5% drifts each exhibiting very good RBS ductile behavior and exceeded AISC acceptance criteria with no beam flange welded joint failures as had been seen in Specimens 1 and 2. Figure 12(a) illustrates that the beam experienced significantly more local flange, web and lateral-torsional buckling as compared to Specimens 1 and 2. Additionally, by increasing the c dimension of the RBS section, beam flange weld demands were reduced. As indicated by earlier research by Ricles, et al [9], use of an improved weld access hole geometry and removing steel backing in the top flange also eliminated the development of top flange edge condition cracks as had been witnessed in Specimens 1 and 2. The beam eventually fractured in the beam top flange RBS region due to low cycle fatigue during the first cycle at 6% drift shown in Fig. 12(b). The test specimen response is illustrated in Figure 12(c), demonstrating overall ductility and RBS behavior with distinct levels of stiffness degradation while meeting AISC acceptance criteria. (a) Specimen 3 at 6% Drift (b) Fracture RBS Top Flange (c) Global Hysteretic Response Figure 12. Specimen 3 RBS Results

11 Conclusions The results of the testing program described herein amount to a significant contribution to available knowledge on the performance of welded built-up box columns in steel special moment frames (SMF). This is particularly important given the very limited amount of testing conducted in the U.S. using these connections, notwithstanding, the widespread use of the built-up box column in regions of high seismicity for use in complex structures such as tall buildings. This testing program identified a notch effect condition inherent in the fabrication process of ESW electro-slag welding that when used as a closer weld in a built-up box column continuity plate moment connection, is prone to initiate a crack that propagates through the weld heat effected zones and column plate material leading to brittle premature fracture under cyclic seismic loading. Additionally, this testing program developed several measures to significantly improve performance and reliability of the built-up box column RBS moment connection. Most significantly, improvements included the beveled transition of the ESW containment plates at the continuity plate to inside column plate face and thereby mitigating the ESW notch effect, whereby, prolonging the premature onset of brittle fracture allowing predicted ductile moment connection behavior. The application of the SMF RBS qualification testing herein is limited to the San Diego Central Courthouse project, however, significant care was employed in configuring the test specimens in the interest of contributing to extending the AISC 358 qualification limits. Beyond the scope of this paper, additional finite element modeling of this test specimen has demonstrated that good ductile behavior of the built-up box column RBS connection is achieved, and therefore, is limited primarily by the reliability of the ESW. Two potential contributions beyond the scope of this project can be achieved as a consequence of this moment frame connection qualification testing program: (1) Extend limits of AISC 358 prequalification for large built-up box columns with reduced beam section (RBS) moment connections; and, (2) Address the reliability of the ESW in moment connections as a demand critical weld and integral component of the load path under peak cyclic seismic loads to achieve intended ductile performance of the qualified connection. An AWS ESW Task Group has been formed as a result of this testing to address brittle failure mode issues and identify further research and/or testing to reduce or eliminate brittle behavior. Acknowledgments The authors are very grateful to the support provided by the Judicial Council of California and Administrative Office of the Courts (AOC) in pursuing this testing effort, thus contributing to furthering the state-of-practice and research. References 1. AISC 358, Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications, Including Supplement No. 1, ANSI/AISC , ANSI/AISC 358s1-11, American Institute of Steel Construction, Chicago, IL. 2. AISC 341, Seismic Provisions for Structural Steel Buildings, ANSI/AISC , American Institute of Steel Construction,, Chicago, IL. 3. AWS D1.8, American Welding Society, AWS D1.8/D1.8M: 2009, Structural Welding Code Seismic

12 Supplement, 2 nd Edition, Miami, FL. 4. Ozkula, G. and Uang, C. M. (2013), Cyclic Testing of Steel RBS Moment Connections with Built-up Box Column for the San Diego Central Courthouse, Report No. TR-13/01, Department of Structural Engineering, University of California, San Diego, La Jolla, CA. 5. AWS D1.1, American Welding Society, AWS D1.1/D1.1M: 2011, Structural Welding Code Steel, 22nd Edition, Miami, FL. 6. AWS D1.5, American Welding Society, AASHTO/AWS D1.5M/D1.5: 2008, Bridge Welding Code, 5th Edition, A Joint Publication of American Association of State Highway and Transportation Officials and American Welding Society. 7. Zhang, X., Ricles, J.M., (2006), Experimental Evaluation of Reduced Beam Section Connections to Deep Columns, Journal of Structural Engineering, American Society of Civil Engineers. 8. AISC 360, Specification for Structural Steel Buildings, ANSI/AISC , American Institute of Steel Construction, Chicago, IL. 9. Ricles, J.M., Fisher, J.W., Lu, L.-W. and Kaufmann, E.J. (2002), Development of Improved Welded Moment Connections for Earthquake-Resistant Design, Journal of Constructional Steel Research. Vol. 58, pp

EFFECTS OF LOADING HISTORY ON CYCLIC PERFORMANCE OF STEEL RBS MOMENT CONNECTIONS

EFFECTS OF LOADING HISTORY ON CYCLIC PERFORMANCE OF STEEL RBS MOMENT CONNECTIONS EFFECTS OF LOADING HISTORY ON CYCLIC PERFORMANCE OF STEEL RBS MOMENT CONNECTIONS C M UANG 1, Q S YU 2 And C S GILTON 3 SUMMARY The cyclic response of steel reduced beam section moment connections under

More information

ACHIEVING DUCTILE BEHAVIOR OF MOMENT CONNECTIONS PART II

ACHIEVING DUCTILE BEHAVIOR OF MOMENT CONNECTIONS PART II Beam Seismic Design Panel zone ACHIEVING DUCTILE BEHAVIOR OF MOMENT CONNECTIONS PART II The results of additional tests provide further confirmation that weld metal toughness is key in achieving ductile

More information

Seismic Performance of Flange Plate Connections to Built-up Box Columns

Seismic Performance of Flange Plate Connections to Built-up Box Columns Seismic Performance of Flange Plate Connections to Built-up Box Columns A. Deylami, M. Tehranizadeh & M. Gholami Amirkabir University of Technology, Iran SUMMURY This paper presents analytical and experimental

More information

CYCLIC BEHAVIOR OF STEEL SHEAR LINKS USED IN REPLACEABLE COUPLING BEAMS

CYCLIC BEHAVIOR OF STEEL SHEAR LINKS USED IN REPLACEABLE COUPLING BEAMS 10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska CYCLIC BEHAVIOR OF STEEL SHEAR LINKS USED IN REPLACEABLE COUPLING

More information

Supplemental Structural Correction Sheet Steel Moment Frame Design (2017 LABC)

Supplemental Structural Correction Sheet Steel Moment Frame Design (2017 LABC) Supplemental Structural Correction Sheet Steel Moment Frame Design (2017 LABC) Plan Check/PCIS Application No.: Checked By: Your feedback is important, please visit our website to complete a Custom Survey

More information

EngDoc.ir. Page 1 of 51

EngDoc.ir. Page 1 of 51 Page 1 of 51 1994 Northridge Earthquake Widespread failure of welded flange - bolted web moment connections Page 2 of 51 Damage Observations: Steel Moment Connections Pre-Northridge Welded Flange Bolted

More information

3. CLASSIFICATION AND IMPLICATIONS OF DAMAGE

3. CLASSIFICATION AND IMPLICATIONS OF DAMAGE 3. CLASSIFICATION AND IMPLICATIONS OF DAMAGE 3.1 Summary of Earthquake Damage There are no modifications to the Guidelines or Commentary of Section 3.1 at this time. 3.2 Damage Types There are no modifications

More information

THE REDUCED BEAM SECTION MOMENT CONNECTION WITHOUT CONTINUITY PLATES

THE REDUCED BEAM SECTION MOMENT CONNECTION WITHOUT CONTINUITY PLATES 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 1504 THE REDUCED BEAM SECTION MOMENT CONNECTION WITHOUT CONTINUITY PLATES Scott M. ADAN 1 and Lawrence

More information

SEISMIC PERFORMANCE OF SCBF BRACED FRAME GUSSET PLATE CONNECTIONS

SEISMIC PERFORMANCE OF SCBF BRACED FRAME GUSSET PLATE CONNECTIONS 4th International Conference on Earthquake Engineering Taipei, Taiwan October 12-13, 2006 Paper No. 80 SEISMIC PERFORMANCE OF SCBF BRACED FRAME GUSSET PLATE CONNECTIONS Charles W. Roeder 1, Dawn E. Lehman

More information

Cold-Formed Steel Special Bolted Moment Frames: Cyclic Testing and Numerical Modeling of Moment Connections

Cold-Formed Steel Special Bolted Moment Frames: Cyclic Testing and Numerical Modeling of Moment Connections Cold-Formed Steel Special Bolted Moment Frames: Cyclic Testing and Numerical Modeling of Moment Connections by Chia-Ming Uang 1, Jong-Kook Hong 2, Atsushi Sato 3 and Ken Wood 4 ABSTRACT Cyclic tests on

More information

Survey and Testing of Pre-1988 Braced Frame Structures From The West Coast of the United States

Survey and Testing of Pre-1988 Braced Frame Structures From The West Coast of the United States Survey and Testing of Pre-1988 Braced Frame Structures From The West Coast of the United States Dan Sloat 1, Charles W. Roeder 2, Dawn E. Lehman 3, and Jeffrey W. Berman 4 1 Graduate Student, Dept. of

More information

Full-scale Testing of the Cast Steel Yielding Brace System

Full-scale Testing of the Cast Steel Yielding Brace System Full-scale Testing of the Cast Steel Yielding Brace System M.G. Gray, C. Christopoulos & J.A. Packer Department of Civil Engineering, University of Toronto, Toronto, Canada ABSTRACT: The cast steel Yielding

More information

SEISMIC BEHAVIOR AND DESIGN OF STEEL SHEAR CONNECTIONS WITH FLOOR SLABS

SEISMIC BEHAVIOR AND DESIGN OF STEEL SHEAR CONNECTIONS WITH FLOOR SLABS SEISMIC BEHAVIOR AND DESIGN OF STEEL SHEAR CONNECTIONS WITH FLOOR SLABS Judy LIU 1 And Abolhassan ASTANEH-ASL 2 SUMMARY The 1994 Northridge earthquake raised many questions regarding welded steel moment

More information

manualwise BRACED FOR BETTER SEISMIC DESIGN

manualwise BRACED FOR BETTER SEISMIC DESIGN An introduction to the newest edition of AISC s Seismic Design Manual. manualwise BRACED FOR BETTER SEISMIC DESIGN BY ERIC BOLIN, PE, AND MICHAEL GANNON, SE, PE DO YOU DESIGN PROJECTS with seismic systems?

More information

CHAPTER 14 SLOTTEDWEB (SW) MOMENT CONNECTION

CHAPTER 14 SLOTTEDWEB (SW) MOMENT CONNECTION 1 CHAPTER 14 SLOTTEDWEB (SW) MOMENT CONNECTION The user s attention is called to the fact that compliance with this chapter of the standard requires use of an invention covered by patent rights. 1 By publication

More information

RECENT RESEARCH ON LINK PERFORMANCE IN STEEL ECCENTRICALLY BRACED FRAMES

RECENT RESEARCH ON LINK PERFORMANCE IN STEEL ECCENTRICALLY BRACED FRAMES 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 302 RECENT RESEARCH ON LINK PERFORMANCE IN STEEL ECCENTRICALLY BRACED FRAMES Taichiro OKAZAKI 1, Gabriela

More information

CYCLIC BEHAVIOR OF AN INNOVATIVE STEEL SHEAR WALL SYSTEM

CYCLIC BEHAVIOR OF AN INNOVATIVE STEEL SHEAR WALL SYSTEM 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 2576 CYCLIC BEHAVIOR OF AN INNOVATIVE STEEL SHEAR WALL SYSTEM Qiuhong ZHAO 1 and Abolhassan ASTANEH-ASL

More information

STEEL MOMENT RESISTING CONNECTIONS SUBJECT TO EARTHQUAKE LOADING. ENCE 710 STEEL STRUCTURES Kirk P. Volovar, P.E. & C. C. Fu, P.E.

STEEL MOMENT RESISTING CONNECTIONS SUBJECT TO EARTHQUAKE LOADING. ENCE 710 STEEL STRUCTURES Kirk P. Volovar, P.E. & C. C. Fu, P.E. STEEL MOMENT RESISTING CONNECTIONS SUBJECT TO EARTHQUAKE LOADING ENCE 710 STEEL STRUCTURES Kirk P. Volovar, P.E. & C. C. Fu, P.E. 1 STEEL MRF SEISMIC CONNECTION INTRO AND PRESENTATION OVERVIEW Early development

More information

steelwise WHAT S NEW WITH PREQUALIFIED CONNECTIONS? A look at the latest version of AISC 358.

steelwise WHAT S NEW WITH PREQUALIFIED CONNECTIONS? A look at the latest version of AISC 358. A look at the latest version of AISC 358. steelwise WHAT S NEW WITH PREQUALIFIED CONNECTIONS? BY MICHAEL D. ENGELHARDT, PhD, AND MARGARET A. MATTHEW, PE WHEN IT COMES to the chronicles of steel construction,

More information

Effect of Geometry of Vertical Rib Plate on Cyclic Behavior of Steel Beam to Built-up Box Column Moment Connection

Effect of Geometry of Vertical Rib Plate on Cyclic Behavior of Steel Beam to Built-up Box Column Moment Connection Available online at www.sciencedirect.com Procedia Engineering 14 (2011) 3010 3018 The Twelfth East Asia-Pacific Conference on Structural Engineering and Construction Effect of Geometry of Vertical Rib

More information

CYCLIC TESTING OF BOLTED CONTINUOUS I-BEAM-TO-HOLLOW SECTION COLUMN CONNECTIONS

CYCLIC TESTING OF BOLTED CONTINUOUS I-BEAM-TO-HOLLOW SECTION COLUMN CONNECTIONS 10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska CYCLIC TESTING OF BOLTED CONTINUOUS I-BEAM-TO-HOLLOW SECTION COLUMN

More information

Ductility of Welded Steel Column to Cap Beam Connections Phase 2

Ductility of Welded Steel Column to Cap Beam Connections Phase 2 Ductility of Welded Steel Column to Cap Beam Connections Phase 2 Test 2 Summary Report 1 June 2011 1. Executive Summary Prepared for: Alaska Department of Transportation and Public Facilities Alaska University

More information

Supplemental Structural Correction Sheet Steel Brace Frame Design (2017 LABC)

Supplemental Structural Correction Sheet Steel Brace Frame Design (2017 LABC) Supplemental Structural Correction Sheet Steel Brace Frame Design (2017 LABC) Plan Check Submittal Date: Plan Check / PCIS App #: Job Address: Applicant: P.C. Engineer: (print first / last name) E-mail:

More information

EVALUATION OF WELDED FLANGE PLATE CONNECTIONS BETWEEN STEEL BEAMS AND BOX COLUMNS

EVALUATION OF WELDED FLANGE PLATE CONNECTIONS BETWEEN STEEL BEAMS AND BOX COLUMNS Advanced Steel Construction Vol. 9, No. 1, pp. 59-76 (2013) 59 EVALUATION OF WELDED FLANGE PLATE CONNECTIONS BETWEEN STEEL BEAMS AND BOX COLUMNS M. Gholami, M. Tehranizadeh* and A. Deylami Department of

More information

SEISMIC PERFORMANCE OF PARTIAL JOINT PENETRATION WELDS IN COLUMN SPLICES

SEISMIC PERFORMANCE OF PARTIAL JOINT PENETRATION WELDS IN COLUMN SPLICES 10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska SEISMIC PERFORMANCE OF PARTIAL JOINT PENETRATION WELDS IN COLUMN SPLICES

More information

Seismic Evaluation of Steel Moment Resisting Frame Buildings with Different Hysteresis and Stiffness Models

Seismic Evaluation of Steel Moment Resisting Frame Buildings with Different Hysteresis and Stiffness Models Seismic Evaluation of Steel Moment Resisting Frame Buildings with Different Hysteresis and Stiffness Models ABSTRACT : Jiwook Shin 1 and Kihak Lee 2* 1 M.S. student, Dept. of Architectural Engineering,

More information

Copyright. Apostolos Drolias

Copyright. Apostolos Drolias Copyright by Apostolos Drolias 2007 Experiments on Link-to-Column Connections in Steel Eccentrically Braced Frames by Apostolos Drolias, DCE Thesis Presented to the Faculty of the Graduate School of The

More information

ICC-ES Evaluation Report Issued November 1, 2011 This report is subject to renewal November 1, 2012.

ICC-ES Evaluation Report Issued November 1, 2011 This report is subject to renewal November 1, 2012. ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-1093* Issued November 1, 2011 This report is subject to renewal November 1, 2012. A Subsidiary of the International Code Council

More information

ANALYTICAL AND EXPERIMENTAL STUDIES ON SEISMIC BEHAVIOR OF DEEP COLUMN-TO-BEAM WELDED REDUCED BEAM SECTION MOMENT CONNECTIONS

ANALYTICAL AND EXPERIMENTAL STUDIES ON SEISMIC BEHAVIOR OF DEEP COLUMN-TO-BEAM WELDED REDUCED BEAM SECTION MOMENT CONNECTIONS 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 24 Paper No. 1599 ANALYTICAL AND EXPERIMENTAL STUDIES ON SEISMIC BEHAVIOR OF DEEP COLUMN-TO-BEAM WELDED REDUCED BEAM

More information

Tests of R/C Beam-Column Joint with Variant Boundary Conditions and Irregular Details on Anchorage of Beam Bars

Tests of R/C Beam-Column Joint with Variant Boundary Conditions and Irregular Details on Anchorage of Beam Bars October 1-17, 8, Beijing, China Tests of R/C Beam-Column Joint with Variant Boundary Conditions and Irregular Details on Anchorage of Beam Bars F. Kusuhara 1 and H. Shiohara 1 Assistant Professor, Dept.

More information

Learning Objectives. Topics. Moment Frames: Design and Detailing per AISC 341 and 358. Topics. Lateral Analysis/Choosing your Code

Learning Objectives. Topics. Moment Frames: Design and Detailing per AISC 341 and 358. Topics. Lateral Analysis/Choosing your Code Topics Moment Frames: Design and Detailing per AISC 341 and 358 By Matthew J. Mester, PE, SE SidePlate Systems, Inc. SE University, June, 2017 www.learnwithseu.com 2 Learning Objectives Topics Identify

More information

THE PLAZA AT PPL CENTER ALLENTOWN, PA

THE PLAZA AT PPL CENTER ALLENTOWN, PA : MOMENT FRAME COMPARISON Introduction Design Intent IBC 2000 and ASCE 7-98 recognizes steel frames designed with a response modification factor, R, less than or equal to three as structural steel systems

More information

DESIGN OF A SHEAR CONNECTOR FOR A NEW SELF-CENTERING WALL SYSTEM

DESIGN OF A SHEAR CONNECTOR FOR A NEW SELF-CENTERING WALL SYSTEM DESIGN OF A SHEAR CONNECTOR FOR A NEW SELF-CENTERING WALL SYSTEM R.S. Henry 1, S. Aaleti 2, S. Sritharan 3 and J.M. Ingham 4 1 Ph.D Candidate, Dept. of Civil and Environmental Engineering, University of

More information

CHAPTER 1 INTRODUCTION 1.1 MOMENT END-PLATE CONNECTIONS

CHAPTER 1 INTRODUCTION 1.1 MOMENT END-PLATE CONNECTIONS CHAPTER 1 INTRODUCTION 1.1 MOMENT END-PLATE CONNECTIONS The typical moment end-plate connection shown in Fig. 1-1 consists of a plate that is shop-welded to the end of a beam which is then bolted to the

More information

CHEVRON BRACED FRAMES WITH YIELDING BEAMS: EXPERIMENTS AND NUMERICAL ANALYSIS

CHEVRON BRACED FRAMES WITH YIELDING BEAMS: EXPERIMENTS AND NUMERICAL ANALYSIS Eleventh U.S. National Conference on Earthquake Engineering Integrating Science, Engineering & Policy June 25-29, 2018 Los Angeles, California CHEVRON BRACED FRAMES WITH YIELDING BEAMS: EXPERIMENTS AND

More information

DIVISION: METALS SECTION: STRUCTURAL STEEL FRAMING REPORT HOLDER: SEISMIC STRUCTURAL DESIGN ASSOCIATES, INC.

DIVISION: METALS SECTION: STRUCTURAL STEEL FRAMING REPORT HOLDER: SEISMIC STRUCTURAL DESIGN ASSOCIATES, INC. 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1093 Reissued 03/2018 This report is subject to renewal 03/2019. DIVISION: 05 00

More information

STEEL REACTION FRAME

STEEL REACTION FRAME STEEL REACTION FRAME Kyle Coleman, CEE Laboratory Manager Andrew Myers, Assistant Professor Jerome F. Hajjar, Professor and Chair, Director, STReSS Laboratory Department of Civil and Environmental Engineering,

More information

Lateral Force-Resisting Capacities of Reduced Web-Section Beams: FEM Simulations

Lateral Force-Resisting Capacities of Reduced Web-Section Beams: FEM Simulations Lateral Force-Resisting Capacities of Reduced Web-Section Beams: FEM Simulations *Seungpil Kim 1), Myoungsu Shin 2), and Mark Aschheim 3) 1), 2) School of Urban and Environmental Engineering, UNIST, Ulsan

More information

Analysis of Fracture Behavior of Large Steel Beam-Column Connections

Analysis of Fracture Behavior of Large Steel Beam-Column Connections 12 th International Conference on Advances in Steel-Concrete Composite Structures (ASCCS 2018) Universitat Politècnica de València, València, Spain, June 27-29, 2018 Doi: http://dx.doi.org/10.4995/asccs2018.2018.7122

More information

CYCLIC BEHAVIOR OF TRADITIONAL AND INNOVATIVE COMPOSITE SHEAR WALLS

CYCLIC BEHAVIOR OF TRADITIONAL AND INNOVATIVE COMPOSITE SHEAR WALLS 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 2578 CYCLIC BEHAVIOR OF TRADITIONAL AND INNOVATIVE COMPOSITE SHEAR WALLS Qiuhong ZHAO 1 and Abolhassan

More information

SEISMIC PERFORMANCE OF US STEEL BOX COLUMN CONNECTIONS

SEISMIC PERFORMANCE OF US STEEL BOX COLUMN CONNECTIONS 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 981 SEISMIC PERFORMANCE OF US STEEL BOX COLUMN CONNECTIONS Taejin KIM 1, Bozidar STOJADINOVIC 2 and Andrew

More information

Study of Reduced Beam Section Connections with Web Opening

Study of Reduced Beam Section Connections with Web Opening Study of Reduced Beam Section Connections with Web Opening Mohammad Taghi Kazemi & Seyed-Babak Momenzadeh Sharif University of Technology, Iran Masoud Hoseinzadeh Asl Tabriz University, Iran SUMMARY: Seismic

More information

Span Length Effect on Seismic Demand on Column Splices in Steel Moment Resisting Frames

Span Length Effect on Seismic Demand on Column Splices in Steel Moment Resisting Frames Span Length Effect on Seismic Demand on Column Splices in Steel Moment Resisting Frames B. Akbas Gebze Institute of Technology, Turkey Blank Line 9 pt O. Seker Yildiz Technical University, Turkey Blank

More information

A New Rigid Connection for Heavy Beams and Columns in Steel Moment Resisting Frames

A New Rigid Connection for Heavy Beams and Columns in Steel Moment Resisting Frames Proceedings of the 21 Convention of the Structural Engineers Association of California A New Rigid Connection for Heavy Beams and Columns in Steel Moment Resisting Frames Farzad Naeim, Kan Patel and Kai-Chen

More information

Figure 1 Example of HSS column splice

Figure 1 Example of HSS column splice HSS Column Splices Mike Manor, PE, MLSE FORSE Consulting Technical Consultant to the Steel Tube Institute Hollow Structural Sections (HSS) columns are prevalent in many types of construction, especially

More information

Experimental research on reduced beam section to concrete-filled steel tubular column joints with RC slab

Experimental research on reduced beam section to concrete-filled steel tubular column joints with RC slab Proceedings of the Tenth Pacific Conference on Earthquake Engineering Building an Earthquake-Resilient Pacific 6-8 November 15, Sydney, Australia Experimental research on reduced beam section to concrete-filled

More information

M. Bruneau 1, Y. Alzeni 2, P. Fouché 2

M. Bruneau 1, Y. Alzeni 2, P. Fouché 2 Steel Innovations Conference 2013 Christchurch, New Zealand 21-22 February 2013 SEISMIC BEHAVIOR OF CONCRETE-FILLED STEEL SANDWICH WALLS AND CONCRETE-FILLED STEEL TUBE COLUMNS M. Bruneau 1, Y. Alzeni 2,

More information

Parametric study and design of rib-reinforced steel moment connections

Parametric study and design of rib-reinforced steel moment connections Engineering Structures 27 (2005) 699 708 www.elsevier.com/locate/engstruct Parametric study and design of rib-reinforced steel moment connections Cheng-Chih Chen,Cheng-An Lu, Chun-Chou Lin Department of

More information

Structural Performance of 800 MPa High-Strength Steel Members

Structural Performance of 800 MPa High-Strength Steel Members ctbuh.org/papers Title: Author: Subject: Keywords: Structural Performance of 800 MPa High-Strength Steel Members Cheol H. Lee, Department of Architecture and Architectural Engineering, Seoul National University

More information

INNOVATIVE DESIGN AND TESTING OF A SEISMIC RETROFITTED STEEL DECK TRUSS BRIDGE

INNOVATIVE DESIGN AND TESTING OF A SEISMIC RETROFITTED STEEL DECK TRUSS BRIDGE INNOVATIVE DESIGN AND TESTING OF A SEISMIC RETROFITTED STEEL DECK TRUSS BRIDGE Dr. Majid Sarraf, P.E., P.Eng Dr. Michel Bruneau, P.Eng Dr. Sarraf is a Senior Project Engineer and Seismic Specialist at

More information

Overview of Presentation. SCBFs are Conceptually Truss Structures

Overview of Presentation. SCBFs are Conceptually Truss Structures Ultimate Strength and Inelastic Behavior of Braced Frame Gusset Plate Connections Charles W. Roeder University of Washington Department of Civil and Environmental Engineering Seattle, WA 98195 Structural

More information

Recommended Seismic Design Criteria for New Steel 1. INTRODUCTION

Recommended Seismic Design Criteria for New Steel 1. INTRODUCTION 1. INTRODUCTION 1.1 Purpose This report, Recommended Seismic Design Moment- Frame Buildings has been developed by the SAC Joint Venture under contract to the Federal Emergency Management Agency (FEMA)

More information

Effects of Width-to-Thickness Ratio of RHS Column on the Elasto-Plastic Behavior of Composite Beam

Effects of Width-to-Thickness Ratio of RHS Column on the Elasto-Plastic Behavior of Composite Beam Memoirs of the Graduate Schools of Engineering and System Informatics Kobe University No. 6, pp. 1 6, 2014. doi:10.5047/gseku.e.2014.001 Effects of Width-to-Thickness Ratio of RHS Column on the Elasto-Plastic

More information

SEISMIC BEHAVIOR OF FOUR-CIDH PILE SUPPORTED FOUNDATIONS

SEISMIC BEHAVIOR OF FOUR-CIDH PILE SUPPORTED FOUNDATIONS SEISMIC BEHAVIOR OF FOUR-CIDH PILE SUPPORTED FOUNDATIONS José I. Restrepo 1, Inho Ha 2 and M.J.Nigel Priestley 3 Abstract This paper discusses the results of two large-scale models of Four-Cast-In-Drilled-

More information

Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications

Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications ANSI/AISC 358-05 An American National Standard Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications December 13, 2005 Approved by the AISC Connection Prequalification

More information

Seismic Behavior of Composite Shear Wall Systems and Application of Smart Structures Technology

Seismic Behavior of Composite Shear Wall Systems and Application of Smart Structures Technology Steel Structures 7 (2007) 69-75 www.ijoss.org Seismic Behavior of Composite Shear Wall Systems and Application of Smart Structures Technology Qiuhong Zhao 1 and Abolhassan Astaneh-Asl 2, * 1 Assistant

More information

EXPERIMENTAL EVALUATION OF NONLINEAR REPLACEABLE LINKS IN ECCENTRICALLY BRACED FRAMES AND MOMENT RESISTING FRAMES

EXPERIMENTAL EVALUATION OF NONLINEAR REPLACEABLE LINKS IN ECCENTRICALLY BRACED FRAMES AND MOMENT RESISTING FRAMES EXPERIMENTAL EVALUATION OF NONLINEAR REPLACEABLE LINKS IN ECCENTRICALLY BRACED FRAMES AND MOMENT RESISTING FRAMES Nabil Mansour 1, Yunlu Shen 1, Constantin Christopoulos 2 and Robert Tremblay 3 1 Graduate

More information

Beam-column joint tests with grade 500E reinforcing

Beam-column joint tests with grade 500E reinforcing Beam-column joint tests with grade 500E reinforcing L.M. Megget & N.J. Brooke Department of Civil & Environmental Engineering, University of Auckland, New Zealand. R.C. Fenwick Visitor, Department of Civil

More information

Seismic Retrofitting of Moment-Resisting Connections Using Beam Web Opening

Seismic Retrofitting of Moment-Resisting Connections Using Beam Web Opening Seismic Retrofitting of Moment-Resisting Connections Using Beam Web Opening A. Deylami Professor, Dept. of Structural Engineering, Amirkabir University of Technology, Tehran, Iran M. Aminifar Msc Structural

More information

DIVISION: METALS SECTION: STRUCTURAL STEEL FRAMING REPORT HOLDER: CAST CONNEX CORPORATION

DIVISION: METALS SECTION: STRUCTURAL STEEL FRAMING REPORT HOLDER: CAST CONNEX CORPORATION 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3031 Reissued 12/2017 This report is subject to renewal 12/2019. DIVISION: 05 00

More information

PRELIMANARY INVESTIGATION OF SMA-BASED RECENTERING BEAM- COLUMN CONNECTION

PRELIMANARY INVESTIGATION OF SMA-BASED RECENTERING BEAM- COLUMN CONNECTION PRELIMANARY INVESTIGATION OF SMA-BASED RECENTERING BEAM- COLUMN CONNECTION M.S. Speicher 1, R. DesRoches 2, and R.T. Leon 3 1 Ph.D. Candidate, Dept. of Civil and Environmental Engineering, Georgia Institute

More information

TEMPERING. Tremors. San Bernardino s new courthouse features a comprehensive seismic design that minimizes life-cycle costs.

TEMPERING. Tremors. San Bernardino s new courthouse features a comprehensive seismic design that minimizes life-cycle costs. TEMPERING Tremors BY MARK SARKISIAN, S.E., P.E., PETER LEE, S.E., P.E., LINDSAY HU, P.E., AND ALVIN TSUI, S.E., P.E. San Bernardino s new courthouse features a comprehensive seismic design that minimizes

More information

MOMENT RESISTING CONNECTION WITH SIDEPLATE (GEOMETRIC ASPECTS)

MOMENT RESISTING CONNECTION WITH SIDEPLATE (GEOMETRIC ASPECTS) 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 194 MOMENT RESISTING CONNECTION WITH SIDEPLATE (GEOMETRIC ASPECTS) Ardeshir DEYLAMI 1, and R. ASHRAF

More information

Seismic Performance of WUF-W Moment Connections According to Access Hole Geometries

Seismic Performance of WUF-W Moment Connections According to Access Hole Geometries Seismic Performance of WUF-W Moment Connections According to Access Hole Geometries Sang Whan Han, a) M.EERI, Jin Jung, a) and Sung Jin Ha a) The welded unreinforced flange-welded web (WUF-W) moment connection

More information

Ductile Design of Steel Structures

Ductile Design of Steel Structures Ductile Design of Steel Structures Michel Bruneau, Ph.D., P.Eng. Chia-Ming Uang, Ph.D. Rafael Sabelli, S.E. Second Edition Mc Grain/ Hill New York Chicago San Francisco Lisbon London Madrid Mexico City

More information

HYBRID MOMENT RESISTING STEEL FRAMES

HYBRID MOMENT RESISTING STEEL FRAMES HYBRID MOMENT RESISTING STEEL FRAMES Finley A. Charney 1 and Ozgur Atlayan 2 1 Associate Professor, Department of Civil and Environmental Engineering, Virginia Tech, Blacksburg, VA, 2461, USA 2 Graduate

More information

22. DESIGN OF STEEL BRACED FRAMES Eccentrically Braced Steel Frames

22. DESIGN OF STEEL BRACED FRAMES Eccentrically Braced Steel Frames 22. DESIGN OF STEEL BRACED FRAMES 22.1 Eccentrically Braced Steel Frames Objective is to dissipate energy in the shear or moment links and to protect the remainder of the frame from inelastic action, including

More information

Global Performance of Lateral Drift and Gravity Load Tests for Prefabricated Stair Assemblies as Manufactured by Pacific Stair Company

Global Performance of Lateral Drift and Gravity Load Tests for Prefabricated Stair Assemblies as Manufactured by Pacific Stair Company Global Performance of Lateral Drift and Gravity Load Tests for Prefabricated Stair Assemblies as Manufactured by Pacific Stair Company Christopher Higgins Associate Professor of Structural Engineering

More information

EVALUATION OF SEISMIC PERFORMANCE FACTORS FOR CHEVRON BUCKLING RESTRAINED BRACED FRAMES

EVALUATION OF SEISMIC PERFORMANCE FACTORS FOR CHEVRON BUCKLING RESTRAINED BRACED FRAMES EALUATION OF SEISMIC PERFORMANCE FACTORS FOR CHERON BUCKLING RESTRAINED BRACED FRAMES M.B. Bozkurt 1, Y.O. Özkılıç 2 and C. Topkaya 3 1 Res. Assist. Dr., Civil Eng. Department, Manisa Celal Bayar University,

More information

Cyclic Testing of the Column-tree Type and the WUF-B Weak-axis Steel Moment Connections

Cyclic Testing of the Column-tree Type and the WUF-B Weak-axis Steel Moment Connections Cyclic Testing of the Column-tree Type and the WUF-B Weak-axis Steel Moment Connections Kangmin Lee, Rui Li & Liuyi Chen Chungnam National University, Korea Kyoung Hwan Oh Samsung Construction and Trading,

More information

Journal of Constructional Steel Research. Experimental investigation of link-to-column connections in eccentrically braced frames

Journal of Constructional Steel Research. Experimental investigation of link-to-column connections in eccentrically braced frames Journal of Constructional Steel Research 65 (2009) 1401 1412 Contents lists available at ScienceDirect Journal of Constructional Steel Research journal homepage: www.elsevier.com/locate/jcsr Experimental

More information

Cyclic testing of steel column-tree moment connections with various beam splice lengths

Cyclic testing of steel column-tree moment connections with various beam splice lengths Steel and Composite Structures, Vol. 16, No. 2 (2014) 221-231 DOI: http://dx.doi.org/10.12989/scs.2014.16.2.221 221 Cyclic testing of steel column-tree moment connections with various beam splice lengths

More information

Deformation Capacity of RC Structural Walls without Special Boundary Element Detailing

Deformation Capacity of RC Structural Walls without Special Boundary Element Detailing Proceedings of the Tenth Pacific Conference on Earthquake Engineering Building an Earthquake-Resilient Pacific 6-8 November 2015, Sydney, Australia Deformation Capacity of RC Structural Walls without Special

More information

Originally Issued: 09/28/2017 Valid Through: 09/30/2018

Originally Issued: 09/28/2017 Valid Through: 09/30/2018 SIDEPLATE SYSTEMS, INC. SidePlate Steel Frame Connection Technology: Field-Welded and Field-Bolted Connections CSI Sections: 05 12 00 Structural Steel Framing 1.0 RECOGNITION SidePlate Steel Frame Connection

More information

THE AISC SEISMIC PROVISIONS: PAST, PRESENT AND FUTURE

THE AISC SEISMIC PROVISIONS: PAST, PRESENT AND FUTURE THE AISC SEISMIC PROVISIONS: PAST, PRESENT AND FUTURE J.O. MALLEY BIOGRAPHY OF AUTHOR James O. Malley is a Senior Principal with Degenkolb Engineers of San Francisco, California. He received both his Bachelors

More information

Cold-Formed Steel Special Bolted Moment Frames: Capacity Design Requirements

Cold-Formed Steel Special Bolted Moment Frames: Capacity Design Requirements Cold-Formed Steel Special olted Moment Frames: Capacity Design Requirements by Atsushi Sato 1 and Chia-Ming Uang 2 ASTRACT Design provisions of the Cold-Formed Steel Special olted Moment Frame (CFS SMF)

More information

Steel moment frames have been one of the most frequently

Steel moment frames have been one of the most frequently Seismic Demand on Splices in Steel Moment Frames JAY SHEN, THOMAS A. SABOL, BULENT AKBAS and NARATHIP SUTCHIEWCHARN ABSTRACT This study addresses seismic demands on column splices in steel moment-resisting

More information

2016 AISC Standards. Specification for Structural Steel Buildings & Code of Standard Practice for Steel Buildings and Bridges.

2016 AISC Standards. Specification for Structural Steel Buildings & Code of Standard Practice for Steel Buildings and Bridges. 2016 AISC Standards Specification for Structural Steel Buildings & Code of Standard Practice for Steel Buildings and Bridges Eric Bolin Staff Engineer June 1, 2017 2016 AISC Standards 2018 INTERNATIONAL

More information

The Effect of Straightening Method on the k Area Loading Behavior of Rolled Column Sections

The Effect of Straightening Method on the k Area Loading Behavior of Rolled Column Sections Lehigh University Lehigh Preserve ATLSS Reports Civil and Environmental Engineering 12-1-2001 The Effect of Straightening Method on the k Area Loading Behavior of Rolled Column Sections E. Kaufmann John

More information

EXPERIMENTAL STUDY ON SEISMIC PERFORMANCE OF STEEL BEAM TO SRC COLUMN CONNECTIONS

EXPERIMENTAL STUDY ON SEISMIC PERFORMANCE OF STEEL BEAM TO SRC COLUMN CONNECTIONS Journal of the Chinese Institute of Engineers, Vol. 31, No. 2, pp. 239-252 (28) 239 EXPERIMENTAL STUDY ON SEISMIC PERFORMANCE OF STEEL BEAM TO SRC COLUMN CONNECTIONS Cheng Chiang Weng*, Yen Liang Yin,

More information

Seismic design of braced frame gusset plate connections

Seismic design of braced frame gusset plate connections Earthquake Resistant Engineering Structures V 105 Seismic design of braced frame gusset plate connections C. W. Roeder, D. E. Lehman, A. Christopolus, I. Gunnarson, S. Johnson & J. H. Yoo Department of

More information

EFFECTS OF END REGION CONFINEMENT ON SEISMIC PERFORMANCE OF RC CANTILEVER WALLS

EFFECTS OF END REGION CONFINEMENT ON SEISMIC PERFORMANCE OF RC CANTILEVER WALLS 10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska EFFECTS OF END REGION CONFINEMENT ON SEISMIC PERFORMANCE OF RC CANTILEVER

More information

Testing of a Laterally Stable Eccentrically Braced Frame for Steel Bridge Piers

Testing of a Laterally Stable Eccentrically Braced Frame for Steel Bridge Piers .1.. Testing o a Laterally Stable Eccentrically Braced Frame or Steel Bridge Piers Jerey W. Berman Ph.D. Student, Dept. o Civil Structural and Environmental Engineering, University at Bualo Research Supervisor:

More information

SHEAR FUSE I 2. systems. heights, equipped with the. replaced. Moment. that are expected. to dissipate decades, made to. specific segments of the beam

SHEAR FUSE I 2. systems. heights, equipped with the. replaced. Moment. that are expected. to dissipate decades, made to. specific segments of the beam INITE ELEMENT INVESTIGATION O MOMENT RESISTING RAMES WITH A NEW SHEAR STRUCTURAL USE M.T. NIKOUKALAM 1 and Kiarash M. DOLATSHAHI I 2 ABSTRACT Special moment resisting frames (SMRs) are of the most desirable

More information

INFLUENCE OF DIFFERENT TYPES OF FULLY RESTRAINED CONNECTIONS ON THE RESPONSE OF SMRF STRUCTURES

INFLUENCE OF DIFFERENT TYPES OF FULLY RESTRAINED CONNECTIONS ON THE RESPONSE OF SMRF STRUCTURES INFLUENCE OF DIFFERENT TYPES OF FULLY RESTRAINED CONNECTIONS ON THE RESPONSE OF SMRF STRUCTURES Akshay GUPTA And Helmut KRAWINKLER SUMMARY The behavior, response, and performance of code-compliant designs

More information

The SlottedWeb Steel Moment Connection

The SlottedWeb Steel Moment Connection The SlottedWeb Steel Moment Connection Seismic Structural Design Associates http://slottedweb.com Jay Allen, S.E. Jay Allen President (602)President 251-0329 Jim Partridge, C.E. Jim Partridge Secretary

More information

The Professional Journal of the Earthquake Engineering Research Institute PREPRINT

The Professional Journal of the Earthquake Engineering Research Institute PREPRINT The Professional Journal of the Earthquake Engineering Research Institute PREPRINT This preprint is a PDF of a manuscript that has been accepted for publication in Earthquake Spectra. It is the final version

More information

Weld Effective Lengths for Round HSS Connections

Weld Effective Lengths for Round HSS Connections Weld Effective Lengths for Round HSS Connections by Jeffrey A. Packer Bahen/Tanenbaum Professor of Civil Engineering, University of Toronto, Ontario, Canada The AISC Specification (AISC 2016) gives weld

More information

Interpretation of SECTION 12 DESIGN AND DETAILING FOR EARTHQUAKE LOADS IS

Interpretation of SECTION 12 DESIGN AND DETAILING FOR EARTHQUAKE LOADS IS Interpretation of SECTION 12 DESIGN AND DETAILING FOR EARTHQUAKE LOADS 12.1 General IS 800-2007 Steel frames shall be so designed and detailed as to give them adequate strength, stability and ductility

More information

BEHAVIOR OF STEEL PLATE SHEAR WALLS WITH IN-SPAN PLASTIC HINGES

BEHAVIOR OF STEEL PLATE SHEAR WALLS WITH IN-SPAN PLASTIC HINGES 716 BEHAVIOR OF STEEL PLATE SHEAR WALLS WITH IN-SPAN PLASTIC HINGES Ronny Purba 1 and Michel Bruneau 2 1 Graduate Research Assistant, Department of Civil, Structural, and Environmental Engineering, University

More information

CISC HANDBOOK OF STEEL CONSTRUCTION REVISIONS LIST NO. 1 - MAY 2011

CISC HANDBOOK OF STEEL CONSTRUCTION REVISIONS LIST NO. 1 - MAY 2011 CISC HANDBOOK OF STEEL CONSTRUCTION 10 th Edition, 1 st Printing 2010 REVISIONS LIST NO. 1 - MAY 2011 The following revisions and updates have been incorporated into the 2 nd Printing (2011) of the 10

More information

EXPERIMENTAL RESPONSE OF BOUNDARY ELEMENTS OF CODE- COMPLIANT REINFORCED CONCRETE SHEAR WALLS

EXPERIMENTAL RESPONSE OF BOUNDARY ELEMENTS OF CODE- COMPLIANT REINFORCED CONCRETE SHEAR WALLS 10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska EXPERIMENTAL RESPONSE OF BOUNDARY ELEMENTS OF CODE- COMPLIANT REINFORCED

More information

ANSI/AWS D An American National Standard. Structural Welding Code Sheet Steel

ANSI/AWS D An American National Standard. Structural Welding Code Sheet Steel ANSI/AWS D1.3-98 An American National Standard Structural Welding Code Sheet Steel Key Words Sheet steel, allowable stresses, details of welded joints, workmanship qualification, visual acceptance criteria,

More information

IMPROVED WELDED CONNECTIONS FOR EARTHQUAKE LOADING

IMPROVED WELDED CONNECTIONS FOR EARTHQUAKE LOADING IMPROVED WELDED CONNECTIONS FOR EARTHQUAKE LOADING Wolfgang SCHOLZ 1 And Charles CLIFTON 2 SUMMARY This paper presents an overview of fracture tests performed on welded samples representing the column/

More information

Cold-formed Steel Special Bolted Moment Frames Capacity Design Requirements

Cold-formed Steel Special Bolted Moment Frames Capacity Design Requirements Missouri University of Science and Technology Scholars' Mine International Specialty Conference on Cold- Formed Steel Structures (2008) - 19th International Specialty Conference on Cold-Formed Steel Structures

More information

GUIDELINES ON NONLINEAR DYNAMIC ANALYSIS FOR SEISMIC DESIGN OF STEEL MOMENT FRAMES

GUIDELINES ON NONLINEAR DYNAMIC ANALYSIS FOR SEISMIC DESIGN OF STEEL MOMENT FRAMES Eleventh U.S. National Conference on Earthquake Engineering Integrating Science, Engineering & Policy June 25-29, 2018 Los Angeles, California GUIDELINES ON NONLINEAR DYNAMIC ANALYSIS FOR SEISMIC DESIGN

More information

SPECIAL PROVISION FOR STRUCTURAL STEEL AND ALUMINUM CONSTRUCTION. C&T:SJC 1 of 10 C&T:APPR:DAJ:DBP: FHWA:APPR:

SPECIAL PROVISION FOR STRUCTURAL STEEL AND ALUMINUM CONSTRUCTION. C&T:SJC 1 of 10 C&T:APPR:DAJ:DBP: FHWA:APPR: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STRUCTURAL STEEL AND ALUMINUM CONSTRUCTION C&T:SJC 1 of 10 C&T:APPR:DAJ:DBP:07-09-07 FHWA:APPR:07-19-07 a. Description. This specification covers

More information

SEISMIC SIMULATION OF AN EXISTING STEEL MOMENT-FRAME BUILDING RETROFITTED WITH EXTERNAL CABLE-STAYED SYSTEM

SEISMIC SIMULATION OF AN EXISTING STEEL MOMENT-FRAME BUILDING RETROFITTED WITH EXTERNAL CABLE-STAYED SYSTEM 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 561 SEISMIC SIMULATION OF AN EXISTING STEEL MOMENT-FRAME BUILDING RETROFITTED WITH EXTERNAL CABLE-STAYED

More information

Canadian Welding Bureau Welding Procedure Qualification AWS D1.1 vs CSA W47.1

Canadian Welding Bureau Welding Procedure Qualification AWS D1.1 vs CSA W47.1 Welding Procedure Qualification Canadian Welding Bureau Welding Procedure Qualification Comparison of Key Concepts and Requirements This document provides a general comparison of key concepts and requirements

More information

Experimental and analytical investigation of tubular links for eccentrically braced frames

Experimental and analytical investigation of tubular links for eccentrically braced frames Engineering Structures 29 (2007) 1929 1938 www.elsevier.com/locate/engstruct Experimental and analytical investigation of tubular links for eccentrically braced frames Jeffrey W. Berman a,, Michel Bruneau

More information