Analysis of working behavior of Jinping-I Arch Dam during initial impoundment

Size: px
Start display at page:

Download "Analysis of working behavior of Jinping-I Arch Dam during initial impoundment"

Transcription

1 Water Science and Engineering 2016, 9(3): 240e248 HOSTED BY Available online at Water Science and Engineering journal homepage: Analysis of working behavior of Jinping-I Arch Dam during initial impoundment Shi-yong Wu*, Wei Cao, Jiang Zheng Yalong River Hydropower Development Company, Ltd., Chengdu , China Received 7 April 2016; accepted 8 July 2016 Available online 9 November 2016 Abstract To study the stress, deformation, and seepage pressure during the initial impoundment of the Jinping-I Arch Dam, monitoring analysis and numerical calculation were used in a dam behavior analysis that focused on the working behavior of the dam during the late period of the initial impoundment up to the end of November The numerical calculation was performed based on feedback analysis of the deformation and stress of the arch dam through inversion of the elastic moduli (E ) of the dam body and foundation, using a three-dimensional finite element model for the linear elastic material of the arch dam. The main monitoring indices presented insignificant changes in the late period of the initial impoundment, and the results of feedback analysis were consistent with monitoring results. Analysis results also show that the deformations of the dam body and dam foundation were within the design range; the dam stress distributions were normal, with values lower than the design control criteria; and the seepage flows through the dam body and dam foundation were lower than the design drainage capacity of the deep-well pump house, demonstrating that the Jinping-I Arch Dam was in good working condition, and the initial impoundment had been successfully completed. The results of the working behavior analysis of the Jinping-I hydropower project during the initial impoundment can provide references for safe operation of similar projects Hohai University. Production and hosting by Elsevier B.V. This is an open access article under the CC BY-NC-ND license ( creativecommons.org/licenses/by-nc-nd/4.0/). Keywords: Dam safety monitoring; Working behavior; Elastic modulus; Dam impoundment; Jinping-I hydropower project 1. Introduction During the dam's initial impoundment, monitoring indices change with the water load and other factors, so impoundment is crucial to dam safety. Many engineering accidents occur in the initial impoundment period, so it is important to analyze the working behavior of a dam during this period to ensure the dam's safe operation. China has several of the world's highest dams, for example the Shuangjiangkou hydropower project, with a maximum height of 314 m, which is the highest dam under construction This work was supported by the National Key Technology Support Program (Grant No. 2013BAB05B05). * Corresponding author. address: wushiyong@ylhdc.com.cn (Shi-yong Wu). Peer review under responsibility of Hohai University. in the world, and the Jinping-I hydropower project, with a maximum height of 305 m, which is the highest completed dam in the world. Basic information on some large hydropower projects in China is given in Table 1. As some large hydropower projects, such as the Shuibuya, Laxiwa, Xiaowan, and Xiluodu hydropower stations, have been put into operation, the safety evaluation of hydropower projects during the initial impoundment has been extensively carried out in China (Wu, 2003; Hu et al., 2012; Jin et al., 2011). Monitoring and analysis of the dam foundation deformation, stress-strain, and seepage pressure during the initial impoundment, using an automatic observation system, have been carried out for the Laxiwa and Xiaowan hydropower projects (Li et al., 2009; Han et al., 2010; Wang et al., 2003, 2010; Huang et al., 2006). The monitoring results show that the dam deformation is closely related to the reservoir water level, and the deformation in the upper part of the dam is more sensitive to / 2016 Hohai University. Production and hosting by Elsevier B.V. This is an open access article under the CC BY-NC-ND license ( creativecommons.org/licenses/by-nc-nd/4.0/).

2 241 Table 1 Basic information on high dams in China. Project Year of completion Type of dam Installed capacity (MW) Maximum height of dam (m) Shuangjiangkou Scheduled to 2023 Earth core rockfill dam Jinping-I 2014 Concrete arch dam Shuibuya 2008 Concrete face rockfill dam Laxiwa 2010 Concrete arch dam Xiaowan 2010 Concrete arch dam Xiluodu 2014 Concrete arch dam the water load than that in the lower part. Based on prototype monitoring results, a finite element model has been used to carry out feedback analysis of the working behaviors of the Shuibuya and Xiluodu hydropower projects, and to perform safety assessment of the dams in the late operation stage (Zhou et al., 2011; Zhang and Yin, 2014; Zhang et al., 2016). According to analysis results, dam deformations appear downstream and towards the banks under the water load. The dam deformation during the initial impoundment is consistent with the variation of the reservoir water level. According to the comprehensive analysis results, the dams are in a safe condition during the initial impoundment. With regards to the Jinping-I hydropower project, Zhou and Rao (2014) launched seepage control research, dam safety monitoring analysis, structural stress and deformation analysis, and safety assessment of the dam during the reservoir impoundment according to the construction progress and monitoring information. Chen and Ruan (2014) and Yang and Dong (2015) carried out preliminary analyses of the working behavior of the dam based on the monitoring results during the initial impoundment. The deformation, stress-strain, and seepage pressure of the dam meet general rules, with their values within the range of design control indices, and the performances of the structures are normal overall. Based on relevant research achievements, two methods, monitoring analysis and numerical calculation, were used in the working behavior analysis of the dam in this study. The working behavior of the dam during the initial impoundment, such as the stress, deformation, and seepage pressure, was evaluated through monitoring result analysis and feedback analysis, so as to provide a technical foundation for comprehensive study of dam performance, successful completion of the initial impoundment, and safe operation of hydropower projects. 2. Impoundment process and monitoring design of Jinping-I Arch Dam 2.1. Project overview Located on the main stream of the Yalong River in Yanyuan County and Muli County, in the Liangshan Yi Autonomous Prefecture in Sichuan Province, the Jinping-I hydropower project is a controlling reservoir downstream of the Yalong River, with significant compensative regulation effect on downstream cascade hydropower stations. The project consists of a water-retaining structure, a flood discharge and energy dissipation structure, and power generation facilities, with a total installed capacity of 3600 MW. The water-retaining structure is a concrete double-curvature arch dam with a maximum height of 305 m, and is the highest completed arch dam in the world. The dam is composed of 26 sections from the left bank to right bank, poured with concrete without longitudinal joints, and the concrete material is divided into three areas known, respectively, as A, B, and C, with area A being a strong constraint area and area C a weak constraint area. The partition of dam sections and zoning design of the concrete material are shown in Fig. 1. The normal water storage level of the reservoir is 1880 m, the dead water level is 1800 m, and the total storage capacity is 7.76 km 3. The project construction started in 2005, and the first two generation units were put into operation in August All the units had been put into operation by July Initial impoundment process The Jinping-I hydropower project is large in scale with complicated geological conditions. The initial impoundment was divided into four stages. In November 2012, the right bank diversion tunnel was closed for impoundment. In December, the diversion bottom outlet was opened, and the water level in front of the dam reached 1707 m, the impoundment goal of the first stage. In July 2013, the reservoir water level reached the design dead water level, 1800 m, completing the second stage of the initial impoundment. In September 2013, the diversion bottom outlet was closed, and the water level reached 1840 m in October, the impoundment goal of the third stage. The fourth stage of the initial impoundment was started in July In August 2014, the reservoir reached the normal water storage level, 1880 m, which meant the completion of the fourth stage of the initial impoundment. In order to comprehensively evaluate the working behavior of the dam during the initial impoundment, this study focused on the working behavior of the dam just after the completion of the fourth stage of the initial impoundment, from August 2014 to the end of November 2014, which is called the late period of the initial impoundment in this paper. During this period, the water level was kept between 1876 m and 1880 m, close to the normal water storage level. In contrast to the late period, the period that consists of the four stages of the initial impoundment is called

3 242 Fig. 1. Partition of dam sections and zoning design of concrete material. the early stage of the initial impoundment. The initial impoundment process of the dam is shown in Fig Dam monitoring design Key technical issues related to the impoundment safety of high dams include the dam structural stress and deformation, as well as seepage control. In order to guarantee the safe operation of the dam in the initial impoundment period, comprehensive monitoring measures of the Jinping-I hydropower project were designed, with a monitoring range covering the dam body, dam foundation, pedestal, dam outlets, plunge pool, and subsidiary dam. The main monitoring items included the deformation, stress-strain, seepage pressure, temperature, environmental parameters, and special factors (Wu and Cao, 2014). By November 30, 2014, a total of 3450 sets of monitoring instruments had been installed (Deng and Dong, 2014). 3. Analysis of working behavior of dam The study focused on the working behavior of the dam during the late period of the initial impoundment up to the end Fig. 2. Initial impoundment process. of November Monitoring data obtained during this period include the radial horizontal deformation with positive values downstream and negative values upstream, the tangential horizontal deformation with positive values towards the left bank and negative values towards the right bank, the chord length variation with positive values for elongation and negative values for shortening, the vertical deformation with positive values for settling and negative values for upraising, the joint opening with positive values for enlargement and negative values for shrinkage, and the stress with positive values for tensile stresses and negative values for compressive stresses Monitoring results Monitoring results during early period of initial impoundment The arrangement of plumb lines for deformation monitoring of the dam is shown in Fig. 3, where PL means the plumb line, IP means the inverted plumb line, the subscripts L and R mean the left and right banks, respectively, and the other subscripts mean the numbers of the dam section and plumb line in each section, respectively. The monitoring results of the maximum deformation and seepage of the Jinping-I Arch Dam before and after each stage in the early period of the initial impoundment are shown in Table 2. The statistical results show that they are positively correlated with the reservoir water level Monitoring results during late period of initial impoundment During the late period of the initial impoundment, the relevant monitoring results can be described as follows: (1) Dam foundation deformation The calculated results of the maximum radial deformation and tangential deformation of the dam foundation obtained from the

4 243 Fig. 3. Monitoring arrangement of plumb lines. arch-cantilever method, with values of 27.2 mm and 22.5 mm, respectively, were taken as the reference control standards. According to the monitoring results, the maximum radial deformation was mm, and the maximum tangential deformation was 2.36 mm. The measured values were within the design range. The dam foundation joints were in a compressive state. When the water level reached 1880 m at the end of the early period of the initial impoundment, the opening variation of the dam foundation joints was less than 0.1 mm, and the value was less than 0.2 mm during the late period of the initial impoundment, demonstrating that the dam foundation joints were in a safe condition. (2) Dam body deformation The dam body deformation includes the horizontal deformation, vertical deformation, chord length variation, and joint opening variation. The calculated results of the maximum radial deformation and tangential deformation of the dam body obtained from the arch-cantilever method, with values of 85.0 mm and 24.3 mm, respectively, were taken as the reference control standards. According to the monitoring results from November 2014, the horizontal deformation of the dam body appeared downstream and towards both banks of the river. The radial deformation of the dam body appeared downstream. The maximum value appeared in the middle section, and the deformation decreased gradually towards both banks. The largest radial deformation occurred in the #13 dam section at an elevation of 1730 m, leading to a displacement value of mm (Fig. 4(a)). The tangential deformation of the dam body pointed to the left on the left bank, and to the right on the right bank. The largest tangential deformation on the left bank occurred in the #11 dam section at an elevation of 1730 m, leading to a displacement value of 8.31 mm; the largest tangential deformation on the right bank occurred in the #16 dam section at an elevation of 1829 m, leading to a deformation value of 4.72 mm (Fig. 4(b)). The radial displacement graph of the #13 dam section and the tangential displacement graph of the #11 dam section during the initial impoundment are shown in Fig. 5. According to the monitoring results, the dam body deformation had a strong correlation with the reservoir water level, and the overall Table 2 Comparison of monitoring results of maximum deformation and seepage before and after four stages in early period of initial impoundment. Impoundment stage Date Water level (m) Radial deformation (mm) 1 Nov. 30, 2012 Dec. 7, 2012 June 17, 2013 July 18, 2013 Sep. 26, 2013 Oct. 14, 2013 July 10, 2014 Aug. 24, Tangential deformation (mm) Vertical deformation (mm) Total seepage (L/s) Uplift pressure reduction coefficient for seepage proof curtain of dam foundation Chord length variation (mm) Note: The maximum radial deformation was obtained at the measuring point PL13-4, the maximum tangential deformation was obtained at the measuring point PL11-4, the maximum vertical deformation was obtained at an elevation of 1664 m, the maximum value of the uplift pressure reduction coefficient was obtained at the measuring point PL13-2, and the maximum value of the chord length variation was obtained at an elevation of 1785 m.

5 244 Fig. 4. Contour maps of horizontal deformation of dam body in November 2014 (units: mm). Fig. 5. Horizontal deformation graphs for #11 and #13 dam sections at different elevations during initial impoundment. deformation was insignificant. All measured values were within the design range. The vertical deformation of the dam body presented the following characteristics: the largest deformation of mm in November 2014 appeared at the arch crown, and the deformation decreased gradually towards both banks. The chord length of the dam body was shortened for approximately 4e7 mm during the early period of the initial impoundment. However, the chord length was then extended approximately 1e2 mm during the late period. The horizontal joints of the dam were under compression, with a variation of less than 0.2 mm. In general, the distribution patterns of the radial, tangential, and vertical displacements complied with the design expectations. (3) Dam stress According to the current arch dam design code, concrete strength control standards were determined by categorized factors. The concrete material of the Jinping-I Arch Dam was divided into three sections, and their concrete strength control standards are shown in Table 3. According to stress calculations, the strain gauge groups should be arranged at the locations with large tensile and compressive stresses, the locations at 1/4 of the dam length from the two ends, the locations at 1/4 of the arch ring from the two ends, the representative arch crowns, and the two ends of the abutments. According to industry standards, the uniaxial, five-direction, and nine-direction strain gauge sets as well as the non-stress meter were adopted in monitoring. The monitoring points of stress-strain of the dam body are shown in Fig. 6. During the late period of the initial impoundment, the upstream water level was basically unchanged, and the dam stress monitoring results obtained in November 2014 can be described as follows: The dam heel and dam toe were in strong constraint areas, close to the dam foundation (area A). They were in a compressive state in general. The maximum vertical compressive stress of 4.57 MPa appeared at the dam heel in the #12 dam section. The maximum vertical tensile stress of 0.1 MPa appeared at the dam heel in the #2 dam section. The maximum tangential compressive stress of 5.13 MPa appeared at the dam toe in the #21 dam section. The maximum tangential tensile stress of 0.26 MPa appeared at the dam toe in the #4 dam section. The maximum radial compressive stress of 4.76 MPa appeared at the dam toe in the #9 dam section. The maximum radial tensile stress of 0.83 MPa appeared at the dam heel in the #2 dam section. The stress graphs for the arch abutment heel in the #12 dam section, the arch abutment toe in the #21 dam section, and arch abutment toe in the #9 dam section during the initial impoundment are shown in Fig. 7. The dam body (areas B and C) was generally in a compressive state, without tensile stress detected. The maximum vertical compressive stress of 5.93 MPa appeared in the middle part of the #11 dam section at an elevation of 1720 m. The maximum tangential compressive stress of 6.94 MPa appeared downstream of the #13 dam section at an

6 245 Table 3 Compressive and tensile strength control standards of concrete material of dam body. Status Permanent status Transient status Check flood status Seismic status Calculation method Arch-cantilever method Finite element method Arch-cantilever method Finite element method Arch-cantilever method Finite element method Arch-cantilever method Compressive strength (MPa) Tensile strength (MPa) C18040 (area A) C18035 (area B) C18030 (area C) C18040 (area A) C18035 (area B) C18030 (area C) Fig. 6. Monitoring arrangement of stress-strain of dam body. elevation of 1684 m and in the middle part of the #11 dam section at an elevation of 1720 m. The maximum radial compressive stress of 4.76 MPa appeared downstream of the #9 dam section at an elevation of 1648 m. Basically, the arch dam was in a compressive state, the stress distribution of the dam could be considered normal, and all values were less than the design control criteria. (4) Seepage pressure According to the Design Specification for Concrete Arch Dams (DL/T 5346d2006) and engineering practices, the uplift pressure reduction coefficients are set mainly based on the pros and cons of the geological conditions of the dam foundation, seepage proof curtain, and drainage facilities. Considering the actual situation of the Jinping-I Arch Dam, the relevant design control criteria for seepage proof structures were set as follows: the uplift pressure reduction coefficient for the seepage proof curtain of the dam foundation was a1 0:4, the uplift pressure reduction coefficient for the main drainage curtain of the dam foundation was a2 0:2, and the design drainage capacity of the deep-well pump house was 450 m3/h. The curtain and drainage effects, determined by the uplift pressure reduction coefficient, were studied. As the water level downstream of the Jinping-I hydropower project was lower than the bedrock elevation, the following formula for the uplift pressure reduction coefficient was adopted: ai ¼ Fig. 7. Stress graphs recorded by five-direction strain gauges at arch abutment heel or arch abutment toe in different dam sections during initial impoundment. Hi H4 H1 H4 ð1þ where H1 is the upstream water level, H4 is the bedrock elevation, and Hi is the actual water level at the measurement location i. The arch dam foundation curtain showed a strong antiseepage performance. The maximum reduction coefficient was 0.29 behind the seepage proof curtain, and 0.08 behind the drainage curtain, less than the design value of the reduction coefficient. The practically measured seepage flow through the dam body and dam foundation corridors was L/s. The total seepage flow through the left bank dam foundation was L/s, and the total seepage flow through the right bank dam foundation was 9.99 L/s. These values were lower than the design drainage capacity of the deep-well pump house. According to the monitoring results, the working behavior of the dam body and dam foundation was basically normal at the water level of 1880 m, and seepage controlling works operated normally. The dam was in an elastic state during the late period of the initial impoundment.

7 Feedback analysis Feedback analysis is an effective complementary analysis approach for test result analysis. To obtain the accurate results of deformation and stress and provide a more comprehensive evaluation of the working behavior of the arch dam, feedback calculation of the deformation and stress of the arch dam, based on inversion of the elastic moduli (E ) of the dam body and dam foundation, was carried out by means of a statistical model and finite element model. In the feedback analysis, a representative period and a target point for reflecting deformation characteristics of the arch dam were selected, and the observed displacement at the target point was taken as the target value. The elastic moduli of the dam body and dam foundation were adjusted repeatedly so that the computed deformation at the target point approached its observed value. The mean square deviation between the observed displacement and computed displacement was used to check their agreement, and the elastic modulus leading to the minimum mean square deviation was taken as the best feedback parameter Numerical model Based on the engineering design and geological data, a threedimensional finite element model for the linear elastic material of the Jinping-I Arch Dam was established. The model used the centerline of the arch dam as a reference, from which a range of 900 m on both sides was included. The model also used the origin of the crest as a reference, from which a range of 750 m upstream and downstream was included, respectively. A range of 700 m below the foundation surface was covered as well. In the model, the slope of the rock mass above the crest was cut to the natural boundary elevation; for the mountains on both banks, a range of 2.5 times the dam height was extended upstream and downstream, and one dam height was extended upwards from the crest. The finite element model was used to simulate the complex faults f 2,f 5,f 8,f 42-9,f 13,f 14, and f 18 (Fig. 3), lamprophyre veins, and other weak structural planes, as well as the terrain and stratum partitions in the project area. The faults f 8 and f 42-9 are not shown in Fig. 3. The fault f 8 was a subfault near the hanging wall of the fault f 5, and the fault f 42-9 was located on the left dam abutment. Simulation was also carried out of the engineering measures, such as the pedestal, concrete plug, shear force transmission tunnel, replacement of concrete grillage, subsidiary dam, plunge pool, and grouting. The classification of rock mass quality in the dam foundation is shown in Fig. 8. The mechanical parameters of rocks and structural planes are shown in Table 4. The three-dimensional finite element model is shown in Fig Inversion of elastic modulus Feedback analysis was first performed for the duration from the starting of the water level monitoring on December 1, 2011 to the completion of the fourth stage of the initial impoundment on August 24, 2014 for inversion of the elastic modulus. The load that was taken into account mainly consisted of the dead weight and water pressure. Comparisons of test results and design values of the elastic moduli of the dam body and dam foundation with those obtained from the feedback Fig. 8. Classification of rock mass quality in dam foundation. Table 4 Mechanical parameters of rocks and structural planes. Material Initial elastic modulus E (GPa) Poisson's ratio n Category-II rock Category-III 1 rock Category-III 2 rock Category-IV 1 rock Category-IV 2 rock Category-V rock Backfill concrete Concrete pedestal Grouting of faults Fig. 9. Three-dimensional finite element model. Density r (10 3 kg/m 3 ) analysis are shown in Tables 5 and 6. In the arch dam design, the long-term elastic modulus of dam body concrete was used, which was only 0.6e0.7 times the instantaneous elastic modulus, leading to a significant difference between the design values of the elastic modulus and those from the feedback analysis. Meanwhile, the age of concrete for laboratory tests and in situ tests of the elastic modulus was only 180 d, far less than the actual age of concrete under the water load. Thus, the elastic modulus increment after the age of 180 d was not included in the tests. Therefore, the elastic moduli of the dam body from the feedback analysis are greater than the design values and experimental values, and the values from the feedback analysis, ranging from 36.6 to 38.2 GPa, are deemed consistent with the actual situation. For the elastic moduli of the dam foundation, the design values were determined based on the most unfavorable situation, while, in the feedback analysis, the deformation parameters that most probably occurred in the actual situation, instead of the parameters that might occur in the most unfavorable situation,

8 247 Table 5 Comparison of test results and design values of elastic modulus of dam body with those obtained from feedback analysis. Area Design value of E (GPa) E obtained from feedback analysis (GPa) E obtained from laboratory test (GPa) E obtained from in situ test (GPa) Poisson's ratio n Density r (kg/m3) A B C Table 6 Comparison of design values of elastic modulus of dam foundation with those obtained from feedback analysis. Bedrock Design value of E (GPa) E obtained from feedback analysis (GPa) Category-II rock Category-III1 rock Category-III2 rock Category-IV1 rock Category-IV2 rock Category-V rock were used. Moreover, the elastic modulus of boreholes would increase after consolidation grouting of the dam foundation. Due to these factors, the elastic moduli of the dam foundation from the feedback analysis are also greater than the design values, and the values from the feedback analysis are generally considered reasonable Feedback analysis of dam deformation and stress The deformation and stress of the arch dam at the normal water storage level were analyzed based on inversion of the elastic moduli of the dam body and foundation. Analysis results are shown below: (1) Feedback analysis of dam deformation At the normal water storage level, radial deformation appeared towards the inner side of the arch dam, with the maximum value occurring in the middle sections, while tangential deformation appeared towards the two banks. The maximum radial deformation was 48.8 mm, which appeared in the #12 dam section at an elevation of 1870 m (Fig. 10(a)). The maximum tangential deformation was 13.9 mm, which appeared towards the right bank at an elevation of 1875 m in the #18 dam section (Fig. 10(b)). The overall deformation pattern was basically consistent with the monitoring results, and the calculated results were within the design range. (2) Feedback analysis of structural stress At the normal water storage level, key sections of the arch dam in the upper and lower reaches were in a compressive state. On the upstream face, the maximum hoop compressive stress was 5 MPa, the maximum arch compressive stress was 8 MPa, and the maximum tensile stress was 1.47 MPa. These values were lower than the design control standards. On the downstream face, the maximum hoop compressive stress was 9 MPa, and the maximum tensile stress was 1.2 MPa, which also met the design requirements. In conclusion, feedback analysis results show that the deformation and stress distribution patterns of the arch dam were normal, and the arch dam operated normally at the normal water storage level. Fig. 10. Dam deformation at normal water storage level obtained from feedback analysis. 4. Conclusions and suggestions (1) The monitoring results show that the observed deformation values of the dam body and foundation were lower than the design values; the total seepage flows through the dam body and foundation were lower than the design drainage capacity of the deep-well pump house; the dam stress distributions were normal, with values lower than the design control criteria; and the arch dam was basically in a compressive state during the initial impoundment. The results of the dam deformation and stress distribution from the feedback analysis were basically consistent with the monitoring results, and the values were within the design range. The working behavior of the Jinping-I Arch Dam was normal during the initial impoundment. (2) The two approaches, monitoring analysis and numerical calculation, supplement and prove each other in the comprehensive analysis and evaluation of the working behavior of the dam in terms of stress, deformation, and seepage pressure. The results of analysis and evaluation provide a technical foundation for safe operation of the dam in the future, and can provide a reference for similar high dam projects.

9 248 (3) The safe operation of high dams during impoundment is a long-term dynamic process. Thus it is necessary to carry out long-term safety monitoring and analysis based on monitoring, tracing, and feedback, and pay close attention to the working behavior of the dam, so as to provide reliable technical support for the long-term safe operation of projects. References Chen, X.P., Ruan, Y.S., Analysis on the vertical monitoring results of the initial impoundment for the arch dam of Jinping-I hydropower station. Sichuan Water Power 33(s1), 128e j.issn z1.037 (in Chinese). Deng, J.H., Dong, Y.J., Report on Safety Monitoring Analysis of Jinping-I Hydropower Project during Fourth-stage Impoundment. Jinping Construction and Administration Bureau, Chengdu (in Chinese). Han, S.D., Zhao, B., Liao, Z.Y., Xia, J.H., Analysis and evaluation of monitoring data by plumb lines in early impoundment period of Xiaowan Arch Dam. Dam Saf. (3), 44e47. (in Chinese). Hu, B., Wu, Z.R., Liu, G.B., Zhao, B., Xu, B., Safety evaluation of replacement reinforcement quality in abutment contact zones of ultra-high arch dam in first impoundment period based on prototype monitoring. Water Sci. Eng. 5(2), 210e Huang, X.C., Tang, L., Zhao, W., Deformation monitoring design for Goupitan hydropower station. Yangtze River 37(3), 48e50. dx.doi.org/ /j.issn (in Chinese). Jin, F., Hu, W., Pan, J.W., Yang, J., Wang, J.T., Zhang, C.H., Comparative study procedure for the safety evaluation of high arch dams. Comput. Geotechnics 38(3), 306e Li, P.J., Wei, P., Zhang, Q., Behavior of Laxiwa Arch Dam in the period of first impounding. Hydropower Stn. 35(11), 12e /j.issn (in Chinese). Wang, Z.H., Hu, Q.Y., Yu, X.H., Duan, G.X., Analysis of operation condition of Goupitan Hydropower Station arch dam in initial impoundment period. Yangtze River 41(22), 29e31. j.issn (in Chinese). Wang, Z.Y., Yang, H., Huang, H.D., Analysis on dam deformation during initial impoundment period of Dachaoshan hydropower station. Hydropower Automation Dam Monit. 27(5), 57e /j.issn (in Chinese). Wu, S.Y., Cao, W., Analysis on working behaviors of Jinping-I hydropower project during initial impoundment period. In: Proceedings of 2014 Academic Annual Conference of Chinese National Committee on Large Dams. The Yellow River Conservancy Press, Guiyang, pp. 309e318 (in Chinese). Wu, Z.R., Safety Monitoring Theory and It's Application to Hydraulic Structures. Higher Education Press, Beijing (in Chinese). Yang, H., Dong, Y.J., Analysis on monitoring data of Jinping-I hydropower dam during first impoundment. Dam Saf. (3), 34e40. dx.doi.org/ /j.issn (in Chinese). Zhang, C., Yin, H.A., Feedback analysis of extra-high arch dam of Xiluodu in the initial impoundment phase. Hydropower Stn. Des. 30(2), 7e12. (in Chinese). Zhang, C., Wang, R.K., Tang, X.J., Safety evaluation of Xiluodu ultrahigh arch dam during the initial impoundment period. J. Hydraulic Eng. 47(1), 85e93. (in Chinese). Zhou, W., Hua, J.J., Chang, X.L., Yang, Q.G., Ma, G., Estimation of work status and deformation prediction of Shuibuya CFRD. Chin. J. Geotechnical Eng. 33(s1), 65e70 (in Chinese). Zhou, Z., Rao, H.L., Special Report on Monitoring, Analysis and Assessment of Dam and Slope Safety of Jinping-I Hydropower Project in Initial Impoundment. Power China Chengdu Engineering Corporation Limited, Chengdu (in Chinese).

THE SUMMARY OF SAFETY MONITORING AND OPERATION ABOUT RCC GRAVITY DAM IN CHINA

THE SUMMARY OF SAFETY MONITORING AND OPERATION ABOUT RCC GRAVITY DAM IN CHINA COMITÊ BRASILEIRO DE BARRAGENS XXX SEMINÁRIO NACIONAL DE GRANDES BARRAGENS FOZ DO IGUAÇU - PR - 11 A 13 DE MAIO DE 2015 THE SUMMARY OF SAFETY MONITORING AND OPERATION ABOUT RCC GRAVITY DAM IN CHINA Quansheng

More information

Discussions on the Technical Issues of the Construction of 300m High CFRD. Xu Zeping. (China Institute of Water resources and Hydropower Research)

Discussions on the Technical Issues of the Construction of 300m High CFRD. Xu Zeping. (China Institute of Water resources and Hydropower Research) COMMISSION INTERNATIONALE DES GRANDS BARRAGES ------- LA 78 EME CONGRES DES GRANDS BARRAGES Hanoi-Vietnam, may 2010 Discussions on the Technical Issues of the Construction of 300m High CFRD Xu Zeping (China

More information

Petroleum. Mechanical performance analysis of hollow cylindrical roller bearing of cone bit by FEM

Petroleum. Mechanical performance analysis of hollow cylindrical roller bearing of cone bit by FEM Petroleum 1 (2015) 388e396 Contents lists available at ScienceDirect Petroleum homepage: www.keaipublishing.com/en/s/petlm Original article Mechanical performance analysis of hollow cylindrical bearing

More information

Engineering 2 (2016) Contents lists available at ScienceDirect. Engineering. journal homepage:

Engineering 2 (2016) Contents lists available at ScienceDirect. Engineering. journal homepage: Engineering 2 (2016) 350 359 Contents lists available at ScienceDirect Engineering journal homepage: www.elsevier.com/locate/eng Research Hydro Projects Article Key Technologies in the Design and Construction

More information

Journal of Chemical and Pharmaceutical Research, 2013, 5(9): Research Article. Stability analysis of cantilever retaining wall with FEM

Journal of Chemical and Pharmaceutical Research, 2013, 5(9): Research Article. Stability analysis of cantilever retaining wall with FEM Available online www.jocpr.com Journal of Chemical and Pharmaceutical Research, 2013, 5(9):362-371 Research Article ISSN : 0975-7384 CODEN(USA) : JCPRC5 Stability analysis of cantilever retaining wall

More information

THE EXPERIMENTAL STUDY ON INNER SHIFT LINING STRUCTURE OF FREEZING SHAFT IN DEEP THICK AQUIFEROUS SOFT ROCK**

THE EXPERIMENTAL STUDY ON INNER SHIFT LINING STRUCTURE OF FREEZING SHAFT IN DEEP THICK AQUIFEROUS SOFT ROCK** AGH Journal of Mining and Geoengineering vol. 36 No. 3 2012 Zhishu Yao*, Haiqing Song*, Hua Cheng*, Chuanxin Rong* THE EXPERIMENTAL STUDY ON INNER SHIFT LINING STRUCTURE OF FREEZING SHAFT IN DEEP THICK

More information

Mechanical properties of multiple large-diameter corrugate steel pipes in embankment

Mechanical properties of multiple large-diameter corrugate steel pipes in embankment Mechanical properties of multiple large-diameter corrugate steel pipes in embankment *Huan He 1), Shi-Sheng Zhou 2), Wen-Xue Gao 3) and Hong-Liang Deng 4) 1), 3), 4) College of Architecture and Civil Engineering,

More information

THREE-DIMENSIONAL NUMERICAL ANALYSIS ON EXCAVATION AND SUPPORT OF DEEP PIT NEAR THE SUBWAY TUNNEL BY COMPUTER SIMULATION TECHNIQUE

THREE-DIMENSIONAL NUMERICAL ANALYSIS ON EXCAVATION AND SUPPORT OF DEEP PIT NEAR THE SUBWAY TUNNEL BY COMPUTER SIMULATION TECHNIQUE THREE-DIMENSIONAL NUMERICAL ANALYSIS ON EXCAVATION AND SUPPORT OF DEEP PIT NEAR THE SUBWAY TUNNEL BY COMPUTER SIMULATION TECHNIQUE 1, 2 DAPENG ZHU, 1 YUNDIAN LIN, 3 ECHUAN YAN 1 School of Civil Engineering

More information

Available online at ScienceDirect. Procedia Engineering 84 (2014 )

Available online at   ScienceDirect. Procedia Engineering 84 (2014 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 84 (2014 ) 868 872 2014 ISSST, 2014 International Symposium on Safety Science and Technology Study on attenuation law of open-pit

More information

Structural Performance Assessment and Control of Super Tall Buildings During Construction

Structural Performance Assessment and Control of Super Tall Buildings During Construction Available online at www.sciencedirect.com Procedia Engineering 14 (211) 253 251 The Twelfth East Asia-Pacific Conference on Structural Engineering and Construction Structural Performance Assessment and

More information

The Effect of Groundwater Seepage on Stability of Tunnel by Using Strength Reduction Method Considering Fluid Solid Coupling

The Effect of Groundwater Seepage on Stability of Tunnel by Using Strength Reduction Method Considering Fluid Solid Coupling International Journal of Transportation Engineering and Technology 2018; 4(4): 75-82 http://www.sciencepublishinggroup.com/j/ijtet doi: 10.11648/j.ijtet.20180404.12 ISSN: 2575-1743 (Print); ISSN: 2575-1751

More information

Rong He School of Civil Engineering and Communication, North China University of Water Resources and Electric Power, Zhengzhou, , China

Rong He School of Civil Engineering and Communication, North China University of Water Resources and Electric Power, Zhengzhou, , China doi:10.21311/002.31.12.08 Dynamic Characteristics Analysis of Wide Well Ditch Aqueduct Wei He * School of Civil Engineering and Communication, North China University of Water Resources and Electric Power,

More information

NUMERICAL MODELING OF CONCRETE FACE ROCKFILL DAM AT SEISMIC IMPACT

NUMERICAL MODELING OF CONCRETE FACE ROCKFILL DAM AT SEISMIC IMPACT NUMERICAL MODELING OF CONCRETE FACE ROCKFILL DAM AT SEISMIC IMPACT V.B. Glagovsky 1 and E.V. Kourneva 2 1 Deputy Director, The B.E.Vedeneev Research Institute of Hydraulic Engineering (VNIIG), Saint Petersburg,

More information

Numerical Simulation of Flexural-tensile Properties of Reinforced Concrete Beam

Numerical Simulation of Flexural-tensile Properties of Reinforced Concrete Beam American Journal of Engineering and Applied Sciences Original Research Paper Numerical Simulation of Flexural-tensile Properties of Reinforced Concrete Beam 1,2 Shi Di, 2 Wang Juan and 1 Liu Jianjun 1

More information

Numerical Analysis of the Durability of Retaining Wall with Anchor

Numerical Analysis of the Durability of Retaining Wall with Anchor Numerical Analysis of the Durability of Retaining Wall with Anchor Qingyu Meng 1, 2, Chao Li 1, 2, Hongbo Zhang 1, 2, Xin Li 1, 2 1. School of Civil Engineering, Shandong University, Jinan, 250061, China

More information

Numerical Simulation of Liquefaction Deformation of Sand Layer around Bucket Foundations under Dynamic Loadings

Numerical Simulation of Liquefaction Deformation of Sand Layer around Bucket Foundations under Dynamic Loadings The Open Ocean Engineering Journal, 2010, 3, 75-81 75 Open Access Numerical Simulation of Liquefaction Deformation of Sand Layer around Bucket Foundations under Dynamic Loadings Chi Li 1,*, Xiaobing Lu

More information

Characteristic study on seepage field of dam under cutoff wall construction defects and freeze in winter

Characteristic study on seepage field of dam under cutoff wall construction defects and freeze in winter Available online www.jocpr.com Journal of Chemical and Pharmaceutical Research, 2014, 6(6):1094-1098 Research Article ISSN : 0975-7384 CODEN(USA) : JCPRC5 Characteristic study on seepage field of dam under

More information

3-D finite element analysis on shear lag effect of curved box girder under multi-dimensional seismic excitation

3-D finite element analysis on shear lag effect of curved box girder under multi-dimensional seismic excitation 3-D finite element analysis on shear lag effect of curved box girder under multi-dimensional seismic excitation Heng Cai 1, Hailin Lu 2, Zheng Tang 3 School of Resource and Civil Engineering, Wuhan Institute

More information

Numerical simulation of seismic damage and cracking of concrete slabs of high concrete face rockfill dams

Numerical simulation of seismic damage and cracking of concrete slabs of high concrete face rockfill dams Water Science and Engineering 2016, 9(3): 205e211 HOSTED BY Available online at www.sciencedirect.com Water Science and Engineering journal homepage: http://www.waterjournal.cn Numerical simulation of

More information

1688. Study on the dynamic response of subway tunnel by viaduct collapsing vibration and the protective measures of reducing vibration

1688. Study on the dynamic response of subway tunnel by viaduct collapsing vibration and the protective measures of reducing vibration 1688. Study on the dynamic response of subway tunnel by viaduct collapsing vibration and the protective measures of reducing vibration Huabing Zhao 1, Yuan Long 2, Chong Ji 3, Xinghua Li 4, Mingshou Zhong

More information

Simulation Analysis of Mass Concrete Temperature Field

Simulation Analysis of Mass Concrete Temperature Field Available online at www.sciencedirect.com Procedia Earth and Planetary Science 5 (2012) 5 12 2012 International Conference on Structural Computation and Geotechnical Mechanics Simulation Analysis of Mass

More information

Finite Element Simulation of Molding Process of Cold Bending Pipe

Finite Element Simulation of Molding Process of Cold Bending Pipe Finite Element Simulation of Molding Process of Cold Bending Pipe Dongshen He 1, Jie Yang 1, Liquan Shen 2, Gehong Liu 1 1 School of Mechanical Engineering, Southwest Petroleum University, Chengdu, 610500,

More information

Silvan Dam and Revisions to Adapt for Latest Developments in High CFRD Design and Construction

Silvan Dam and Revisions to Adapt for Latest Developments in High CFRD Design and Construction Silvan Dam and Revisions to Adapt for Latest Developments in High CFRD Design and Construction Ö. Özen, H. Küsmez, A. Akman Dam and Tunnel Projects Director, İLCİ Holding & TR COLD Member, Ankara, Turkey

More information

The die failure prediction and prevention of the orbital forging process

The die failure prediction and prevention of the orbital forging process journal of materials processing technology 201 (2008) 9 13 journal homepage: www.elsevier.com/locate/jmatprotec The die failure prediction and prevention of the orbital forging process J.J. Sheu, C.H.

More information

Anti-fatigue Performance Analysis on Steel Crane Beam

Anti-fatigue Performance Analysis on Steel Crane Beam Sensors & Transducers 2013 by IFSA http://www.sensorsportal.com Anti-fatigue Performance Analysis on Steel Crane Beam Yuanmin Xie College of Machinery and Automation, Wuhan University of Science and Technology,

More information

Advances in Engineering Research (AER), volume Global Conference on Mechanics and Civil Engineering (GCMCE 2017)

Advances in Engineering Research (AER), volume Global Conference on Mechanics and Civil Engineering (GCMCE 2017) 217 Global Conference on Mechanics and Civil Engineering (GCMCE 217) Active Limit State Analysis of Soil Considering Displacement Effect of the Retaining Wall Bin Peng1,a, Zhijun Li1, He Huang1, Hanyang

More information

Migration Behavior of Life Source Contaminants in a Landfill Site

Migration Behavior of Life Source Contaminants in a Landfill Site Migration Behavior of Life Source Contaminants in a Landfill Site Liwen CAO *, Dongmei WU, Yong WANG, Ke HAN, Xue QU and Pan HUO School of Resource and Earth Science, China University of Mining and Technology,

More information

Analysis of the Sensitivity of Influencing Factors on Tunnel Secondary Lining Structure *

Analysis of the Sensitivity of Influencing Factors on Tunnel Secondary Lining Structure * Analysis of the Sensitivity of Influencing Factors on Tunnel Secondary Lining Structure * Kezhi Song School of Civil Engineering Ludong University Yantai, China ytytskz@126.com Liangji Kong Yantai No.1

More information

Flood control and safety evaluation of Banqiao reservoir

Flood control and safety evaluation of Banqiao reservoir Available online at www.sciencedirect.com Procedia Engineering 8 (01) 368 375 01 International Conference on Modern Hydraulic Engineering Flood control and safety evaluation of Banqiao reservoir GUAN Tie-sheng

More information

Mitigation Measures Evaluation for Concrete Faced Rockfill Dams. Juan E. Quiroz Mehdi Modares REC Conference - IIT

Mitigation Measures Evaluation for Concrete Faced Rockfill Dams. Juan E. Quiroz Mehdi Modares REC Conference - IIT 1 Mitigation Measures Evaluation for Concrete Faced Rockfill Dams Juan E. Quiroz Mehdi Modares REC Conference - IIT INTRODUCTION 2 Dams for water impoundment can be: Gravity Arch Masonry Roller Compacted

More information

Available online at ScienceDirect

Available online at  ScienceDirect Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 71 ( 2014 ) 16 21 Experimental Study on Temperature Distribution of Concrete Filled Steel Tube Reinforced Concrete Square Short

More information

Optimization and Stress Analysis of Underground Oil Pipelines in High and Steep Slope Areas

Optimization and Stress Analysis of Underground Oil Pipelines in High and Steep Slope Areas Send Orders for Reprints to reprints@benthamscience.ae The Open Civil Engineering Journal, 215, 9, 477-483 477 Open Access Optimization and Stress Analysis of Underground Oil Pipelines in High and Steep

More information

Analysis on the influence of rotational speed to aerodynamic performance of vertical axis wind turbine

Analysis on the influence of rotational speed to aerodynamic performance of vertical axis wind turbine Available online at www.sciencedirect.com Procedia Engineering 31 (2012) 245 250 International Conference on Advances in Computational Modeling and Simulation Analysis on the influence of rotational speed

More information

State Key Laboratory of Hydraulics and Mountain River Engineering Sichuan University

State Key Laboratory of Hydraulics and Mountain River Engineering Sichuan University State Key Laboratory of Hydraulics and Mountain River Engineering Sichuan University 24, South Section No.1, Yihuan Road, Chengdu, P.R.China 610065. http://www.hydraulics.org.cn/ Outline Authorized by

More information

SEISMIC ASSESSMENT AND STRENGTHENING OF A SLENDER ARCH DAM

SEISMIC ASSESSMENT AND STRENGTHENING OF A SLENDER ARCH DAM SEISMIC ASSESSMENT AND STRENGTHENING OF A SLENDER ARCH DAM N. Nilipour 1 and L. Mouvet 2 ABSTRACT : 1 M.Sc. Civil Engineer, Project Manager, STUCKY Ltd, Switzerland 2 M.Sc. Civil Engineer, Head of Dams

More information

TEST STUDY ON BASIC STATIC CHARACTERISTICS OF CABLE SUPPORTED BARREL VAULT STRUCTURE

TEST STUDY ON BASIC STATIC CHARACTERISTICS OF CABLE SUPPORTED BARREL VAULT STRUCTURE Advanced Steel Construction Vol. 8, No. 2, pp. 199-211 (2012) 199 TEST STUDY ON BASIC STATIC CHARACTERISTICS OF CABLE SUPPORTED BARREL VAULT STRUCTURE Wentao Qiao 1,*, Zhihua Chen 2 and Mingshan Zhao 3

More information

Finite Element Analysis of the O-ring Squeezed into the Sealing Clearance Based on ABAQUS

Finite Element Analysis of the O-ring Squeezed into the Sealing Clearance Based on ABAQUS 2017 Asia-Pacific Engineering and Technology Conference (APETC 2017) ISBN: 978-1-60595-443-1 Finite Element Analysis of the O-ring Squeezed into the Sealing Clearance Based on ABAQUS Liejiang Wei, Qinghui

More information

PSEUDO-DYNAMIC TEST AND NON-LINEAR ANALYSIS OF A 1:10 SCALE PRE-STRESSED CONCRETE CONTAIN VESSEL MODEL FOR CNP1000 NUCLEAR POWER PLANT

PSEUDO-DYNAMIC TEST AND NON-LINEAR ANALYSIS OF A 1:10 SCALE PRE-STRESSED CONCRETE CONTAIN VESSEL MODEL FOR CNP1000 NUCLEAR POWER PLANT PSEUDO-DYNAMIC TEST AND NON-LINEAR ANALYSIS OF A 1:10 SCALE PRE-STRESSED CONCRETE CONTAIN VESSEL MODEL FOR CNP1000 NUCLEAR POWER PLANT J.R. Qian 1 A. Duan 2 Z.Z. Zhao 3 Z.F. Xia 4 and M.D. Wang 4 1 2 3

More information

Long-term Stress of Simply Supported Steel-concrete Composite Beams

Long-term Stress of Simply Supported Steel-concrete Composite Beams The Open Construction and Building Technology Journal, 2011, 5, 1-7 1 Open Access Long-term Stress of Simply Supported Steel-concrete Composite Beams Min Ding 1,2, Xiugen Jiang 1, Zichen Lin 3 and Jinsan

More information

The Study of Reservoir Immersion of a Hydropower Station

The Study of Reservoir Immersion of a Hydropower Station 2017 2 nd International Conference on Architectural Engineering and New Materials (ICAENM 2017) ISBN: 978-1-60595-436-3 The Study of Reservoir Immersion of a Hydropower Station Shi You Zhang, Ai Guo Li

More information

Simulated Calculation of Temperature Control and Anti-crack during Construction of Inverted Siphon

Simulated Calculation of Temperature Control and Anti-crack during Construction of Inverted Siphon IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS Simulated Calculation of Temperature Control and Anti-crack during Construction of Inverted Siphon To cite this article: Shifa Xia

More information

Analysis of plastic penetration in process of groove ball-section ring rolling

Analysis of plastic penetration in process of groove ball-section ring rolling Journal of Mechanical Science and Technology Journal of Mechanical Science and Technology 22 (2008) 1374~1382 www.springerlink.com/content/1738-494x Analysis of plastic penetration in process of groove

More information

Precast segmental design and construction in China

Precast segmental design and construction in China Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Precast segmental design and construction in China Dong, Xu, Huichi Li & Chao Liu

More information

Structural behaviour of recycled concrete filled steel tube columns strengthened with CFRP sheets under axial loading

Structural behaviour of recycled concrete filled steel tube columns strengthened with CFRP sheets under axial loading Structural behaviour of recycled concrete filled steel tube columns strengthened with CFRP sheets under axial loading J.F. Dong 1,2, Q.Y. Wang 1*, Z.W. Guan 2 1 School of Architecture and Environment,

More information

ScienceDirect. Deep drawing of cylindrical cup using incremental electromagnetic assisted stamping with radial magnetic pressure

ScienceDirect. Deep drawing of cylindrical cup using incremental electromagnetic assisted stamping with radial magnetic pressure Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 81 (2014 ) 813 818 11th International Conference on Technology of Plasticity, ICTP 2014, 19-24 October 2014, Nagoya Congress

More information

STRUCTURAL CONTROL OF A HIGH ARCH DAM

STRUCTURAL CONTROL OF A HIGH ARCH DAM STRUCTURAL CONTROL OF A HIGH ARCH DAM Gao LIN 1, Shichun CHI 2 And Zhiqiang HU 3 SUMMARY Feasibility study of vibration control systems applied to massive structure, a 292m high arch dam is carried out.

More information

Three-dimensional computer simulation of soil nailing support in deep foundation pit

Three-dimensional computer simulation of soil nailing support in deep foundation pit Three-dimensional computer simulation of soil nailing support in deep foundation pit Abstract Chang Zhi Zhu 1,2*, Quan Chen Gao 1 1 School of Mechanics & Civil Engineering, China University of Mining &

More information

Study on Bearing Capacity Formula and Influence Factors of PBH Shear Connectors

Study on Bearing Capacity Formula and Influence Factors of PBH Shear Connectors Research Journal of Applied Sciences, Engineering and Technology 6(5): 900-906, 2013 ISSN: 2040-7459; e-issn: 2040-7467 Maxwell Scientific Organization, 2013 Submitted: October 30, 2012 Accepted: December

More information

Optimum design on impeller blade of mixed-flow pump based on CFD

Optimum design on impeller blade of mixed-flow pump based on CFD Available online at www.sciencedirect.com Procedia Engineering 31 (2012) 187 195 International Conference on Advances in Computational Modeling and Simulation Optimum design on impeller blade of mixed-flow

More information

136. Roller spinning forming regularity

136. Roller spinning forming regularity 136. Roller spinning forming regularity Yang Pan 1, Li Xueguang 2, Chen Zhe 3, Yu Yang 4 College of Mechanical and Electric Engineering, Changchun University of Science and Technology, Changchun, 130022,

More information

Siphon Pipeline Resistance Characteristic Research

Siphon Pipeline Resistance Characteristic Research Available online at www.sciencedirect.com Procedia Engineering 28 (2012) 99 104 2012 International Conference on Modern Hydraulic Engineering Siphon Pipeline Resistance Characteristic Research Yan tao,

More information

Design and Finite Element Analysis of A Spatial Tubular Truss and Its Pin Support

Design and Finite Element Analysis of A Spatial Tubular Truss and Its Pin Support 28 September 2 October 2009, Universidad Politecnica de Valencia, Spain Alberto DOMINGO and Carlos LAZARO (eds.) Design and Finite Element Analysis of A Spatial Tubular Truss and Its Pin Support Wen YANG*,

More information

doi: / Experimental and Simulation Analysis of Prestressed Concrete Continuous Box Girder Bridge

doi: / Experimental and Simulation Analysis of Prestressed Concrete Continuous Box Girder Bridge doi:10.21311/001.39.11.49 Experimental and Simulation Analysis of Prestressed Concrete Continuous Box Girder Bridge Yuqian Zhao *1, Yang Zhou 1, Chunheng Feng 2, Zhong Liu 2 and Zhonghai He 1 1 Northeastern

More information

Identification of Critical Lines in Power System Based on Optimal Load Shedding

Identification of Critical Lines in Power System Based on Optimal Load Shedding Energy and Power Engineering, 2017, 9, 261-269 http://www.scirp.org/journal/epe ISSN Online: 1947-3818 ISSN Print: 1949-243X Identification of Critical Lines in Power System Based on Optimal Load Shedding

More information

DAMS AND APPURTENANT HYDRAULIC STRUCTURES

DAMS AND APPURTENANT HYDRAULIC STRUCTURES rs-t DAMS AND APPURTENANT HYDRAULIC STRUCTURES LJUBOMIR TANCEV Professor, Faculty of Civil Engineering, Sts Cyril and Methodius University, Skopje, Republic of Macedonia A.A. BALKEMA PUBLISHERS LEIDEN

More information

Passage under Lövstavägen at Bypass Stockholm From Design to Realization

Passage under Lövstavägen at Bypass Stockholm From Design to Realization Passage under Lövstavägen at Bypass Stockholm From Design to Realization Roslin Mattias 1, Borio Luca 2 and Tomas Hellström 3 1 Swedish Transport Administration, Solna Strandväg 98, 171 54 Solna, mattias.roslin@trafikverket.se

More information

Ecological Study of Moisture Content of Clay Soil Affecting Compressive Failure of the CEP Pile

Ecological Study of Moisture Content of Clay Soil Affecting Compressive Failure of the CEP Pile Ekoloji 27(106): 905-911 (2018) Ecological Study of Moisture Content of Clay Soil Affecting Compressive Failure of the CEP Pile Yongmei Qian 1*, Xue Feng 1, Wei Tian 1, Ruozhu Wang 1 1 Jilin Jianzhu University,

More information

Three Dimensional Seepage Analyses in Mollasadra Dam after Its Impoundments

Three Dimensional Seepage Analyses in Mollasadra Dam after Its Impoundments JASEM ISSN 1119-8362 All rights reserved Full-text Available Online at www.bioline.org.br/ja J. Appl. Sci. Environ. Manage. June, 2011 Vol. 15 (2) 241-246 Three Dimensional Seepage Analyses in Mollasadra

More information

SIZE EFFECT ON CONFINING STRESS OF CIRCULAR CONCRETE FILLED IN STEEL TUBE UNDER AXIAL COMPRESSION

SIZE EFFECT ON CONFINING STRESS OF CIRCULAR CONCRETE FILLED IN STEEL TUBE UNDER AXIAL COMPRESSION 9th International Conference on Fracture Mechanics of Concrete and Concrete Structures FraMCoS-9 V. Saouma, J. Bolander and E. Landis (Eds) DOI 10.21012/FC9.103 SIZE EFFECT ON CONFINING STRESS OF CIRCULAR

More information

Research Development of the Traditional and Flexible Shed-holes Yunfei Luo1, 3, Jiao Jiang2, Jianrong Yang1, 2, Yitang Zhou2

Research Development of the Traditional and Flexible Shed-holes Yunfei Luo1, 3, Jiao Jiang2, Jianrong Yang1, 2, Yitang Zhou2 th International Conference on Civil Engineering and Transportation (ICCET 01) Research Development of the Traditional and Flexible Shed-holes Yunfei Luo1, 3, Jiao Jiang, Jianrong Yang1,, Yitang Zhou (1.

More information

1948. Dynamic response analysis of concrete lining structure in high pressure diversion tunnel under seismic load

1948. Dynamic response analysis of concrete lining structure in high pressure diversion tunnel under seismic load 1948. Dynamic response analysis of concrete lining structure in high pressure diversion tunnel under seismic load Jian Deng 1, Ming Xiao 2 State Key Laboratory of Water Resources and Hydropower Engineering

More information

Application of Progressive Collapse Analysis in a High-Rise Frame-Core Tube Structure

Application of Progressive Collapse Analysis in a High-Rise Frame-Core Tube Structure American Journal of Civil Engineering 2016; 4(3): 111-116 http://www.sciencepublishinggroup.com/j/ajce doi: 10.11648/j.ajce.20160403.18 ISSN: 2330-8729 (Print); ISSN: 2330-8737 (Online) Application of

More information

On Mechanical Characteristics of Stiffening Suspension Cable Reinforced Steel Truss Bridge X.B. SU, S.H. GONG & J.N. SU

On Mechanical Characteristics of Stiffening Suspension Cable Reinforced Steel Truss Bridge X.B. SU, S.H. GONG & J.N. SU 5th International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 216) On Mechanical Characteristics of Stiffening Suspension Cable Reinforced Steel Truss Bridge X.B. SU, S.H. GONG

More information

THE STRUCTURAL ANALYSIS OF STEEL SILOS WITH CYLINDRICAL-WALL BEARING AND PROFILE-STEEL BEARING

THE STRUCTURAL ANALYSIS OF STEEL SILOS WITH CYLINDRICAL-WALL BEARING AND PROFILE-STEEL BEARING THE STRUCTURAL ANALYSIS OF STEEL SILOS WITH CYLINDRICAL-WALL BEARING AND PROFILE-STEEL BEARING Zhengjun Tang 1, Daibiao Zhou 2, Chenwei Peng 1, Wenping Wu 1* 1. School of Civil Engineering, Wuhan University,

More information

The Failure Behavior of Composite Honeycomb Sandwich Structure with. Stringer Reinforcement and Interfacial Debonding

The Failure Behavior of Composite Honeycomb Sandwich Structure with. Stringer Reinforcement and Interfacial Debonding ICCM015, 14-17 th July, Auckland, NZ The Failure Behavior of Composite Honeycomb Sandwich Structure with Stringer Reinforcement and Interfacial Debonding *Ruixiang Bai 1, S.H. Bao ¹, X.Y. Liu, and X.H.

More information

Research on the Effects of Foundation Excavation by the Environment

Research on the Effects of Foundation Excavation by the Environment 2015 2 nd International Conference on Material Engineering and Application (ICMEA 2015) ISBN: 978-1-60595-323-6 Research on the Effects of Foundation Excavation by the Environment Manxia Wu 1, Wen Wang

More information

Design and Model Test of Shaft Lining Compressible Connector in Deep Hydrophobic Alluvium*

Design and Model Test of Shaft Lining Compressible Connector in Deep Hydrophobic Alluvium* Available online at www.sciencedirect.com Procedia Environmental Sciences 12 (2012 ) 864 870 2011 International Conference on Environmental Science and Engineering (ICESE 2011) Design and Model Test of

More information

Dynamic Characteristics Analysis of Large Self-anchored Suspension Bridge

Dynamic Characteristics Analysis of Large Self-anchored Suspension Bridge Modern Applied Science; Vol. 8, No. 2; 2014 ISSN 1913-1844 E-ISSN 1913-1852 Published by Canadian Center of Science and Education Dynamic Characteristics Analysis of Large Self-anchored Suspension Bridge

More information

Effects of irrigation on groundwater recharge under deep buried depth condition

Effects of irrigation on groundwater recharge under deep buried depth condition IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS Effects of on groundwater recharge under deep buried depth condition To cite this article: DONG Qiguang et al 2017 IOP Conf. Ser.:

More information

In-plane testing of precast concrete wall panels with grouted sleeve

In-plane testing of precast concrete wall panels with grouted sleeve In-plane testing of precast concrete wall panels with grouted sleeve P. Seifi, R.S. Henry & J.M. Ingham Department of Civil Engineering, University of Auckland, Auckland. 2017 NZSEE Conference ABSTRACT:

More information

Seismic Response Analysis of Typical Rammed Earth House in Disaster Areas of Chinese Wenchuan Ms8.0 Earthquake using Finite Element Method

Seismic Response Analysis of Typical Rammed Earth House in Disaster Areas of Chinese Wenchuan Ms8.0 Earthquake using Finite Element Method Seismic Response Analysis of Typical Rammed Earth House in Disaster Areas of Chinese Wenchuan Ms8.0 Earthquake using Finite Element Method S. Xu, K. Liu, L. Wang & J. Sun Key Laboratory of Loess Earthquake

More information

POSTER PAPER PROCEEDINGS

POSTER PAPER PROCEEDINGS ITA - AITES WORLD TUNNEL CONGRESS 21-26 April 2018 Dubai International Convention & Exhibition Centre, UAE POSTER PAPER PROCEEDINGS Study on quick excavation and support method of Expressway Tunnel with

More information

Effects of water and soil conservation works on runoff and sediment variation in the areas with high and coarse sediment yield of the middle Yellow River Wei Ying SUN, Pan ZHANG, Li LI, and Jiang Nan CHEN

More information

Research and Application of a New Type of Water Flooding Characteristic Curve in Oilfield Development

Research and Application of a New Type of Water Flooding Characteristic Curve in Oilfield Development Advances in Petroleum Exploration and Development Vol. 11, No. 2, 2016, pp. 1-5 DOI:10.3968/8394 ISSN 1925-542X [Print] ISSN 1925-5438 [Online] www.cscanada.net www.cscanada.org Research and Application

More information

Research on self-centering ability of tapered roll for initial flatness waves of steel strip in the continuous annealing furnace

Research on self-centering ability of tapered roll for initial flatness waves of steel strip in the continuous annealing furnace University of Wollongong Research Online Faculty of Engineering and Information Sciences - Papers: Part A Faculty of Engineering and Information Sciences 2015 Research on self-centering ability of tapered

More information

Finite element simulation of railway through concrete-filled steel tube tied arch bridge based on static analysis

Finite element simulation of railway through concrete-filled steel tube tied arch bridge based on static analysis 207 th International Civil Engineering, Architecture and Machinery Conference(ICEAMC 207) Finite element simulation of railway through concrete-filled steel tube tied arch bridge based on static analysis

More information

Non-linear Time History Response Analysis of Low Masonry Structure with tie-columns

Non-linear Time History Response Analysis of Low Masonry Structure with tie-columns Non-linear Time History Response Analysis of Low Masonry Structure with tie-columns Nina Zheng & Jing Zhou Key Lab of Chinese Education Ministry for Construction and New Technology of Mountain Cities,

More information

The Open Civil Engineering Journal

The Open Civil Engineering Journal Send Orders for Reprints to reprints@benthamscience.ae The Open Civil Engineering Journal, 2017, 11, (Suppl-4, M5) 955-964 955 The Open Civil Engineering Journal Content list available at: www.benthamopen.com/tociej/

More information

Numerical Simulation of Soil Nailing Wall in Deep Foundation Pit

Numerical Simulation of Soil Nailing Wall in Deep Foundation Pit 2017 2 nd International Conference on Architectural Engineering and New Materials (ICAENM 2017) ISBN: 978-1-60595-436-3 Numerical Simulation of Soil Nailing Wall in Deep Foundation Pit Xiao Jie Geng ABSTRACT

More information

Bayardo Materon Bayardo Materon & Associates, Sao Paulo, Brazil

Bayardo Materon Bayardo Materon & Associates, Sao Paulo, Brazil Concrete Face Rockfill Dams Paulo T. Cruz Dam Consulting Engineer, Sao Paulo, Brazil Bayardo Materon Bayardo Materon & Associates, Sao Paulo, Brazil Manoel Freitas Hydrogeo Engharia SIC Ltda, Sao Paulo,

More information

Seismic Performance Analysis and Reinforcement Suggestion of RC Frame Structures

Seismic Performance Analysis and Reinforcement Suggestion of RC Frame Structures American Journal of Civil Engineering 2017; 5(6): 371-378 http://www.sciencepublishinggroup.com/j/ajce doi: 10.11648/j.ajce.20170506.19 ISSN: 2330-8729 (Print); ISSN: 2330-8737 (Online) Seismic Performance

More information

Season Greetings. Merry Christmas and Happy New Year!

Season Greetings. Merry Christmas and Happy New Year! Season Greetings While the New Year is going to open the corridors to new dreams and possibilities, Chinese National Committee on Large Dams (CHINCOLD) wishes you a Happy, Healthy and Successful New Year

More information

Development and Application of Intelligent Model Knowledge Base for the Plate Hot Leveler

Development and Application of Intelligent Model Knowledge Base for the Plate Hot Leveler Available online at www.sciencedirect.com Procedia Engineering 15 (2011 ) 1010 1014 Development and Application of Intelligent Model Knowledge Base for the Plate Hot Leveler Xiaogang Wang 1,a Hu Ying 1,b

More information

TUG - Institute of Hydraulic Engineering and Water Resources Management 1

TUG - Institute of Hydraulic Engineering and Water Resources Management 1 Large Dams Design, Construction and Performance Gerald Zenz Graz - University of Technology 1 Dam Structures & Geotechnique Design Construction / Observation Operation / Monitoring Cooperation & Transfer

More information

Mesocosmic study on autogenous shrinkage of concrete with consideration of effects of temperature and humidity

Mesocosmic study on autogenous shrinkage of concrete with consideration of effects of temperature and humidity Water Science and Engineering, 2009, 2(4): 85-94 doi:10.3882/j.issn.1674-2370.2009.04.008 http://kkb.hhu.edu.cn e-mail: wse@hhu.edu.cn Mesocosmic study on autogenous shrinkage of concrete with consideration

More information

2. SCOPE OF WORK Evolution of Plan of Study Hydrology ALASKA ENERGY AUTHORITY AEA ENGINEERING FEASIBILITY REPORT

2. SCOPE OF WORK Evolution of Plan of Study Hydrology ALASKA ENERGY AUTHORITY AEA ENGINEERING FEASIBILITY REPORT 2. SCOPE OF WORK 2.1. Evolution of Plan of Study The purpose of this feasibility study is to define all aspects of the Project in sufficient detail to support the State s decision process regarding project

More information

SEISMIC RISK ASSESSMENT OF LARGE DAMS

SEISMIC RISK ASSESSMENT OF LARGE DAMS SEISMIC RISK ASSESSMENT OF LARGE DAMS G. Varbanov & M. Kostov National Institut for Geophysics, Geodesy and Geography, Bulgarian Academy of Sciences A. Andonov, K. Apostolov, A. Iliev Risk Engineering

More information

STUDY ON THE TUNNEL SECONDARY LINING CONCRETE CRACKING PERFORMANCE DURING SERVICE PERIOD OF WU- GUANG PASSENGER DEDICATED LINE

STUDY ON THE TUNNEL SECONDARY LINING CONCRETE CRACKING PERFORMANCE DURING SERVICE PERIOD OF WU- GUANG PASSENGER DEDICATED LINE STUDY ON THE TUNNEL SECONDARY LINING CONCRETE CRACKING PERFORMANCE DURING SERVICE PERIOD OF WU- GUANG PASSENGER DEDICATED LINE Yan Liu (1) Xian Liu (2) Lei Huang (3) Guoping Liu (3) (1) School of Material

More information

Physical Simulation for Water Injection of Horizontal Wells in Naturally Fractured Buried- Hill Reservoirs

Physical Simulation for Water Injection of Horizontal Wells in Naturally Fractured Buried- Hill Reservoirs Available online at www.sciencedirect.com Energy Procedia 16 (2012) 1364 1371 2012 International Conference on Future Energy, Environment, and Materials Physical Simulation for Water Injection of Horizontal

More information

A construction strategy for a tunnel with big deformation

A construction strategy for a tunnel with big deformation DOI 1.17/s4534-13-14-y A construction strategy for a tunnel with big deformation Liang Chen Shougen Chen Xinrong Tan Received: 19 March 213 / Revised: May 213 / Accepted: 22 May 213 / Published online:

More information

Application of polymer grouting reinforcement technology in the treatment of slope collapse Zhichao ZHANG1, a, Kan LIU1, b, Longzhen YE1,c

Application of polymer grouting reinforcement technology in the treatment of slope collapse Zhichao ZHANG1, a, Kan LIU1, b, Longzhen YE1,c 5th International Conference on Environment, Materials, Chemistry and Power Electronics (EMCPE 2016) Application of polymer grouting reinforcement technology in the treatment of slope collapse Zhichao

More information

ERECTION ANALYSIS OF THE CFST ARCH BRIDGE BY VERTICAL SWING METHOD OVER THE JING-HANG CANAL IN XUZHOU, CHINA

ERECTION ANALYSIS OF THE CFST ARCH BRIDGE BY VERTICAL SWING METHOD OVER THE JING-HANG CANAL IN XUZHOU, CHINA Arch Bridges ARCH 04 P. Roca and E. Oñate (Eds) CIMNE, Barcelona, 2004 ERECTION ANALYSIS OF THE CFST ARCH BRIDGE BY VERTICAL SWING METHOD OVER THE JING-HANG CANAL IN XUZHOU, CHINA Chao SUN, Baochun Chen,

More information

International Power, Electronics and Materials Engineering Conference (IPEMEC 2015)

International Power, Electronics and Materials Engineering Conference (IPEMEC 2015) International Power, Electronics and Materials Engineering Conference (IPEMEC 2015) Structure Optimization of Corrugated Aluminium Sheath of XLPE Power Cables for Longitudinal Water Resistance Lei LI 1,

More information

Mechanical properties of prestressing steel at elevated temperature and after cooling

Mechanical properties of prestressing steel at elevated temperature and after cooling Southern Cross University epublications@scu 23rd Australasian Conference on the Mechanics of Structures and Materials 2014 Mechanical properties of prestressing steel at elevated temperature and after

More information

Tailings dam raise with reinforced walls

Tailings dam raise with reinforced walls Tailings dam raise with reinforced walls Jorge Alvarez Tiburcio Anddes Asociados S.A.C.,Peru ABSTRACT This paper presents the design of a tailings dam raise with reinforced walls lined with geomembrane,

More information

Numerical Modeling of Slab-On-Grade Foundations

Numerical Modeling of Slab-On-Grade Foundations Numerical Modeling of Slab-On-Grade Foundations M. D. Fredlund 1, J. R. Stianson 2, D. G. Fredlund 3, H. Vu 4, and R. C. Thode 5 1 SoilVision Systems Ltd., 2109 McKinnon Ave S., Saskatoon, SK S7J 1N3;

More information

Comprehensive experimental study on prevention of land subsidence caused by dewatering in deep foundation pit with hanging waterproof curtain

Comprehensive experimental study on prevention of land subsidence caused by dewatering in deep foundation pit with hanging waterproof curtain Proc. IAHS, 372, 1 5, 2015 doi:10.5194/piahs-372-1-2015 Author(s) 2015. CC Attribution 3.0 License. Comprehensive experimental study on prevention of land subsidence caused by dewatering in deep foundation

More information

Shaft-lining Non-mining Fracture Multi-factor Forecasting Evaluation System Research

Shaft-lining Non-mining Fracture Multi-factor Forecasting Evaluation System Research An Interdisciplinary Response to Mine Water Challenges - Sui, Sun & Wang (eds) 014 China University of Mining and Technology Press, Xuzhou, ISBN 978-7-5646-437-8 Shaft-lining Non-mining Fracture Multi-factor

More information

Underground Construction Technology

Underground Construction Technology Underground Construction Technology Course Lectures Part 4.2 Permanent support Dr Ákos TÓTH 1 Segmental Lining in TBM Tunnelling Segmental lining is the support system for shield TBM excavated tunnels.

More information

Finite element analysis of double layer metal bellows flexible hose for chemical pipeline Weijie Du, He-hui Wang 1,b), Shidong Wen 1,c) 1

Finite element analysis of double layer metal bellows flexible hose for chemical pipeline Weijie Du, He-hui Wang 1,b), Shidong Wen 1,c) 1 nd International Conference on Automation, Mechanical Control and Computational Engineering (AMCCE 017) Finite element analysis of double layer metal bellows flexible hose for chemical pipeline 1,a) Weijie

More information